Driving-Range Solar 60 kWp — Latam TCO Use-Case

Verdict (base case, 20-yr horizon, USD, discount rate 10%): NPV of project (benefit − cost) = USD 85,133; NPV of costs = USD 101,825; NPV of benefits = USD 186,958; IRR = 22.08 %; simple payback = 4.44 yr; discounted payback = 6.17 yr. TCO per km = USD 0.071 for the EV duty cycle vs USD 0.204 for the displaced ICE baseline, i.e. USD 0.133/km saved, USD 532,040 saved over the 20-year horizon.

Reference system (named, commercially available Tier-1 SKUs): PV array = LONGi Hi-MO 9 module family (n-type HPBC 2.0 back-contact monocrystalline) at 60 kWp DC; inverter = Sungrow SG125HT (125 kW, 1500 Vdc three-phase string inverter, from the Sungrow string-inverter range); LFP buffer = Huawei LUNA2000 family Smart ESS (commercial variant, paired with a 100 kW STS) governing ~120 kWh usable at year-zero; charger = Huawei FusionCharge family DC fast charger (CCS2, IEC 61851-1); vehicles = mid-size BEV fleet for the closed-loop duty cycle. All limits below (DC max voltage, MPPT range, SOC window) are taken from the named OEM product pages / standards listed in section 9.

Location class: representative Latam site at ~1,500–1,700 kWh/kWp/yr (central Chile, southern Brazil, northern Argentina, highland Mexico); EC JRC PVGIS mandatory before procurement. Evidence-date: 15 January 2026. Limitation: the model is anchored to a closed-loop driving range (test / training / depot loop) where the operator owns both asset and energy bill; do not extrapolate to public road logistics duty cycles without re-running energy and km inputs.

Headline decision table (base case, USD)
MetricValue
NPV (project, benefit − cost)USD 85,133
IRR22.08 %
Simple payback4.44 yr
Discounted payback6.17 yr
PV of TCO (discounted costs)USD 101,825
PV of benefits (discounted)USD 186,958
TCO / km — EV duty cycleUSD 0.071
TCO / km — displaced ICE baselineUSD 0.204
Savings / kmUSD 0.133
Savings over horizonUSD 532,040

1. Use-case framing

An EV fleet operator owns a closed-loop driving range (test, training, or depot-loop shuttle duty) in a representative Latin American location. The site hosts a 60 kWp LONGi solar canopy above the parking bays plus a Huawei LUNA2000-family LFP cabinet that absorbs midday surplus and dispatches it into Huawei FusionCharge DC chargers during evening sessions. The reference fleet is 8 mid-size BEVs. The model assumes the range draws charging energy from the PV-plus-storage system first, with grid import as the residual balancer.

2. Reference system (named, commercially available)

Sub-assemblyModel family / SKUPublic catalogue entryKey limit (taken from OEM product page cited)
PV moduleLONGi Hi-MO 9 module family (n-type HPBC 2.0 back-contact monocrystalline, up to 670 W, up to 24.8 % efficiency, bifaciality up to 80 %; 12-yr product / 30-yr linear power warranty) → 60 kWp DC arrayhttps://www.longi.com/en/products/modules/hi-mo-9/Max system voltage 1500 V DC; bifaciality up to 80 %; 30-yr linear power warranty (LONGi Hi-MO 9 product page)
String inverter (PV)Sungrow SG125HT (125 kW, 1500 Vdc, 12 MPPT — part of Sungrow string-inverter range)https://www.sungrowpower.com/en/products/string-inverterMax input voltage 1500 V DC; MPPT range suitable for 1500 Vdc arrays; IP66; Sungrow SG125HT datasheet confirmed at RFQ
LFP battery (buffer)Huawei LUNA2000 family Smart ESS (commercial cabinet variant, paired with 100 kW STS)https://solar.huawei.com/enRecommended SOC window 5–100 %; cycle life ≥ 6000 @ 90 % DoD (Huawei LUNA2000 Smart ESS product page; exact cabinet SKU confirmed at RFQ)
DC fast chargerHuawei FusionCharge DC fast charger family (CCS2, IEC 61851-1)https://e.huawei.com/en/products/fusionchargeOutput 200–1000 V DC; OCPP 1.6J; FusionCharge product brochure
Vehicles (BEV fleet duty)Mid-size BEV fleet (8 vehicles) used interchangeably in this model class; BYD ATTO 3 EVO confirmed as a representative reference SKU (74.8 kWh battery, 510 km WLTP RWD / 470 km AWD, 220 kW DC 10–80 % in 25 min, 800 V architecture)https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/Battery 74.8 kWh; WLTP range 510 km RWD / 470 km AWD; 220 kW DC charging; 800 V architecture

3. Bounded model assumptions (NOT sourced facts)

The following inputs are not documented in any allow-listed source row of section 10. They are presented here as bounded, explicitly flagged model assumptions so the auditor can re-run with site-specific data. Replace before procurement.

Model keyBounded assumption used in the runRe-run range recommended by TradVolt Research
asset.ev_fleet.diesel_l_per_km0.05 L/km (light-duty ICE van baseline)0.04–0.08 L/km — re-validate against the specific ICE vehicle displaced
asset.ev_fleet.diesel_per_lUSD 1.40 /L (delivered, ex-tax, representative Latam depot)USD 0.90–1.70 /L — bind to destination's latest ex-tax diesel price
asset.ev_fleet.maint_ev_per_kmUSD 0.025 /kmUSD 0.015–0.040 /km — bind to fleet operator's maintenance contract
asset.ev_fleet.maint_ice_per_kmUSD 0.090 /kmUSD 0.060–0.150 /km — bind to the displaced ICE class
asset.ev_fleet.ice_capex_per_vehicleUSD 22,000 (light-duty ICE van)USD 15,000–35,000 — bind to RFQ quotes for the comparator fleet

4. Inputs table (sourced rows only)

ParameterSymbolValueUnitSource row (see section 10)
PV array nameplateP_pv60kWpLONGi Hi-MO 9 product page (Hi-MO 9 module family)
Annual PV yield (specific)Y_pv1,500kWh/kWp/yrIRENA, Renewable Power Generation Costs 2023 (Latam solar PV LCOE input set)
System performance ratioPR0.82—IEA-PVPS, Trends in PV Applications 2024
Battery round-trip efficiencyη_batt0.88—Huawei LUNA2000 product page (AC round-trip, incl. STS)
Battery energy capacity (usable)E_batt120kWhHuawei LUNA2000 Smart ESS product page (90 % DoD window at year 0)
EV consumption factorkWh_km0.18kWh/kmIEA, Global EV Outlook 2024 (mid-size BEV fleet average)
Annual km target per vehiclekm_yr25,000km/yr(bound closed-loop duty — re-validate with operator)
Fleet sizeN_fleet8vehicles(bound — re-validate with operator)
Grid import price (delivered)P_grid0.14USD/kWhOLADE, Energy Statistics Report 2024 (Latam non-residential average)
PV CAPEX (turnkey)CAPEX_pv900USD/kWpIRENA, Renewable Power Generation Costs 2023 (Latam commercial PV)
Battery CAPEX (turnkey)CAPEX_batt320USD/kWhBloombergNEF Battery Price Survey 2024 (LFP commercial pack + BoS)
Fixed OPEX (% of CAPEX, per year)OPEX_pct0.012—IRENA, Renewable Power Generation Costs 2023 (O&M median)
Discount rater0.10—(bound — re-validate against operator WACC)
Analysis horizonN20yearsLONGi Hi-MO 9 product page (30-yr linear power warranty); Huawei LUNA2000 product page (≥15-yr operating life at 80 % SoH)
Residual value (% of CAPEX)RV_pct0.10—(bound — re-validate at RFP close)
Grid-balance uplift (PV share reaching chargers after daytime self-use)u_grid0.30—(bound — re-validate against operator duty profile)

5. Computed TCO summary (computed — from scenario model)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)20
Discount rate10.00 %
Total undiscounted cost (USD)110,100.92
Total discounted cost / PV of costs (USD)101,825.18
Total undiscounted benefit (USD)439,200.00
Total discounted benefit (USD)186,957.86
NPV (USD)85,132.68
IRR0.2208
Simple payback (year)4.44
Discounted payback (year)6.17
TCO per km — EV (USD/km)0.0710
TCO per km — ICE (USD/km)0.2040
Savings per km (USD/km)0.1330
Savings over horizon (USD)532,040.00

6. Computed year-by-year cash flow (computed — verbatim from scenario model)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
092,400.000.0000-92,400.001.00-92,400.000.0000
11,108.8021,960.0020,851.200.909118,955.640.0000
21,130.9821,960.0020,829.020.826417,214.070.0000
31,153.6021,960.0020,806.400.751315,632.160.0000
41,176.6721,960.0020,783.330.683014,195.300.0000
51,200.2021,960.0020,759.800.620912,890.200.0000
61,224.2021,960.0020,735.800.564511,704.820.0000
71,248.6921,960.0020,711.310.513210,628.180.0000
81,273.6621,960.0020,686.340.46659,650.330.0000
91,299.1421,960.0020,660.860.42418,762.220.0000
101,325.1221,960.0020,634.880.38557,955.640.0000
111,351.6221,960.0020,608.380.35057,223.110.0000
121,378.6521,960.0020,581.350.31866,557.850.0000
131,406.2321,960.0020,553.770.28975,953.700.0000
141,434.3521,960.0020,525.650.26335,405.040.0000
151,463.0421,960.0020,496.960.23944,906.810.0000
161,492.3021,960.0020,467.700.21764,454.370.0000
171,522.1421,960.0020,437.860.19784,043.520.0000
181,552.5921,960.0020,407.410.17993,670.450.0000
191,583.6421,960.0020,376.360.16353,331.700.0000
20-7,624.6921,960.0029,584.690.14864,397.580.0000

Year 20 cost is negative because residual value (CAPEX × 10 %) is recognised as a benefit-side credit in the scenario model; the figure reconciles to the discounted payback and IRR shown above.

7. Verdict by scenario

Scenario A — Conservative Latam (high yield, low grid price)

Y_pv = 1,700 kWh/kWp/yr, P_grid = USD 0.10/kWh. Discounted payback shortens; NPV rises materially because the higher PV yield outweighs the lower grid tariff in the residual grid-import leg. Verdict: solar canopy pays back inside the horizon at any grid tariff above USD 0.10/kWh; recommend proceeding to EPC tender.

Scenario B — Base case (mid-band)

Inputs as in section 4. NPV (project) = USD 85,133; IRR = 22.08 %; discounted payback = 6.17 yr. Verdict: competitive against a typical Latam diesel baseline at well-to-wheel equivalent ≥ USD 0.12/km; proceed with standard procurement.

Scenario C — Pessimistic (low yield, high grid price inverted)

Y_pv = 1,300 kWh/kWp/yr, P_grid = USD 0.18/kWh. Verdict: still defensible; the canopy retains hedge value against grid-price escalation. The dominant residual risk in this scenario is battery CAPEX (Huawei LUNA2000 pack price) rather than PV — phase battery procurement to capture downstream cost-down.

8. Certification & compliance block (regulator-cited)

Certification list is illustrative. Final certificate set must be confirmed by the project EPC against the destination country's authority having jurisdiction.

9. HS code block — photovoltaic components and EV supply equipment

ComponentHS heading (2022 edition)Description (WCO HS explanatory notes)Cross-reference
PV modules (monocrystalline silicon)8541.43Photovoltaic cells and panels of crystalline siliconUSITC HTS 8541.43 · EU TARIC consultation EC TARIC
Lithium-ion accumulators (LFP cells / packs)8507.60Lithium-ion accumulators, electricUSITC HTS 8507.60
Static converters (PV string inverters)8504.40Static converters — photovoltaic invertersUSITC HTS 8504.40
Canopy steel / aluminium structure7308.30 / 7610.90Structures and parts of iron/steel or aluminiumUSITC HTS 7308.30
EV charging station (AC / DC)8537.10Boards / panels for electric control, ≤ 1,000 V (DC charger) — high-voltage ≥ 1,000 V DC chargers may classify under 8504.40USITC HTS 8537.10
Smart logger / energy meter9028.30Electricity supply / production metersUSITC HTS 9028.30
Disclaimer: TradVolt does not assert any duty rate as fact. HS classification depends on the exact technical description, composition and intended use of the goods at import time, and preferential origin treatment under Mercosur / Pacific Alliance / EU agreements must be checked against the live tariff schedule by a licensed customs broker or trade attorney. The headings above are traceable to the WCO Harmonized System 2022 and to the USITC HTS / EU TARIC entries cited; they are not legal advice.

10. Sources (allow-listed — every cited claim linked to a specific document URL)

#Publisher / regulatorDocument titleYearURLUsed for
1IRENARenewable Power Generation Costs in 2023 — Latam PV LCOE input set2024https://www.irena.org/Publications/2024/Jun/Renewable-power-generation-costs-in-2023PV yield (mid-band), CAPEX_pv, OPEX_pct
2IEA-PVPSTrends in PV Applications 2024 — commercial rooftop performance ratio2024https://iea-pvps.org/trends_reports/trends-in-pv-applications-2024/System performance ratio (PR = 0.82)
3BloombergNEFBattery Price Survey 2024 — public press release / summary2024https://about.bnef.com/blog/lithium-ion-battery-pack-prices-see-largest-drop-since-2017-falling-to-115-per-kilowatt-hour-bnef/Battery CAPEX benchmark (LFP pack + BoS)
4IEAGlobal EV Outlook 2024 — mid-size BEV fleet consumption2024https://www.iea.org/reports/global-ev-outlook-2024EV consumption factor (0.18 kWh/km)
5OLADEEnergy Statistics Report 2024 — Latam non-residential electricity2024https://www.olade.org/publicaciones/estadisticas-energeticas/Grid import price (USD 0.14/kWh, Latam mid-band)
6EC JRCPVGIS — Photovoltaic Geographical Information System (yield data)2024https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_enSite-specific PV yield validation (mandatory before procurement)
7IECIEC 61215-1:2021 ed2 — Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (TC 82)2021https://webstore.iec.ch/en/publication/61345Module qualification standard
8IECIEC 61730-1:2016 ed2 — PV module safety qualification, Part 1: Requirements for construction (TC 82)2016https://webstore.iec.ch/en/publication/25674Module safety standard
9IECIEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82)2010https://webstore.iec.ch/en/publication/6470Inverter safety standard
10IECIEC 62109-2:2011 — Safety of power converters for PV, Part 2: Particular requirements for inverters (TC 82)2011https://webstore.iec.ch/en/publication/6471Inverter particular-requirements standard
11IECIEC 62619:2022 ed2 — Secondary lithium cells and batteries for industrial applications incl. stationary/ESS (TC 21/SC 21A)2022https://webstore.iec.ch/en/publication/64073Battery (industrial Li-ion) standard
12IECIEC 63056:2020 — ESS lithium battery safety (to 1500 V DC)2020https://webstore.iec.ch/en/publication/29224Stationary ESS lithium safety standard
13IECIEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium ion batteries (TC 21)2020https://webstore.iec.ch/en/publication/29086Stationary lithium battery installation safety
14IECIEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1: General requirements (TC 69)2017https://webstore.iec.ch/en/publication/33644EVSE standard
15ULUL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications2023https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973Battery safety standard
16NFPANFPA 855 — Installation of Stationary Energy Storage Systems2023https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855ESS spacing standard
17UNECEUN Manual of Tests and Criteria, Rev. 7 (ST/SG/AC.10/11/Rev.7) — Part III 38.3 (lithium batteries)2019https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteriaBattery transport classification
18USITCHTS 8541.43 — Photovoltaic cells and panels (crystalline silicon)2026 ed.https://hts.usitc.gov/?query=8541.43HS code for PV modules
19USITCHTS 8507.60 — Lithium-ion accumulators2026 ed.https://hts.usitc.gov/?query=8507.60HS code for LFP battery
20USITCHTS 8504.40 — Static converters2026 ed.https://hts.usitc.gov/?query=8504.40HS code for PV inverter
21EU TARICEC TARIC consultation (HS / duty lookup)livehttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=enEU TARIC cross-check for HS headings
22LONGiHi-MO 9 module product page (HPBC 2.0 back-contact)2026https://www.longi.com/en/products/modules/hi-mo-9/Reference PV product family
23SungrowSungrow string-inverter range (incl. SG125HT C&I 3-phase)2026https://www.sungrowpower.com/en/products/string-inverterReference inverter SKU
24Huawei Digital PowerFusionSolar landing (incl. LUNA2000 Smart ESS, FusionCharge)2026https://solar.huawei.com/enReference LFP battery family + DC EVSE family
25Huawei eFusionCharge DC fast charger product brochure2024https://e.huawei.com/en/products/fusionchargeReference DC EVSE
26BYDBYD ATTO 3 EVO — 74.8 kWh / 510 km WLTP (RWD) / 220 kW DC / 800 V2026https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/Representative reference BEV SKU (mid-size)

11. Next steps

Request a tailored RFQ for the 60 kWp Latam driving-range configuration Download year-by-year cashflow (CSV)