# BMS Firmware Version-Control & Rollback SOP — Corridor CN → QA

**Document type:** Process / SOP | **Vertical:** EVSE | **Equipment scope:** Battery Management System (BMS) firmware on EVSE-integrated energy storage modules | **Corridor:** CN manufacturing line → QA acceptance site | **Owner team:** TradVolt Engineering Operations

**Scope statement.** This SOP defines how TradVolt pins, ships, accepts, and rolls back BMS firmware across the CN manufacturing line and the QA acceptance site. It applies to every BMS firmware release shipped on EVSE hardware after 2026-01-01. The procedure does not cover wire-out communications firmware, charger-side firmware, or vehicle-side ECUs. [Claim — internal scope policy]

## 1. Step sequence

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive firmware release package (signed artifact, OEM release note, SHA-256 checksum) from the firmware supplier. | QA Lead | OEM release note, signed firmware package | Inbound receipt log entry | SHA-256 of artifact matches the OEM release note and the receipt log is signed. |
| 2 | Stage the artifact in the version-control vault, assign a semantic version tag, and freeze dependencies. | Release Engineer | Signed firmware package | Version vault record, pinned version tag | Version tag is immutable and visible in the version registry. |
| 3 | Flash the pinned firmware on the golden BMS unit and run the bench regression checklist (cell balancing, SOC accuracy, CAN diagnostics). | Test Engineer | Pinned firmware, bench regression checklist `BMS-REGR-CHECKLIST-v3.pdf` | Bench regression report | All bench checklist items pass and the report is countersigned by the Test Engineer. |
| 4 | Issue the line build instruction with the pinned version to the CN production line. | Process Engineer | Approved version pin, line build instruction template | Line build instruction `LBI-CN-BMS-XXXX.pdf` | Line build instruction is acknowledged by the CN line supervisor. |
| 5 | Program every BMS module in the CN line and record the firmware version on each traveler. | CN Line Operator | Line build instruction, traveler sheet | Traveler sheet with version column | 100% of travelers in that unit carry the pinned firmware version. |
| 6 | Pack units with the firmware version manifest and prepare shipment under the named Incoterm to the QA acceptance site. | Logistics Operator | Traveler sheet, packing list, version manifest | Shipment file with Incoterm, version manifest | Version manifest is attached and the Incoterm code matches the sales contract. |
| 7 | Receive units at the QA acceptance site and verify firmware version on each unit; run acceptance sampling per ISO 2859-1. | QA Inspector | Shipment file, AQL sampling plan | Incoming inspection report | Sampling result is recorded and lot disposition is set. |
| 8 | Sign off the accepted lot and update the version registry with the production tag. | QA Lead | Incoming inspection report | Version registry update, lot release note | Lot release note is filed and the version registry shows the production tag. |
| 9 | Detect a regression in service and log a ticket with stack traces, installed firmware version, and unit serial range. | Field Engineer | Service ticket, diagnostic log dump | Regression ticket with evidence pack | Ticket is categorised as firmware regression and routed to Engineering Manager. |
| 10 | Authorise the rollback to the previously pinned good version recorded in the version registry. | Engineering Manager | Regression ticket, version registry | Rollback authorisation record | Authorisation record names the target pinned version and the affected serial range. |
| 11 | Flash the pinned firmware on affected units and run the rollback checklist `BMS-ROLLBACK-CHECKLIST-v2.pdf`. | Service Technician | Pinned firmware, rollback checklist | Rollback service report | All checklist items pass and the unit reports the pinned version. |
| 12 | Append the rollback event to the audit log and notify QA to close the original ticket. | Release Engineer | Rollback service report | Audit log entry, closed ticket | Audit log entry is timestamped and QA confirms ticket closure. |

## 2. Roles & responsibilities (RACI summary)

| Role | Primary responsibility in this SOP |
| --- | --- |
| QA Lead | Receives firmware package, signs off accepted lots. |
| Release Engineer | Stages firmware in version-control vault, maintains audit log. |
| Test Engineer | Runs bench regression on golden unit. |
| Process Engineer | Issues line build instruction. |
| CN Line Operator | Programs BMS modules, records version on traveler. |
| Logistics Operator | Packs units, attaches version manifest, ships under Incoterm. |
| QA Inspector | Runs ISO 2859-1 acceptance sampling on incoming lots. |
| Field Engineer | Logs regression tickets from service. |
| Engineering Manager | Authorises rollbacks. |
| Service Technician | Executes rollback flash and checklist. |

## 3. Document checklist (files to keep on record)

- `OEM-RELEASE-NOTE-BMS-vX.Y.pdf` — OEM release note for each firmware version.

- `BMS-FIRMWARE-PACKAGE-vX.Y.signed.bin` — signed firmware artifact.

- `BMS-FIRMWARE-CHECKSUM-vX.Y.txt` — SHA-256 checksum file.

- `BMS-REGR-CHECKLIST-v3.pdf` — bench regression checklist for golden unit.

- `LBI-CN-BMS-XXXX.pdf` — line build instruction issued to CN production line.

- `TRAVELER-CN-BMS-XXXX.pdf` — traveler sheet with version column.

- `SHIPMENT-MANIFEST-BMS-XXXX.pdf` — shipment manifest including version list and Incoterm code.

- `AQL-PLAN-BMS-v2.pdf` — ISO 2859-1 sampling plan used at QA acceptance.

- `INCOMING-INSPECTION-REPORT-BMS-XXXX.pdf` — QA incoming inspection report.

- `BMS-ROLLBACK-CHECKLIST-v2.pdf` — rollback checklist used in the field.

- `ROLLBACK-AUTH-RECORD-XXXX.pdf` — rollback authorisation record.

- `AUDIT-LOG-BMS.csv` — append-only audit log of version events.

## 4. Timeline & dependencies

| Phase | Depends on | Indicative duration |
| --- | --- | --- |
| Receive & verify OEM release (Step 1) | OEM release package available | 0.5 working day (indicative) |
| Stage & pin in vault (Step 2) | Step 1 complete | 0.5 working day (indicative) |
| Bench regression (Step 3) | Step 2 complete, golden unit available | 1 working day (indicative) |
| Line build instruction (Step 4) | Step 3 pass | 0.5 working day (indicative) |
| CN line programming (Step 5) | Step 4 issued, CN line slot booked | 1-2 working days per build lot (indicative) |
| Shipment CN &rarr; QA (Step 6) | Step 5 complete, Incoterm defined in sales contract | UNCERTAIN — depends on Incoterm and lane |
| Incoming inspection at QA (Step 7) | Step 6 delivery | 1 working day per lot (indicative) |
| Lot sign-off (Step 8) | Step 7 pass | 0.5 working day (indicative) |
| Regression detection (Step 9) | Field report, unit serial range | 0.5 working day (indicative) |
| Rollback authorisation (Step 10) | Step 9 ticket triaged | 0.5 working day (indicative) |
| Rollback flash & verify (Step 11) | Step 10 authorised, technician dispatched | 0.5-1 working day per site visit (indicative) |
| Audit log update (Step 12) | Step 11 report filed | 0.25 working day (indicative) |

**Lead-time notice.** All lead-times labelled "indicative" are planning figures derived from TradVolt's internal SOP review and are subject to OEM release cadence, CN line slot availability, customs clearance times, and the Incoterm named in the underlying sales contract. Treat every figure in this table as UNCERTAIN until confirmed on the active quotation. [Claim — internal SOP draft, dated 2026-09-21]

## 5. Acceptance sampling reference

Incoming inspection at the QA acceptance site uses an attribute single-sampling plan drawn from ISO 2859-1. The AQL class, inspection level, and accept/reject numbers are defined per contract in `AQL-PLAN-BMS-v2.pdf`; this SOP does not hardcode AQL values here. [Claim — ISO 2859-1 sampling reference, Src: ISO 2859-1, URL: https://www.iso.org/standard/1141.html, accessed 2026-09-21]

## 6. Incoterms reference

The shipment from the CN manufacturing site to the QA acceptance site is executed under the Incoterm named in the active sales contract (commonly EXW, FCA, FOB, CIP, or DAP depending on the corridor). Cost transfer, risk transfer, and customs responsibility follow ICC Incoterms 2020 definitions. The Incoterm code is recorded on the shipment manifest and on the version manifest. [Claim — Incoterms definition, Src: ICC Incoterms 2020, URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/, accessed 2026-09-21]

## 7. Duty / HS code block

- **Equipment covered:** BMS modules and sub-assemblies for EVSE-integrated energy storage hardware shipped on the CN &rarr; QA corridor.

- **HS code (equipment/parts):** **PENDING — lookup** against the official customs tariff of the importing country at the time of shipment. Confirm in the WCO Harmonized System reference and the national tariff of the importing customs authority before each shipment. [Claim — HS classification to be confirmed, Src: WCO Harmonized System, URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx, accessed 2026-09-21]

- **Import duty rate:** **PENDING — lookup** on the official customs portal of the importing country at the time of shipment. Do not rely on third-party tariff calculators.

- **VAT / GST rate:** **PENDING — lookup** on the official tax portal of the importing country at the time of shipment.

- **Official customs portals to consult:**

- China General Administration of Customs: [http://english.customs.gov.cn/](http://english.customs.gov.cn/)

- EU TARIC consultation: [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp)

- National customs portal of the QA importing country (confirm URL on the active sales contract).

**Disclaimer.** The HS code, import duty rate, and VAT/GST rate shown above are intentionally marked "PENDING — lookup" and must be confirmed on the official customs and tax portals of the importing country at the time of each shipment. TradVolt does not provide duty or tax advice; consult a licensed customs broker in the importing jurisdiction. This block is informational only and does not constitute a customs declaration.

## 8. Compliance & standards references

- Bench regression on the golden BMS unit is documented against the OEM service manual for the BMS hardware revision in scope; field-engineer rollback is executed against the OEM service manual revision in scope. [Claim — OEM service manual reference, Src: OEM service manual for BMS hardware revision in scope, URL: *see active contract folder*, accessed 2026-09-21]

- Bench regression includes electrical safety checks aligned with IEC 61851-1 (EV conductive charging system) and UL 1973 (batteries for stationary applications) where applicable to the EVSE hardware configuration. [Claim — standard reference, Src: IEC 61851-1, URL: https://webstore.iec.ch/publication/33644, accessed 2026-09-21] [Claim — standard reference, Src: UL 1973, URL: https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=36484, accessed 2026-09-21]

- CE marking for units placed on the EU market is verified against the applicable CE directives listed in the technical file; this SOP does not issue or renew CE certificates. [Claim — CE conformity reference, Src: EU CE marking portal, URL: https://single-market-economy.ec.europa.eu/single-market/ce-marking_en, accessed 2026-09-21]

- Shipment documentation follows FIATA multimodal transport documentation practice where applicable. [Claim — documentation reference, Src: FIATA, URL: https://fiata.org/, accessed 2026-09-21]

## 9. Cost slots

The line items below are cost slots only. TradVolt does not publish fixed prices on this SOP; final pricing is confirmed on the active quotation.

- Firmware release engineering & version-control vault handling — **indicative**, per active quotation.

- Bench regression on golden unit — **indicative**, per active quotation.

- CN line programming per BMS module — **indicative**, per active quotation.

- Shipment CN &rarr; QA under named Incoterm — **UNCERTAIN** until lane, mode, and Incoterm are fixed.

- QA incoming inspection per lot (ISO 2859-1 sampling) — **indicative**, per active quotation.

- Field rollback per site visit — **indicative**, per active quotation.

- Import duty, VAT/GST, and customs broker fees — **UNCERTAIN** until HS code and importing customs portal lookup is completed at the time of shipment.

## 10. CTAs & downloads

[Request Quote — replies in 48h](/rfq/) [Download BMS regression checklist (PDF)](https://tradvolt.com/downloads/BMS-REGR-CHECKLIST-v3.pdf)

Both links above are live CTAs on tradvolt.com; if either fails to resolve, contact [engineering@tradvolt.com](mailto:engineering@tradvolt.com) for the current artifact.

## 11. Claim-row references

1. [Claim — OEM service manual reference | Src: OEM service manual for BMS hardware revision in scope | URL: see active contract folder | accessed 2026-09-21]

2. [Claim — IEC 61851-1 reference | Src: IEC 61851-1 | URL: https://webstore.iec.ch/publication/33644 | accessed 2026-09-21]

3. [Claim — UL 1973 reference | Src: UL 1973 | URL: https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=36484 | accessed 2026-09-21]

4. [Claim — ISO 2859-1 sampling reference | Src: ISO 2859-1 | URL: https://www.iso.org/standard/1141.html | accessed 2026-09-21]

5. [Claim — Incoterms definition | Src: ICC Incoterms 2020 | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21]

6. [Claim — HS classification to be confirmed | Src: WCO Harmonized System | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx | accessed 2026-09-21]

7. [Claim — China customs portal | Src: China General Administration of Customs | URL: http://english.customs.gov.cn/ | accessed 2026-09-21]

8. [Claim — EU TARIC consultation | Src: European Commission TARIC | URL: https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp | accessed 2026-09-21]

9. [Claim — FIATA documentation reference | Src: FIATA | URL: https://fiata.org/ | accessed 2026-09-21]

10. [Claim — CE conformity reference | Src: EU CE marking portal | URL: https://single-market-economy.ec.europa.eu/single-market/ce-marking_en | accessed 2026-09-21]

---

&copy; TradVolt. This page is a process / SOP draft for EVSE service teams. It does not constitute customs, tax, or legal advice. HS codes, duty rates, and lead-times must be confirmed against the official customs and tax portals of the importing country at the time of each shipment. Last reviewed: 2026-09-21.