---
title: "Pre-Shipment Inspection Checklist (AQL + UN38.3 Re-check) — CN→VN Corridor | Tradvolt EVSE"
source_url: "https://tradvolt.com/en/guides/pre-shipment-inspection-checklist-aql-un38-3-re-check-cnvn-corridor-tradvolt-evse/"
lang: "en"
description: "Standard operating procedure for pre-shipment inspection of EVSE equipment shipped from China to Vietnam, including AQL sampling per ISO 2859-1 and UN38.3 transport re-check."
generator: "tradvolt-tier-c-edge-md"
---

# Pre-Shipment Inspection Checklist (AQL + UN38.3 Re-check) — CN→VN Corridor

**Verdict:** Use this SOP for any EVSE shipment (AC/DC chargers and any lithium-ion auxiliary battery modules) moving from a Chinese OEM facility to a Vietnamese consignee when the buyer (or seller's appointed agent) is responsible for pre-shipment inspection. Expected cycle time: **5–8 working days** from PO date T0. Mandatory sampling: **ISO 2859-1 General Inspection Level II**, with AQL **1.0 for major defects** and AQL **2.5 for minor defects**; zero critical defects allowed. Equipment scope: **Sungrow AC011E-01 (AC, 11 kW)**, **Sungrow IDC30E (DC fast, 30 kW)**, **Huawei FusionCharge AC 7 kW** and **Huawei FusionCharge DC 60 kW** families, plus EVE Energy **LF105** cells used in charger buffer packs. Horizon: as of **2026-09-21**. Limitation: this page is process guidance only — it does not replace OEM warranty terms, customs broker rulings, or the underlying sales contract.

| Decision point | Outcome | Source |
| --- | --- | --- |
| Apply SOP? | YES — CN→VN EVSE lane, ≥80% production complete | This document §1, §3 |
| AQL plan | ISO 2859-1, Level II, AQL 1.0 major / 2.5 minor, 0 critical | ISO 2859-1:1999 Table II-A — https://www.iso.org/standard/1141.html |
| UN38.3 re-check | Required for any Li-ion cell; T1–T8 summary ≤ 12 months | UN Manual of Tests and Criteria, Rev.7 (2023), §38.3 — https://unece.org/transport/documents/2023/file/114050 |
| Insulation limit | ≥ 1 MΩ between live parts and exposed conductive parts | IEC 61851-1:2017, cl. 11.4.1 — https://webstore.iec.ch/publication/7328 |
| Carton drop test | 0.5 m, 1 corner / 3 edges / 6 faces | ISO 4180:2019, Annex A — https://www.iso.org/standard/72151.html (referenced by OEM packing spec) |

**Document type:** Process / Standard Operating Procedure | **Vertical:** EVSE (Electric Vehicle Supply Equipment) | **Trade lane:** China → Vietnam

This SOP defines the mandatory pre-shipment inspection (PSI) sequence for **Sungrow AC011E-01**, **Sungrow IDC30E**, **Huawei FusionCharge AC 7 kW** and **Huawei FusionCharge DC 60 kW** units, plus spare parts and **EVE Energy LF105** lithium-ion auxiliary battery modules, shipped from Chinese OEM facilities to Vietnamese import consignees. It consolidates statistical sampling per ISO 2859-1, the UN Manual of Tests and Criteria §38.3 transport re-check, and INCOTERMS® 2020 allocation of inspection responsibilities.

[Claim: Sungrow AC011E-01 and IDC30E are marketed 11 kW AC and 30 kW DC EVSE models | Src: Sungrow "AC011E-01" datasheet and "IDC30E" product page | URL: https://en.sungrowpower.com/ev-charging/ev-charger-detail/ac011e-01 and https://en.sungrowpower.com/ev-charging/ev-charger-detail/idc30e | accessed 2026-09-21] [Claim: Huawei FusionCharge AC 7 kW and DC 60 kW are public EVSE models | Src: Huawei Smart PV & EV Charging product page | URL: https://e.huawei.com/en/products/ev-charging | accessed 2026-09-21] [Claim: EVE Energy LF105 is a 3.2 V 105 Ah LFP prismatic cell used in stationary/buffer packs | Src: EVE LF105 product page | URL: https://www.eveenergy.com/en/product/lfp-105.html | accessed 2026-09-21] [Claim: IEC 61851-1 specifies ≥ 1 MΩ insulation resistance for EV conductive charging equipment | Src: IEC 61851-1:2017 cl. 11.4.1 | URL: https://webstore.iec.ch/publication/7328 | accessed 2026-09-21]

## 1. Scope and Applicability

- Applies to all EVSE shipments of **Sungrow AC011E-01** (≤ IEC 62196-2 Type 2, 11 kW AC) and **Sungrow IDC30E** (30 kW DC fast), and to **Huawei FusionCharge AC 7 kW** and **FusionCharge DC 60 kW** units exported from CN factories to VN destinations.

- Applies to lithium-ion battery modules integrated into or shipped alongside EVSE (e.g., **EVE Energy LF105** buffer packs, RFID backup cells).

- Not a substitute for in-process or during-production inspections; PSI occurs when production is ≥80% complete and ≥20% packed.

## 2. Regulatory and Documentary References

| Reference | Issuing body | Applicability | Document URL |
| --- | --- | --- | --- |
| IEC 61851-1:2017 | IEC | EV conductive charging system — general requirements | https://webstore.iec.ch/publication/7328 |
| IEC 62196-2 | IEC | Plugs, socket-outlets, vehicle connectors (Type 1/2) | https://webstore.iec.ch/publication/6316 |
| ISO 2859-1:1999 | ISO | Sampling procedures by attributes — AQL | https://www.iso.org/standard/1141.html |
| UN Manual of Tests and Criteria, Rev.7 (2023), §38.3 | UN | Lithium battery transport classification | https://unece.org/transport/documents/2023/file/114050 |
| ICC INCOTERMS® 2020 | ICC | Trade term allocation (FCA/FOB/CIF/DAP) | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ |
| FIATA Multimodal Transport Documents | FIATA | Through bills of lading for combined transport | https://fiata.org/transport-documents/ |
| Sungrow AC011E-01 / IDC30E — Installation & Commissioning Manual | Sungrow | OEM limits, torque, insulation | https://en.sungrowpower.com/ev-charging |
| Huawei FusionCharge AC/DC — User Manual | Huawei | OEM limits, SOC behaviour, commissioning | https://e.huawei.com/en/products/ev-charging |
| EVE LF105 — Product Specification | EVE Energy | Cell datasheet — voltage, SOC, UN38.3 reference | https://www.eveenergy.com/en/product/lfp-105.html |

[Claim: ISO 2859-1 General Inspection Level II is the default attribute sampling plan referenced in QA SOPs | Src: ISO 2859-1:1999 | URL: https://www.iso.org/standard/1141.html | accessed 2026-09-21] [Claim: UN38.3 tests T1–T8 are required for lithium cells shipped standalone or with equipment | Src: UN Manual of Tests and Criteria, Rev.7, §38.3 | URL: https://unece.org/transport/documents/2023/file/114050 | accessed 2026-09-21]

## 3. Step-Sequence Table

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Confirm PO, INCOTERMS® 2020 term, and inspection allocation (FCA/FOB → buyer; CIP/CIF/DAP → seller coordinates). | Tradvolt Order Manager | Purchase Order; Sales Contract | Inspection Allocation Note (IAN) | IAN signed by both parties; INCOTERMS code recorded. |
| 2 | Retrieve OEM datasheets and manuals: *Sungrow AC011E-01 / IDC30E Installation & Commissioning Manual* (rev. ≥2024) and *Huawei FusionCharge AC/DC User Manual* (rev. ≥2024); confirm CE/IEC/UL type-test reports ≤ 24 months old. | Tradvolt QA Lead | Supplier Document Pack (SDP) | Document Completeness Log | All CE/UL/IEC reports present, revision dates ≤ 24 months. |
| 3 | Verify UN38.3 test summary validity for any **EVE LF105** cells shipped (T1–T8 completed per UN §38.3; summary dated ≤ 12 months; chemistry = LFP; nominal 3.2 V, 105 Ah). | Tradvolt QA Lead | UN38.3 Test Summary; MSDS | UN38.3 Re-check Record | Test summary matches cell chemistry (LFP) and watt-hour rating (105 Ah × 3.2 V = 336 Wh/cell). |
| 4 | Generate AQL sampling plan per ISO 2859-1: **General Inspection Level II**, AQL **1.0 (major)**, AQL **2.5 (minor)**, critical = 0. | Third-party Inspector | Lot size; ISO 2859-1:1999 Table II-A | AQL Sampling Plan Sheet | Sample size and accept/reject numbers recorded; plan attached to lot. |
| 5 | Execute AQL visual + functional checks: cosmetic defects, label legibility, plug insertion force per IEC 62196-2, insulation resistance ≥ **1 MΩ** between live parts and exposed metal per IEC 61851-1:2017 cl. 11.4.1, ground continuity, Sungrow AC011E-01 torque on AC terminal block per OEM manual (typ. 1.2–1.5 N·m, confirm against current rev.), Huawei FusionCharge DC 60 kW auxiliary voltage check (24 V control circuit). | Third-party Inspector | AQL Sampling Plan Sheet; OEM Checklist | Inspection Worksheet | Defects within AQL limits; critical defects = 0. |
| 6 | Packaging verification: carton drop test **0.5 m**, 1 corner / 3 edges / 6 faces per ISO 4180:2019 Annex A; IP rating intact (Sungrow AC011E-01 = IP65, IDC30E = IP54 per datasheets; Huawei FusionCharge AC = IP54, DC = IP54 per datasheet), desiccant present, handling marks per ISO 780. | Third-party Inspector | Packaging Specification | Packaging Inspection Record | No carton rupture; marks legible per ISO 780 pictograms. |
| 7 | Confirm marking: CE mark, rating label, country of origin, HS code, UN3481 (lithium) where applicable, Vietnamese-language warning label. | Third-party Inspector | Label Artwork; OEM datasheet | Marking Compliance Form | All mandatory marks photographed and verified. |
| 8 | Photograph lot (≥ 10 photos: pallet overview, random cartons, opened sample, label close-up, serial numbers). | Third-party Inspector | Digital camera; Lot ID | PSI Photo Set | Photos uploaded to Tradvolt inspection portal within 4 h. |
| 9 | Issue Pre-Shipment Inspection Report (PSIR): pass / conditional pass / fail. | Tradvolt QA Lead | Inspection Worksheet; Photo Set | PSIR (PDF) | PSIR uploaded, shared with buyer within 24 h of inspection. |
| 10 | Coordinate customs docs: commercial invoice, packing list, certificate of origin (FORM E for VN under ACFTA), UN38.3 summary, MSDS, FIATA FBL if multimodal. | Tradvolt Logistics Coordinator | PSIR; PO; Shipping Mark file | Customs Dossier | All docs stamped by customs broker; shipment released for export. |

[Claim: Carton drop 0.5 m, 1 corner / 3 edges / 6 faces is the default packaged-unit drop sequence per ISO 4180 Annex A | Src: ISO 4180:2019 | URL: https://www.iso.org/standard/72151.html | accessed 2026-09-21 — model assumption unless the OEM packaging spec is more stringent] [Claim: Sungrow AC011E-01 ingress protection is IP65 and IDC30E is IP54 | Src: Sungrow product pages | URL: https://en.sungrowpower.com/ev-charging/ev-charger-detail/ac011e-01 and https://en.sungrowpower.com/ev-charging/ev-charger-detail/idc30e | accessed 2026-09-21] [Claim: Huawei FusionCharge AC and DC product family lists IP54 | Src: Huawei EV Charging product page | URL: https://e.huawei.com/en/products/ev-charging | accessed 2026-09-21 — model assumption, verify against the serial-number-specific datasheet]

## 4. Timeline with Dependencies

| Phase | Duration | Earliest start | Dependencies |
| --- | --- | --- | --- |
| Doc retrieval (Steps 1–3) | 1–2 working days | PO confirmed | Supplier SDP received |
| Lot ready signal | 0 days | Production ≥ 80 % | Supplier notification |
| Inspector mobilization (Step 4–8) | 1–3 working days | Lot ready + Docs OK | Travel/visa arrangements |
| Inspection & PSIR (Steps 5–9) | 1 working day on-site | Inspector on-site | AQL plan issued |
| Customs dossier (Step 10) | 1–2 working days | PSIR issued | Form E issued by competent authority in CN |
| Total elapsed | **5–8 working days** (indicative) | PO date T0 | All upstream clear |

Timings are indicative and depend on factory production schedule, public holidays in CN/VN, and inspector availability. Tradvolt does not warrant lead-times as contractual obligations.

## 5. Documentation Checklist (Literal Filenames)

- `PSIR_[PO#]_[Lot#]_v1.pdf` — Pre-Shipment Inspection Report

- `AQL_Plan_[PO#]_[LotSize].xlsx` — ISO 2859-1 sampling worksheet (Level II, AQL 1.0/2.5)

- `UN38.3_Summary_EVE_LF105.pdf` — Lithium cell test summary (T1–T8, ≤ 12 months old)

- `MSDS_EVE_LF105_[IssueDate].pdf` — Material Safety Data Sheet

- `FORM_E_[Invoice#].pdf` — ACFTA Certificate of Origin (issued by China Customs / COC authority)

- `CI_PL_[PO#].pdf` — Commercial Invoice + Packing List

- `OEM_Datasheet_Sungrow_AC011E-01_or_IDC30E_or_Huawei_FusionCharge.pdf` — EVSE type-test datasheet

- `PSI_Photos_[PO#]_[Date].zip` — Compressed photo evidence

- `Marking_Compliance_[PO#].pdf` — Label & marking compliance form

## 6. Duty / HS Code Reference

| Item | Likely HS heading | Duty rate (VN import) | Source portal |
| --- | --- | --- | --- |
| AC EVSE (Sungrow AC011E-01, Huawei FusionCharge AC 7 kW) | 8537.10 (control panels) or 8504.40 (static converters) — final classification depends on VN customs ruling | PENDING — lookup at Vietnam Customs Electronic Tariff | Vietnam General Department of Customs — https://www.customs.gov.vn/index.jsp?pageId=8 |
| DC fast charger (Sungrow IDC30E, Huawei FusionCharge DC 60 kW) | 8504.40 (static converters) — confirm at classification time | PENDING — lookup | Vietnam General Department of Customs — https://www.customs.gov.vn/index.jsp?pageId=8 |
| Lithium-ion cells (EVE LF105 standalone) | 8507.60 | PENDING — lookup | Vietnam General Department of Customs — https://www.customs.gov.vn/index.jsp?pageId=8 |

HS classifications above are indicative only. Final HS assignment, applicable MFN or ACFTA preferential rates, VAT, and any anti-dumping or safeguard duties must be verified by a qualified customs broker at the time of shipment against the official Vietnam Customs Electronic Tariff. Tradvolt does not provide legal or fiscal advice.

[Claim: Vietnam Customs Electronic Tariff is the official source for HS classification and duty rates | Src: Vietnam General Department of Customs, Electronic Tariff portal | URL: https://www.customs.gov.vn/index.jsp?pageId=8 | accessed 2026-09-21] [Claim: ACFTA preferential treatment requires FORM E certificate of origin issued by the exporting party's competent authority | Src: ASEAN-China Free Trade Area, Agreement on Trade in Goods | URL: https://asean.org/our-communities/economic-community/asean-china-free-trade-area/ | accessed 2026-09-21] [Claim: HTS heading 8507.60 covers lithium-ion accumulators (HS 2022 subheading) — used as an indicative cross-check for VN classification | Src: USITC HTS 2026, Chapter 85 | URL: https://hts.usitc.gov/?query=8507.60 | accessed 2026-09-21 — model assumption for VN mapping]

## 7. Cost Reference (Indicative)

| Cost line | Basis | Unit | Amount |
| --- | --- | --- | --- |
| Third-party inspector fee (CN on-site) | Day rate, 1 inspector | USD / day | indicative — 350–500 |
| UN38.3 summary review (per EVE LF105 shipment) | Per shipment | USD | indicative — 80–120 |
| Form E issuance (CN authority) | Per invoice | CNY | UNCERTAIN — depends on local chamber |
| AQL rework / re-inspection (if fail) | Per re-visit | USD | indicative — 250–400 |
| Vietnam import duty | Per HS code | % CIF | PENDING — lookup at Vietnam Customs |
| Vietnam VAT | standard rate | % (D + CIF) | UNCERTAIN — confirm at clearance |

All cost figures are indicative and not quotations. Tradvolt will issue binding pricing only against a written Request for Quote.

## 8. Out-of-Scope / Limitations

- This SOP does not replace container loading supervision (CLS) — a separate service is offered.

- Pre-shipment inspection does not absolve the supplier of contractual warranties per CISG or the underlying sales contract.

- AQL sampling carries an inherent producer's and consumer's risk per ISO 2859-1 Annex A.

- Insulation resistance limit (≥ 1 MΩ), carton drop height (0.5 m), and IP ratings referenced are derived from the cited IEC/ISO/OEM documents; if the OEM manual revision on file is stricter, the OEM value prevails — model assumption until the as-shipped revision is matched.

## 9. Call to Action

[Request Quote — replies in 48h](/rfq/)

Filenames and links above are operational references, not contractual offers. Confirmation of pricing, lead-times, and HS classification is provided only after Tradvolt issues a written quotation.
