---
title: "Division 2: Clean Rack Power & Digital Substation Grid Hub — Tradvolt"
source_url: "https://tradvolt.com/clean-rack-power-grid/"
lang: "en"
description: "100% Non-Hazardous (Non-DG) high-density rack power conversion, 48V/54V busbar distribution, per-outlet metered/switched Smart PDUs, out-of-band HTML5 iKVM consoles, and IEC 61850 digital substation telemetry gateways. Engineered with zero lithium cells (HS 8507.60 and Class 9 UN3480 hazmat strictly excluded) for frictionless air-freight and sea-freight deployment to AI colocation cages, edge PoPs, and utility substations."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt Hong Kong Kitting & Interconnect Desk](/)       GO WHITELIST — ACTIVE KITTING 100% NON-DG / EAR99 VERIFIED D3 D5 D12 GRID

# Division 2: Clean Rack Power & Digital Substation Grid Hub

**D3 OCP ORv3 Titanium PSUs · D5 OCP Mechanical Racks & Busbars · D12 Monitored/Switched Smart PDUs & iKVM · GRID IEC 61850 Digital Substation Gateways (100% Non-DG)**

100% Non-Hazardous (Non-DG) high-density rack power conversion, 48V/54V busbar distribution, per-outlet metered/switched Smart PDUs, out-of-band HTML5 iKVM consoles, and IEC 61850 digital substation telemetry gateways. Engineered with zero lithium cells (HS 8507.60 and Class 9 UN3480 hazmat strictly excluded) for frictionless air-freight and sea-freight deployment to AI colocation cages, edge PoPs, and utility substations.

Indicative FOB/FCA HK Band**$2,480 – $10,500 USD (FOB/FCA Hong Kong)** Kitting Lead Time SLA**48h Bonded Spares / <= 10 Business Days Kitting** Supported Incoterms (2020)**FCA Hong Kong, FOB Hong Kong, CPT, CIP, DAP Buyer-IOR** Engineering NRE Tier**L1 ($1,000) Rack Whip & Phase Map · L2 ($1,500–$2,000) DCIM / IEC 61850 Protocol Test**   [Request Proforma Quote (FCA/FOB HK)](/rfq/?division=clean-rack-power-grid) [Launch Band Configurator](/quote.html?division=clean-rack-power-grid)

### 100% Non-DG Electrical & Grid Architecture (Zero Hazmat Lithium / HS 8507.60 Excluded)

Division 2 supplies purely solid-state electrical power conversion, distribution, and IEC 61850 grid protocol hardware. We never supply lithium-ion BBU/BESS cells (HS 8507.60 / UN3480), standalone solar PV panels, or EV charging posts, eliminating Class 9 dangerous-goods air-cargo embargoes while providing informational TCO modeling references.

## Division Engineering Tracks & Sub-Systems

D3DIV-02

### OCP ORv3 Titanium PSUs & 54V Power Shelves

80 Plus Titanium (96%+ efficiency) CRPS/M-CRPS redundant server power supplies (2400W–5500W) and OCP Open Rack v3 54V DC power shelves.

D5DIV-02

### OCP Mechanical Racks, Busbars & Whip Harnesses

48V/54V blind-mate rack busbars, laminated copper distribution bars, and LSZH C13/C19/Anderson high-amperage locking power whips.

D12DIV-02

### Monitored/Switched Smart PDUs & OOB HTML5 iKVM

40kW–100kW 3-phase per-outlet metered & switched Smart PDUs (Redfish/SNMPv3/Modbus) paired with out-of-band HTML5 IP-KVM & serial consoles.

GRIDDIV-02

### IEC 61850 Digital Substation Gateways (100% Non-DG)

IEC 61850-3 hardened MMS/GOOSE/SV protocol gateways with PRP/HSR optical redundancy and supercapacitor RTC (zero lithium coin cells).

Filter by Track:

## Technical Specification & Compliance Comparison Matrix

| Model / SKU | Track | Form Factor & Interface | Data Rate / Power Rating | Export & Safety Compliance | FOB/FCA HK Band | Lead SLA |
| --- | --- | --- | --- | --- | --- | --- |
| `TV-D3-ORV3-18KW` | D3 | 1OU OCP Open Rack v3 Power Shelf (6x 3000W Titanium PSU) | 18kW Total (15kW N+1) · 48V/54V DC Busbar Output · PMBus | UL/CB 62368-1 · CE LVD/EMC · 80 Plus Titanium · 100% Non-DG | **$1,850 – $2,950 USD / Shelf** | 7–10 Business Days |
| `TV-D3-CRPS-3200T` | D3 | 185mm CRPS / M-CRPS Hot-Swap Titanium Server PSU | 2400W / 3200W / 5500W · 96.2% Peak Efficiency · PMBus 1.3 | UL/CB 62368-1 ·FCC Class A · RoHS · EAR99 Non-DG | **$240 – $520 USD / Unit** | 5–8 Business Days |
| `TV-D5-BUSBAR-800A` | D5 | OCP ORv3 Vertical Blind-Mate Copper Busbar & Clip Kit | 48V/54V DC up to 800A Continuous · Silver-Plated Contacts | UL 94-V0 Insulation · IEC 61439 Verified · EAR99 Passive | **$380 – $740 USD / Assembly** | 7–10 Business Days |
| `TV-D12-PDU-43KW` | D12 | 3-Phase 415V 63A Per-Outlet Metered & Switched Smart PDU | 43.6kW · 24x C13 + 12x C19/C13 Combo · +/-1% Billing Grade | UL/CB 62368-1 · Redfish REST / SNMPv3 / TLS 1.3 · Non-DG | **$680 – $1,250 USD / Unit** | 5–10 Business Days |
| `TV-D12-IKVM-32P` | D12 | 1U Dual-IP HTML5 Out-of-Band KVM + 32-Port Serial Console | Zero-Java HTML5 Virtual Media · Dual AC/DC Feed · FIPS Crypto | EAR99 / 5A991 · CE/FCC · Non-DG Supercap RTC | **$590 – $1,120 USD / Unit** | 5–8 Business Days |
| `TV-GRID-61850-GW` | GRID | DIN/1U IEC 61850 Digital Substation Gateway (4x SFP + 8x RS485) | IEC 61850 MMS, GOOSE & Sampled Values to Modbus/DNP3/MQTT | IEC 61850-3 & IEEE 1613 Surge · No-RF · Non-DG (No CR2032) | **$490 – $880 USD / Unit** | 7–10 Business Days |
| `GO-SKU-07 / GO-SKU-09` | D12 | ToR Switch-to-Rack 400G DAC & 4x100G Breakout Copper | 400G PAM4 Passive Twinax · Pre-Coded to Colocation Switch | EAR99 · Non-DG · VNA S-Parameter Verified | **$95 – $280 USD / Unit** | 5–8 Business Days |
| `GO-SKU-14 / GO-SKU-16` | D12 | Colocation Cross-Connect 400G DR4 & 100G LR4/CWDM4 Optics | 100m to 10km SMF · Multi-Vendor Coded + MPO/LC Patch Cords | EAR99 / 5A991 Non-MACsec · 400x End-Face Micrograph | **$75 – $650 USD / Unit** | 24–48h Coding |

## Mapped Turnkey Kitting Bundles (B1–B8)

BUNDLE-04D12 D3 D5 GRID ROBOT

### [Bundle B4: Non-DG Clean Rack Power, Smart PDU & AMR 4S Infrastructure Kit](/bundles/b4/)

100% Non-DG Rack Power Distribution (D12/D3) & AMR/AGV 4S Vision/Chassis Maintenance Kitting Pack

- Per-outlet metered & switched Smart Rack PDUs (SNMPv3/Redfish) + OCP ORv3 Titanium PSU / busbar whip kit

- Out-of-Band HTML5 IP-KVM console switch & IEC 61850-3 digital substation telemetry gateway option

- AMR/AGV 4S configuration: 3D ToF obstacle camera + RK3588 No-RF/Non-DG node + shielded PCIe Gen5 riser

- Day-1 ToR interconnect starter pack: 400G/100G DAC & QSFP28 SR4/LR4 optics coded to host switch NOS

- Strict Non-Equivalence & Non-DG Guarantee: Zero lithium cells (HS 8507.60 / UN3480 excluded); air-cargo ready

**Indicative FOB/FCA HK Band:** $4,900 – $5,800 USD / Kit (Standard Indicative FOB/FCA HK: $5,200 USD)**Engineering NRE Tier:** L2 ($1,500–$2,000 USD) 100% Prepaid Rack / Fleet BOM Qualification NRE**Kitting Lead Time SLA:** <= 10 Business Days (FCA/FOB Hong Kong)**Target Deployment Profile:** Colocation Cage Operators, Utility PoP Integrators & AMR/AGV 4S Maintenance Centers[Quote This Bundle (B4)](/rfq/?division=clean-rack-power-grid&amp;bundle=B4)[Launch Band Configurator](/quote.html?division=clean-rack-power-grid&amp;bundle=B4) BUNDLE-06D13 D1 D8/D9 D12

### [Bundle B6: Regional ISP & Neocloud 100G/400G/800G Optical-Copper Spine-Leaf Pod Kit](/bundles/b6/)

Turnkey High-Density AI Rack Pod: 800G/400G DAC & DSP-AEC + CMIS 5.0 DR4/FR4 Optics + Smart PDU

- 800G OSFP/QSFP-DD (GO-SKU-08) and 400G QSFP-DD (GO-SKU-07/09) passive & breakout DAC trunks with VNA S4P plots

- 400G QSFP-DD Active Electrical Cables (GO-SKU-10, 3m–7m DSP retimed) for inter-rack spine-leaf spans

- 400G DR4/FR4 (GO-SKU-14/15) and 100G SR4/LR4 (GO-SKU-16) non-MACsec optical transceivers + MPO-12/LC patch cords

- 15-minute live switch traffic burn-in verification and Tx bias screening to prevent link flapping

- Single Hong Kong Proforma Invoice consolidating 5 factories with optional 48h advance spare pool

**Indicative FOB/FCA HK Band:** $9,800 – $11,200 USD / Pod (Standard Indicative FOB/FCA HK: $10,500 USD)**Engineering NRE Tier:** L2 ($1,500–$2,000 USD) 100% Prepaid Spine-Leaf Topology & EEPROM Matrix NRE**Kitting Lead Time SLA:** <= 10 Business Days (FCA/FOB Hong Kong)**Target Deployment Profile:** Regional Neoclouds, Sovereign GPU Clusters & Tier-2 ISP Data Centers[Quote This Bundle (B6)](/rfq/?division=clean-rack-power-grid&amp;bundle=B6)[Launch Band Configurator](/quote.html?division=clean-rack-power-grid&amp;bundle=B6) BUNDLE-07D2 D13 D1 D3

### [Bundle B7: University & HPC Lab Sub-$10k Direct-Procurement Micro-Pod Kit](/bundles/b7/)

Micro-Purchase Threshold (<$10,000 USD) Retimer + MCIO + 400G/800G RoCEv2 Lab Interconnect Bundle

- Flagship GO-SKU-13 Kitting Pack: 1x PCIe 5.0 Retimer card + 2x MCIO 8i trunks + 4x U.2/E3.S NVMe fanout cables

- 800G / 400G passive DAC and asymmetric breakout copper assemblies for low-latency RoCEv2 lab clusters

- 400G QSFP-DD DR4 open CMIS 5.0 optical transceivers (GO-SKU-14) with 400x scope certification

- Structured below the $10,000 USD institutional direct-procurement ceiling on a single Hong Kong Proforma Invoice

- Complete TDR impedance, VNA S-parameter, and BER (<1e-12) engineering test dossier included

**Indicative FOB/FCA HK Band:** $8,200 – $9,400 USD / Pod (Standard Indicative FOB/FCA HK: $8,800 USD)**Engineering NRE Tier:** L1 ($1,000 USD) or L2 ($1,500 USD) 100% Prepaid Lab Topology Review NRE**Kitting Lead Time SLA:** <= 10 Business Days (FCA/FOB Hong Kong)**Target Deployment Profile:** University AI Research Labs, National Supercomputing Centers & Bioinformatics HPC Groups[Quote This Bundle (B7)](/rfq/?division=clean-rack-power-grid&amp;bundle=B7)[Launch Band Configurator](/quote.html?division=clean-rack-power-grid&amp;bundle=B7) BUNDLE-08D6/D7 D12 D2 D1 LOWALT

### [Bundle B8: Industrial Edge & Interconnect 48h Emergency Continuity Starter Kit](/bundles/b8/)

Bonded Hong Kong Buffer Stock of High-Criticality MCIO Harnesses, 100G/400G Optics & No-RF Edge Nodes

- Pre-tested emergency buffer of MCIO 8i trunks (GO-SKU-01) and PCIe 5.0 passive bifurcation cards (GO-SKU-12)

- Multi-coded 100G QSFP28 SR4/LR4 (GO-SKU-16) and 400G DAC (GO-SKU-07) hot-standby transceivers and cables

- 1x Pre-flashed RK3588 No-RF / Non-DG industrial edge AI box (GO-SKU-17) ready for immediate air courier dispatch

- Tamper-evident Hong Kong kitting seals, verified EAR99/Non-DG documentation, and 72h/48h/24h SLA options

**Indicative FOB/FCA HK Band:** $2,200 – $2,800 USD / Starter Pool (Standard Indicative FOB/FCA HK: $2,480 USD)**Engineering NRE Tier:** L1 ($1,000 USD) 100% Prepaid Spare BOM Locking & Serialization NRE**Kitting Lead Time SLA:** 48h Hong Kong Bonded Dispatch / <= 10 Business Days Replenishment**Target Deployment Profile:** Data Center Maintenance Teams, Industrial OEMs & Peak-Season Supply Continuity Buyers[Quote This Bundle (B8)](/rfq/?division=clean-rack-power-grid&amp;bundle=B8)[Launch Band Configurator](/quote.html?division=clean-rack-power-grid&amp;bundle=B8)

## Filterable GO-SKU Catalog & Reference Assemblies

GO WHITELIST — ACTIVE KITTINGD13

### [GO-SKU-07: 400G QSFP-DD Passive Direct Attach Copper (DAC 1.0m–2.5m)](/sku/go-sku-07/)

8x50G PAM4 passive Twinax assembly (26–30 AWG), dual-end custom EEPROM coding compatible with Arista, Cisco, Juniper, NVIDIA, and Edgecore SONiC switches.

**Indicative FOB/FCA HK Band:** $95 – $180 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 10 – 20 Units**Export & Safety Compliance:** EAR99 · Non-DG · VNA S-Parameter Report Included[Add to RFQ (GO-SKU-07)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-07)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-07) GO WHITELIST — ACTIVE KITTINGD13

### [GO-SKU-08: 800G OSFP / QSFP-DD Passive Direct Attach Copper (DAC 1.0m–2.0m)](/sku/go-sku-08/)

8x100G PAM4 (112G per lane) ultra-low-loss passive copper for in-rack AI ToR switch-to-server links. Supplied with individual VNA insertion-loss and return-loss S-parameter plots.

**Indicative FOB/FCA HK Band:** $190 – $350 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 10 – 20 Units**Export & Safety Compliance:** EAR99 · Non-DG · 100% Back-to-Back Order-Locked QA[Add to RFQ (GO-SKU-08)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-08)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-08) GO WHITELIST — ACTIVE KITTINGD13

### [GO-SKU-09: 400G QSFP-DD to 2x200G / 4x100G Asymmetric Breakout DAC](/sku/go-sku-09/)

1-to-2 or 1-to-4 passive breakout copper (1.0m–2.5m) with independent vendor EEPROM coding on switch trunk end (e.g., Arista/Cisco) and server NIC ends (e.g., Mellanox/Intel).

**Indicative FOB/FCA HK Band:** $160 – $280 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 10 – 20 Units**Export & Safety Compliance:** EAR99 · Non-DG · Zero Link-Flapping Live Switch Verified[Add to RFQ (GO-SKU-09)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-09)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-09) GO WHITELIST — ACTIVE KITTINGD1

### [GO-SKU-14: 400G QSFP-DD DR4 (500m Parallel SMF) Open Compatible Optical Transceiver](/sku/go-sku-14/)

4x100G PAM4 single-mode MPO-12 optical module, CMIS 4.0/5.0 compliant. Non-MACsec architecture ensures clean export classification. Includes Hong Kong 400x optical end-face inspection photo and cleaner pen.

**Indicative FOB/FCA HK Band:** $450 – $650 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 4 – 10 Units**Export & Safety Compliance:** EAR99 / 5A991 (Non-MACsec) · FDA/IEC Class 1 Laser[Add to RFQ (GO-SKU-14)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-14)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-14) GO WHITELIST — ACTIVE KITTINGD1

### [GO-SKU-15: 400G QSFP-DD FR4 (2km Duplex LC CWDM4) Compatible Optical Transceiver](/sku/go-sku-15/)

4-wavelength CWDM mux/demux over duplex LC single-mode fiber up to 2km. Undergoes 15-minute live switch traffic burn-in and Tx Bias current screening to guarantee 100% prime new laser diodes.

**Indicative FOB/FCA HK Band:** $500 – $720 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 4 – 10 Units**Export & Safety Compliance:** EAR99 / 5A991 · Non-DG · Class 1 Laser[Add to RFQ (GO-SKU-15)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-15)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-15) GO WHITELIST — ACTIVE KITTINGD1

### [GO-SKU-16: 100G QSFP28 SR4 (100m) / CWDM4 (2km) / LR4 (10km) Multi-Vendor Optical Module](/sku/go-sku-16/)

High-compatibility 100G optical transceiver series specializing in EOS/EOL replacement and high-barrier vendor coding (Extreme, Nokia, Aruba, Juniper, Cisco) for ITAD and regional ISP backbones.

**Indicative FOB/FCA HK Band:** $75 – $220 USD (SR4/CWDM4) | $320 – $450 USD (LR4) (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 4 – 20 Units (MOQ=1 Custom Coding in Bundles)**Export & Safety Compliance:** EAR99 / 5A991 · 400x End-Face Inspected · Bundled with Patch Cords[Add to RFQ (GO-SKU-16)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-16)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-16) GO WHITELIST — ACTIVE KITTINGD6/D7

### [GO-SKU-17: RK3588 (8GB/16GB, 4x PoE+) Factory No-RF & Non-DG Fanless Industrial AI Edge Box](/sku/go-sku-17/)

Rockchip RK3588 (6 TOPS NPU), 8GB+64GB or 16GB+128GB eMMC (SKU-18 PoE+ variant), dual GbE + 4x PoE+, isolated RS232/485, 12V–36V wide DC. Factory physical No-RF (Wi-Fi/BT/4G unpopulated) and Non-DG (CR2032 coin cell removed, NTP sync), pre-flashed with Ubuntu 22.04 + ROS2.

**Indicative FOB/FCA HK Band:** $340 – $580 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 5 – 10 Units**Export & Safety Compliance:** Factory No-RF & Non-DG (UN3091 Exempt) · EAR99[Add to RFQ (GO-SKU-17)](/rfq/?division=clean-rack-power-grid&amp;sku=GO-SKU-17)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=GO-SKU-17) GO WHITELIST — ACTIVE KITTINGD3

### [D3 Reference: OCP Open Rack v3 18kW Power Shelf & 3000W/3200W Titanium CRPS](/rfq/?division=clean-rack-power-grid&amp;track=D3)

1OU 6-bay OCP ORv3 48V/54V DC power shelf with N+1 hot-swap 80 Plus Titanium (96.2% peak efficiency) rectifier modules and PMBus 1.3 telemetry.

**Indicative FOB/FCA HK Band:** $1,850 – $2,950 USD / Shelf · $240 – $520 USD / CRPS Module (FOB/FCA HK)**Standard MOQ / Lot:** 2 Shelves / 10 CRPS Modules (Kitted in B4/B6)**Export & Safety Compliance:** UL/CB 62368-1 · CE LVD/EMC · EAR99 · 100% Non-DG (Zero Lithium)[Add to RFQ (TV-D3-ORV3-18KW)](/rfq/?division=clean-rack-power-grid&amp;sku=TV-D3-ORV3-18KW)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=TV-D3-ORV3-18KW) GO WHITELIST — ACTIVE KITTINGD5

### [D5 Reference: OCP ORv3 48V/54V Blind-Mate Vertical Busbar & LSZH Power Whip Kit](/rfq/?division=clean-rack-power-grid&amp;track=D5)

CNC-machined laminated copper vertical rack busbar (up to 800A continuous), silver-plated blind-mate server clips, and color-coded locking C13/C19/Anderson LSZH power whip cords.

**Indicative FOB/FCA HK Band:** $380 – $740 USD / Assembly (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 5 Assemblies (Kitted with D3/D12)**Export & Safety Compliance:** UL 94-V0 Insulation · IEC 61439 · EAR99 Passive · 100% Non-DG[Add to RFQ (TV-D5-BUSBAR-800A)](/rfq/?division=clean-rack-power-grid&amp;sku=TV-D5-BUSBAR-800A)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=TV-D5-BUSBAR-800A) GO WHITELIST — ACTIVE KITTINGD12

### [D12 Reference: 43.6kW Per-Outlet Metered/Switched Smart PDU & 32-Port HTML5 OOB iKVM](/rfq/?division=clean-rack-power-grid&amp;track=D12)

3-phase 415V 63A Smart PDU with +/-1% billing-grade per-outlet kWh telemetry, individual relay switching, Redfish REST API / SNMPv3, paired with zero-Java HTML5 IP-KVM console switch.

**Indicative FOB/FCA HK Band:** $680 – $1,250 USD (Smart PDU) · $590 – $1,120 USD (HTML5 iKVM) (FOB/FCA HK)**Standard MOQ / Lot:** 4 Units (Bundled in B4/B6)**Export & Safety Compliance:** UL/CB 62368-1 · CE/FCC · EAR99 · 100% Non-DG Supercapacitor RTC[Add to RFQ (TV-D12-PDU-IKVM)](/rfq/?division=clean-rack-power-grid&amp;sku=TV-D12-PDU-IKVM)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=TV-D12-PDU-IKVM) GO WHITELIST — ACTIVE KITTINGGRID

### [GRID Reference: IEC 61850-3 Digital Substation Gateway (MMS / GOOSE / Sampled Values)](/rfq/?division=clean-rack-power-grid&amp;track=GRID)

Substation-hardened DIN/1U protocol gateway with 4x 100/1000Base-X SFP (PRP/HSR zero-packet-loss redundancy) and 8x isolated RS485 ports bridging IEC 61850 MMS/GOOSE to Modbus TCP, DNP3, and IEC 60870-5-104.

**Indicative FOB/FCA HK Band:** $490 – $880 USD / Unit (FOB/FCA Hong Kong)**Standard MOQ / Lot:** 5 Units**Export & Safety Compliance:** IEC 61850-3 & IEEE 1613 Surge · Factory No-RF & Non-DG (No CR2032 Coin Cell)[Add to RFQ (TV-GRID-61850-GW)](/rfq/?division=clean-rack-power-grid&amp;sku=TV-GRID-61850-GW)[BOM Configurator](/quote.html?division=clean-rack-power-grid&amp;sku=TV-GRID-61850-GW)

## Division Engineering, Customs & Procurement FAQ

### Which hardware tracks are covered in Division 2 (/clean-rack-power-grid/)?

Division 2 covers Track D3 (OCP ORv3 54V power shelves and 80 Plus Titanium CRPS/M-CRPS server PSUs), Track D5 (OCP open rack mechanical frames, blind-mate busbars, and high-amperage whip harnesses), Track D12 (40kW–100kW per-outlet metered and switched Smart PDUs with SNMPv3/Redfish telemetry plus HTML5 OOB IP-KVM switches), and Track GRID (IEC 61850 MMS/GOOSE/SV digital substation gateways).

### Does Division 2 ship lithium-ion battery backup units (BBU) or stationary BESS containers?

No. All Division 2 deliverables—including Bundle B4 and Bundle B8—are 100% Non-DG electrical distribution and control hardware with zero lithium cells (HS 8507.60 excluded). Any coin-cell RTC backup in gateways is factory-removed in favor of supercapacitor/NTP timekeeping for unrestricted air freight.

### How do D12 Smart PDUs and GRID gateways integrate into existing DCIM and utility SCADA systems?

Our D12 Smart PDUs support open Redfish REST APIs, SNMPv3, and Modbus TCP for drop-in DCIM integration, while GRID substation gateways are hardware-verified for IEC 61850-3 EMI immunity, dual-homing PRP/HSR optical Ethernet, and GOOSE/MMS protocol conversion.

### Which Incoterms and spare-pool SLAs are available for colocation rollouts?

Shipments operate under FCA Hong Kong, FOB Hong Kong, CPT, CIP, or DAP Buyer-IOR. Buyers can pair Bundle B4 cabinet kits with Bundle B8 bonded Hong Kong consignment spares for 72h/48h/24h advance replacement dispatch.

## Need a Consolidated Multi-Factory Hong Kong Proforma Invoice?

Submit your server, rack, or robotics BOM for 24-48h cross-vendor EEPROM coding verification, TDR eye-diagram plots, and landed-cost band screening under FCA Hong Kong, FOB Hong Kong, or DAP Buyer-IOR.

[Request Proforma Quote (FCA/FOB HK)](/rfq/?division=clean-rack-power-grid) [Launch Band Configurator](/quote.html?division=clean-rack-power-grid)
