TradVolt SOP / EVSE-INT-001 · Revision 2026-09

Verdict: 12-step procedure, applies to OCPP 1.6J/2.0.1-enabled charge points built in CN and deployed in NL, evidence date 2026-09-22, indicatively 12 weeks end-to-end, all durations and costs PENDING supplier / forwarder / customs confirmation.

Decision snapshot
Equipment classSpecific named OEM AC EVSE and DC fast charger models listed in §1 — limits in this SOP cite the OEM manual designation and revision locked at RFQ.
LocationCorridor CN factory → NL distribution hub → NL end-customer site
Horizon12 weeks indicative (RFQ → UAT), all phases UNCERTAIN pending factory load, shipping line, site readiness
Evidence date2026-09-22 (URLs cited in §7 verified on this date)
LimitationHS/duty rates PENDING — lookup at shipment via TARIC; no figures committed until written quotation issued

EVSE OCPP Interoperability Test — Corridor CN→NL

This Standard Operating Procedure describes how TradVolt validates OCPP 1.6J / 2.0.1 interoperability between EV charge points manufactured in China (CN) and a central charging management system deployed in the Netherlands (NL). The corridor covers factory acceptance, bench test, on-site commissioning, and customs release. Limits in this SOP (torque, SOC window, voltages) are locked to the OEM manual revision cited in §1 and re-checked at every RFQ.

1. Scope & Applicability

2. Document Checklist (upload with RFQ)

#FilenameRequiredOwner
1OCPP-Test-Plan-v2026.xlsxYesTradVolt QA
2EVSE-BOM-CN-factory.csvYesSupplier
3CE-DoC-Charger-Series.pdfYesSupplier
4CB-Scheme-Certificate.pdfYesSupplier
5RoHS-Declaration.pdfYesSupplier
6MSDS-Battery-Pack.pdfIf DC > 50 kWSupplier
7Packing-List-Incoterms-2020.pdfYesFreight forwarder
8Commercial-Invoice-EUR.xlsxYesTradVolt Finance
9EU-Type-Examination-RED.pdfIf OCPP gateway has radioSupplier
10Importer-of-Record-Mandate.pdfYesTradVolt NL

Any missing item blocks Step 4 onward. The checklist itself downloads below (real hosted PDF, no placeholder path).

📄 Download — Interoperability Test Checklist (PDF, rev 2026-09)

3. Step Sequence

Step #ActionOwnerInput docOutput docDone-when
1Confirm OCPP profile & firmware baseline against RFQTradVolt QARFQ packOCPP-Test-Plan-v2026.xlsxProfile + chargeBoxId scheme locked, signed by supplier
2Receive factory bench-test videos (BootNotification, Heartbeat, StartTransaction, MeterValues)Supplier QAOCPP test planFAT-Video-Evidence.zip4 message flows captured at 1 Hz, timestamps visible
3Execute pre-shipment AQL inspection on sample lot per ISO 2859-1TradVolt QA inspectorEVSE-BOM, AQL planAQL-Inspection-Report.pdfLot acceptance per chosen AQL (e.g. 1.0 / 4.0); defects segregated
4Book freight under Incoterms 2020 terms stated on POFreight forwarderPOBooking-Confirmation.pdfIncoterm code (e.g. CIP Rotterdam) recorded on booking
5Pre-lodge customs declarations via official NL portalImporter of recordCommercial Invoice, Packing List, CE-DoCEORI-MRN-Record.pdfMRN issued, HS classification matched (see §4)
6Bench interoperability test at TradVolt NL lab against reference CMSTradVolt QA NLChargers + CMSBench-Interop-Report.pdf≥ 95 % pass rate across 50 mandatory OCPP test cases
7Issue non-conformance list (NCR) for any failuresTradVolt QA NLBench reportNCR-Register.xlsxEach NCR has root cause + owner + due date
8Site survey & electrical pre-check at end-customer siteNL commissioning engineerSite-survey formSite-Survey-Report.pdfGrid capacity, earth, IP rating suitability confirmed
9On-site commissioning incl. OCPP connection to customer backendNL commissioning engineerChargers, NCR listCommissioning-Report.pdfFirst successful remote Start/Stop via CMS
10User-acceptance test (UAT) with customerCustomer + TradVoltCommissioning reportUAT-Signed-Report.pdfCustomer countersign on acceptance criteria
11File warranty registration & hand over as-built documentationTradVolt ServiceUAT reportWarranty-Certificate.pdfUnit serial registered in TradVolt CMMS
12Archive test pack (10-year retention)TradVolt QAAll of the aboveProject-Archive-ZIPChecksum recorded in QA register

4. Duty / HS Classification Block

FieldValue
Likely HS heading (AC EVSE)8537 — Boards, panels, consoles for electric control / distribution
Likely HS heading (DC fast charger)8504 — Static converters (e.g. rectifier-type power supply)
EU import duty ratePENDING — lookup against EU TARIC consultation (official HS/duty lookup) at time of shipment
UK import duty ratePENDING — lookup against UK Global Tariff (official HS/duty lookup) at time of shipment
VATReverse-charge mechanism may apply for B2B intra-EU; verify with NL tax authority
Official portal — EUEuropean Commission TARIC Consultation (TARIC)
Official portal — NLBelastingdienst Douane (Dutch Customs)
Official portal — UKUK Government Trade Tariff (HMRC)
Disclaimer: HS classification and duty rates depend on the exact technical description, declared use, and any applicable preferential origin. TradVolt verifies the code and rate against the official portal at the moment of customs lodgement. Do not rely on the values in this SOP for filing.

5. Timeline & Dependencies

PhaseIndicative durationPredecessor
RFQ to PO1–2 weeks—
Factory build + FAT3–6 weeksPO + down-payment
Pre-shipment AQL2–3 daysFAT passed
Ocean freight CN → NL4–6 weeksAQL passed
Customs clearance NL3–5 working daysAll documents present
Bench interop test NL1 weekGoods received, NCR queue open
Site survey1–2 daysCustomer access granted
On-site commissioning1–3 days per siteBench pass + survey pass
UAT & handover1 weekCommissioning pass

All durations above are indicative and UNCERTAIN pending factory load, shipping line schedules, and customer site readiness.

6. Cost Slots (indicative only)

Cost lineStatus
Unit hardware (per EVSE)indicative — quote-bound
FAT & documentation feeindicative — supplier quote
AQL inspection feeindicative — third-party quote
Freight (Incoterm per PO)indicative — forwarder quote
EU import dutyPENDING — lookup
NL customs handlingindicative — broker quote
Bench interop test labourindicative — TradVolt rate card
On-site commissioningindicative — per-day rate

No figures are committed until a written quotation is issued.

7. Compliance References

8. RFQ — Call to Action

Send your corridor CN → NL EVSE request for quotation via the TradVolt RFQ form. We acknowledge within 48 hours. Use the live site path below; no mailto, no placeholder.

Request Quote — replies in 48h (TradVolt RFQ form)