---
title: "ESS PCS Grid-Fault Ride-Through Test SOP | CN→BR Corridor | Tradvolt"
source_url: "https://tradvolt.com/en/guides/ess-pcs-grid-fault-ride-through-test-sop-cnbr-corridor-tradvolt/"
lang: "en"
description: "Standard operating procedure for ESS PCS grid-fault ride-through testing on the China-to-Brazil LFP battery corridor. Built for the Sungrow PowerTitan2.0 PCS variant and Sungrow ST2752UX battery container. 14-day process with documentation, duty block, and RFQ CTA."
generator: "tradvolt-tier-c-edge-md"
---

SOPProcessESS / PCSCN → BRLFPSungrow PowerTitan2.0Sungrow ST2752UX

# ESS PCS Grid-Fault Ride-Through Test — CN→BR Corridor (LFP, Vertical)

**Verdict (first 100 words):** This SOP delivers a **14-day, IEC 62933-5-2-based LVRT/HVRT acceptance test** on Power Conversion System units arriving on the **CN→BR corridor**, with a documented **release-or-quarantine decision by D+12**. Equipment: **Sungrow PowerTitan2.0 PCS** (1500 V DC; -30 to 50 °C operating envelope) coupled with the **Sungrow ST2752UX** liquid-cooled LFP battery container (2752 kWh per unit, 1500 V DC). Horizon: D+0 arrival to D+14 client notification. Evidence-date: 2026-09-22. Limitation: HS code, ICMS, PIS/COFINS, and Siscomex duty rates are *not* hardcoded — they must be looked up at booking on the Brazil Siscomex portal. Model-specific torque, SOC window, and DC voltage limits below are taken from the OEM product page and must be re-confirmed against the *shipment-specific* Sungrow PowerTitan2.0 Service Manual revision attached at RFQ.

| Item | Value | Source / link |
| --- | --- | --- |
| SOP horizon | 14 calendar days (D+0 → D+14) | Internal TradVolt process design |
| Release decision date | D+12 | §4 timeline |
| Equipment family | Sungrow PowerTitan2.0 PCS + Sungrow ST2752UX LFP container | Sungrow PowerTitan2.0 product page · Sungrow ST2752UX product page |
| Standard for ride-through | IEC 62933-5-2 (BESS safety — grid-integrated systems) | IEC Webstore — cite designation IEC 62933-5-2 in full |
| Safety standard | UL 9540 (Energy Storage Systems and Equipment) | UL energy-storage certification scope |
| Sampling standard | ISO 2859-1:1999 (attribute sampling) | ISO 2859 search — cite ISO 2859-1:1999 in full |
| Customs lookup (BR) | Siscomex portal | Siscomex Portal Único · Siscomex NCM enquiry |
| RFQ | /rfq/ | TradVolt RFQ form |

[Request Quote — replies in 48h](/rfq/)

---

## 1. Scope and Applicability

This procedure applies to **Sungrow PowerTitan2.0 PCS** units and associated **Sungrow ST2752UX** liquid-cooled LFP battery containers received under TradVolt's China-to-Brazil (CN→BR) corridor service. Sungrow PowerTitan2.0 is published as a 2.5 MW / 5 MWh PCS-coupled BESS in a 20-ft container, 1500 V DC, operating -30 to 50 °C [Src: [Sungrow PowerTitan2.0 product page](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2)]. The ST2752UX battery container is published at 2752 kWh stored energy, 1500 V DC, operating -30 to 50 °C [Src: [Sungrow ST2752UX product page](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX)].

It governs the on-arrival grid-fault ride-through acceptance test required before site commissioning in Brazil.

The procedure references the following allow-listed standards and documents only. Any local deviation must be filed as an addendum referenced against the same source.

- IEC 62933-2-1 — Safety considerations for BESS, Part 2-1 [Src: IEC Webstore | URL: [https://webstore.iec.ch/](https://webstore.iec.ch/) — cite IEC 62933-2-1:2017/AMD1:2024 in full | accessed 2026-09-22]

- IEC 62933-5-2 — BESS safety requirements for grid-integrated systems [Src: IEC Webstore | URL: [https://webstore.iec.ch/](https://webstore.iec.ch/) — cite IEC 62933-5-2:2023 in full | accessed 2026-09-22]

- IEC 62477 — Power electronic converter systems safety [Src: IEC Webstore | URL: [https://webstore.iec.ch/](https://webstore.iec.ch/) — cite IEC 62477-1:2022/AMD1:2024 in full | accessed 2026-09-22]

- UL 9540 — Energy Storage Systems and Equipment [Src: UL Solutions | URL: [https://www.ul.com/services/energy-storage-system-testing-and-certification](https://www.ul.com/services/energy-storage-system-testing-and-certification) | accessed 2026-09-22]

- ISO 2859-1:1999 — Sampling procedures by attributes, AQL [Src: ISO | URL: [https://www.iso.org/search.html?q=2859](https://www.iso.org/search.html?q=2859) | accessed 2026-09-22]

- ICC Incoterms® 2020 [Src: ICC | URL: [https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) | accessed 2026-09-22]

- FIATA transport documents framework [Src: FIATA | URL: [https://fiata.org/](https://fiata.org/) | accessed 2026-09-22]

- Brazil Siscomex / Receita Federal import portal [Src: Receita Federal do Brasil | URL: [https://portalunico.siscomex.gov.br/portal/](https://portalunico.siscomex.gov.br/portal/) | accessed 2026-09-22]

- China GACC customs portal [Src: General Administration of Customs of China | URL: [http://english.customs.gov.cn/](http://english.customs.gov.cn/) | accessed 2026-09-22]

- Sungrow PowerTitan2.0 + ST2752UX OEM product pages (cited inline; shipment-specific Service Manual revision to be attached at RFQ stage) [Src: [PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2) · [ST2752UX](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX) | accessed 2026-09-22]

**Allow-list enforcement:** No third-party blog, distributor marketing sheet, or unverified forum post may be cited as a source for any factual claim in this SOP. The Sungrow PowerTitan2.0 / ST2752UX OEM Service Manual revision (with firmware version, DC torque values, SOC window, and 1500 V DC insulation limits) is *not* yet attached; it must be supplied per shipment at the RFQ stage and re-attached to this SOP as an addendum before Step 4 begins.

## 2. Step Sequence

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive shipment, verify Incoterms® 2020 term, count PCS units and serial numbers against packing list. | Logistics Coordinator | Packing list, Bill of Lading, Sungrow PowerTitan2.0 datasheet | Goods Receipt Note (GRN-CNB-###) | GRN signed, discrepancy = 0 unit; HS code field populated (see §6). |
| 2 | Validate customs clearance documents (FIATA FCR / multimodal waybill); confirm Siscomex DU-E registration on the Siscomex Portal Único [Src: Siscomex Portal Único]. | Customs Broker | Commercial Invoice, FIATA FCR, GACC export declaration | Despacho de Importação (DI) record | DI registered, tax IDs reconciled, no holds in Siscomex. |
| 3 | Stage Sungrow PowerTitan2.0 PCS units in the test bay; pull the shipment-specific OEM Service Manual revision and firmware version (to be attached at RFQ stage). | Workshop Supervisor | Sungrow PowerTitan2.0 Service Manual (per-shipment rev.), ST2752UX datasheet, GRN | Staging Sheet | Each serial cross-referenced to its OEM manual revision page. |
| 4 | Execute pre-test safety checklist: 1500 V DC isolation verification, AC isolation, lockout/tagout, PPE, earthing continuity, container spacing ≥ 15 cm per Sungrow PowerTitan2.0 published spec [Src: PowerTitan2.0]. | Safety Officer | UL 9540 isolation checklist, Sungrow Service Manual | Pre-Test Safety Sign-Off | All items checked; two-person sign-off recorded. |
| 5 | Configure grid simulator to the LVRT / HVRT profiles defined in IEC 62933-5-2 and the Sungrow PowerTitan2.0 ride-through envelope (1500 V DC, max AC output 2520 kW) [Src: PowerTitan2.0]. | Test Engineer | IEC 62933-5-2, Sungrow PowerTitan2.0 datasheet | Simulator Profile Sheet | Profile time-voltage curve exported and saved as PDF. |
| 6 | Execute LVRT and HVRT ride-through sequence at 1500 V DC; record DC bus behaviour, reactive current injection, and trip/hold status. | Test Engineer | Simulator Profile Sheet, Sungrow Service Manual | Raw oscilloscope / DSO traces (.csv) | Three consecutive successful runs per fault profile recorded. |
| 7 | Compile test report, attach traces, obtain OEM-spec sign-off block. | Quality Engineer | Raw traces, Sungrow PowerTitan2.0 datasheet | Grid-Fault Ride-Through Test Report (GF-RT-###) | Report signed by Test Engineer, Safety Officer, and QA Lead. |
| 8 | Apply ISO 2859-1:1999 attribute sampling on the lot; record AQL level used and lot size. | Quality Engineer | ISO 2859-1:1999, Lot Register | Sampling Inspection Record | Sample size, Ac/Re numbers, and disposition recorded. |
| 9 | Archive the compliance pack (GRN, DI, Sungrow Service Manual, report, sampling record) to the project folder. | Document Controller | All upstream outputs | Archived Compliance Pack (PDF + native) | Checksum recorded; folder path logged in ERP. |
| 10 | Release units for commissioning, or quarantine the lot if any step failed; raise NCR if quarantined. | Operations Manager | Compliance Pack, NCR form | Release Note or NCR-### | ERP status updated; client notified within 24 h. |

## 3. Document Checklist (literal filenames)

Each shipment handled under this SOP must produce the following artefacts with the filename convention shown. Filenames are literal; do not abbreviate.

| # | Filename | Owner | Format |
| --- | --- | --- | --- |
| D1 | GRN-CNB-{YYYYMMDD}-{Seq}.pdf | Logistics Coordinator | PDF (signed scan) |
| D2 | DI-{ShipmentID}.pdf | Customs Broker | PDF (Siscomex export) |
| D3 | FCR-{ShipmentID}.pdf | Customs Broker | PDF (FIATA multimodal) |
| D4 | Sungrow-PowerTitan2.0-ServiceManual-{Rev}_{FWver}.pdf | Workshop Supervisor | PDF (per-shipment OEM doc — datasheet to be attached at RFQ stage) |
| D5 | Sungrow-PowerTitan2.0-Datasheet.pdf | Workshop Supervisor | PDF (per-shipment OEM doc) |
| D6 | PreTest-Safety-{YYYYMMDD}.pdf | Safety Officer | PDF (signed) |
| D7 | Simulator-Profile-{ProfileID}.pdf | Test Engineer | PDF + .csv |
| D8 | GF-RT-Report-{Serial}.pdf | Quality Engineer | PDF + native |
| D9 | ISO2859-Sampling-{LotID}.xlsx | Quality Engineer | Excel |
| D10 | Compliance-Pack-{ShipmentID}.zip | Document Controller | ZIP (checksum logged) |

**Note on D4:** the Sungrow PowerTitan2.0 + ST2752UX Service Manual revision is *not yet attached*. It is to be supplied per shipment at the RFQ stage and added to the Compliance Pack before Step 4 begins. Until then, the public Sungrow product pages cited inline stand as the design-intent reference.

## 4. Timeline with Dependencies

| Day | Activity | Depends on | Slot |
| --- | --- | --- | --- |
| D+0 | Goods arrival at Santos / Itajaí bonded warehouse | — | Confirmed |
| D+1 to D+3 | Siscomex DI registration, Receita Federal release via Siscomex Portal Único [Src: Siscomex Portal Único] | D+0; valid FCR + commercial invoice | Indicative |
| D+3 to D+5 | Inland transfer to test bay, staging | D+1 customs release | Indicative |
| D+5 to D+6 | Pre-test safety checklist, simulator configuration (1500 V DC, -30 to 50 °C envelope) [Src: PowerTitan2.0] | Staging complete, Sungrow Service Manual on file | Confirmed |
| D+6 to D+8 | LVRT / HVRT execution, raw trace capture at 1500 V DC | Simulator configured, PCS ready | Confirmed |
| D+8 to D+10 | Report compilation, ISO 2859-1:1999 sampling, QA sign-off | Traces captured | Confirmed |
| D+10 to D+12 | Compliance pack archive, release decision | QA sign-off | Confirmed |
| D+12 to D+14 | Client notification, shipment to site | Release Note issued | Indicative |

**Slot legend:** "Confirmed" = internal TradVolt activity under our control. "Indicative" = depends on Brazilian customs clearance time or carrier schedule and is therefore variable.

## 5. Cost Slots

| Slot | Description | Basis |
| --- | --- | --- |
| Indicative | Test bay day-rate and engineering hours per PCS unit (Sungrow PowerTitan2.0) | Quoted per shipment on RFQ; not fixed in this SOP. |
| Indicative | Reactive current injection measurement instrumentation hire | Per shipment RFQ; depends on availability in BR. |
| UNCERTAIN | Brazilian import duty + ICMS + PIS/COFINS on PCS / spare parts | See §6 — values must be looked up at booking on Siscomex Portal Único [Src: Siscomex Portal Único]. |
| Indicative | FIATA documentation fees, Siscomex transaction fees | Per shipment RFQ. |

## 6. Duty / HS Code Block (REQUIRED — lookup at booking)

| Item | HS code (suggested) | Duty / tax rate | Official portal |
| --- | --- | --- | --- |
| PCS (Sungrow PowerTitan2.0) for BESS | 8504.40 — Static converters (verify at booking) | PENDING — lookup | Siscomex Portal Único · Siscomex NCM enquiry |
| LFP battery container (Sungrow ST2752UX) for ESS | 8507.60 — Lithium-ion accumulators (verify at booking) | PENDING — lookup | Siscomex (same portal) |
| Spare PCB assemblies / power electronics parts | 8504.90 or 8534.00 (verify at booking) | PENDING — lookup | Siscomex (same portal) |

**Disclaimer — duty and HS block:** HS classifications and applicable import duty, ICMS, PIS, COFINS, and anti-dumping rates are **not** hardcoded in this SOP. They must be looked up against the official Siscomex Portal Único / Receita Federal at the time of booking, against the exact OEM part description, technical sheet, and Mercosur Common Nomenclature (NCM) in force [Src: [Siscomex Portal Único](https://portalunico.siscomex.gov.br/portal/)]. Rates change periodically and depend on tariff regime (general, preferential Mercosur/China, or special Ex-Tarifário regime where applicable). TradVolt accepts no liability for rates applied without current official verification.

## 7. Acceptance Criteria

- PCS must remain grid-connected (no trip) for the LVRT and HVRT profiles specified in IEC 62933-5-2 and the Sungrow PowerTitan2.0 datasheet at 1500 V DC [Src: IEC 62933-5-2 via [IEC Webstore](https://webstore.iec.ch/) · [Sungrow PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2) | accessed 2026-09-22].

- Reactive current injection during fault must fall within the envelope published in the Sungrow PowerTitan2.0 datasheet (max AC output 2520 kW) [Src: [Sungrow PowerTitan2.0 product page](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2) | accessed 2026-09-22].

- Post-fault active power recovery time must be within the value declared in the Sungrow PowerTitan2.0 Service Manual revision in force for this shipment (datasheet to be attached at RFQ stage). Until the shipment-specific manual is attached, the public Sungrow product page stands as the design-intent reference [Src: [Sungrow PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2)].

- Lot sampling per ISO 2859-1:1999 must yield zero critical defects; AQL level chosen is recorded on the sampling sheet [Src: ISO 2859-1:1999 via [ISO search](https://www.iso.org/search.html?q=2859) | accessed 2026-09-22].

- Document pack completeness must satisfy the filename list in §3 with no missing artefacts.

## 8. Roles and Responsibilities

- **Logistics Coordinator** — owns receipt, GRN, and Incoterms® 2020 verification [Src: [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)].

- **Customs Broker** — owns Siscomex DI registration and FIATA document set [Src: [FIATA](https://fiata.org/) · [Siscomex Portal Único](https://portalunico.siscomex.gov.br/portal/)].

- **Workshop Supervisor** — owns staging and Sungrow PowerTitan2.0 + ST2752UX Service Manual custody.

- **Safety Officer** — owns pre-test safety sign-off per UL 9540 [Src: [UL energy-storage certification](https://www.ul.com/services/energy-storage-system-testing-and-certification)].

- **Test Engineer** — owns simulator configuration, execution, and raw capture per IEC 62933-5-2.

- **Quality Engineer** — owns report, ISO 2859-1:1999 sampling, and disposition.

- **Document Controller** — owns archiving, checksum, and ERP logging.

- **Operations Manager** — owns release / quarantine decision and client notification.

## 9. Exceptions and Non-Conformities

Any failure of the acceptance criteria in §7 results in a Non-Conformity Report (NCR). The lot is quarantined in the bonded area until root cause is filed and a corrective action is approved. Re-test is permitted only after firmware or hardware rework documented against the **Sungrow PowerTitan2.0 Service Manual revision in force for this shipment** (datasheet to be attached at RFQ stage; until then, public [Sungrow PowerTitan2.0 product page](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2) stands as the design-intent reference).

**Model assumptions (to confirm at RFQ stage):** (a) Sungrow PowerTitan2.0 firmware revision current at booking. (b) Sungrow ST2752UX SOC window for grid-fault testing — confirm in per-shipment Service Manual. (c) Sungrow PowerTitan2.0 DC bus torque values and 1500 V DC insulation test voltage — confirm in per-shipment Service Manual. (d) Reactive current envelope expressed as percentage of max AC output (2520 kW).

## 10. Call to Action

For shipments covered by this SOP, TradVolt issues a quotation within 48 hours of receiving the RFQ pack (commercial invoice draft, Sungrow PowerTitan2.0 datasheet, Sungrow ST2752UX datasheet, packing list).

[Request Quote — replies in 48h](/rfq/)

© TradVolt. Sources cited are allow-listed: IEC, UL Solutions, ISO, ICC Incoterms® 2020, FIATA, Receita Federal do Brasil / Siscomex Portal Único, GACC, and Sungrow-issued PowerTitan2.0 / ST2752UX product pages. Last reviewed 2026-09-22.
