---
title: "CN→SA EVSE CE Machinery Risk File SOP | TradVolt"
source_url: "https://tradvolt.com/en/guides/ce-machinery-directive-risk-assessment-file-sop-corridor-cnsa-tradvolt-evse/"
lang: "en"
description: "SOP for compiling the Machinery Directive 2006/42/EC technical file and EN ISO 12100:2010 risk assessment for EVSE hardware shipped from China to Saudi Arabia."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/) › [Process & SOP](/process/) › CE Machinery Risk-Assessment File (CN→SA)

# CE Machinery Directive Risk-Assessment File SOP — Corridor CN→SA

Standard Operating Procedure for compiling the Machinery Directive 2006/42/EC technical file and EN ISO 12100:2010 risk assessment for EVSE hardware shipped China → Saudi Arabia. Vertical: Electric Vehicle Supply Equipment.

## 1. Scope and applicability

Confirm the applicable legislation, equipment scope and assessment route before requesting conformity evidence. A CE file does not establish Saudi market compliance.

The risk-assessment methodology follows EN ISO 12100:2010, the type-B safety standard for general principles for design — risk assessment and risk reduction [Claim | Src: ISO/TC 199 catalogue entry for ISO 12100:2010 | https://www.iso.org/standard/51528.html | accessed 2026-09-21]. Electrical safety verification follows EN 60204-1:2018 for the electrical equipment of machines [Claim | Src: IEC Webstore entry for IEC 60204-1:2016 (adopted as EN 60204-1) | https://webstore.iec.ch/publication/26037 | accessed 2026-09-21].

## 2. Roles and owners

- **Compliance Lead** — owner of the technical file; signs the Declaration of Conformity.

- **Quality Lead** — owner of pre-shipment AQL inspection.

- **Logistics Lead** — owner of the export booking and document set forwarded to the consignee.

## 3. Input documents checklist

| Filename (literal) | Purpose |
| --- | --- |
| OEM_ServiceManual_EVSE_[model].pdf | Source-of-truth drawings, BOM, and safety information from the manufacturer. |
| RiskAssessment_ENISO12100_Worksheet.xlsx | Hazard list, severity, probability, risk-reduction measures. |
| HarmonisedStandardsMatrix_v01.xlsx | Applied EN/IEC clauses with edition dates. |
| DoC_MachineryDirective_2006-42-EC.pdf | Declaration of Conformity template, populated per unit. |
| AQL_Report_ISO2859-1_Lot[n].pdf | Inspection report for the production lot. |
| CE_Marking_Artwork_v01.dwg | CE graphic with height ≥ 5 mm per Annex III. |
| CommercialInvoice_DAP_Jeddah.pdf | Shipping commercial document. |
| PackingList_CN_to_SA.xlsx | Carton-level serial number trace. |

## 4. Step sequence

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive OEM technical file package (manual, BOM, DoC template, harmonised standards list). | Compliance Lead | OEM_ServiceManual_EVSE_[model].pdf | File index entry opened in TFS register | Index row created with receipt date, OEM contact, model code. |
| 2 | Confirm the applicable legislation, equipment scope and assessment route before requesting conformity evidence. A CE file does not establish Saudi market compliance. | Compliance Lead | OEM_ServiceManual_EVSE_[model].pdf | Scope memo (1 page, signed) | Scope memo references Annex I hazards and the chosen route. |
| 3 | Compile the harmonised standards matrix listing EN ISO 12100:2010, EN 60204-1, EN 61851-1, EN 61000-6-2/6-4 where applicable. | Compliance Lead | OEM_ServiceManual_EVSE_[model].pdf | HarmonisedStandardsMatrix_v01.xlsx | Each clause has edition date and pass/fail tick. |
| 4 | Draft the risk assessment per EN ISO 12100:2010: iterate hazard identification, severity, probability, risk reduction. | Compliance Lead | RiskAssessment_ENISO12100_Worksheet.xlsx (blank) | RiskAssessment_ENISO12100_Worksheet.xlsx (filled) | Every hazard has residual-risk score ≤ acceptable threshold. |
| 5 | Send risk assessment, general assembly drawings, and BOM to OEM for review and revision marking. | Compliance Lead | RiskAssessment_ENISO12100_Worksheet.xlsx (filled) | OEM review transmittal email + tracked PDF | OEM returns the package with at least one signed revision page. |
| 6 | Receive OEM sign-off; apply CE marking artwork with height ≥ 5 mm per Annex III of 2006/42/EC. | Compliance Lead | CE_Marking_Artwork_v01.dwg | Marked-up drawing set with CE graphic callout | CE graphic callout dimensioned on at least one view. |
| 7 | Perform lot inspection at the OEM plant against ISO 2859-1:1999, AQL 1.5 General Inspection Level II [Claim \| Src: ISO/TC 69 catalogue entry for ISO 2859-1:1999 \| https://www.iso.org/standard/1141.html \| accessed 2026-09-21]. | Quality Lead | Production lot pull | AQL_Report_ISO2859-1_Lot[n].pdf | Report records lot size, sample size, Ac/Re numbers, and disposition. |
| 8 | Sign Declaration of Conformity naming responsible person, applied directives, and harmonised standards. | Compliance Lead | DoC_MachineryDirective_2006-42-EC.pdf (template) | DoC_MachineryDirective_2006-42-EC.pdf (signed) | DoC signed and dated; PDF is not editable. |
| 9 | Assemble final technical file as one PDF with table of contents, version-control page, and document checklist. | Compliance Lead | All upstream outputs | TechnicalFile_EVSE_[model]_[serial].pdf | PDF opens, TOC links resolve, file size < 100 MB. |
| 10 | Archive the technical file for the retention period stated in 2006/42/EC and notify Logistics Lead that the file is released for export. | Compliance Lead | TechnicalFile_EVSE_[model]_[serial].pdf | Archive record + release email to Logistics Lead | Archive location, retention date, and release email are logged. |
| 11 | Book consignment under ICC Incoterms 2020 DAP Jeddah or DAP Riyadh; attach file cover sheet to the commercial invoice; forward haulier booking. | Logistics Lead | TechnicalFile_EVSE_[model]_[serial].pdf (cover sheet) + CommercialInvoice_DAP_Jeddah.pdf | Booking confirmation + shipper's letter of instruction | Booking reference is logged in the shipment register and the consignee is notified. |

## 5. Timeline with dependencies

| Day | Activity | Dependency |
| --- | --- | --- |
| D + 0 | Step 1 — receive OEM technical file package. | None (start). |
| D + 2 | Step 2 — scope verification and route selection. | Depends on Step 1. |
| D + 4 | Step 3 — harmonised standards matrix. | Depends on Step 2. |
| D + 7 | Step 4 — draft risk assessment. | Depends on Step 3. |
| D + 8 | Step 5 — send to OEM for sign-off. | Depends on Step 4. |
| D + 11 | Step 6 — receive OEM sign-off and apply CE marking. | Depends on Step 5. |
| D + 13 | Step 7 — AQL inspection at OEM plant. | Depends on production lot being released to inspection. |
| D + 15 | Step 8 — sign Declaration of Conformity. | Depends on Steps 6 and 7. |
| D + 17 | Step 9 — compile final technical file PDF. | Depends on Step 8. |
| D + 18 | Step 10 — archive and release to Logistics. | Depends on Step 9. |
| D + 20 | Step 11 — book DAP Jeddah / DAP Riyadh shipment. | Depends on Step 10 and consignee's delivery slot. |

## 6. Duty / HS code block

HS code for the EVSE unit (charging station for electric vehicles) is **8537.10** — "Boards, panels, consoles, desks, cabinets and other bases, equipped with two or more apparatus for switching, protecting, connecting to or controlling electrical circuits, for a voltage not exceeding 1,000 V" — commonly used for EV charging stations and accepted by the SFDA customs portal and the Saudi ZATCA single-window for goods classification [Claim | Src: Saudi ZATCA HS Code Inquiry (official customs portal) | https://www.zatca.gov.sa/en/rulings/pages/hscode-inquiry.aspx | accessed 2026-09-21]. Spare parts fall under heading 8538 ("parts suitable for use solely or principally with the apparatus of heading 8537") [Claim | Src: WCO Harmonized Commodity Description and Coding System, Explanatory Notes to Chapter 85 | http://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx | accessed 2026-09-21].

**Disclaimer.** Applicable import duty rates, VAT treatment, and any Saudi Conformity Assessment (SALEH/SASO IECEE) programme fees are PENDING — lookup on the official ZATCA and SASO portals at the time of each shipment. Do not hardcode rates in this SOP. Always verify against the live ZATCA HS Code Inquiry and the SASO Product Safety portal before quoting [Claim | Src: Saudi SASO Product Safety portal | https://saso.gov.sa/en/Product-Safety/ | accessed 2026-09-21].

## 7. Cost slots

| Cost line | Status | Notes |
| --- | --- | --- |
| Confirm the applicable legislation, equipment scope and assessment route before requesting conformity evidence. A CE file does not establish Saudi market compliance. | UNCERTAIN | Quoted per OEM request; certificate number not yet issued. |
| AQL inspection day-rate | indicative | Indicative day-rate provided on RFQ; final rate depends on lot size. |
| Translation of the technical file to Arabic (consignee requirement) | indicative | Indicative per-page rate; final quote depends on document length. |
| Saudi import duty (HS 8537.10) | PENDING — lookup | Verify on ZATCA HS Code Inquiry at time of shipment. |
| SASO IECEE certificate fee | PENDING — lookup | Verify on SASO Product Safety portal at time of shipment. |
| Sea freight CN → Jeddah (40' HC, indicative) | indicative | Indicative only; final rate depends on sailing schedule. |

## 8. Output documents

- TechnicalFile_EVSE_[model]_[serial].pdf — final consolidated file.

- DoC_MachineryDirective_2006-42-EC.pdf — signed Declaration of Conformity.

- AQL_Report_ISO2859-1_Lot[n].pdf — lot inspection report.

- CommercialInvoice_DAP_Jeddah.pdf — shipping commercial document.

- PackingList_CN_to_SA.xlsx — carton-level serial number trace.

[Request Quote — replies in 48h](/rfq?topic=ce-machinery-risk-assessment) Download Checklist (PDF)

## 9. Named sources cited

1. EUR-Lex consolidated text of Directive 2006/42/EC (Machinery Directive) — https://eur-lex.europa.eu/eli/dir/2006/42/oj — accessed 2026-09-21.

2. ISO catalogue entry for ISO 12100:2010 (Safety of machinery — General principles for design — Risk assessment and risk reduction) — https://www.iso.org/standard/51528.html — accessed 2026-09-21.

3. IEC Webstore entry for IEC 60204-1:2016 (Safety of machinery — Electrical equipment of machines) — https://webstore.iec.ch/publication/26037 — accessed 2026-09-21.

4. ISO catalogue entry for ISO 2859-1:1999 (Sampling procedures for inspection by attributes) — https://www.iso.org/standard/1141.html — accessed 2026-09-21.

5. ICC Incoterms 2020 official page — https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ — accessed 2026-09-21.

6. FIATA — International Federation of Freight Forwarders Associations documentation overview — https://fiata.org — accessed 2026-09-21.

7. Saudi ZATCA HS Code Inquiry (official customs portal) — https://www.zatca.gov.sa/en/rulings/pages/hscode-inquiry.aspx — accessed 2026-09-21.

8. Saudi SASO Product Safety portal — https://saso.gov.sa/en/Product-Safety/ — accessed 2026-09-21.

9. WCO Harmonized System Nomenclature 2022 Edition, Explanatory Notes — http://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx — accessed 2026-09-21.
