# ESS Site Acceptance Test — Corridor CN→MA

Edition note: ISO 2859-1:1999 is withdrawn. ISO 2859-1:2026 is the published replacement. References to the 1999 edition below describe the stated sampling plan; agree the applicable edition and acceptance criteria before inspection.

**Verdict (first 100 words):** 9 steps, **~5 working days (D0 → D0+5)**, on the CN→MA corridor for vertical-solar BoS projects using either a CATL EnerC outdoor liquid-cooled LFP cabinet (372 kWh class) or a Huawei LUNA2000-200/290/215 series Smart String ESS (200 / 215 / 290 kWh classes). All numeric limits below are *model assumptions* reproduced from the published OEM datasheets; the controlling values at execution are the service-manual revision physically shipped with the unit. Citation reference date: **2026-09-22**. Output: signed SAT dossier `CNMA-SAT-FINAL.pdf` + release notice enabling Incoterms® 2020 DAP Tanger Med / Casablanca.

| Item | Value | Source / limitation |
| --- | --- | --- |
| Sequence | 9 steps | §3 below |
| Total SAT duration | ~5 working days (D0 → D0+5) | §5 timeline; assumes no NCR rework loop |
| Equipment family (option A) | CATL EnerC outdoor liquid-cooled LFP cabinet, 372 kWh class | CATL ESS; SKU + service-manual revision confirmed at RFQ (*model assumption*) |
| Equipment family (option B) | Huawei Smart String ESS LUNA2000-200 / LUNA2000-215 / LUNA2000-290 series, 200 / 215 / 290 kWh classes | Huawei FusionSolar; SKU + user-manual revision confirmed at RFQ (*model assumption*) |
| Location / corridor | CN → MA; release basis DAP Tanger Med / Casablanca | ICC Incoterms 2020 |
| Horizon / evidence date | Citation reference date: 2026-09-22; HS/duty lookups live at ADII, EU TARIC, USITC HTS | §6 + Evidence Pack |
| Main limitations | (i) HS sub-heading + MA duty rate PENDING — lookup at ADII before shipment; (ii) torque/clearance/insulation limits are CATL EnerC / Huawei LUNA2000 OEM-specific — confirm against shipped SKU manual rev; (iii) Customs brokerage not performed by Tradvolt | §2, §6, §8 |
| Output | Signed SAT dossier + release notice | Step 9 |

**Scope:** Standard Operating Procedure for the Site Acceptance Test (SAT) of Energy Storage System (ESS) equipment supplied under vertical-solar Balance of System (BoS) contracts on the China → Morocco import corridor.

*Page type: Process / SOP. Audience: EPC contractors, site engineers, QC inspectors, logistics coordinators.*

## 1. Purpose

This SOP defines the on-site acceptance sequence for ESS units arriving from CN suppliers into Moroccan sites, ensuring that every unit meets the contractual and OEM performance envelope before commissioning.

## 2. Equipment Family & Normative References

### 2.1 Equipment model — exact public product reference

This SOP is dimensioned against two public, commercially-marketed ESS cabinet families routinely shipped on the CN → MA corridor for vertical-solar BoS projects. Confirm the shipped SKU against its OEM service manual *revision* before executing §3 (limits below are SKU-specific; *model assumptions* until the RFQ pack returns the manual rev):

- **CATL EnerC outdoor liquid-cooled LFP cabinet** — 372 kWh class; modular 1P48S LFP cells per rack. OEM: Contemporary Amperex Technology Co., Ltd. Family landing: [https://www.catl.com/en/ess/](https://www.catl.com/en/ess/). Cabinet rating, clearances, torque and insulation values are reproduced from the CATL EnerC datasheet family; controlling service-manual revision is RFQ-pending (*model assumption*).

- **Huawei Smart String ESS — LUNA2000-200 / LUNA2000-215 / LUNA2000-290 series** — 200 kWh / 215 kWh / 290 kWh classes; modular LFP, designed for pairing with Huawei SUN2000 string inverters under FusionSolar. OEM: Huawei Digital Power. Family landing: [https://solar.huawei.com/en](https://solar.huawei.com/en). Cabinet rating, clearances, torque and insulation values are reproduced from the published LUNA2000 family documentation; controlling user-manual revision is RFQ-pending (*model assumption*).

### 2.2 OEM-defined SAT limits (SKU-specific — confirm against shipped manual revision)

Numeric limits used in §3 are reproduced from the OEM datasheets for the two families above and treated here as the project's working envelope. They are flagged as *model assumptions* until cross-checked against the service-manual revision physically shipped with the unit.

| Parameter (with units) | Value | Applies to | Source |
| --- | --- | --- | --- |
| M12 anchor torque | 65 N·m (≈ 47.9 lbf·ft) | Cabinet base anchoring (M12 grade 8.8 bolt) | CATL EnerC / Huawei LUNA2000 OEM service manual — merchant level, rev RFQ-pending (*model assumption*) |
| Side clearance | 1.0 m (≈ 3.28 ft) | Cabinet side-to-wall / side-to-cabinet | OEM service manual, rev RFQ-pending (*model assumption*) |
| Front clearance | 1.5 m (≈ 4.92 ft) | Door / HVAC service zone | OEM service manual, rev RFQ-pending (*model assumption*) |
| Rear clearance | 0.6 m (≈ 1.97 ft) | Rear airflow / DC busbar access | OEM service manual, rev RFQ-pending (*model assumption*) |
| Insulation resistance | ≥ 1 MΩ @ 500 V DC test voltage | DC bus to chassis, pre-energisation | OEM service manual, rev RFQ-pending (*model assumption*) |
| Ground bond | ≤ 0.1 Ω (milliohm-class bond) | Cabinet chassis to station PE | OEM service manual, rev RFQ-pending (*model assumption*) |
| Functional cycle | 0.5 C charge / 0.5 C discharge @ 25 °C ambient (± 2 °C) | Commissioning acceptance cycle | OEM service manual, rev RFQ-pending (*model assumption*) |
| SOC operating window (commissioning) | 5–95 % SOC (5 % lower / 95 % upper) | Functional run only | OEM service manual, rev RFQ-pending (*model assumption*) |
| DC operating voltage | per OEM datasheet for the shipped SKU (≤ 1500 V DC) | Energisation checks | OEM service manual, rev RFQ-pending (*model assumption*) |
| Sampling AQL (major / minor) | AQL 1.0 (major defects) / AQL 4.0 (minor defects), General Inspection Level II | Final lot inspection | ISO standards search — ISO 2859-1:1999; bot-walled, cite designation + edition in any RFQ pack |
| Indicative HS heading — Li-ion accumulator modules | 8507.60 (confirm at RFQ) | Customs declaration | ADII; EU TARIC; USITC HTS |
| Indicative HS heading — BoS enclosures / BMS cabinets / switchboards | 8537.10 (confirm at RFQ) | Customs declaration | ADII / EU TARIC / USITC HTS as above |
| Indicative HS heading — Power cables / busbars / connectors | 8544 (confirm at RFQ) | Customs declaration | ADII / EU TARIC / USITC HTS as above |

### 2.3 Normative References

- [IEC 62619:2022 ed2](https://webstore.iec.ch/en/publication/64073) — Secondary lithium cells and batteries for use in industrial applications, including stationary/ESS (TC 21/SC 21A). Cite full designation "IEC 62619:2022 ed2" in any RFQ pack.

- [IEC 62485-5:2020](https://webstore.iec.ch/en/publication/29086) — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium-ion batteries (TC 21). Cite full designation "IEC 62485-5:2020" in any RFQ pack.

- [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470) — Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82). Cite "IEC 62109-1:2010" in any RFQ pack.

- [UL 1973](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973) — Batteries for Use in Stationary and Motive Auxiliary Power Applications. Cite full designation + edition in any RFQ pack.

- [UL 9540A](https://www.ul.com/services/ul-9540a-test-method) — Standard for Test Method for Evaluating Thermal Runaway Fire Propagation in BESS. Cite full designation + edition in any RFQ pack.

- [UL 61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1) — Photovoltaic (PV) Module Safety Qualification, Part 1. Cite full designation + edition in any RFQ pack.

- [IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644) — Electric vehicle conductive charging system, Part 1: General requirements (TC 69).

- [UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) — UN 38.3 lithium-battery test provisions (UNECE, bot-walled; cite full designation + revision in any RFQ pack, never substitute a guessed deep URL).

- [ISO 2859-1:1999](https://www.iso.org/search.html?q=2859) — Sampling procedures by attributes, Part 1 (bot-walled; cite designation + title + year in any RFQ pack, never guess a deep /standard/NNNNN.html URL).

- [Regulation (EU) 2023/1542 (CELEX 32023R1542)](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) — EU Battery Regulation (BattReg): carbon-footprint / recycled-content / due-diligence declarations on CN-exported industrial batteries.

- [Incoterms® 2020 (ICC)](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) — DAP Tanger Med / Casablanca basis.

- [IATA Dangerous Goods Regulations (DGR)](https://www.iata.org/en/programs/cargo/dgr/) — lithium-battery air-freight segments if used.

- [IPPC ISPM 15](https://www.ippc.int/en/core-activities/standards-setting/ispms/) — Wood packaging compliance for CN crates.

- [FIATA](https://fiata.org/) — multimodal transport documents (MTWB / FBL / FCR).

- [Morocco ADII (Douane)](https://www.douane.gov.ma/) — official duty / VAT lookup.

- [CATL EnerC cabinet family](https://www.catl.com/en/ess/) — service-manual revision confirmed at RFQ (*model assumption*).

- [Huawei LUNA2000-200/215/290 series](https://solar.huawei.com/en) — user-manual revision confirmed at RFQ (*model assumption*).

## 3. Step Sequence

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Verify HS classification (indicative 8507.60 / 8537.10 / 8544) and prepare pre-arrival dossier (commercial invoice, packing list, OEM test report, UN 38.3 summary, IEC 62619:2022 ed2 attestation). | Logistics Coordinator | Commercial Invoice; Packing List; OEM Test Report | Pre-arrival file `CNMA-PREARRIVAL-v01.pdf` | HS sub-heading confirmed against ADII; cross-checked vs EU TARIC / USITC HTS; dossier attached to waybill. |
| 2 | Receive equipment at site, photograph crates, check tilt/shock indicators, verify IPPC ISPM 15 wood-packaging mark. | Site Receiving Officer | CMR / FIATA MTWB | Receiving report `CNMA-RCV-001.pdf` | All crates signed for; no indicator triggered without annotation; ISPM 15 mark present. |
| 3 | Stage at SAT bay; confirm clearances per OEM service manual for the shipped SKU — **1.0 m side, 1.5 m front, 0.6 m rear** (CATL EnerC / Huawei LUNA2000 family, working envelope; controlling values in the shipped manual). | Site Engineer | Site layout drawing; OEM service manual (CATL or Huawei) | Staging checklist `CNMA-STAGE-001.pdf` | Clearance tape placed; bay signed by Safety Officer. |
| 4 | Mechanical fit-check: levelling, anchor torque — M12 → **65 N·m (≈ 47.9 lbf·ft)**, per CATL EnerC / Huawei LUNA2000 OEM service manual (working envelope, *model assumption*), bolt grade, anti-seize application. | Mechanical Lead | OEM torque table; Anchor plan | Mechanical record `CNMA-MECH-001.pdf` | All critical fasteners torqued and recorded; torque wrench calibration in date. |
| 5 | Electrical: continuity, insulation resistance **≥ 1 MΩ @ 500 V DC**, ground bond **≤ 0.1 Ω** per IEC 62109-1:2010 + IEC 62485-5:2020 + OEM service manual for the shipped SKU. | Electrical Lead | IEC 62109-1:2010; IEC 62485-5:2020; OEM wiring diagram (CATL / Huawei) | Electrical record `CNMA-EL-001.pdf` | All three measurements within limits and countersigned by Site Engineer. |
| 6 | Functional run: charge/discharge cycle per OEM datasheet — **0.5 C charge / 0.5 C discharge @ 25 °C ambient (± 2 °C)**, within the OEM SOC window (typically **5–95 % SOC**); verify round-trip efficiency and BMS telemetry. | Commissioning Engineer | OEM datasheet (CATL / Huawei); Commissioning plan | Functional record `CNMA-FCT-001.pdf` | RTE ≥ OEM datasheet minimum; telemetry stream confirmed; SOC stayed inside the OEM-defined window. |
| 7 | Sampling inspection per ISO 2859-1:1999, General Inspection Level II, AQL 1.0 (major) / AQL 4.0 (minor). | QC Inspector | ISO 2859-1:1999 tables; Lot register | Sampling report `CNMA-AQL-001.pdf` | Accept / Reject decision recorded; lot disposition logged. |
| 8 | Punch-list and sign-off: raise NCRs, obtain customer signature on SAT protocol. | SAT Lead | SAT protocol; NCR log | Signed SAT `CNMA-SAT-FINAL.pdf` | Protocol signed by customer and SAT Lead; NCRs issued or closed. |
| 9 | Archive dossier and notify logistics chain that the unit is released for Incoterms® 2020 DAP Tanger Med / Casablanca transfer of risk and cost. | Document Controller | SAT dossier | Archive index entry | Dossier filed in project repository; release e-mail sent. |

## 4. Document Checklist (filenames — load to your project folder)

- `CNMA-PREARRIVAL-v01.pdf` — pre-arrival dossier

- `CNMA-RCV-001.pdf` — receiving report

- `CNMA-STAGE-001.pdf` — staging checklist

- `CNMA-MECH-001.pdf` — mechanical record

- `CNMA-EL-001.pdf` — electrical record

- `CNMA-FCT-001.pdf` — functional record

- `CNMA-AQL-001.pdf` — sampling report

- `CNMA-SAT-FINAL.pdf` — signed SAT protocol

- `CNMA-SAT-CHECKLIST.pdf` — printable one-page SAT checklist (generated from this SOP at submission)

Project folder location is set per project (no public download path on this page — request the printable checklist via the RFQ form).

## 5. Timeline & Dependencies

| Day | Activity | Depends on |
| --- | --- | --- |
| D-7 | Pre-arrival dossier completed | Supplier invoice, OEM test report, UN 38.3 + IEC 62619:2022 ed2 attestations |
| D-2 | Customs clearance (ADII) | HS sub-heading confirmed, CE/UL attestations, EU BattReg (Reg. 2023/1542) declarations if applicable |
| D0 | Receiving + crate inspection | Customs release, transport waybill, ISPM 15 mark visible |
| D0+1 | Staging + mechanical fit-check | D0 receiving clearance |
| D0+2 | Electrical + functional run | D0+1 mechanical clearance |
| D0+3 | Sampling inspection (ISO 2859-1:1999) | D0+2 functional results |
| D0+4 | Punch-list + sign-off | All records filed |
| D0+5 | Dossier archive + release notice | Signed SAT |

## 6. Duty / HS Code Block (REQUIRED)

*Equipment family:* Energy Storage System (lithium-ion) racks and BoS components (enclosures, busbars, BMS, cabling) for the CATL EnerC cabinet family or Huawei LUNA2000-200 / -215 / -290 series referenced in §2.1. Indicative HS heading range: **8507** (electric accumulators, sub-heading 8507.60 for Li-ion), **8537** (boards/panels for electric control, sub-heading 8537.10), or **8544** (insulated wire, cable, busbars), depending on how the unit is electrically presented at customs.

| Item | HS heading (indicative) | Applicable MA rate | Lookup portal |
| --- | --- | --- | --- |
| Lithium-ion accumulator modules / racks (CATL EnerC cabinet or Huawei LUNA2000 cabinet) | 8507.60 (indicative — confirm with customs broker at RFQ) | **PENDING — lookup at ADII** | ADII ; EU TARIC ; USITC HTS |
| BoS enclosures, switchboards, BMS cabinets | 8537.10 (indicative — confirm at RFQ) | **PENDING — lookup at ADII** | ADII ; EU TARIC ; USITC HTS |
| Power cables, busbars, connectors | 8544 (indicative — confirm at RFQ) | **PENDING — lookup at ADII** | ADII ; EU TARIC ; USITC HTS |

**Official portal:** Moroccan customs duties and VAT are governed by the *Administration des Douanes et Impôts Indirects (ADII)* — [https://www.douane.gov.ma/](https://www.douane.gov.ma/).

**Disclaimer:** Tradvolt is not a licensed customs broker. HS codes above are indicative placeholders only and must be confirmed against the ADII Tarif des Douanes and any applicable trade-agreement preferences (only where a currently applicable agreement and proof of origin support the preference) before shipment. Duty and VAT rates shown as **PENDING — lookup** and must not be quoted to end-clients until verified against the official ADII portal. For EU-export-relevant shipments, also reference [EU TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); for US reference, the [USITC HTS](https://hts.usitc.gov/).

## 7. Cost & Lead-time Slots

- Customs clearance fee — **indicative**; quote per shipment via Moroccan broker.

- Inland transport Tanger Med → site — **indicative**; depends on site location and crane day.

- SAT crew day-rate — **indicative**; per project BOQ.

- Spare-parts lead-time from CN — **UNCERTAIN**; subject to OEM MOQ and current sea-freight schedule.

- HS duty rate — **PENDING — lookup at ADII** (see §6).