[TradVolt](https://tradvolt.com/) &rsaquo; [Guides](https://tradvolt.com/guides/) &rsaquo; [CN→Sea Battery-Rack Label (R14)](https://tradvolt.com/guides/cn-sea-battery-rack-label-r14/)

# Battery-Rack Label Compliance Guide: CN→Sea Corridor

*Maintenance and process guide — revision R14. Reference example: **CATL EnerC-1C-372kWh**; OEM manual "EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual", Rev. 2.3 (Sep 2025).*

**Decision in one paragraph (≈100 words).** Buyers must apply the battery-rack label on every CN→sea shipment using the named rack OEM's current datasheet revision, supported by a UN 38.3 test summary (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, §38.3), MSDS, packing list and OEM-approved artwork, before container stuffing. **Equipment:** CATL EnerC-1C-372kWh (372 kWh, 51.2 V / 7.27 kWh modules, N-cell 3.65 V nominal, 4.2 V max). **Location:** CN→sea corridor (port-of-load: PRC; port-of-discharge: partner-confirmed). **Horizon:** 5–10 working days per shipment (TRADVOLT-MODEL-ASSUMPTION; first-time kit build INDICATIVE 5–7 wd). **Evidence date:** 2026-09-22. **Limitation:** Customs duty rows PENDING until a destination-port rate is recorded from the named customs authority (EU TARIC, USITC HTS, UK Global Tariff, etc.).

| Item | Value | Status |
| --- | --- | --- |
| Reference rack OEM / model | CATL EnerC-1C-372kWh — manual Rev. 2.3 (Sep 2025) | SOURCED |
| Capacity / chemistry | 372 kWh; LFP (3.65 V nominal, 4.2 V max per cell) | SOURCED |
| Recommended SOC (shipping / idle) | SOC 30–50% (per OEM manual Rev. 2.3) | SOURCED |
| Cabinet fastener torque (M6) | 4.0 N·m ± 0.2 N·m | SOURCED |
| Busbar bolt torque (M8) | 12 N·m ± 0.5 N·m | SOURCED |
| Corridor | CN → sea (ocean freight) | FIXED |
| Cycle horizon | 5–10 wd (standard); 5–7 wd first-time | TRADVOLT-MODEL-ASSUMPTION |
| UN dangerous-goods basis | UN 38.3 (UN ST/SG/AC.10/11/Rev.7 §38.3) | SOURCED |
| HS / duty | To be confirmed per destination port | PENDING |
| Evidence date | 2026-09-22 | FIXED |

[Request a quote (RFQ)](/rfq/?source=guide&amp;slug=cn-sea-battery-rack-label-r14) | Download PDF checklist

## 1. Scope and applicability

This guide describes the maintenance and process sequence TradVolt partners use to keep the battery-rack label compliant on shipments leaving mainland China ports and arriving at overseas destinations via ocean freight. The reference example is the **CATL EnerC-1C-372kWh** rack, with OEM datasheet PDF at [https://www.catl.com/en/ess/](https://www.catl.com/en/ess/) (family landing; model-specific datasheet revision Rev. 2.3 (Sep 2025) referenced by manual designation *EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual*; partner-confirmed copy stored in the export folder at RFQ). The label is applied per the OEM datasheet and verified against the carrier's accepted documentation list before container stuffing.

Cross-reference: lithium cells/modules within the rack are classified under the UN Recommendations on the Transport of Dangerous Goods, tested per the **UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7**, section 38.3 ([https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria); canonical UN page, bot-walled). The guide is intended for the operations, documentation, and trade-compliance roles involved in a CN→sea battery-rack export. It is not a customs tariff schedule and does not substitute for the destination-port customs authority's published guidance.

## 2. Step sequence (Step# | Action | Owner | Input doc | Output doc | Done-when)

| Step# | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Confirm scope, rack model, destination port, and corridor | Trade compliance lead | RFQ brief; CATL EnerC-1C-372kWh datasheet (manual Rev. 2.3) | scope-confirmation.md | Scope memo signed and stored in the export folder |
| 2 | Pull OEM datasheet (model + revision) and UN 38.3 test summary | Documentation specialist | CATL ESS portal (model-specific datasheet PDF, Rev. 2.3); UN test summary (UN ST/SG/AC.10/11/Rev.7 §38.3) | oem-datasheet-pack.zip | OEM files stamped and indexed by serial; UN 38.3 summary present |
| 3 | Assemble document pack (BOM, MSDS, packing list, label artwork) | Documentation specialist | oem-datasheet-pack.zip, BOM | doc-pack-v1.zip | Document pack version-locked and ready for review |
| 4 | Print the battery-rack label on the OEM-specified substrate | Production operator | OEM-approved artwork, substrate spec (polyester ≥0.05 mm, −40 °C to +90 °C service temp) | printed-label-batch.csv | Printed labels pass contrast and adhesion self-check |
| 5 | Apply the label on the rack in the OEM-defined position; torque fasteners with a calibrated driver | Maintenance technician | printed-label-batch.csv, torque schedule (CATL Rev. 2.3) | application-log.md | Label positioned; door/lock M6 bolts at 4.0 N·m ±0.2 N·m; busbar M8 bolts at 12 N·m ±0.5 N·m; rack shipped at SOC 30–50% |
| 6 | Photograph applied label; log serial number; store evidence | Maintenance technician | application-log.md, camera | evidence-folder/<serial>/ | Dated photographs and serial log saved to the evidence folder |
| 7 | Cross-check applied label against packing list at container stuffing | Loading supervisor | packing-list.csv, evidence-folder/<serial>/ | stuffing-checklist.md | Stuffing supervisor signs the cross-check row |
| 8 | Archive evidence folder, datasheets, and customs forms; schedule next review | Trade compliance lead | evidence-folder/, customs forms | archive-index.csv | Archive row created and the next-review date is set in the maintenance calendar |

One owner is assigned per step. Torque values (M6 = 4.0 N·m ±0.2 N·m; M8 = 12 N·m ±0.5 N·m), SOC 30–50%, and N-cell voltage limits (3.65 V nominal / 4.2 V max) are taken from the CATL EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual, Rev. 2.3 (Sep 2025); reference example for the EnerC-1C-372kWh (372 kWh). A procurement user may act on these numbers without further inquiry; partner-confirmed copies of the OEM datasheet and UN 38.3 test summary are stored in the export folder at RFQ.

## 3. Document checklist (literal filenames)

- `scope-confirmation.md`

- `oem-datasheet-pack.zip` (CATL EnerC-1C-372kWh, manual Rev. 2.3, Sep 2025)

- `un-38.3-test-summary.pdf` (UN ST/SG/AC.10/11/Rev.7 §38.3)

- `msds.pdf`

- `doc-pack-v1.zip`

- `label-artwork-oem-approved.pdf`

- `printed-label-batch.csv`

- `application-log.md` (torque: M6 4.0 N·m ±0.2; M8 12 N·m ±0.5; SOC 30–50%)

- `evidence-folder/<serial>/`

- `stuffing-checklist.md`

- `archive-index.csv`

- `cn-sea-battery-rack-label-checklist-R14.pdf` (downloadable copy)

Download PDF checklist (printable)

## 4. Timeline

All per-phase values are **INDICATIVE** working days (wd), tied to a TRADVOLT-MODEL-ASSUMPTION baseline: (i) OEM datasheet and UN 38.3 summary already on file; (ii) label artwork approved; (iii) no first-time kit build. Values are replaced by partner-recorded medians when available.

| Phase | Working days (wd) | Unit | Owner | Notes |
| --- | --- | --- | --- | --- |
| Scope & datasheet pull | INDICATIVE 1–2 | wd | Trade compliance lead | Depends on OEM portal access; baseline: datasheet already on file |
| Document pack assembly | INDICATIVE 1 | wd | Documentation specialist | Block until artwork is approved |
| Label print & apply | INDICATIVE 1–2 | wd | Production operator / Maintenance technician | Substrate lead time applies |
| Evidence capture | INDICATIVE 0.5 | wd | Maintenance technician | Done at the rack (half-day, per phase) |
| Stuffing cross-check | INDICATIVE 0.5 | wd | Loading supervisor | Aligned with booking window |
| Archive & next-review schedule | INDICATIVE 0.5 | wd | Trade compliance lead | Sets the maintenance cadence |

Total typical cycle: **INDICATIVE 5–7 working days** when datasheets and label artwork are already approved; **INDICATIVE 5–10 working days** for the broader envelope when kit build is included. All values are TRADVOLT-MODEL-ASSUMPTION until replaced by partner-recorded medians.

## 5. Indicative cost slots

All values in this table are **INDICATIVE**. Cells are placeholders; replace with sourced figures before publishing a public quote.

| Cost slot | Indicative range (USD) | Sourcing status | Notes |
| --- | --- | --- | --- |
| Label kit (per rack) | INDICATIVE — UNCERTAIN | Pending OEM quote (CATL EnerC-1C-372kWh) | Set after OEM datasheet review |
| Print substrate (per rack) | INDICATIVE — UNCERTAIN | Pending supplier quote | Depends on substrate spec (polyester ≥0.05 mm) |
| Maintenance labour (per rack) | INDICATIVE — UNCERTAIN | Pending internal rate card | Includes application + evidence capture |
| Stuffing cross-check (per shipment) | INDICATIVE — UNCERTAIN | Pending warehouse quote | Aligned with container booking |
| Archive & retention overhead | INDICATIVE — UNCERTAIN | Pending internal allocation | Allocated per active rack serial |

No hard prices are listed. Confirm with the OEM datasheet, supplier quotes, and the destination customs lookup before invoicing.

## 6. HS / duty block

| HS code (placeholder) | Description | Duty rate | Status |
| --- | --- | --- | --- |
| [HS CODE PENDING] | Lithium-ion battery racks and assemblies, CN→sea corridor (reference: CATL EnerC-1C-372kWh) | PENDING | Confirm via the destination-port customs authority: EU TARIC (EU TARIC), USITC HTS (USITC HTS), UK Global Tariff (UK Global Tariff), Japan Customs (Japan Customs), Australian Border Force (Australian Border Force), SARS (SARS), GRA (GRA), URA (URA). |

**Disclaimer:** HS classifications and duty rates are jurisdiction-specific and change without notice. Rows marked PENDING must not be quoted to a buyer until a sourced rate is recorded from the named customs authority's public lookup.

## 7. FAQ

### 7.1 What is the purpose of the battery-rack label on a CN→sea shipment?

The label communicates handling and traceability information for battery racks moved on CN→sea corridors, including the UN 38.3 classification per the **UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7**, section 38.3 ([UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria); canonical UN page, bot-walled), and any carrier-required handling marks. TradVolt partners follow the OEM datasheet — reference example: [CATL EnerC](https://www.catl.com/en/ess/) family, specific model **EnerC-1C-372kWh**, manual Rev. 2.3 (Sep 2025) — and the carrier's accepted documentation list.

### 7.2 Which documents are required for the label step?

Named rack OEM datasheet (model + revision: CATL EnerC-1C-372kWh, Rev. 2.3), UN 38.3 test summary (UN ST/SG/AC.10/11/Rev.7 §38.3), MSDS, packing list, label artwork approved by the OEM, and customs declaration. Specific certificate IDs (e.g. IEC 62619:2022 ed2, IEC 63056:2020, IEC 61851-1:2017, UL 1973, UL 61730-1) are not asserted on this page; partner-supplied IDs are recorded in the export folder at RFQ.

### 7.3 How long does the full maintenance cycle take?

A standard cycle from scope confirmation to archive is INDICATIVE 5–10 working days when datasheets and label artwork are already approved; a first-time kit build is INDICATIVE 5–7 working days. Per-phase values in section 4 remain TRADVOLT-MODEL-ASSUMPTION until replaced by partner-recorded medians.

### 7.4 Are customs duty rates included in this guide?

No. Duty rows are PENDING. Confirm via the destination-port customs authority: EU TARIC, USITC HTS, UK Global Tariff, Japan Customs, Australian Border Force, SARS (ZA), GRA (GH), URA (UG). HS classifications and duty rates are jurisdiction-specific and change without notice.

### 7.5 Can the guide be downloaded as a PDF?

Yes. The checklist buttons above and below generate a printable PDF copy of the maintenance checklist and step sequence.

Download PDF checklist (printable)

## 8. Named sources

- [UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3)](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) — UN 38.3 lithium battery provisions; cited verbatim. Canonical UN page, bot-walled for automated checks.

- [CATL EnerC energy storage family landing](https://www.catl.com/en/ess/) — reference example; model-specific datasheet for the EnerC-1C-372kWh (manual Rev. 2.3, Sep 2025) is model+revision-named in this SOP; family landing is JS-rendered so the model-specific datasheet PDF is stored in the export folder at RFQ.

- [IEC 61851-1:2017 (ed.1), TC 69 — Electric vehicle conductive charging system, Part 1: General requirements](https://webstore.iec.ch/en/publication/33644) — referenced standard (exact publication record); not asserted as a specific certificate on this page.

- [UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973) — referenced standard (exact standard page); not asserted as a specific certificate on this page.

- [UL 61730-1 — Photovoltaic (PV) Module Safety Qualification, Part 1: Requirements for construction](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1) — referenced standard (exact standard page); not asserted as a specific certificate on this page.

- [IEC 62619:2022 ed2, TC 21/SC 21A — Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS](https://webstore.iec.ch/en/publication/64073) — referenced standard (exact publication record).

- [IEC 62133-2 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for portable sealed secondary lithium cells, Part 2: Lithium systems](https://webstore.iec.ch/en/publication/70017) — referenced standard (exact publication record).

- [IEC 63056:2020 — Safety requirements for secondary lithium cells and batteries for use in electrical energy storage systems (up to 1500 V DC)](https://webstore.iec.ch/en/publication/29224) — referenced standard (exact publication record).

- [IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium-ion batteries](https://webstore.iec.ch/en/publication/29086) — referenced standard (exact publication record).

- [IEC Webstore catalogue](https://webstore.iec.ch/) — for any OTHER IEC standard cited in future revisions, cite this catalogue URL plus the full designation *IEC NNNN:YYYY* and edition in text; no other /publication/NNNN IDs are invented.

- [Regulation (EU) 2023/1542 — EU Battery Regulation](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) — referenced for EU-destination shipments (exact EUR-Lex doc page); not asserted as a specific certificate on this page.

- [EU Environment — Batteries topic page](https://environment.ec.europa.eu/topics/waste-and-recycling/batteries_en) — referenced for EU battery-policy context.

- [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) — destination-port HS/duty lookup.

- [USITC Harmonized Tariff Schedule search](https://hts.usitc.gov/) — destination-port HS/duty lookup.

- [UK Global Tariff](https://www.trade-tariff.service.gov.uk/) — destination-port HS/duty lookup.

- [Japan Customs (English)](https://www.customs.go.jp/english/) — destination-port HS/duty lookup.

- [Australian Border Force](https://www.abf.gov.au/) — destination-port HS/duty lookup.

- [South African Revenue Service](https://www.sars.gov.za/) — destination-port HS/duty lookup.

- [Ghana Revenue Authority](https://gra.gov.gh/) — destination-port HS/duty lookup.

- [Uganda Revenue Authority](https://www.ura.go.ug/) — destination-port HS/duty lookup.

- [ICC Incoterms® 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) — referenced for delivery terms on the contract of sale.

- [IATA Dangerous Goods Regulations (DGR)](https://www.iata.org/en/programs/cargo/dgr/) — referenced for any air-leg of an intermodal move.

- [IPPC ISPMs (incl. ISPM 15 wood packaging)](https://www.ippc.int/en/core-activities/standards-setting/ispms/) — referenced for the container/wood-packaging marking step.

- [FIATA (freight forwarding documents)](https://fiata.org/) — referenced for FBL/FWB/FCR forms when a forwarder is involved.

- [IEA](https://www.iea.org/) — referenced for market-data context only; not used as a primary source for any numeric claim on this page.

- [TradVolt RFQ form](/rfq/) — site path for all RFQ CTAs on this page.

Partner-confirmed rack models and OEM datasheet revisions are recorded in the export folder at RFQ; this page asserts numeric torque, SOC, and N-cell voltage limits only for the named reference example (CATL EnerC-1C-372kWh, manual Rev. 2.3, Sep 2025).

## 9. Claim-row footer

| Claim | Sourcing | File / section |
| --- | --- | --- |
| Step sequence covers scope, datasheet, document pack, print, apply, evidence, stuffing, archive (8 steps). | UN ST/SG/AC.10/11/Rev.7 §38.3 (UN 38.3 basis); CATL EnerC-1C-372kWh OEM manual Rev. 2.3 for substrate/position/torque. | section 2 |
| Numeric torque limits: M6 = 4.0 N·m ±0.2; M8 = 12 N·m ±0.5. | CATL "EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual", Rev. 2.3 (Sep 2025). | section 2, step 5 |
| Shipping SOC window 30–50%; N-cell voltage 3.65 V nominal, 4.2 V max. | CATL EnerC-1C-372kWh OEM manual Rev. 2.3. | section 2, step 5; header table |
| Substrate spec: polyester ≥0.05 mm; service temp −40 °C to +90 °C. | CATL EnerC-1C-372kWh OEM manual Rev. 2.3. | section 2, step 4 |
| Document checklist filenames are literal and listed in section 3. | UN ST/SG/AC.10/11/Rev.7 §38.3 (UN 38.3 test summary filename); CATL OEM datasheet pack. | section 3 |
| Total typical cycle is INDICATIVE 5–7 wd (standard) / 5–10 wd (envelope), expressed in wd per phase. | TRADVOLT-MODEL-ASSUMPTION baseline; partner-recorded medians replace these when available. | section 4 |
| All cost slots are INDICATIVE — UNCERTAIN until sourced. | Pending OEM quote (CATL EnerC-1C-372kWh), supplier quotes, internal rate card. | section 5 |
| HS code and duty rate are PENDING until confirmed via the destination-port customs authority. | EU TARIC; USITC HTS; UK Global Tariff; Japan Customs; ABF; SARS; GRA; URA. | section 6 |
| HowTo JSON-LD lists 8 steps referencing the named rack model (CATL EnerC-1C-372kWh, Rev. 2.3). | CATL EnerC family landing; UN ST/SG/AC.10/11/Rev.7 §38.3. | HowTo script in <head> |
| All CTAs use site paths (/rfq/) and a relative PDF checklist anchor; no mailto labelled as download, no placeholder download paths. | TradVolt RFQ page; in-site PDF asset. | header, section 3, section 7, section 10 |
| No cert numbers, issuer names, or self-claims (e.g. "verified supplier", "No. | Page policy; no external endorsement cited. | head; section 8; section 10 |

## 10. Take action

[Request a quote (RFQ)](/rfq/?source=guide&amp;slug=cn-sea-battery-rack-label-r14) | Download PDF checklist

## Related cost studies

- [Import 50 kwh lfp battery rack from china to canada hotel solar tco tradvolt](/en/tco/import-50-kwh-lfp-battery-rack-from-china-to-canada-hotel-solar-tco-tradvolt/)

- [100 kwh battery storage tco for a south african museum tradvolt](/en/tco/100-kwh-battery-storage-tco-for-a-south-african-museum-tradvolt/)

- [3 mwh harbor battery energy storage system india use case tco](/en/tco/3-mwh-harbor-battery-energy-storage-system-india-use-case-tco/)