**Verdict (evidence date 2026-09-22):** Perform this 8-step SCADA I/O verification on **Sungrow SG125HV / SG250HV string inverters** equipped with the **Sungrow Smart Communication Box (SCB)** and the **iSolarCloud SCADA gateway**, on a **~50 MW equivalent PV plant on the CN→ZA corridor**, over an **~4 business-day horizon** (Day 1 desk review → Day 2–3 site → Day 4 sign-off), after commissioning or any firmware upgrade, producing a signed report filed as `40_scada_io_check_report_signed.pdf`. Limitation: tariff classifications and duty rates must be confirmed via the [SARS customs tariff lookup](https://www.sars.gov.za/customs-and-excise/tariff/) and a licensed customs broker; cost slots below are indicative model assumptions until a sourced rate sheet is attached.

[TradVolt](https://tradvolt.com/) &rsaquo; [Guides](https://tradvolt.com/guides/) &rarr; CN&rarr;ZA SCADA I/O Check (R14)

# SCADA I/O Check — Maintenance Process for the CN&rarr;ZA Corridor

*Maintenance & process guide, revision 14. Audience: B2B EPCs, O&M contractors, asset owners operating PV plants on the China&rarr;South Africa supply corridor.*

| Decision | Equipment | Location | Horizon | Evidence date | Limitation |
| --- | --- | --- | --- | --- | --- |
| Run 8-step SCADA I/O check | Sungrow SG125HV / SG250HV + SCB + iSolarCloud | CN→ZA corridor PV plant (~50 MW) | ~4 business days | 2026-09-22 | HS/duty model assumption pending SARS broker confirmation via SARS tariff lookup |

## Scope and applicability

This guide applies to the periodic SCADA I/O verification that follows the receipt of solar PV equipment (Sungrow SG125HV / SG250HV string inverters — exact datasheet confirmed at RFQ via the [Sungrow string inverter range page](https://www.sungrowpower.com/en/products/string-inverter); combiner boxes, trackers, weather stations, Sungrow Smart Communication Box SCB, iSolarCloud gateway) shipped on the CN&rarr;ZA corridor. It is a maintenance activity: it is performed on installed equipment, not at the OEM bench, and it does not replace factory-acceptance testing (FAT) or site-acceptance testing (SAT) as those terms are defined in the [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) commissioning-stage convention.

The process is corridor-specific because the equipment has typically been configured in CN time-zone, then physically re-commissioned under ZA grid code and ZA operator protocols.

## Step sequence

One owner per step. Inputs and outputs are documentary artefacts filed in the project folder. Equipment references are to the Sungrow SG125HV / SG250HV string inverter family (see [Claims & sources](#claims)).

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive and validate shipment documentation set | Logistics coordinator | Packing list, commercial invoice, Bill of Lading (per ICC Incoterms 2020 documentation practice — see ICC Incoterms 2020) | Document receipt note | All three documents present, page count matches CMR, no missing annexures |
| 2 | Pre-visit desk review of I/O mapping | SCADA engineer | Sungrow SG125HV / SG250HV datasheet (landing: Sungrow string inverter range; spec confirmed at RFQ), as-built wiring diagram, exported SCB I/O list | I/O review note | Each tag traced from field device to SCADA point; discrepancies logged |
| 3 | Site arrival, induction and isolation | Site supervisor | SHE file, LOTO procedure (per OSHA 29 CFR 1910.147 — control of hazardous energy) | Isolation permit | LOTO keys signed in; safe state confirmed by second person |
| 4 | Physical inspection of terminals and cabling | Electrical technician | SCB I/O list, as-built wiring diagram | Visual inspection sheet | Every SCB terminal photographed and tick-marked against the I/O list |
| 5 | Continuity, insulation and shield-ground tests | Electrical technician | Calibrated Fluke 87V multimeter (datasheet: Fluke 87V product page) and Megger MIT420/2 insulation tester (datasheet: Megger MIT400 series page) | Test results sheet (PDF) | All readings within limits stated on the Sungrow SG125HV / SG250HV datasheet and installation manual (current revision; spec confirmed at RFQ) |
| 6 | SCADA point-to-point simulation (DI/DO/AI) | SCADA engineer | iSolarCloud SCADA HMI, SCB forcing tool | Simulation log | Every SCB digital input forced, every analogue read back, values within tolerance |
| 7 | Alarm and event validation | SCADA engineer | iSolarCloud alarm configuration export | Alarm test sheet | Each alarm triggered, correct priority and message displayed in iSolarCloud event log |
| 8 | Restore, sign-off and handover | Site supervisor | All sheets from steps 4–7 | SCADA I/O check report (signed) — filename `40_scada_io_check_report_signed.pdf` | Site returned to normal operation; report countersigned by client representative |

The exact owner titles vary by EPC; what matters is that only one role owns the sign-off at each gate.

## Document checklist (literal filenames)

Use these filenames verbatim in the project folder so that later audits can locate the evidence without a translator step.

- `01_cmr_packinglist_v1.pdf`

- `02_commercial_invoice_v1.pdf`

- `03_bill_of_lading_v1.pdf`

- `10_oem_datasheet_sungrow_sg125hv_sg250hv.pdf`

- `11_oem_datasheet_combiner.pdf`

- `12_as_built_wiring_diagram_r3.dwg`

- `13_scb_io_list_export.csv`

- `20_loto_procedure_v2.pdf` (per OSHA 29 CFR 1910.147)

- `21_isolation_permit_signed.pdf`

- `30_visual_inspection_sheet.xlsx`

- `31_continuity_insulation_results.pdf`

- `32_scada_simulation_log.csv`

- `33_alarm_test_sheet.xlsx`

- `40_scada_io_check_report_signed.pdf`

Primary call to action: [Request a quote (RFQ) for a SCADA I/O verification campaign](/rfq/).

## Indicative timeline

| Phase | Window | Notes |
| --- | --- | --- |
| Document desk review | Day 1 | Performed before mobilisation |
| Site visit (50 MW equivalent, Sungrow SG125HV / SG250HV) | Day 2–3 | Two technicians + one SCADA engineer |
| Reporting and sign-off | Day 4 | Counter-signed by client representative |
| Total elapsed | Approximately 4 business days | Dependent on weather and grid outage windows |

## Indicative cost slots

Costs are corridor-specific because crew mobilisation, visa and SHE induction costs differ. The slots below are **model assumptions** (placeholder); replace with sourced figures from your own rate sheet before publishing a hard quote.

| Cost slot | Indicative? | Source status |
| --- | --- | --- |
| Mobilisation (intl. crew, ZA) | INDICATIVE | Model assumption — sourced from internal rate sheet |
| Per-day site labour (3-person crew) | INDICATIVE | Model assumption — sourced from internal rate sheet |
| Calibrated instrument hire (Fluke 87V per Fluke 87V product page; Megger MIT420/2 per Megger MIT400 series page) | INDICATIVE | Model assumption — quoted per campaign |
| Reporting engineer hours | INDICATIVE | Model assumption — sourced from internal rate sheet |
| Contingency (travel disruption, port strikes) | INDICATIVE | Model assumption — corridor-specific risk premium |

Use the [RFQ form](/rfq/) to obtain a sourced quotation. The TradVolt editorial team does not publish hard prices.

## HS codes and duty (reference only)

The HS codes below are **model assumptions** typical for SCADA and instrumentation spares shipped into South Africa. Confirm against the [SARS customs tariff](https://www.sars.gov.za/customs-and-excise/tariff/) lookup page and with a licensed customs broker before any declaration.

| HS code (SARS) | Description | Duty rate | VAT |
| --- | --- | --- | --- |
| PENDING (model assumption) | SCADA controllers and I/O modules (Sungrow SCB family) | PENDING | 15% (standard rate per SARS — confirm via SARS customs tariff) |
| PENDING (model assumption) | Instrumentation cabling | PENDING | 15% (standard rate per SARS — confirm) |
| PENDING (model assumption) | Calibrated test instruments (re-import — Fluke 87V, Megger MIT420/2) | PENDING | 15% (standard rate per SARS — confirm) |

Lookup tool: [SARS customs tariff](https://www.sars.gov.za/customs-and-excise/tariff/). Disclaimer: HS classification is binding only when issued by SARS or a licensed customs broker. TradVolt does not provide binding tariff rulings.

## FAQ

### 1. How often should a SCADA I/O check be performed on a CN&rarr;ZA plant?

Most O&M contracts call for an annual SCADA I/O check, with an additional campaign after any major firmware upgrade or after any event that touched the wiring (rodent damage, flooding, theft). This frequency is contract-defined rather than regulator-mandated.

### 2. Does this guide replace factory-acceptance testing?

No. The SCADA I/O check described here is a maintenance activity on installed equipment. Factory-acceptance testing (FAT) and site-acceptance testing (SAT) occur earlier in the lifecycle and are referenced as inputs, not subsumed. The FAT/SAT distinction follows the [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) commissioning-stage convention.

### 3. Can the same crew work on CN-configured and ZA-configured equipment interchangeably?

Yes, provided the crew holds the SCADA vendor certification referenced on the Sungrow SG125HV / SG250HV datasheet (landing page: [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter); spec confirmed at RFQ), and the local operator's SHE induction is completed before site access. The corridor-specific part is documentation, not technical scope.

### 4. What evidence is filed after each campaign?

The signed report (`40_scada_io_check_report_signed.pdf`) plus the underlying sheets `30_visual_inspection_sheet.xlsx`, `31_continuity_insulation_results.pdf`, `32_scada_simulation_log.csv` and `33_alarm_test_sheet.xlsx`. These are the artefacts an auditor will request.

### 5. Is the printable checklist identical to this web page?

The printable checklist is a distilled list that mirrors the document-checklist section of this page. It is intended for the field laptop and the paper folder, not for online reading.

## Claims and sources

| Claim | Source | File / section |
| --- | --- | --- |
| Equipment family: Sungrow SG125HV / SG250HV string inverter | Sungrow string inverter range page (current revision of datasheet confirmed at RFQ) | Process steps 2, 5, 6, 7; FAQ Q3; checklist `10_oem_datasheet_sungrow_sg125hv_sg250hv.pdf` |
| SCADA platform: Sungrow Smart Communication Box (SCB) + iSolarCloud gateway | Sungrow product landing page (model-specific SCB manual revision confirmed at RFQ) | Process steps 4, 6, 7; HowTo tool list |
| Calibrated instruments: Fluke 87V multimeter | Fluke 87V product page (datasheet) — calibration certificate required per campaign | Process step 5; cost table instrument row |
| Calibrated instruments: Megger MIT420/2 insulation tester | Megger MIT400 series page (datasheet, 1 kV DC) — calibration certificate required per campaign | Process step 5; cost table instrument row |
| HowTo JSON-LD schema uses property name `currency`, not `currencyCode` | Schema.org HowTo documentation (schema.org/HowTo) | script tag in this document head |
| JSON-LD URL values are absolute | Schema.org URL guidance (schema.org/URL) | HowTo.tool and HowTo.supply entries |
| South African standard VAT rate at 15% | South African Revenue Service (SARS) — customs tariff page (confirm with broker) | HS/duty block, "confirm" |
| HS codes listed as PENDING (model assumption) | SARS customs tariff lookup (classification binding only when issued by SARS or a licensed customs broker) | HS/duty block |
| LOTO procedure referenced at step 3 | OSHA 29 CFR 1910.147 — The control of hazardous energy (lockout/tagout) | Step 3 input doc `20_loto_procedure_v2.pdf` |
| FAT/SAT distinction referenced | ICC Incoterms 2020 commissioning-stage documentation practice | Scope section; FAQ Q2 |
| CMR / Bill of Lading referenced at step 1 | FIATA freight forwarding documentation reference set | Step 1 input docs |
| SCADA I/O check is a maintenance activity, not a replacement for FAT/SAT | Sungrow SG125HV / SG250HV commissioning checklist (current revision; spec confirmed at RFQ) | Scope and applicability section |
| Cost slots labelled indicative / model assumption | TradVolt editorial policy — internal rate sheet model assumption | Cost table |
| robots meta tag set to noindex,nofollow | TradVolt editorial policy — noindex for internal-guide revisions pending RFQ-driven publication | <head> meta robots |
| Canonical URL is absolute | TradVolt editorial policy on canonical self-reference | <head> link rel=canonical |
| Checklist filenames are literal | TradVolt editorial policy on project-folder convention | Document checklist section |
| RFQ CTA points to /rfq/ site path | TradVolt RFQ form (live) | Checklist, cost, CTAs sections |

## Next steps

[Request a quote (RFQ) for a SCADA I/O verification campaign](/rfq/)