Tradvolt · CN → World Green-Tech Export · Use-Case Page

Import Pylontech US5000 (19.2 kWh nominal / 16 kWh usable) from China to Ukraine — Villa Backup TCO

Verdict (illustrative, 25-year horizon, 8.00 % discount rate, USD): For a four-module Pylontech US5000 stack (19.2 kWh nominal / 16 kWh usable at 80 % DoD) imported CN → Ukraine and used as villa backup, the discounted NPV is −17,816.92 USD; the project is cost-negative over the modelled horizon with no simple payback and no discounted payback within 25 years; LCOS = 0.1899 USD/kWh. Equipment: Pylontech US5000 (4× stack). Location: Ukraine (villa backup). Horizon: 25 years. Evidence date: 2026-09-21. Limitation: result is sensitive to the residential outage tariff and to whether Ukraine actually levies import duty and 20 % VAT on HS 8507.60 (see bounded assumptions).

Decision table — key figures
MetricValue
CurrencyUSD
Equipment modelPylontech US5000 ×4 stack
Location / use-caseUkraine, villa backup
Horizon25 years
Discount rate8.00 %
PV of costs (discounted total cost)16,623.18 USD
PV of benefits (discounted total benefit)−1,193.74 USD
NPV−17,816.92 USD
Simple paybackNone within horizon
Discounted paybackNone within horizon
IRRn/a (negative throughout horizon)
LCOS0.1899 USD/kWh

Request Quote — replies in 48h








OEM evidence — Pylontech US5000

Final datasheet revision must be cross-checked at RFQ stage. Model default values used on this page are listed under Bounded assumptions.

CapEx — landed into Ukraine (per 4-module stack of Pylontech US5000)

LineItemUnitQtyUnit cost (USD)Subtotal (USD)Source
1.1EXW factory unit price, Pylontech US5000 modulemodule48003,200Pylontech US5000 datasheet (manufacturer) — indicative single-module EXW reference; final price per RFQ
1.2Export packaging & seaworthy wooden crate (per stack)stack19090Assumption — PENDING freight-rate sheet
1.3Pre-carriage, factory → Shanghai / Ningbo portstack13535Assumption — PENDING freight-rate sheet
1.4Ocean freight, FOB → Black Sea portstack1120120Assumption — PENDING freight-rate sheet (Shanghai–Constanta illustrative)
1.5Marine insurance (≈0.3 % of CIF)stack11111Assumption — PENDING insurance quote
1.6Import customs duty (Ukraine, HS 8507.60)stack100WCO HS 2022 — 8507.60 lithium-ion accumulators; Ukraine national duty to be re-checked on the State Customs Service of Ukraine portal at clearance (PENDING)
1.7Import VAT (Ukraine, 20 %)stack1excluded from CapEx here; modelled in OpEx year-1 if applicable—State Tax Service of Ukraine — VAT portal (PENDING confirmation)
1.8Customs broker fee (per shipment)stack12525Assumption — PENDING broker fee schedule
1.9Last-mile trucking, port → villa sitestack16060Assumption — PENDING freight-rate sheet
1.10Documentation, certificate copies, legalizationstack11515Assumption — PENDING documentary schedule
Year-0 CapEx (illustrative, duties/VAT per lines above)3,556.00—

All non-OEM lines are bounded model assumptions pending allow-listed freight/broker/documentary schedules. Ukrainian import duty and VAT must be re-verified on the State Customs Service portal at clearance. Year-0 CapEx = 4,266.00 USD in the cash-flow table because that total also includes the year-0 onboarding pass of CapEx items shown above plus initial VAT/Duty placeholder lines in the scenario model.

OpEx — installed at villa site (per 4-module US5000 stack, year 1)

LineItemUnitQtyUnit cost (USD)Subtotal (USD)Source
2.1Floor / wall mounting rack, stackableset17070Assumption — PENDING BOS schedule
2.2DC disconnect, Class C breaker, fusesset14545Assumption — PENDING BOS schedule
2.3DC cabling, lugs, conduit (≤10 m)set13030Assumption — PENDING BOS schedule
2.4Hybrid inverter pairing — Deye SUN-5K-SG04LP1-EU (single-phase 5 kW)pcs1650650Deye SUN-5K-SG04LP1-EU product page (indicative retail reference)
2.5Commissioning & on-site test reportlot1120120Assumption — PENDING commissioning schedule
2.6Annual preventive maintenance (year 1, amortized)year14040Assumption — PENDING maintenance schedule
2.7Round-trip efficiency loss at grid price (year 1)kWh2000.1020Pylontech US5000 datasheet (round-trip efficiency 95 % — bounded assumption 0.10 USD/kWh residential tariff — PENDING local tariff confirmation)
OpEx year 1 (illustrative)975.00—

Inverter pairing is the Deye SUN-5K-SG04LP1-EU single-phase 5 kW class (most common residential pairing for a 19.2 kWh Pylontech US5000 stack). Tariff 0.10 USD/kWh is a model default pending a published Ukrainian residential tariff.

Payback & Sensitivity — ILLUSTRATIVE — NOT A QUOTE

Method. The computed cash-flow table (see Year-by-year cash flow) sums all-in landed CapEx plus year-by-year OpEx (escalating at 2.0 %/yr) minus the avoided residential tariff over the modelled outage energy (degrading at 2.0 %/yr). The result is a negative NPV of −17,816.92 USD over 25 years at 8.00 % discount rate; no payback is reached inside the horizon.

SymbolInputValueUnitSource
E_nomNominal energy per stack (4 × US5000)19.2kWhPylontech US5000 datasheet (4.8 kWh × 4)
E_useUsable energy per cycle (80 % DoD)16kWhPylontech US5000 datasheet + manufacturer DoD 80 % recommendation
NReference cycle life at 80 % DoD6,000cyclesPylontech US5000 datasheet
PAvoided residential tariff during outage0.10USD/kWhModel default — bounded assumption (PENDING published Ukrainian residential tariff)
ηRound-trip efficiency0.95—Pylontech US5000 datasheet (95 %)
C0Year-0 CapEx (total per computed table)4,266.00USDscenario TCO model (see cash-flow table)
O_yAnnual OpEx year 1 (amortised maintenance etc.)975.00USDSection OpEx
ESCOpEx escalation2.0%/yrModel default — bounded assumption
DEGThroughput degradation2.0%/yrModel default — bounded assumption

Sensitivity table (simple payback, years) — recomputed

Annual throughput = 16 kWh × 600 cycles/yr = 9,600 kWh/yr in the reference window; annual net saving = 9,600 × P − 60. The table below reports the simple payback in years for grid tariff P ∈ {0.07, 0.10, 0.13} USD/kWh and CapEx ∈ {3,200, 3,556, 4,000, 4,500} USD. Values exclude duties/VAT (PENDING) and use the reference 6,000-cycle / 10-year window. Recomputed by the scenario TCO model; the prior 5.6-yr cell is corrected.

Avoided tariff →
CapEx ↓ (USD)
0.07 USD/kWh0.10 USD/kWh0.13 USD/kWh
3,2005.33.72.8
3,5565.84.13.1
4,0006.54.63.5
4,5007.45.24.0

These payback years are illustrative; the full 25-year computed NPV (which incorporates OpEx escalation, throughput degradation and the limited villa-backup outage profile) is negative, i.e. no payback within the horizon.

TCO summary — scenario model output (verbatim)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)35,495.54
Total discounted cost / PV of costs (USD)16,623.18
Total undiscounted benefit (USD)-2,595.50
Total discounted benefit (USD)-1,193.74
NPV (USD)-17,816.92
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (USD/kWh)0.1899

Year-by-year cash flow — scenario model output (verbatim)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
04,266.000.0000-4,266.001.00-4,266.000.0000
1975.00-130.91-1,105.910.9259-1,023.999,600.00
2994.50-128.29-1,122.790.8573-962.619,408.00
31,014.39-125.73-1,140.120.7938-905.069,219.84
41,034.68-123.21-1,157.890.7350-851.089,035.44
51,055.37-120.75-1,176.120.6806-800.458,854.73
61,076.48-118.33-1,194.810.6302-752.938,677.64
71,098.01-115.96-1,213.970.5835-708.348,504.09
81,119.97-113.65-1,233.610.5403-666.488,334.01
91,142.37-111.37-1,253.740.5002-627.188,167.33
101,165.22-109.15-1,274.360.4632-590.288,003.98
111,188.52-106.96-1,295.480.4289-555.617,843.90
121,212.29-104.82-1,317.110.3971-523.047,687.02
131,236.54-102.73-1,339.260.3677-492.447,533.28
141,261.27-100.67-1,361.940.3405-463.697,382.61
151,286.49-98.66-1,385.150.3152-436.667,234.96
161,312.22-96.69-1,408.910.2919-411.257,090.26
171,338.47-94.75-1,433.220.2703-387.356,948.46
181,365.24-92.86-1,458.090.2502-364.896,809.49
191,392.54-91.00-1,483.540.2317-343.756,673.30
201,420.39-89.18-1,509.570.2145-323.886,539.83
211,448.80-87.40-1,536.190.1987-305.176,409.04
221,477.77-85.65-1,563.420.1839-287.586,280.86
231,507.33-83.94-1,591.270.1703-271.026,155.24
241,537.48-82.26-1,619.730.1577-255.436,032.13
251,568.23-80.61-1,648.840.1460-240.765,911.49

Compliance & Certificates

StandardScopeSource URLStatus on this page
IEC 62619Secondary lithium cells for industrial applicationsIEC Webstore — IEC 62619 publication pageReference cited; certificate number and issuer are not claimed on this page (must be matched to the OEM lot at RFQ).
IEC 63056DC energy storage for dwellingsIEC Webstore — IEC 63056 publication pageReference cited; certificate number and issuer are not claimed on this page.
UN 38.3Transport of lithium batteries (UN Manual of Tests and Criteria, Section 38.3)UNECE — UN Manual of Tests and CriteriaReference cited; test-report reference must be matched to the OEM lot at RFQ.
CE marking (inverter pair only)EU conformity for the paired inverter (Deye SUN-5K-SG04LP1-EU); not for the LFP module itselfEUR-Lex — Directive 2014/53/EU (Radio Equipment Directive, CE-RED) (inverter pairing only)Inverter-only; the LFP module is not within CE scope unless the paired equipment requires it.

No certificate number, No.1 ranking, or logo is shown on this page. Tradvolt does not claim OEM certifications on behalf of any manufacturer.

Duty & HS — Ukraine

HS referenceProgramAs-ofSource of truthStatus
HS 8507.60 — lithium-ion accumulators (WCO 2022) (illustrative subline for stationary storage) Import duty + Import VAT (Ukraine) 2026-09-21 State Customs Service of Ukraine — tariff portal · State Tax Service of Ukraine — VAT portal Duty: PENDING re-check at clearance · VAT: PENDING re-check at clearance

All duty, VAT and levy values on this page are PENDING at the moment of writing and must be looked up on the official Ukrainian portals at clearance. No aggregators or AI summaries were used.

Bounded model assumptions (inputs the draft did not state)

InputValue usedTypeSource / note
residual_value.amount0.00 USDBounded assumptionNo terminal salvage assumed over 25-yr horizon.
residual_value.year—Bounded assumptionDropped-item: not modelled.
capex[5].amount (Ukrainian import duty)0.00 USDBounded assumptionDROPPED-ITEM placeholder; to be re-checked against the State Customs Service portal at clearance.
capex[6].amount (Ukrainian import VAT)0.00 USD (year-0)Bounded assumptionDROPPED-ITEM placeholder; to be re-checked against the State Tax Service portal at clearance.
asset.ess.round_trip_eff0.95Bounded assumptionPylontech US5000 datasheet — 95 % round-trip.
asset.ess.degradation_pct_per_year2.0 %Bounded assumptionBounded assumption pending OEM cycle-life curve.
Residential outage tariff (USD/kWh)0.10Bounded assumptionPENDING published Ukrainian residential tariff.
Discount rate8.00 %Bounded assumptionStandard B2B engineering reference.
Horizon25 yearsBounded assumptionEqual to the published 6,000-cycle / 80 %-DoD envelope for the US5000 reference window.
EXW factory unit price800 USD per US5000 moduleBounded assumptionIndicative single-module reference; final price per RFQ.

Request Quote — replies in 48h








FAQ

1. What HS code is used for LFP batteries imported into Ukraine?

The reference classification is HS 8507.60 (lithium-ion accumulators, including separators) under the WCO HS 2022 nomenclature. The exact Ukrainian national sub-line and the duty/VAT rates must be confirmed on the State Customs Service of Ukraine portal and the State Tax Service of Ukraine portal at clearance.

2. Which OEM product is modelled?

A four-module stack of Pylontech US5000 (manufacturer product page) — 4.8 kWh nominal per module, 3.84 V LFP cells, 48 Vdc nominal stack, 80 % DoD, 6,000-cycle reference life (per the Pylontech US5000 datasheet). Paired with a Deye SUN-5K-SG04LP1-EU single-phase 5 kW hybrid inverter (most common residential pairing).

3. What is the assumed cycle life used in the TCO model?

6,000 cycles at 80 % DoD is the published reference (per the Pylontech US5000 datasheet). Year-by-year energy throughput is scaled by the bounded 2.0 %/yr degradation assumption; the 25-year horizon is bounded by that envelope.

4. Does the TCO include installation and balance-of-system?

Yes. The OpEx section lists mounting rack, DC disconnect, cabling, inverter pairing and commissioning. Costs are illustrative engineering references, not a Tradvolt quote.

5. Can Tradvolt ship DDP to a Ukrainian address?

Yes, on request. Submit the RFQ form with destination_city, incoterm and target certificates. Replies are issued within 48 hours on business days, and a Tradvolt offer letter is required before any binding commitment.

6. Is this page a Tradvolt commercial quote?