---
title: "Cross-Factory Hardware Kitting Bundles (B1–B8) — Tradvolt"
source_url: "https://tradvolt.com/bundles/"
lang: "en"
description: "Compare Tradvolt B1–B8 cross-factory hardware kitting bundles: PCIe Gen5 MCIO harnesses, 400G/800G optical-copper pods, No-RF/Non-DG edge AI boxes, and colocation rack power kits shipped under one Hong Kong Proforma Invoice."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/)     B1–B8 Cross-Factory Kitting Architecture

# Cross-Factory Hardware Kitting Bundles (B1–B8)

Consolidate 4 to 5 specialized manufacturing plants into one Hong Kong Proforma Invoice, one unified pre-shipment QC dossier (VNA S-parameters, 400x fiber end-face, No-RF/Non-DG declarations), and one customs-cleared dispatch under FCA Hong Kong, FOB Hong Kong, or DAP Buyer-IOR.

[B1: PCIe Gen5 Kit](/bundles/b1/) [B2: 400G/800G Pod Kit](/bundles/b2/) [B3: No-RF Edge Vision Kit](/bundles/b3/) [B4: Clean Rack Power Kit](/bundles/b4/) [BOM Configurator](/configurator/?bundle=B1)

## Interactive B1–B8 Cross-Factory Kitting Matrix

| Bundle | Canonical Kit Name & Scope | Target Buyer Profile | Indicative FCA/FOB HK Band | Lead Time & NRE | Mandatory Pre-Shipment QC Artifact | Configure / RFQ |
| --- | --- | --- | --- | --- | --- | --- |
| B1 Tracks: D2, D8, D3 HS6: 854442 | **B1: PCIe Gen5 Internal Server Interconnect Kit** MCIO 8i/4i twinax harnesses + SlimSAS/U.3 NVMe fanouts + PCIe 5.0 x16 Retimer riser + 12V-2x6 power whips + VNA S4P eye-diagram report. | GPU/HPC White-Box Server SIs & OCP Integrators 4 factories / 5 BOM lines | **$2,480 – $4,200** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 7–10 business days NRE: L2 ($1,500–$2,000) / L3 ($3,000) | TDR_EYE_S4P (PCIe Gen5 32 GT/s 85-Ohm VNA S4P + BER < 1e-12 eye diagram) ECCN: EAR99 | Deep Kit Specs (B1)Configure BOMRequest Quote |
| B2 Tracks: D13, D1 HS6: 854470 | **B2: 400G/800G AI Rack-Scale Pod Interconnect Kit** OSFP/QSFP-DD passive DAC & DSP retimed AEC + cross-coded SR8/DR8/DR4/FR4 optics + MPO-12/16 APC trunks + 400x end-face certification. | Regional Neoclouds, GPU Clusters & Colocation Operators 4 factories / 5 BOM lines | **$4,800 – $10,500** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 24–48h EEPROM coding / <=10 business days kitted NRE: L1 ($1,000) / L2 ($1,500) | FIBER_400X + EEPROM_LOG (400x IEC 61300-3-35 end-face & CMIS 5.0 traffic soak) ECCN: EAR99 / 5A991 (No-MACsec) | Deep Kit Specs (B2)Configure BOMRequest Quote |
| B3 Tracks: D6, D7, D9, D3 HS6: 847150 | **B3: Physical No-RF / Non-DG Industrial Edge Vision Kit** RK3588 NPU fanless box with unpopulated RF pads + supercapacitor NTP RTC (no CR2032 lithium cell) + high-flex PoE+ camera harness + DIN PSU. | Factory Automation & Machine Vision System Integrators 5 factories / 6 BOM lines | **$2,650 – $5,400** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 8–10 business days NRE: L2 ($1,500–$2,000) | NO_RF_DECLARATION + NON_DG_DECLARATION (Unpopulated RF pads + Supercap NTP RTC) ECCN: EAR99 / 5A992 | Deep Kit Specs (B3)Configure BOMRequest Quote |
| B4 Tracks: D12, D3, D1, D5 HS6: 853710 | **B4: Colocation Day-1 Clean Rack Power & OOB Management Kit** Dual 3-Phase Zero-U Monitored Smart PDUs + OCP Titanium redundant CRPS PSU + HTML5 OOB IP-KVM + color-coded C13/C19 locking cords. | Colocation Cages, Edge Data Centers & Managed Service Providers 5 factories / 5 BOM lines | **$3,200 – $6,800** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 7–10 business days NRE: L1 ($1,000) / L2 ($1,500) | UL_CB + CE_DOC (3-Phase Zero-U Monitored PDU + OCP Titanium CRPS + OOB iKVM) ECCN: EAR99 | Deep Kit Specs (B4)Configure BOMRequest Quote |
| B5 Tracks: ROBOT, D7, D9 HS6: 903180 | **B5: AMR / Mobile Robot 3D Vision & 4S Maintenance Kit** Industrial 3D ToF / Structured-Light RGB-D camera + high-flex drag-chain harness + isolated CAN/RS485 hub + scheduled wear-part spare pack. | AMR Fleet Operators, Warehouse Automation SIs & Robotics 4S Centers 5 factories / 5 BOM lines | **$2,900 – $5,800** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 8–10 business days NRE: L2 ($1,500–$2,000) | FDA_ACCESSION + CE_DOC (3D ToF / Structured-Light RGB-D + High-Flex Drag-Chain Kit) ECCN: EAR99 | Configure BOMRequest Quote |
| B6 Tracks: D1, D2, D11 HS6: 851762 | **B6: ITAD & Third-Party Maintenance (TPM) EOS Rescue Kit** EOS/EOL cross-coded 100G/400G optical transceivers + legacy server backplane harnesses + counter-rotating hot-swap fan & CRPS spares. | Enterprise ITAD Refurbishers & Multi-Vendor TPM Providers 4 factories / 5 BOM lines | **$3,500 – $8,500** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 5–10 business days NRE: L1 ($1,000) / L2 ($1,500) | EEPROM_LOG + FIBER_400X (ITAD & TPM EOS Cross-Coded 100G/400G + Fan/Harness Spares) ECCN: EAR99 / 5A991 | Configure BOMRequest Quote |
| B7 Tracks: D13, D2, D12 HS6: 854442 | **B7: AI Lab & University HPC Cluster Upgrade Micro-Pod** Sub-$10k procurement-ready micro-pod combining 400G/800G DAC/AEC breakouts, MCIO expansion harnesses, smart metered PDU, and full lab QC dossier. | University Supercomputing Labs & Research Institutes 5 factories / 5 BOM lines | **$3,800 – $9,200** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 7–10 business days NRE: L1 ($1,000) / L2 ($1,500) | TDR_EYE_S4P + QC_PACK (Sub-$10k Academic & HPC Micro-Pod Procurement Kit) ECCN: EAR99 | Configure BOMRequest Quote |
| B8 Tracks: D1, D13, D2, D12, D11 HS6: 854442 | **B8: Kwun Tong 3PL SLA Consignment Spare-Pool Pack** Pre-staged critical optics, DAC/AEC copper, MCIO harnesses, and Smart PDUs held in Hong Kong Kwun Tong 3PL for 72h/48h/24h advance replacement. | Multi-Site APAC/MEA Data Center & Industrial Operators 4 factories / 4 BOM lines | **$2,480 – $6,500 (+ SLA)** FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR | 48h HK 3PL Stock / <=10 business days replenishment NRE: L1 ($1,000) | QC_PACK (Kwun Tong 3PL Consignment Advance-Replacement Spare Pool) ECCN: EAR99 | Configure BOMRequest Quote |

## Supported Incoterms 2020 & Commercial Governance

All cross-factory kits are transacted on a principal buy-sell basis out of Hong Kong with unmodified factory Certificates of Origin and compliance test reports attached. Delivered Duty Paid terms are never offered; buyers or their licensed brokers act as Importer of Record at destination.

### FCA_HK — FCA Hong Kong (Kwun Tong 3PL / Air Cargo Consolidation)

**Air / Express Courier:** Measured carton dimensions (L*W*H/5000) or 2.0x coil volumetric proxy for uncrated harnesses

### FOB_HK_SEA — FOB Hong Kong (Ocean LCL / FCL Container Handover)

**Maritime Sea Freight:** Measured palletized/crated dimensions with unified export customs clearance

### DAP_BUYER_IOR — DAP Destination Facility (Buyer as Importer of Record)

**Door-to-Site Freight Pre-arranged; Buyer Clears Import Duties/Taxes:** Full commercial invoice, packing list, HS6 mapping, and unmodified factory DoCs attached

## Prepaid Engineering NRE & Kwun Tong 3PL Advance-Replacement SLA

### NRE L1 ($1,000)

Pinout verification, connector keying check, cross-factory BOM mapping & 2D drawing sign-off

### NRE L2 ($1,500-$2,000)

Multi-vendor switch/NIC EEPROM cross-coding, Linux/ROS2 image pre-flash & 48h burn-in log

### NRE L3 ($3,000)

PCIe Gen5/800G VNA S-parameter coupon validation, custom overmolding setup, or 2xMOPP safety dossier

### SLA_72H_12PCT

72h Kwun Tong 3PL Advance Replacement — 12% of covered spare pool

### SLA_48H_15PCT

48h Kwun Tong 3PL Advance Replacement — 15% of covered spare pool

### SLA_24H_18PCT

24h Kwun Tong 3PL Advance Replacement — 18% of covered spare pool
