---
title: "Origin documents — China to Botswana"
source_url: "https://tradvolt.com/en/guides/origin-certificate-form-a-rcep-application-sop-corridor-cn-bw-tradvolt/"
lang: "en"
description: "Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility."
generator: "tradvolt-tier-c-edge-md"
---

Tradvolt / SOP Library / Export Compliance / Origin Certificate

# Origin documents — China to Botswana

Standard Operating Procedure for solar Balance-of-System (BoS) equipment exported from China to Botswana. Equipment scope below is anchored to specific OEM models: K2 Systems N-Rack PV mounting, Huawei SUN2000-330KTL-H1 string inverter, LONGi Hi-MO 5m / Hi-MO 7 PV modules, Growatt WIT 50-100K-HU/AU C&I inverter.

Doc type: Process / SOP Corridor: CN → BW Vertical: Solar BoS Doc ID: SOP-EXP-OC-007 Revision: 2026-09-21 Owner: Tradvolt Export Compliance Desk Evidence date: 2026-09-22

Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility.

| Item family / OEM model | HS 6-digit | Preferential instrument | Why | Verification source |
| --- | --- | --- | --- | --- |
| K2 Systems N-Rack PV mounting (aluminium / galvanised steel) — k2-systems.com/en/product-solutions/k2-n-rack-system/ | 7610.90 / 7308.30 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | BURS working tariff |
| LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH) — longi.com/en/products/modules/hi-mo-5m/ | 8541.43 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | BURS working tariff |
| LONGi Hi-MO 7 (610 W, 22.60% eff.) — longi.com/en/products/modules/hi-mo-7/ | 8541.43 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Same — module family | BURS working tariff |
| JinkoSolar Tiger Neo 3.0 (670 W TOPCon, 24.8%) — jinkosolar.com/en/site/tigerneo_3 | 8541.43 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Same — module family | BURS working tariff |
| DC combiner box / MC4 connector / PV cable (DC, double-insulated) | 8537.10 / 8536.69 / 8544.60 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Non-inverter BoS | BURS working tariff |
| Huawei SUN2000-330KTL-H1 (330 kW, 1500 V DC, 8 MPPT) — solar.huawei.com/en/products/sun2000-330ktl-h1 | 8504.40 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. |
| Growatt WIT 50-100K-HU/AU (10 MPPTs × 32 A, IP66) — growatt.com/products/wit-50-100ktl3-h-a | 8504.40 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Same — inverter family | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. |
| Mixed shipment covering both families | Two certificates against split invoice lines | Split commercial invoice required | One cert cannot cover both regimes | Issuing body (CCPIT) |

## 1. Scope and applicability

Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. [k2-systems.com/en/product-solutions/k2-n-rack-system/](https://k2-systems.com/en/product-solutions/k2-n-rack-system/) [solar.huawei.com/en/products/sun2000-330ktl-h1](https://solar.huawei.com/en/products/sun2000-330ktl-h1) [longi.com/en/products/modules/hi-mo-5m/](https://www.longi.com/en/products/modules/hi-mo-5m/) [longi.com/en/products/modules/hi-mo-7/](https://www.longi.com/en/products/modules/hi-mo-7/) [jinkosolar.com/en/site/tigerneo_3](https://www.jinkosolar.com/en/site/tigerneo_3) [growatt.com/products/wit-50-100ktl3-h-a](https://www.growatt.com/products/wit-50-100ktl3-h-a)

Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility.

## Origin documents — China to Botswana

Use the matrix below before opening an application file. Note: ICC Incoterms 2020 governs delivery terms, not preferential origin — see [iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) for delivery-term codes only; origin eligibility is read from the tariff instruments below.

| If the BoS item is… | Default preferential instrument | Verification |
| --- | --- | --- |
| DC combiner box, DC isolator, PV cable, MC4 connector, mounting structure (K2 Systems N-Rack — aluminium / galvanized steel) | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | BURS working tariff |
| PV module — LONGi Hi-MO 5m / Hi-MO 7, JinkoSolar Tiger Neo 3.0 (HS 8541.43) | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | BURS working tariff; module HS sub-classification to be confirmed |
| String inverter or C&I inverter — Huawei SUN2000-330KTL-H1, Growatt WIT 50-100K-HU/AU (HS 8504.40) | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. |
| Mixed shipment covering both | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Split commercial invoice required |

## 3. Step sequence

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Tradvolt Export Compliance Desk | Buyer PO, OEM datasheet (e.g. Huawei SUN2000-330KTL-H1 product page, K2 Systems N-Rack page, LONGi Hi-MO 5m / Hi-MO 7 product pages) | HS classification memo (internal) | 6-digit HS recorded and regime selected in ERP record |
| 2 | Engage a licensed issuing body in China — China Council for the Promotion of International Trade (CCPIT) or a licensed customs broker | Tradvolt China Logistics Coordinator | Issued letter of authorization | Engagement letter with CCPIT / broker | Issuing body account opened on the CCPIT Online Origin System |
| 3 | Collect manufacturer raw-material and value-added declarations from every Chinese factory on the BOM | Chinese OEM factory / supplier | BOM, sub-component PO | Manufacturer declaration of origin (MDO) per sub-component | 100% of BOM lines have a signed MDO with factory stamp |
| 4 | Compile shipping and commercial documents: commercial invoice, packing list, Bill of Lading (or Air Waybill) | Tradvolt China Logistics Coordinator + freight forwarder | Sales contract, packing list | Final commercial invoice, packing list, B/L or AWB | All three documents show identical HS, value, consignee |
| 5 | Prepare product composition dossier (per-line parts list, country of origin, HS sub-classification, non-originating material value) | Tradvolt Export Compliance Desk | MDOs from Step 3, OEM datasheets (Huawei / LONGi / JinkoSolar / Growatt / K2 Systems product pages cited above) | Composition dossier PDF + Excel | Dossier matches B/L and invoice line-by-line |
| 6 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Issuing body (CCPIT or licensed broker) | Composition dossier, invoice, packing list | Application receipt with reference number | Application status reads "accepted" on the issuing body portal |
| 7 | Issuing body review, including on-site factory check on a sampling basis | Issuing body inspector + Chinese OEM factory | Application file | Review report, possible corrective actions | Review report signed without outstanding non-conformities |
| 8 | Pay issuance fee (RMB) to issuing body or broker | Tradvolt Finance AP | Issuing body invoice | Bank remittance + receipt | Receipt acknowledged in the issuing body portal |
| 9 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Issuing body → Tradvolt China Logistics Coordinator | Paid application file | 1 original + 1 electronic certificate per invoice | Original received; PDF saved to the shipment folder |
| 10 | Transmit originals by international courier (DHL / FedEx) and electronic copies to Botswana importer for customs clearance | Tradvolt China Logistics Coordinator | Original certificate + commercial documents | Courier tracking number shared with importer | Importer confirms receipt and lodging of certificate with BURS |

## 4. Document checklist

File-naming convention: `YYYYMMDD_CN-BW_[INVOICE#]_[DOCTYPE].pdf`. All files must be present before Step 6.

- `20260915_CN-BW_INV-2026-0915_CommercialInvoice.pdf` — final commercial invoice (English + Chinese bilingual; delivery term per ICC Incoterms 2020, see [iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/))

- `20260915_CN-BW_INV-2026-0915_PackingList.pdf` — packing list with line-level HS codes

- `20260915_CN-BW_INV-2026-0915_BoL.pdf` — Bill of Lading or Air Waybill

- `20260915_CN-BW_INV-2026-0915_BOM.xlsx` — Bill of Materials with HS sub-classification

- `20260915_CN-BW_INV-2026-0915_MDO-FactoryA.pdf` — Manufacturer Declaration of Origin, Factory A (stamped)

- `20260915_CN-BW_INV-2026-0915_MDO-FactoryB.pdf` — Manufacturer Declaration of Origin, Factory B (stamped)

- `20260915_CN-BW_INV-2026-0915_CompositionDossier.pdf` — product composition dossier

- `20260915_CN-BW_INV-2026-0915_OEMDatasheets.pdf` — OEM product pages / datasheets for each BoS item (Huawei SUN2000-330KTL-H1; LONGi Hi-MO 5m / Hi-MO 7; JinkoSolar Tiger Neo 3.0; K2 Systems N-Rack; Growatt WIT 50-100K-HU/AU)

- `20260915_CN-BW_INV-2026-0915_EngagementLetter.pdf` — CCPIT / broker engagement letter

- Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility.

## 5. Timeline and dependencies

| Day | Activity | Dependency |
| --- | --- | --- |
| D − 14 | Step 1: HS classification + regime decision | Buyer PO received |
| D − 12 | Step 2: Issuing body engaged, portal account active | Step 1 completed |
| D − 10 | Step 3: Manufacturer declarations collected from all BOM factories | Supplier cooperation |
| D − 7 | Step 4 + 5: Shipping docs finalised + composition dossier built | Steps 3, freight booking |
| D − 5 | Step 6: Online application filed with issuing body | Steps 4 + 5 |
| D − 5 → D − 2 | Step 7: Issuing body review + on-site check | Step 6 acceptance |
| D − 2 | Step 8: Fee paid | Issuing body invoice |
| D − 1 | Step 9: Original certificate collected | Step 8 cleared |
| D 0 | Step 10: Documents dispatched to Botswana importer, vessel departs | Steps 4 + 9 |

Total elapsed time from HS classification to certificate dispatch: **approximately 14 calendar days**, consistent with the JSON-LD `totalTime` field above.

## 6. HS code & duty block

**Disclaimer.** Duty rates and preferential concessions must be verified against the official Botswana Unified Revenue Service (BURS) working tariff at the time of each shipment. Tradvolt does not warrant rate accuracy. HS class to be re-checked per shipment

| BoS item (OEM model) | Indicative HS code (6-digit) | Preferential regime to test | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Official verification portal |
| --- | --- | --- | --- | --- | --- |
| K2 Systems N-Rack PV mounting — aluminium | 7610.90 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff at time of shipment | Not applicable | BURS working tariff |
| K2 Systems N-Rack PV mounting — galvanised steel | 7308.30 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Not applicable | BURS working tariff |
| DC combiner box | 8537.10 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Not applicable | BURS working tariff |
| PV cable (DC, double-insulated) | 8544.60 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Not applicable | BURS working tariff |
| MC4 connector pair | 8536.69 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Not applicable | BURS working tariff |
| LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH) / Hi-MO 7 (610 W) | 8541.43 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Not applicable | BURS working tariff |
| JinkoSolar Tiger Neo 3.0 (670 W TOPCon) | 8541.43 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Not applicable | BURS working tariff |
| Huawei SUN2000-330KTL-H1 (330 kW / 1500 V DC / 8 MPPT) | 8504.40 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. |
| Growatt WIT 50-100K-HU/AU (up to 10 MPPTs × 32 A, IP66) | 8504.40 | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | PENDING — lookup on BURS working tariff | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. |

For Chinese export-side customs declarations, the General Administration of Customs of China (GACC) maintains the computed HS reference at [www.customs.gov.cn](http://www.customs.gov.cn/). The WCO HS Nomenclature 2022 edition is the international reference for chapter / note interpretation: see [wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition).

## 7. Cost slots (all figures labeled)

| Cost line | Basis | Amount | Currency | Note |
| --- | --- | --- | --- | --- |
| Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Per certificate | PENDING — confirm with CCPIT before issuance | RMB | Varies with invoice value band; CCPIT schedule applies |
| Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility. | Per certificate | PENDING — confirm with CCPIT before issuance | RMB | Varies with issuing body schedule |
| On-site factory check (if triggered) | Per visit | PENDING — depends on inspector travel | RMB | Indicative only; sampling-based |
| Customs broker service fee (optional) | Per shipment | PENDING — per broker quotation | RMB / USD | Use only if CCPIT in-house filing is not used |
| International courier (DHL / FedEx) — original certs to BW | Per shipment | Indicative: 280–450 | USD | Express envelope, 1–3 business days |

All costs are pass-through and listed without markup; the buyer confirms in writing before issuance begins.

## 8. Risk and rejection modes

- Botswana is not an RCEP party. Confirm the required origin document and any preference with BURS before shipment; do not assume Form A eligibility.

- **Missing manufacturer stamp:** MDOs without an authorised factory stamp or signature are rejected at the dossier review stage.

- **Invoice / B/L mismatch:** any divergence in HS code, value, consignee, or country of origin wording between commercial invoice, B/L and the certificate triggers a re-issue and additional fee.

- **Late submission:** filing after vessel departure disqualifies the consignment for preferential treatment on that shipment.

- **Post-clearance audit by BURS:** Botswana Customs may verify origin up to three years post-importation; the dossier must be archived for at least **three (3) years** from the date of issuance. Documentary retention is the exporter's own obligation under BURS rules; Incoterms 2020 governs delivery terms only.

## 9. RFQ and document download

**Need this SOP executed on a real shipment?** Send the BOQ, OEM datasheet and delivery term (per ICC Incoterms 2020) to the Tradvolt Export Compliance Desk via the RFQ form. We will reply with a fixed-fee quotation within **48 hours**.   [Request Quote — replies in 48h](/rfq/) [Browse SOP Library](/guides/)
