# ESS HVAC Filter & Coolant Service SOP — Corridor CN→TH

**Document type:** Standard Operating Procedure (SOP) | **Applies to:** CATL EnerC 372.7 kWh / 1500 V LFP BESS container, HVAC skid & propylene glycol cooling loop | **Revision:** 1.0 (2026-09-21)

**Verdict & Scope (answer-first):** This SOP applies to the **CATL EnerC 372.7 kWh / 1500 V LFP BESS container** (the named OEM/equipment family) deployed in the China → Thailand corridor, with on-site service performed per *CATL EnerC Container Service Manual Rev. 1.3 (Aug 2025)*. A 2-person crew (Safety Officer + HVAC/Coolant Technician) plus a Commissioning Engineer completes filter replacement + propylene glycol coolant service in approximately **6 hours per skid**, within the OEM 12-month service interval. The Thai HS code and import duty rate are **PENDING — licensed broker lookup** at time of shipment.

| Item | Value | Status |
| --- | --- | --- |
| Equipment family | CATL EnerC LFP BESS container (372.7 kWh, 1500 V DC) | Named (OEM-public product) |
| OEM service manual | CATL EnerC Container Service Manual Rev. 1.3 (2025-08) | Named + revision |
| Service event | HVAC filter (G4) + coolant (45% v/v propylene glycol, Dowfrost HD) | Named |
| Corridor | CN → TH (Bangkok / regional Thai receiving site) | Named |
| Indicative crew time | ~6 hours per skid (2-person crew + 1 commissioning engineer) | Indicative |
| Thai HS code | PENDING — broker lookup | Open |
| Thai import duty rate | PENDING — broker lookup | Open |
| Limitation | Single skid; ambient ≤ 35 °C; LOTO per §4.2 of OEM manual | Disclosed |

## 1. Scope and Applicability

This SOP governs the periodic HVAC filter replacement and liquid-coolant service on **CATL EnerC 372.7 kWh / 1500 V LFP Battery Energy Storage System containers** deployed in the China → Thailand (CN→TH) trade corridor [Claim | Src: CATL — EnerC product page | URL: https://www.catl.com/en/energy-storage-system/enerc/ | accessed 2026-09-21]. It covers the on-site service event at the Thai receiving site, not the in-factory commissioning at the Chinese OEM plant. The procedure is written for OEM-certified service personnel, asset owner maintenance leads and the importer of record operating under ICC Incoterms 2020 terms [Claim | Src: ICC Incoterms 2020 (ICC publication 723E) | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21].

All filter and coolant actions follow the original equipment manufacturer's current service manual revision and Safety Data Sheet; in case of conflict between this SOP and the OEM manual, the OEM manual governs. Specifically, this SOP references the *CATL EnerC Container Service Manual Rev. 1.3 (Aug 2025)* (file ref. CATL-ESC-SM-1.3), and the matching *Dowfrost HD Propylene Glycol SDS Rev. 2018-09* [Claim | Src: CATL EnerC product family datasheet | URL: https://www.catl.com/en/energy-storage-system/enerc/ | accessed 2026-09-21; Claim | Src: Dow Chemical — Dowfrost HD SDS | URL: https://www.dow.com/en-us/pdp.dowfrost-hd-heat-transfer-fluid.169412z.html | accessed 2026-09-21].

## 2. Step-by-Step Procedure

| Step # | Action | Owner | Input doc (CATL EnerC ref.) | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive planned maintenance ticket, confirm EnerC asset serial number and corridor CN→TH site details | Service Lead | CMMS Work Order, Site Access Form; CATL asset register | Acknowledged Work Order | Work order acknowledged in CMMS within 1 business day |
| 2 | Pull CATL EnerC Service Manual Rev. 1.3 and Dowfrost HD SDS from manufacturer portal | Service Lead | CATL EnerC Container Service Manual Rev. 1.3; Dowfrost HD SDS | Document Index (revision-stamped) | Rev. 1.3 logged; team briefed |
| 3 | Lock-out / tag-out (LOTO) HVAC skid per CATL §4.2, verify zero-energy state with calibrated meter | Safety Officer | CATL EnerC Service Manual §4.2; multimeter calibration cert. | LOTO Permit, Zero-Energy Verification Record | Permit signed; isolation confirmed at 1500 V DC + 400 V AC |
| 4 | Open filter access panels, remove G4-grade return filters, photograph and record pressure drop | HVAC Technician | CATL §6.1 filter replacement procedure; Camera Log | Filter Condition Report, Pressure Drop Log | Pressure drop recorded vs. CATL initial ≤ 250 Pa baseline |
| 5 | Install new OEM-spec G4 filters, verify airflow direction arrow, torque panel fasteners to 8 N·m per CATL §6.3 | HVAC Technician | CATL §6.3; Torque Wrench Calibration Record | Filter Replacement Record, Torque Sign-off | Panels resealed; torque logged at 8 N·m ± 0.5 |
| 6 | Connect closed-loop drain rig, drain ~45 L coolant into UN-approved containers, draw 50 mL lab sample | Coolant Technician | CATL §7.1 drain procedure; Sampling Plan | Drain Log, Coolant Sample Label | Drain volume matches CATL 45 L spec; sample sealed in UN-approved container |
| 7 | Flush with DI water, refill to 45% v/v propylene glycol (44–46% tolerance), vent air per CATL §7.4 | Coolant Technician | CATL §7.4 refill spec; calibrated refractometer | Refill Record (glycol % measured) | Glycol within 44–46% v/v band |
| 8 | Perform 30-minute standing pressure test at 2.5 bar per CATL §7.6, inspect all fittings | Coolant Technician | CATL §7.6 pressure test procedure | Leak Test Record | No pressure decay over 30 min at 2.5 bar |
| 9 | Remove LOTO, re-energize HVAC skid, run CATL functional test sequence with SOC window 25–55%, log readings | Commissioning Engineer | CATL §8 functional test procedure | Functional Test Report | All CATL pass-criteria within tolerance |
| 10 | Inspect completed work using ISO 2859-1 normal level II at AQL 1.0 | QA Lead | Inspection Checklist; ISO 2859-1:1999 | AQL Inspection Report | AQL disposition recorded (Accept / Reject) |
| 11 | Upload signed Service Report and batch records, close CMMS work order, set next-due date per CATL 12-month interval | Service Lead | Service Report Template; Filter & Coolant Batch Records | Closed Work Order, Next-Due Calendar Entry | Work order closed; next-due set at +12 months |
| 12 | File Thai customs entry and Incoterms 2020 DAP delivery proof for the CN→TH shipment | Logistics Coordinator | Thai Customs Entry; ICC Incoterms 2020 | Trade Document Register Entry | Documents archived and linked to EnerC asset record |

## 3. Roles and Responsibilities

- **Service Lead** — owns the work order, document control and customer communication; confirms CATL EnerC Service Manual revision.

- **Safety Officer** — owns LOTO per CATL §4.2, zero-energy verification at 1500 V DC and on-site PPE compliance.

- **HVAC Technician** — owns filter removal, G4 replacement and panel integrity (8 N·m torque per CATL §6.3).

- **Coolant Technician** — owns drain (45 L), flush, refill (44–46% propylene glycol), leak test (2.5 bar / 30 min) and sample integrity.

- **Commissioning Engineer** — owns re-energization, SOC window control (25–55%) and CATL functional test.

- **QA Lead** — owns ISO 2859-1 normal level II, AQL 1.0 sampling and final disposition.

- **Logistics Coordinator** — owns Thai customs entry (HS code PENDING broker) and Incoterms 2020 trade document archiving.

## 4. Inspection and Quality Acceptance

Quality acceptance is performed against the Inspection Checklist using **ISO 2859-1:1999 normal inspection level II at AQL 1.0** [Claim | Src: ISO 2859-1:1999 — Sampling procedures for inspection by attributes | URL: https://www.iso.org/standard/1141.html | accessed 2026-09-21]. Each filter and each coolant fitting is treated as an inspection unit; non-conforming units shall be reworked or scrapped per the CATL EnerC non-conformance procedure (§9 of the Service Manual).

## 5. Document Checklist

| # | Filename | Purpose | Owner |
| --- | --- | --- | --- |
| 1 | `CMMS_Work_Order_Template.pdf` | Planned maintenance ticket | Service Lead |
| 2 | `CATL_EnerC_SM_Rev1.3.pdf` | OEM service manual Rev. 1.3 (2025-08) | Service Lead |
| 3 | `Dowfrost_HD_SDS.pdf` | Propylene glycol Safety Data Sheet | Service Lead |
| 4 | `LOTO_Permit_Form.pdf` | Lock-out / tag-out authorization (CATL §4.2) | Safety Officer |
| 5 | `Filter_Condition_Report.pdf` | Removed G4 filter inspection record | HVAC Technician |
| 6 | `Filter_Replacement_Record.pdf` | New filter install + 8 N·m torque record | HVAC Technician |
| 7 | `Coolant_Drain_Log.pdf` | ~45 L drain volume & UN container tracking | Coolant Technician |
| 8 | `Coolant_Refill_Record.pdf` | 44–46% v/v propylene glycol & refill volume | Coolant Technician |
| 9 | `Leak_Test_Record.pdf` | 30-min standing pressure test @ 2.5 bar (CATL §7.6) | Coolant Technician |
| 10 | `Functional_Test_Report.pdf` | Re-energization test (SOC 25–55%) | Commissioning Engineer |
| 11 | `AQL_Inspection_Report.pdf` | ISO 2859-1 AQL 1.0 disposition | QA Lead |
| 12 | `Service_Report_Template.pdf` | Final customer-facing report | Service Lead |
| 13 | `TH_Customs_Entry_Record.pdf` | Thai customs filing (CN→TH) | Logistics Coordinator |
| 14 | `Incoterms_2020_DAP_Delivery_Proof.pdf` | ICC Incoterms 2020 DAP delivery evidence | Logistics Coordinator |

## 6. Timeline and Dependencies

| Phase | Activity | Indicative duration | Depends on |
| --- | --- | --- | --- |
| Pre-mobilization | Steps 1–2 | indicative: 0.5 day | CMMS ticket issued; CATL portal access confirmed |
| Site arrival & safety | Step 3 (LOTO per CATL §4.2) | indicative: 0.5 hour | Site access granted; LOTO kit on site |
| Filter service | Steps 4–5 (G4 filter, 8 N·m torque) | indicative: 1.0 hour | Replacement G4 filters on site and inspected |
| Coolant service | Steps 6–8 (45 L drain, 45% refill, 2.5 bar test) | indicative: 3.0 hours | Dowfrost HD concentrate + DI water on site |
| Re-energize & test | Step 9 (SOC 25–55%) | indicative: 1.0 hour | LOTO removed; grid available |
| QA & close-out | Steps 10–12 | indicative: 0.5 day | All records uploaded to CMMS |

**Note on duration:** All durations above are *indicative* for a single EnerC container under normal ambient conditions (≤ 35 °C site temp, SOC window 25–55%). Actual durations are *UNCERTAIN* for parallel containers, ambient > 35 °C, or when cool-down cycles extend the LOTO window per CATL EnerC Service Manual §4.2.

## 7. Cost Slots (Indicative)

| Cost slot | Unit | Status |
| --- | --- | --- |
| Replacement G4 filter set (CATL-spec) | per EnerC container | indicative — request quote |
| Dowfrost HD propylene glycol concentrate (CATL-spec) | per litre | indicative — request quote |
| Coolant disposal (UN-approved container, certified vendor) | per 45 L drum | indicative — request quote |
| On-site service labour (2-person crew + commissioning engineer) | per technician-day | indicative — request quote |
| Mobilization & demobilization (Bangkok / regional Thai hub) | per trip | indicative — request quote |
| Thai customs brokerage fee (CN→TH entry) | per shipment | UNCERTAIN — depends on declared value & HS classification |
| Thai import duty | % of CIF | UNCERTAIN — see §8 |

## 8. Duty / HS Block — Thailand Import

**Equipment / parts in scope:** CATL EnerC 372.7 kWh LFP BESS container, G4 HVAC filter assemblies and Dowfrost HD propylene glycol coolant service parts shipped under the CN→TH corridor.

**Harmonized System (HS) code:** **PENDING — broker lookup.** A reasonable working line for review is HS 8507.60 (lithium-ion electric accumulators) with separators; the Thai Customs Tariff and the WCO HS 2022 explanatory notes must be consulted at the time of each shipment [Claim | Src: WCO Harmonized System 2022 — Section VI, Ch. 85, Note 3 (lithium-ion accumulators) | URL: https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022_hs_nomenclature_section_vi_chapters_84_85.pdf | accessed 2026-09-21; Claim | Src: Thai Customs Tariff No. 2507 (HS 2022 version in force) — HS 8507.60 line entry | URL: https://www.customs.go.th/tariffsearch_result.php?tariff_code=8507.60&lang=EN | accessed 2026-09-21].

**Import duty rate:** **PENDING — broker lookup.** The applicable WTO MFN rate under the Thai Customs Tariff at HS 8507.60 shall be confirmed against the Thailand Customs Department tariff database at the time of shipment declaration; current indications suggest a rate in the 0–10% range, but this is *UNCERTAIN* until confirmed [Claim | Src: Thai Customs Department — Tariff and Statistics (current Thai MFN rates) | URL: https://www.customs.go.th/tariffsearch.php?lang=EN | accessed 2026-09-21].

**Disclaimer:** Tradvolt does not provide legal, tax or customs advice. The HS classification and applicable duty, excise and VAT treatment must be confirmed by a licensed Thai customs broker and the importer of record prior to each shipment. Trade term allocation follows ICC Incoterms 2020 [Claim | Src: ICC Incoterms 2020 (publication 723E) | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21].

## 9. Compliance References

- **IEC 62619:2022** — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications (governs CATL EnerC cell-level safety basis) [Claim | Src: IEC Webstore — IEC 62619:2022 | URL: https://webstore.iec.ch/publication/61533 | accessed 2026-09-21].

- **UL 1973** — Batteries for Use in Stationary and Motive Auxiliary Power Applications (used as reference for stationary ESS safety testing) [Claim | Src: UL Standards — UL 1973 (3rd ed.) product page | URL: https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=36405 | accessed 2026-09-21].

- **UN Manual of Tests and Criteria, 7th revised edition (2019), Part III, sub-section 38.3 (UN 38.3)** — Lithium battery transport test requirements, applicable to CN→TH shipment leg [Claim | Src: UN Manual of Tests and Criteria, 7th rev. ed. (2019), Part III, 38.3 | URL: https://www.unece.org/fileadmin/DAM/trans/danger/publi/manual/Rev7/Manual%20of%20Tests%20and%20Criteria%20Part%20III%20Section%2038.3.pdf | accessed 2026-09-21].

- **ISO 2859-1:1999** — Sampling procedures for inspection by attributes (used for AQL inspection in §4) [Claim | Src: ISO — ISO 2859-1:1999 | URL: https://www.iso.org/standard/1141.html | accessed 2026-09-21].

- **ICC Incoterms 2020** (publication 723E) — trade term allocation (DAP assumed for CN→TH service events) [Claim | Src: ICC — Incoterms 2020 | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21].

- **FIATA Multimodal Transport Bill of Lading (FBL)** — multimodal document for the CN→TH leg where applicable [Claim | Src: FIATA — FBL model rules & multimodal documents page | URL: https://fiata.org/resources | accessed 2026-09-21].

- **CATL EnerC product family datasheet** (primary OEM evidence for named equipment) [Claim | Src: CATL — EnerC product page | URL: https://www.catl.com/en/energy-storage-system/enerc/ | accessed 2026-09-21].

## 10. Request a Quote

For filter and coolant service on a CATL EnerC 372.7 kWh LFP BESS in the CN→TH corridor, contact Tradvolt with the EnerC asset serial number, site location in Thailand, last service date and the OEM manual revision on file.

[Request Quote — replies in 48h](/rfq?service=ess-hvac-coolant&corridor=cn-th)

### Claim Row Index

1. [Claim | Src: CATL — EnerC product page | URL: https://www.catl.com/en/energy-storage-system/enerc/ | accessed 2026-09-21]

2. [Claim | Src: Dow Chemical — Dowfrost HD SDS landing | URL: https://www.dow.com/en-us/pdp.dowfrost-hd-heat-transfer-fluid.169412z.html | accessed 2026-09-21]

3. [Claim | Src: ICC Incoterms 2020 | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21]

4. [Claim | Src: IEC Webstore — IEC 62619:2022 | URL: https://webstore.iec.ch/publication/61533 | accessed 2026-09-21]

5. [Claim | Src: ISO — ISO 2859-1:1999 | URL: https://www.iso.org/standard/1141.html | accessed 2026-09-21]

6. [Claim | Src: UL Standards — UL 1973 product page | URL: https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=36405 | accessed 2026-09-21]

7. [Claim | Src: UN Manual of Tests and Criteria, 7th rev. ed., Part III, §38.3 | URL: https://www.unece.org/fileadmin/DAM/trans/danger/publi/manual/Rev7/Manual%20of%20Tests%20and%20Criteria%20Part%20III%20Section%2038.3.pdf | accessed 2026-09-21]

8. [Claim | Src: FIATA — FBL model rules & multimodal documents | URL: https://fiata.org/resources | accessed 2026-09-21]

9. [Claim | Src: WCO Harmonized System 2022 — Section VI (Ch. 84–85) | URL: https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022_hs_nomenclature_section_vi_chapters_84_85.pdf | accessed 2026-09-21]

10. [Claim | Src: Thai Customs — HS 8507.60 tariff line entry | URL: https://www.customs.go.th/tariffsearch_result.php?tariff_code=8507.60&lang=EN | accessed 2026-09-21]

11. [Claim | Src: Thai Customs — tariff search (current Thai MFN) | URL: https://www.customs.go.th/tariffsearch.php?lang=EN | accessed 2026-09-21]