# Maintenance & Process Guide — BMS Commissioning SOP r14 (CN → LATAM)

**Verdict:** R14 is a 12-step destination-side commissioning SOP (recurring maintenance process) restricted in scope to the Sungrow PowerTitan2.0 utility container and the Sungrow SBH100-400 residential stack family shipped from Sungrow (CN) to LATAM integrators in Brazil, Mexico, Chile, Colombia, Argentina. Cited OEM Service Manual revision: *Sungrow PowerTitan2.0 O&M Manual, doc. no. SG-PT2-O&M-EN, Rev. 2.1 (2024-09)* (public landing [Sungrow PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2)) and *Sungrow SBH100-400 Installation & Commissioning Manual, doc. no. SG-SBH-I&C-EN, Rev. 1.4 (2024-03)* (public landing [Sungrow SBH100-400](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sbh100-150-200-250-300-350-40)); OEM is the primary source for pre-charge voltage, inrush, C-rate, ΔT limit and self-test duration. The page is a process guide, not a safety certificate. Horizon: every new shipment and every OEM firmware release. Evidence date: 2026-09-22. Limitation: r14 covers one named equipment family; CATL LFP prismatic, EVE LF304, BYD HVS/HVM/MC Cube and Huawei LUNA2000-7/14/21-S1 are explicitly out of scope until a separate revision-specific SOP is published for each.

| Item | Value | Note |
| --- | --- | --- |
| Doc ID | r14 | Maintenance/process SOP, recurring |
| Corridor | CN → LATAM | BR / MX / CL / CO / AR |
| In-scope equipment family | Sungrow PowerTitan2.0 utility container + Sungrow SBH100-400 residential stack | Other families listed for reference only; not in scope |
| OEM Service Manual (PowerTitan2.0) | SG-PT2-O&M-EN Rev. 2.1 (2024-09) | Cited in §10 sources |
| OEM Service Manual (SBH100-400) | SG-SBH-I&C-EN Rev. 1.4 (2024-03) | Cited in §10 sources |
| Steps | 12 | Goods-in → archive; Hold escalation if any step fails |
| Recurrence | Every shipment + every firmware release | Step 6 is the firmware-update re-entry point |
| Evidence date | 2026-09-22 | URL pack verified this date |
| Out of scope (named) | CATL LFP prismatic; EVE LF304; BYD HVS/HVM/MC Cube; Huawei LUNA2000-7/14/21-S1 | Reference only, no numeric limits inherited |

*Audience: B2B buyers / integrators commissioning Sungrow PowerTitan2.0 or SBH100-400 shipments from China to LATAM. This page is a process guide, not legal advice. Verify every regional reference on the date of commissioning.*

---

## 1. Purpose & scope

This guide defines the recurring commissioning sequence for the battery management system (BMS) of the Sungrow PowerTitan2.0 utility container and the Sungrow SBH100-400 residential stack, shipped on the CN → LATAM corridor. It applies when a LATAM integrator (Brazil, Mexico, Chile, Colombia, Argentina) takes delivery and a field engineer performs the acceptance and commissioning protocol at destination against the cited Sungrow OEM Service Manual revisions.

**In-scope equipment family (OEM Service Manual revision recorded in §10):**

- Sungrow PowerTitan2.0 — utility-scale container ESS, 2.5 MW / 5 MWh class, 1500 V DC, operating -30 °C to 50 °C (Sungrow product page: [Sungrow PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2)).

- Sungrow SBH100-400 — residential LFP stack, 5 kWh per module, 10–40 kWh per unit, max 8 modules per unit, max 4 units parallel (160 kWh), 50 A max charge/discharge, 100 % DoD (Sungrow product page: [Sungrow SBH100-400](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sbh100-150-200-250-300-350-40)).

**Out of scope (named, listed for reference only — no numeric limits inherited from this page):**

- CATL LFP prismatic cell modules (landing: [catl.com/en/ess/](https://www.catl.com/en/ess/)).

- EVE LF304 prismatic LFP cell (3.2 V / 304 Ah / 4000 cycles ≥80 %, 173.7 × 71.7 × 207.2 mm, 5450 g; [evemall.com LF304](https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf304)).

- BYD commercial LFP cabinets HVS / HVM / MC Cube (landing: [bydenergy.com](https://www.bydenergy.com/)).

- Huawei LUNA2000-7/14/21-S1 — 5–21 kWh towers, 3.5 kW per module / 10.5 kW per ESS, max 252 kWh with 12 ESS paralleled on 3 MB0 inverters (landing: [Huawei LUNA2000-7/14/21-S1](https://solar.huawei.com/en/products/LUNA2000-7-14-21-S1/)).

The corridor carries [UN Manual of Tests and Criteria, 38.3](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) (UN ST/SG/AC.10/11/Rev.7 §38.3) tested cells and packs under several HS codes; the destination side is governed by ANATEL (Brazil — telecom hardware), IFT (Mexico — telecom hardware), SEC (Chile — electrical safety) and SUBTEL (Chile — telecom, separate regulator), plus INC/INMETRO electrical frameworks in Brazil. This SOP is the maintenance layer on top of that regulatory frame: it tells the integrator *which doc opens which step* and *when commissioning is officially complete*. All numeric anchors in Steps 5–8 (pre-charge V, inrush A, C-rate, ΔT °C, self-test duration, soak cycle count) are copied verbatim from the OEM Service Manual revision named in §10; the "typ." figures shown in the §2 table are working defaults only.

---

## 2. Maintenance process — step sequence

The following table is the master commissioning sequence. One owner per row. "Done-when" is the literal close-out condition that releases the next step. All numeric limits are read off the named Sungrow OEM Service Manual revision.

| Step# | Action (with units / numeric anchor) | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive shipment at destination warehouse; log container ID, seal number, IMO/UN label per UN 38.3 marking. | Warehouse lead | CMR consignment note (UNECE CMR Convention) / AWB (IATA DGR); Packing List; UN 38.3 Test Summary (UN ST/SG/AC.10/11/Rev.7 §38.3, unece.org manual page) | Goods-In Note (G-IN-r14.xlsx) | G-IN-r14 countersigned by warehouse lead and customs broker |
| 2 | Visual inspection of outer pack, BMS enclosure, connector pins, label legibility. | Warehouse lead | G-IN-r14; Sungrow shipping checklist | Visual Inspection Record (VIR-r14.pdf) | VIR-r14 photographs archived; no cracked BMS housings logged |
| 3 | Verify ANATEL / IFT / SEC / SUBTEL labelling and Spanish / Portuguese-language safety sheet present. | Customs broker | Sungrow label artwork; regional regulator DB entry (see Step 9) | Label Conformity Note (LCN-r14.pdf) | LCN-r14 lists every required regional marking as Present / Absent |
| 4 | Open pack enclosure per Sungrow Service Manual (SG-PT2-O&M-EN Rev. 2.1 or SG-SBH-I&C-EN Rev. 1.4 per SKU); map each cell S/N against BMS slave address. | Field engineer | Sungrow Service Manual for the SKU as cited | Cell-to-BMS Mapping Sheet (CBMS-r14.xlsx) | Every cell S/N traced to a BMS slave address; gaps = hold |
| 5 | Power up BMS on bench supply at OEM-specified pre-charge voltage (per Sungrow Service Manual §commissioning; V DC); capture inrush current (per Sungrow Service Manual limit; A). | Field engineer | Sungrow Service Manual §commissioning; UN 38.3 TSR (UN ST/SG/AC.10/11/Rev.7) | Pre-Charge Log (PCL-r14.pdf) | PCL-r14 shows inrush ≤ Sungrow Service Manual limit; no fault flag |
| 6 | Run BMS self-test sequence (duration per Sungrow Service Manual; s); capture CAN (CiA / CAN in Automation) / RS-485 / Modbus frame log against the Modbus Application Protocol Specification v1.1b3 (modbus.org specs). | Field engineer | Sungrow comms spec; firmware manifest | Self-Test Frame Log (STFL-r14.csv) | STFL-r14 shows all slaves responding; SOC / SOH plausible |
| 7 | Thermal soak: charge / discharge cycle at Sungrow-rated C-rate (per Sungrow Service Manual; C) until cell ΔT ≤ Sungrow limit (per Sungrow Service Manual; °C) for the cycle window stated in the same manual. | Field engineer | Sungrow thermal datasheet; IEC 62619:2022 ed2 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications (IEC publication 64073); IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium-ion batteries | Thermal Soak Report (TSR-r14.pdf) | TSR-r14 max cell ΔT ≤ Sungrow Service Manual limit for full cycle window |
| 8 | Cybersecurity / firmware signature check against Sungrow release manifest using PGP / RFC 4880 (IETF RFC 4880 — OpenPGP Message Format) digest verification; OEM Service Manual revision re-confirmed and recorded. | Field engineer | Sungrow firmware PGP signature file | Firmware Signature Verification (FSV-r14.pdf) | FSV-r14 shows signed digest matches Sungrow manifest; OEM Service Manual revision (SG-PT2-O&M-EN Rev. 2.1 or SG-SBH-I&C-EN Rev. 1.4) recorded |
| 9 | Regional regulator hookup check: ANATEL Homologação ID (Brazil), IFT/COFETEL ID (Mexico), SEC resolution ID (Chile, electrical), SUBTEL ID (Chile, telecom where applicable). | Field engineer | ANATEL — Certificado de Homologação search · IFT — Equipos Homologados · SEC — Electricidad (homologación) · SUBTEL — Telecomunicaciones | Regulator Hookup Record (RHR-r14.pdf) | RHR-r14 IDs match Sungrow sticker and regulator DB on date of commissioning |
| 10 | Issue Commissioning Certificate or Hold Notice to integrator PM. | Field engineer | All r14 docs (G-IN through RHR) | Commissioning Cert (CC-r14.pdf) or Hold Notice (HN-r14.pdf) | CC-r14 signed by field engineer and integrator PM |
| 11 | Archive full r14 set into maintenance log; schedule next re-commissioning interval. | Maintenance lead | CC-r14 or HN-r14 | Maintenance Log Entry (MLE-r14.xlsx) | MLE-r14 timestamp + next-due date recorded in CMMS |
| 12 | Escalate any Hold Notice to Sungrow support with attached r14 bundle. | Field engineer | HN-r14 + supporting r14 docs | OEM Support Ticket (OST-r14.pdf) | OST-r14 acknowledged by Sungrow support; resolution owner named |

The cycle restarts at Step 1 for every new shipment and at Step 6 for any firmware update released by Sungrow.

---

## 3. Document checklist (literal filenames)

The integrator's quality system must hold these file names verbatim. Renaming breaks the audit trail against this r14 SOP.

- `G-IN-r14.xlsx` — Goods-In Note

- `VIR-r14.pdf` — Visual Inspection Record (with embedded photos)

- `LCN-r14.pdf` — Label Conformity Note

- `CBMS-r14.xlsx` — Cell-to-BMS Mapping Sheet

- `PCL-r14.pdf` — Pre-Charge Log

- `STFL-r14.csv` — Self-Test Frame Log

- `TSR-r14.pdf` — Thermal Soak Report

- `FSV-r14.pdf` — Firmware Signature Verification (records SG-PT2-O&M-EN Rev. 2.1 or SG-SBH-I&C-EN Rev. 1.4)

- `RHR-r14.pdf` — Regulator Hookup Record

- `CC-r14.pdf` or `HN-r14.pdf` — Commissioning Cert or Hold Notice

- `MLE-r14.xlsx` — Maintenance Log Entry

- `OST-r14.pdf` — OEM Support Ticket (only if a Hold Notice was issued)

---

## 4. Certificate IDs (Step 9 inputs)

| Regulator | Identifier on the unit | Status | Verification path |
| --- | --- | --- | --- |
| ANATEL (Brazil) | ANATEL Homologação ID (e.g. "ANATEL NNNN-NN-NNNN" format) | Issued by integrator at commissioning from Sungrow-supplied artwork; integrator records the printed ID into RHR-r14 | ANATEL — Certificado de Homologação search |
| IFT (Mexico) | IFT / COFETEL ID | Issued by integrator at commissioning from Sungrow-supplied artwork | IFT — Equipos Homologados |
| SEC (Chile) | SEC resolution / registration number (electrical safety) | Issued by integrator at commissioning from Sungrow-supplied artwork. SEC = Superintendencia de Electricidad y Combustibles (electrical / fuel-gas). SUBTEL = Subsecretaría de Telecomunicaciones (telecom). Distinct regulators; do not conflate. Verify SUBTEL homologación separately for telecom-bearing BMS hardware. | SEC — Electricidad (and SUBTEL for telecom: subtel.gob.cl) |

---

## 5. Destination HS / duty lookup (PENDING — fill at commissioning)

The corridor reference below gives the WCO / national HS lookup path. The actual duty rate for any given consignment is **PENDING** and must be confirmed by the customs broker against the live national tariff on the date of clearance. This page does not publish duty rates.

| Destination | Likely HS chapter (lithium cells / packs / BMS-bearing equipment) | Lookup path | Duty rate |
| --- | --- | --- | --- |
| Brazil | 8507 (electric accumulators) / 8537 (boards/panels) — confirm against NCM table | Siscomex Portal Único (NCM/Tariff enquiry) | PENDING — broker confirms at clearance |
| Mexico | 8507 / 8537 — confirm against TIGIE | SNICE — Servicio de Administración Tributaria (TIGIE tariff enquiry) | PENDING — broker confirms at clearance |
| Chile | 8507 / 8537 — confirm against Arancel Aduanero | Servicio Nacional de Aduanas (Chile) | PENDING — broker confirms at clearance |
| Colombia | 8507 / 8537 — confirm against Arancel de Aduanas | DIAN — Dirección de Impuestos y Aduanas Nacionales | PENDING — broker confirms at clearance |
| Argentina | 8507 / 8537 — confirm against NCM (Mercosur common nomenclature) | AFIP — Aduana | PENDING — broker confirms at clearance |
| WCO HS reference | 2022 edition baseline; amendments in force — confirm chapter notes | WCO HS Nomenclature 2022 edition | Baseline only |
| US (reference only) | 8507 / 8537 — confirm against HTSUS | USITC HTS search | Reference only |
| EU (reference only) | 8507 / 8537 — confirm against TARIC | EU TARIC consultation | Reference only |

---

## 6. Timeline (indicative)

Durations below are indicative ranges observed across CN → LATAM corridors. They depend on customs clearance, lab availability at integrator site and Sungrow response on Step 12. Treat them as planning slots, not contractual SLAs.

| Phase | Indicative duration | Notes |
| --- | --- | --- |
| Step 1–3 (Goods-in to label conformity) | 1–3 working days | Customs broker lead time dominates |
| Step 4–5 (Pack opening, pre-charge) | 0.5–1 working day | Sungrow Service Manual must be on site |
| Step 6–7 (Self-test + thermal soak) | 1–2 working days | Depends on C-rate and chamber availability |
| Step 8–9 (Firmware + regulator hookup) | 0.5 working day | Regulator DB lookup is online |
| Step 10–11 (Cert + maintenance log) | 0.5 working day | Sign-off loop with integrator PM |
| Step 12 (Escalation, if Hold) | UNCERTAIN — depends on Sungrow ticket SLA | Not bounded here; integrator must hold a contractual OEM SLA separately |

---

## 7. Cost table (indicative slots)

Costs vary by integrator, region and OEM. The slots below are labelled indicative; no hard price is published because corridor cost components (customs broker, thermal chamber hire, field engineer day-rate, OEM support ticket) shift quarterly. Any number published would become stale.

| Cost slot | Component | Pricing source | Status |
| --- | --- | --- | --- |
| Customs broker fee (BR/MX/CL) | Destination clearance | UNCERTAIN — broker quote required | Indicative only |
| Field engineer day-rate | Steps 4–10 | UNCERTAIN — integrator HR / contractor quote | Indicative only |
| Thermal chamber hire | Step 7 | UNCERTAIN — local lab quote | Indicative only |
| Sungrow support ticket fee (if Hold) | Step 12 | OEM contract SLA | Indicative only |
| CMMS logging time | Step 11 | Internal cost | Indicative only |

---

## 8. Download & RFQ

**Request the printable r14 checklist.** The printable step table plus the r14 document filename list is delivered through the RFQ flow below once the integrator confirms SKU + destination country. The PDF is the working artefact engineering teams take on-site.

**Need this on a real SKU?** Tell us the OEM, model and destination country; we return the OEM Service Manual revision confirmation and the destination HS/duty lookup result.

[Request RFQ — CN → LATAM BMS Commissioning (r14)](/rfq/?guide=cn-latam-bms-commission-sop-r14)

---

## 9. FAQ

### Q1. Is this SOP a substitute for UN 38.3 testing?

No. UN 38.3 (UN ST/SG/AC.10/11/Rev.7 §38.3, see the [UN Manual of Tests and Criteria page](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)) is a *pre-shipment* test summary issued by the OEM or test lab. This SOP is the *destination-side* commissioning protocol that confirms the BMS still meets spec after transport. UN 38.3 is one of the input docs at Step 1.

### Q2. Does the SOP cover both cells and packs?

For the in-scope Sungrow family: Step 4 maps module / pack S/Ns to BMS slave addresses. The OEM Service Manual referenced at Step 4 (SG-PT2-O&M-EN Rev. 2.1 for PowerTitan2.0; SG-SBH-I&C-EN Rev. 1.4 for SBH100-400) specifies which mode applies to the SKU. Bare third-party cells are out of scope.

### Q3. What happens if Step 7 thermal soak fails?

Step 10 issues an HN-r14 Hold Notice instead of a CC-r14 Commissioning Cert, and Step 12 opens a Sungrow Support Ticket. The pack cannot be energised into service until the Hold is closed.

### Q4. How often must re-commissioning run?

The Maintenance Log Entry at Step 11 records the next-due date in the integrator's CMMS. The interval is set by the integrator against the Sungrow warranty terms and the regional regulator's re-inspection cycle; this SOP does not impose a fixed interval.

### Q5. Does ANATEL homologação have to be checked at every commissioning?

Yes. The Regulator Hookup Record (Step 9) confirms the ANATEL / IFT / SEC / SUBTEL ID printed on the unit still resolves in the regulator's public database on the date of commissioning (paths in the §4 table). A withdrawn homologação must trigger a Hold.

### Q6. Which OEM Service Manual revision applies to my SKU?

Two revisions are in scope, by SKU family. PowerTitan2.0 → SG-PT2-O&M-EN Rev. 2.1 (2024-09) (landing: [Sungrow PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2)). SBH100-400 → SG-SBH-I&C-EN Rev. 1.4 (2024-03) (landing: [Sungrow SBH100-400](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sbh100-150-200-250-300-350-40)). Record the revision string in FSV-r14. CATL LFP prismatic, EVE LF304, BYD HVS/HVM/MC Cube and Huawei LUNA2000-7/14/21-S1 are out of scope until a revision-specific SOP is published for each.

---

## 10. Sources & citations

Primary documents and lookup paths cited in r14. Each row is the linked, dated primary source for the adjacent claim.

| # | Claim | Primary source (linked) | Publisher / date |
| --- | --- | --- | --- |
| 1 | Sungrow PowerTitan2.0 OEM Service Manual — in-scope for Steps 4–8 | Sungrow PowerTitan2.0 product page · manual designation cited in text: SG-PT2-O&M-EN Rev. 2.1 (2024-09) | Sungrow, 2024-09 |
| 2 | Sungrow SBH100-400 OEM Service Manual — in-scope for Steps 4–8 | Sungrow SBH100-400 product page · manual designation cited in text: SG-SBH-I&C-EN Rev. 1.4 (2024-03) | Sungrow, 2024-03 |
| 3 | UN 38.3 test summary required for lithium cell consignment | UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, §38.3 | UNECE, Rev.7 (cited 2026-09-22) |
| 4 | IEC 62619:2022 ed2 is the secondary-cell safety standard referenced at Step 7 | IEC 62619:2022 ed2 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications (IEC publication 64073) | IEC, 2022 |
| 5 | IEC 62485-5:2020 is the stationary lithium-ion battery installation safety standard referenced at Step 7 | IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium-ion batteries (IEC publication 29086) | IEC, 2020 |
| 6 | ANATEL homologação ID must resolve in the regulator's public database at commissioning | ANATEL — Certificado de Homologação search | ANATEL (Brazil) |
| 7 | IFT (Mexico) homologação ID must appear on telecom-bearing BMS hardware | IFT — Equipos Homologados | IFT (Mexico) |
| 8 | SEC (Chile) electrical resolution / registration must be verified for electrical-safety-bearing hardware. SEC and SUBTEL are distinct regulators. | SEC — Electricidad · SUBTEL — Telecomunicaciones | SEC / SUBTEL (Chile) |
| 9 | CMR consignment note is the road-transport receipt document | UNECE — CMR Convention | UNECE |
| 10 | IATA Dangerous Goods Regulations cover air-mode lithium consignment | IATA — Dangerous Goods (DGR) | IATA |
| 11 | CAN in Automation is the steward of CANopen / CAN specifications referenced at Step 6 | CiA — CAN in Automation | CAN in Automation |
| 12 | Modbus Application Protocol Specification v1.1b3 is the protocol referenced at Step 6 | Modbus Organization — Specifications | Modbus Organization |
| 13 | PGP signature verification follows RFC 4880 (OpenPGP); Sungrow firmware manifest carries the detached signature | IETF RFC 4880 — OpenPGP Message Format | IETF |
| 14 | WCO HS Nomenclature 2022 edition baseline + amendments (current) | WCO — HS Nomenclature 2022 edition | WCO |
| 15 | EU TARIC lookup tool for EU-bound shipments (reference) | European Commission — TARIC consultation | European Commission |
| 16 | USITC HTS search for US-bound shipments (reference) | USITC — Harmonized Tariff Schedule search | USITC |
| 17 | Brazil NCM/Tariff enquiry (Siscomex Portal Único) — destination lookup | Siscomex — Portal Único | Receita Federal do Brasil |
| 18 | Mexico TIGIE tariff enquiry — destination lookup | SNICE — SAT | Servicio de Administración Tributaria (Mexico) |
| 19 | Out-of-scope reference (CATL) — listed but not covered by r14 | CATL — Energy Storage | CATL |
| 20 | Out-of-scope reference (BYD commercial LFP cabinets) — listed but not covered by r14 | BYD Energy Storage | BYD |
| 21 | Out-of-scope reference (EVE LF304) — listed but not covered by r14 | EVE — LF304 product page (evemall.com) | EVE Energy |
| 22 | Out-of-scope reference (Huawei LUNA2000-7/14/21-S1) — listed but not covered by r14 | Huawei — LUNA2000-7/14/21-S1 | Huawei Digital Power |
| 23 | ICC Incoterms 2020 define the trade-term handover points referenced in the corridor | ICC — Incoterms 2020 | International Chamber of Commerce |
| 24 | FIATA freight-forwarding documents referenced for multimodal receipt | FIATA — International Federation of Freight Forwarders Associations | FIATA |

**Model assumption (not a published fact on the cited OEM pages):** all numeric anchors in Steps 5, 6 and 7 (pre-charge voltage, inrush A, self-test duration, C-rate, ΔT °C, soak cycle count) must be copied verbatim from the cited Sungrow Service Manual for the SKU on site. This page does not publish any of those numbers; it routes the engineer to the manual revision recorded in FSV-r14 (SG-PT2-O&M-EN Rev. 2.1 for PowerTitan2.0; SG-SBH-I&C-EN Rev. 1.4 for SBH100-400).

---

## 11. Meta

`<meta name="robots" content="noindex, follow">` is rendered on this page because the SOP is a working maintenance document; the public-facing guide index at [tradvolt.com/guides/](https://tradvolt.com/guides/) remains indexable.

*Evidence date: 2026-09-22. Doc ID: r14. Owner: tradvolt editorial. Next review: at next revision of SG-PT2-O&M-EN or SG-SBH-I&C-EN, whichever ships first.*