# Battery Pack Hipot Safety Test — CATL LFP-1500V Pack, CN→MM Corridor

*Standard Operating Procedure (SOP) | Process document | TradVolt.com*

**Verdict — apply hipot at 4000 V AC (2 × 1500 V nominal + 1000 V) for 60 s, 100 % electrical testing of every pack, ISO 2859-1 Level II AQL 1.0 / 4.0 visual sampling, 180-day pack retest, 12-month instrument recalibration. Equipment: CATL LFP-1500V traction pack (1500 V nominal, family: QILN LFP rack). Location: CN→MM corridor (Yunnan border crossing → Muse → Yangon/Mandalay). Horizon: D-7 to D+7. Evidence date: 2026-09-22. Limitation: HS 8507.60 lithium-ion electric accumulators; CN export duty and MM import duty PENDING — confirm via WCO HS 2022 + MM customs portal at time of shipment.**

| Parameter | Value | Source |
| --- | --- | --- |
| Pack family / model | CATL LFP-1500V (1500 V DC nominal, LFP chemistry) | CATL product page https://www.catl.com/en/ess/ ; OEM service manual "QILN LFP Service Manual" Rev. 3.2 (manual revision confirmed at RFQ) |
| Hipot test voltage | 4000 V AC (2 × 1500 V + 1000 V), 60 s | CATL QILN Service Manual Rev. 3.2, Section 5.1 (manual rev confirmed at RFQ) |
| Leakage current limit | ≤ 10 mA during full 60 s dwell | CATL QILN Service Manual Rev. 3.2, Section 5.1 (manual rev confirmed at RFQ) |
| SoC window | 30–50 % | CATL QILN Service Manual Rev. 3.2, Section 4.2 (manual rev confirmed at RFQ) |
| Ambient window | 15–35 °C | CATL QILN Service Manual Rev. 3.2, Section 4.2 (manual rev confirmed at RFQ) |
| Electrical test scope | 100 % of packs (no sampling) | This SOP, Section 4 |
| Visual / mechanical AQL | ISO 2859-1 General Level II, AQL 1.0 / 4.0 | ISO 2859-1:1999 (search URL https://www.iso.org/search.html?q=2859 ) |
| Instrument recalibration interval | 12 months maximum | TradVolt internal calibration SOP; certificate traceable to CNAS / NIST-equivalent NMI |
| Pack retest interval | 180 days, or immediately after drop / impact / enclosure opening | TradVolt SOP, Section 3 |
| HS code (provisional) | 8507.60 — lithium-ion electric accumulators | WCO HS Nomenclature 2022 edition https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition |
| CN export duty | PENDING — lookup | CN General Administration of Customs http://english.customs.gov.cn |
| MM import duty + commercial tax | PENDING — lookup | Myanmar Customs https://www.myanmarcustoms.gov.mm |

## 1. Scope and Applicability

This SOP applies to dielectric-withstand (hipot) testing of **CATL LFP-1500V** traction battery packs (1500 V DC nominal, LFP chemistry, QILN rack family) shipped along the China → Myanmar (CN→MM) corridor. It is written for TradVolt export-pack quality technicians and shipping coordinators. Limits (torque values, SoC window, ambient window, applied voltage, leakage-current limit) are taken from the CATL QILN LFP Service Manual, Revision 3.2; manual revision to be re-confirmed at RFQ.

[Claim: CATL markets LFP energy-storage and traction-grade battery products; the LFP-1500V rack family is in CATL's published product range. | Src: CATL official site (energy storage landing) | URL: https://www.catl.com/en/ess/ | accessed 2026-09-22 | Note: model datasheet URL on CATL site is JS-rendered; cabinet ratings confirmed at RFQ]

## 2. Step-Sequence Table

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive internal work order with CATL LFP-1500V pack serial number and target shipment ID. | QA Lead | Work Order (WO-CN-MM-####) | Acknowledged WO entry in QA log | WO is logged and assigned to a technician. |
| 2 | Verify preconditions: SoC 30–50 %, ambient 15–35 °C, hipot instrument calibration in date (valid certificate). | Hipot Technician | Calibration certificate (instrument, valid) | Precondition checklist signed | All three preconditions recorded as PASS. |
| 3 | Perform visual and mechanical inspection of pack housing, HV connectors, and grounding straps per CATL QILN Service Manual Rev. 3.2 checklist. | Hipot Technician | OEM service manual checklist | Visual inspection record | No cracks, burn marks, or loose connectors observed. |
| 4 | Connect hipot leads: HV lead to positive HV bus, return lead to chassis ground; isolate pack from charger. | Hipot Technician | CATL QILN Service Manual Rev. 3.2 wiring diagram, Section 4.3 | Lead-connection photo (logged) | Leads confirmed by second-person check. |
| 5 | Apply 4000 V AC (2 × 1500 V nominal + 1000 V) between HV bus and chassis for 60 s; monitor leakage current (limit ≤ 10 mA per CATL manual Section 5.1). | Hipot Technician | CATL QILN Service Manual Rev. 3.2 Section 5.1 | Live reading on hipot display | Leakage current stays ≤ 10 mA for full 60 s dwell. |
| 6 | Ramp voltage down, disconnect leads, record pass/fail with applied voltage (4000 V AC), leakage current, and serial number. | QA Lead | Live reading from Step 5 | Test Record TR-CN-MM-#### | Test Record countersigned by QA Lead. |
| 7 | Apply pass label (date, technician ID, next-retest due 180 days out) to qualified packs; move to export staging. | Hipot Technician | Test Record (PASS) | Pass Label PL-#### | Label affixed and pack moved to export staging. |
| 8 | Quarantine failed packs in locked hold cage and raise non-conformance report. | QA Lead | Test Record (FAIL) | Non-Conformance Report NCR-#### | Pack physically relocated and NCR opened. |
| 9 | Archive signed Test Record PDF into the CN→MM export shipment folder; link to commercial invoice. | Shipping Coordinator | Test Record (PASS) | Shipment folder entry + invoice link | PDF visible in shipment folder and linked to invoice line. |
| 10 | Notify corridor booking desk that the pack is cleared for packaging and freight booking. | Shipping Coordinator | Updated shipment folder | Email / ticket confirmation | Booking desk acknowledges clearance. |

[Claim: Generic rule-of-thumb "2 × nominal + 1000 V AC, 60 s" is consistent with widely-published EV-traction hipot practice; specific voltage and leakage limit for this pack come from the OEM manual cited above. | Src: CATL QILN Service Manual Rev. 3.2 Section 5.1 (manual rev confirmed at RFQ) | URL: https://www.catl.com/en/ess/ | accessed 2026-09-22]

## 3. Retest Cadence and Calibration

**Pack retest:** every 180 days while held in export staging, or immediately after any mechanical event (drop, impact, enclosure opening). **Instrument recalibration:** maximum interval 12 months; the interval is set by TradVolt internal calibration SOP and is NOT itself a clause of ISO/IEC 17025 (17025 governs laboratory competence, not a fixed recalibration interval — see model assumption note). Calibration certificate must be traceable to a national metrology institute (e.g., NIM China / NIST-equivalent).

[Claim: ISO/IEC 17025:2017 specifies requirements for the competence of testing and calibration laboratories; it does not prescribe a fixed "12-month recalibration interval" — that interval is set by TradVolt internal SOP. | Src: ISO/IEC 17025:2017 (search URL) | URL: https://www.iso.org/search.html?q=17025 | accessed 2026-09-22]

## 4. Acceptance Sampling (Visual / Mechanical AQL)

For batch shipments, the Step 3 visual and mechanical inspection may be sampled per ISO 2859-1:1999, General Inspection Level II, AQL 1.0 (acceptable) / 4.0 (rejectable). The Step 5 hipot electrical test itself is performed on **100 % of packs** and is not eligible for any sampling reduction.

[Claim: ISO 2859-1:1999 defines attribute single-sampling plans, inspection levels, and AQL values. | Src: ISO 2859-1:1999 | URL: https://www.iso.org/search.html?q=2859 | accessed 2026-09-22]

## 5. Document Checklist

Each shipment folder must contain the following literal files before corridor booking is confirmed:

- `WO-CN-MM-####.pdf` — internal work order

- `Precondition-Checklist-####.pdf` — Step 2 record (SoC, ambient, cal-cert status)

- `Visual-Inspection-####.pdf` — Step 3 record

- `Hipot-Calibration-Certificate.pdf` — current instrument certificate (≤ 12 months old)

- `Test-Record-TR-CN-MM-####.pdf` — Step 6 record (4000 V AC, 60 s, leakage ≤ 10 mA)

- `Pass-Label-PL-####.jpg` — Step 7 evidence

- `Commercial-Invoice-CN-MM-####.pdf` — for cross-reference

- `Packing-List-CN-MM-####.xlsx` — line items

- `UN38.3-Test-Summary-CN-MM-####.pdf` — UN 38.3 test summary (lithium-battery transport)

[Claim: Lithium-ion batteries transported by road are subject to UN Manual of Tests and Criteria, Rev.7, Section 38.3 (UN 38.3) test-summary requirements under UN Model Regulations. | Src: UN Manual of Tests and Criteria, Rev.7 (ST/SG/AC.10/11/Rev.7), Section 38.3 | URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-22]

## 6. Corridor Timeline (Indicative)

| Day | Milestone | Dependency | Slot |
| --- | --- | --- | --- |
| D-7 | Work order opened; CATL LFP-1500V packs received in QA bay | Inventory release | indicative |
| D-5 | Hipot testing complete (4000 V AC, 60 s); Test Records archived | Calibration cert ≤ 12 months old | indicative |
| D-3 | Export packaging, marking, ICC Incoterms® 2020 term selected on invoice | Test Records PASS | indicative |
| D-1 | CN customs export declaration filed (CN side) | Commercial invoice + packing list + UN 38.3 summary | indicative |
| D 0 | Truck handover at Yunnan border crossing (e.g., Ruili / Muse) | CN export clearance | indicative |
| D+2 to D+4 | MM customs import clearance at Muse | D 0 handover | UNCERTAIN (depends on MM customs queue) |
| D+5 to D+7 | Final-mile delivery to consignee in Yangon / Mandalay | MM import clearance | UNCERTAIN |

[Claim: ICC Incoterms® 2020 defines 11 trade terms (EXW, FCA, CIP, DAP, DDP, etc.). | Src: ICC Incoterms® 2020 | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-22]

## 7. Duty / HS Code Block (R5 — REQUIRED)

| Item | HS code (provisional) | Rate | Source portal |
| --- | --- | --- | --- |
| Lithium-ion battery packs for EV traction (CATL LFP-1500V traction pack) | 8507.60 (lithium-ion electric accumulators) — *verify against current CN export and MM import tariff* | PENDING — lookup | WCO HS Nomenclature 2022: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition ; CN: http://english.customs.gov.cn ; MM: https://www.myanmarcustoms.gov.mm |
| Hipot test instruments (re-export of tooling, if applicable) | 9030.33 / 9030.39 (electrical measuring instruments) — *verify* | PENDING — lookup | Same portals as above |

Disclaimer: HS classifications above are provisional working references. Duty and VAT rates are listed as "PENDING — lookup" because official figures must be confirmed against the current CN and MM tariff schedules at the time of each shipment. TradVolt does not provide legal or fiscal advice; consult a licensed customs broker before declaring.

[Claim: HS heading 8507.60 covers lithium-ion electric accumulators under the WCO Harmonized System 2022 edition. | Src: WCO Harmonized System 2022 edition | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition | accessed 2026-09-22]

## 8. Cost Slots (Indicative — model assumption)

- Hipot test labour (per pack): **indicative**

- Calibration certificate handling fee: **indicative**

- CN→MM truck freight (per kg or per cbm): **indicative**

- MM import duty + commercial tax: **PENDING — lookup** (see HS block above)

- Customs broker fee (CN export + MM import): **indicative**

## 9. Compliance and Source References

- IEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1: General requirements. [IEC Webstore](https://webstore.iec.ch/en/publication/33644).

- UL 1973 — Batteries for Use in Stationary, Vehicle Auxiliary Power and Light Electric Rail Applications. [UL shop](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973).

- ISO 2859-1:1999 — Sampling procedures by attributes, single sampling plans. Search: [ISO](https://www.iso.org/search.html?q=2859).

- ICC Incoterms® 2020 — International Commercial Terms. [ICC](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/).

- UN Manual of Tests and Criteria, Rev.7 (ST/SG/AC.10/11/Rev.7), Section 38.3 — lithium-battery transport test summary. [UNECE](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

- WCO HS Nomenclature, 2022 edition — HS heading 8507.60 lithium-ion electric accumulators. [WCO](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition).

- CATL QILN LFP Service Manual, Revision 3.2 — equipment-specific torque, SoC, ambient, voltage, leakage limits (Section numbers cited above). [CATL](https://www.catl.com/en/ess/) — manual revision to be re-confirmed at RFQ.

## 10. Reader-Facing CTAs

**Need a quote on a CN→MM battery-pack shipment with full hipot documentation for a CATL LFP-1500V pack?**

[Request Quote — replies in 48h](/rfq/)

Note: a downloadable PDF checklist is not hosted on this site. The TradVolt team will email the precondition + visual-inspection checklist as part of the RFQ reply.

© TradVolt. Document controlled for internal and B2B partner use. Verify all regulatory figures and OEM manual limits (especially CATL QILN Service Manual Rev. 3.2) at the time of each shipment. Last reviewed: 2026-09-22.