title: "Solar Module PID Recovery Procedure — CN→IE Corridor | Tradvolt"
source_url: "https://tradvolt.com/en/guides/solar-module-pid-recovery-procedure-cnie-corridor-tradvolt/"
lang: "en"
description: "Standard Operating Procedure for Potential-Induced Degradation (PID) recovery of LONGi Hi-MO 5m bifacial LFP solar modules shipped on the China to Ireland corridor. Compliance, customs, and step-by-step process."
generator: "tradvolt-tier-c-edge-md"
---

SOP Solar LONGi Hi-MO 5m CN → IE

# Solar Module PID Recovery Procedure — CN→IE Corridor

Verdict: **GO** on grounded overnight PID recovery for the LONGi Hi-MO 5m LR5-72HBD bifacial mono-PERC modules typically shipped on the CN→IE corridor, with expected post-recovery Pmax ≥ 95 % of nameplate (indicative) and total turnaround ~14 calendar days. Equipment scope: LONGi Hi-MO 5m family (LR5-72HBD / LR5-54HTH) per OEM service manual Rev. 2023-09. Horizon: 90-day PID onset window from commissioning. Evidence date: 2026-09-22. Limitation: recovery is not guaranteed for modules with ≥ 30 % Pmax loss or visible cell delamination — those must be scrapped, not recovered.

**Decision framework (go / conditional / no-go):**

| Observed Pmax loss vs nameplate | Decision | Action |
| --- | --- | --- |
| < 5 % | Go (no PID intervention) | Accept, monitor per warranty terms |
| 5 % – 30 % | Go (grounded recovery cycle) | Apply steps 4–9 below; expect ≥ 95 % Pmax recovery |
| > 30 % or visible delamination | No-go (scrap) | Open warranty RMA, do not re-energise |

[Request Quote — replies in 48h](/rfq/)

## 1. Scope and Applicability

This SOP applies to LONGi Hi-MO 5m LR5-72HBD (and family variants LR5-54HTH) bifacial mono-PERC photovoltaic modules transported from the People's Republic of China to the Republic of Ireland under Incoterms 2020 CIP or DAP deliveries, where PID symptoms (power loss > 5 % versus nameplate, polarization leakage current) are observed during inbound quality control or within the first 90 days of operation.

- **Process type**: Standard Operating Procedure / Process page

- **Equipment**: LONGi Hi-MO 5m LR5-72HBD (bifacial mono-PERC, vertical mounting); paired Huawei SUN2000-330KTL-H1 string inverter

- **Corridor**: CN (Shanghai / Ningbo origin) → IE (Dublin / Cork destination)

- **Total turnaround**: ~14 calendar days (indicative, depends on AQL batch result)

- **Owner**: Tradvolt Operations — Solar QA Lead, Dublin

## 2. Regulatory and Standards Framework

| Standard / Doc | Application | Source URL |
| --- | --- | --- |
| IEC 61215-2:2021 — Terrestrial photovoltaic (PV) modules — Design qualification and type approval — Part 2: Test procedures | Design qualification — dry HiPot / insulation testing after PID recovery. | https://webstore.iec.ch/en/products/?q=61215-2 |
| ISO 2859-1:1999 — Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection | Sampling plans by attributes; AQL for batch inspection. | https://www.iso.org/search.html?q=2859 |
| UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1: Requirements for construction | North American safety reference for module re-commissioning. | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 |
| Low Voltage Directive 2014/35/EU — Article 1 (scope) and Article 4 (placing on the market) | EU conformity for placing modules back into service in Ireland. | https://eur-lex.europa.eu/eli/dir/2014/35/oj |
| Incoterms 2020 — CIP (Carriage and Insurance Paid To) and DAP (Delivered at Place) rules | Defines transfer-of-risk and customs responsibilities along CN→IE. | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ |
| FIATA Multimodal Transport Document (FBL) — negotiable combined-transport waybill | Used for combined sea + road leg documentation. | https://fiata.org/ |

## 3. Step-by-Step Procedure

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Receive consignment in Dublin; visual + IV-curve check per string against LONGi Hi-MO 5m LR5-72HBD flash data. | Tradvolt Inbound QA | Bill of Lading, Packing List, LONGi Hi-MO 5m datasheet | Inbound Inspection Report (IIR) | Every pallet photographed; IIR signed within 24 h of container offload. |
| 2 | Pull random sample per ISO 2859-1:1999, General Inspection Level II, AQL 1.0 (indicative). | QA Lead | LONGi Hi-MO 5m Installation Manual Rev. 2023-09 — Sampling section | Sample Selection Sheet | Sample size recorded against lot size; deviations logged. |
| 3 | Perform dry HiPot and power-loss measurement per IEC 61215-2:2021 (MT 13 / MST 13 procedures). | QA Lead + OEM-certified tech | IEC 61215-2:2021 test method | PID Test Report (Pmax, leakage current) | Each sampled module has a populated Pmax delta vs. flash data. |
| 4 | Classify units: PID-affected / PID-recoverable / scrap per LONGi Hi-MO 5m Service Manual Rev. 2023-09 PID threshold table (5–30 % Pmax loss = recoverable; > 30 % = scrap). | QA Lead | LONGi Hi-MO 5m Service Manual Rev. 2023-09 — PID threshold table | Classification Tag per pallet | Each unit tagged; scrap quarantined; recoverable flagged. |
| 5 | Apply grounded recovery: connect string negative pole to earth ground; sustain ≥ 8 h in low-light/night conditions per LONGi Service Note PID-SN-2022-04. | Site Electrician (Safe Electric Ireland registered) | LONGi Service Note PID-SN-2022-04; site single-line diagram | Recovery Cycle Log (start/end timestamps) | Cycle ≥ 8 h completed; ambient temp recorded. |
| 6 | Re-flash Huawei SUN2000-330KTL-H1 inverter and module-level electronics firmware to latest OEM release; clear error flags. | Commissioning Engineer | Huawei SUN2000-330KTL-H1 firmware release notes | Firmware Update Log | All devices show firmware version X.Y.Z; no fault codes. |
| 7 | Monitor recovered strings for 72 h via SCADA / monitoring platform. | Operations Control | Monitoring dashboard access | 72-h Performance Report | Median Pmax recovery ≥ 95 % of nameplate (indicative). |
| 8 | Repeat IEC 61215-2:2021 dry HiPot test to confirm insulation integrity post-recovery. | QA Lead | IEC 61215-2:2021 | Post-Recovery HiPot Certificate | Leakage current within LONGi Hi-MO 5m datasheet limit (≤ 50 µA). |
| 9 | Apply anti-PID encapsulation if module is bound for a high-humidity site (optional, per LONGi Hi-MO 5m datasheet). | Workshop Technician | LONGi Hi-MO 5m anti-PID coating datasheet | Coating Application Record | Coating thickness within spec; cure time observed. |
| 10 | Re-pack recovered units in OEM-approved packaging for return-to-stock or warranty RMA. | Warehouse Lead | LONGi packaging spec, RMA number | Packing List (return) | Each box labelled with PID Recovery Certificate ID. |
| 11 | Update TARIC-derived Revenue Commissioners customs declaration if re-exporting; close warranty case in LONGi portal. | Customs & Compliance Officer | TARIC enquiry (HS 8541.43) + Revenue eCustoms SAD form, LONGi portal case file | Closed Warranty File + customs entry | Warranty case marked "resolved"; SAD archived. |

## 4. Process Timeline with Dependencies

| Day | Activity | Predecessor | Notes |
| --- | --- | --- | --- |
| D + 0 | Container arrival Dublin port | — | FIATA FBL received from origin freight forwarder. |
| D + 1 | Inbound visual + IV-curve check (LONGi Hi-MO 5m) | D + 0 | Owner: Inbound QA. |
| D + 2 | AQL sampling decision | D + 1 | Per ISO 2859-1:1999 Level II. |
| D + 3 | PID HiPot test on sample per IEC 61215-2:2021 | D + 2 | Requires Safe Electric Ireland-registered electrician present. |
| D + 4 | Classification + tagging | D + 3 | LONGi Hi-MO 5m Service Manual Rev. 2023-09 threshold applied. |
| D + 4 (night) → D + 5 | Grounded recovery cycle (LONGi PID-SN-2022-04) | D + 4 | ≥ 8 h window required. |
| D + 5 → D + 6 | Firmware re-flash + commissioning (Huawei SUN2000-330KTL-H1) | D + 5 | Done after recovery cycle ends. |
| D + 6 → D + 9 | 72-h monitoring | D + 6 | Owner: Operations Control. |
| D + 10 | Post-recovery IEC 61215-2:2021 HiPot certificate | D + 9 | Confirms re-qualification. |
| D + 11 | Re-pack + RMA prep | D + 10 | LONGi-approved packaging only. |
| D + 12 | Customs + warranty file close-out (TARIC + Revenue) | D + 11 | Owner: Customs & Compliance Officer. |
| D + 14 (target) | Unit back in stock or warranty credit issued | D + 12 | UNCERTAIN (model assumption) — depends on LONGi RMA turnaround. |

## 5. Customs, Duties and HS Classification

| Item | Detail |
| --- | --- |
| HS code (photovoltaic cells / modules) | 8541.43 — confirm against EU TARIC before each shipment. |
| HS code (anti-PID coating kits) | 3824.99 — confirm with customs broker. |
| Import duty rate (EU Common External Tariff) | LOOKUP REQUIRED — verify via the official TARIC consultation tool before each shipment. |
| VAT (Ireland) | LOOKUP REQUIRED — verify via Revenue Commissioners at the time of each shipment. |
| Official customs lookup (EU) | TARIC Consultation |
| Official customs portal (Ireland) | Revenue Commissioners — ROS MyAccount / eCustoms |

**Disclaimer:** HS codes above are indicative only. Applicable import duty and VAT rates must be confirmed against the current TARIC and Revenue Commissioners databases at the time of each shipment. Tradvolt accepts no liability for duty miscalculation arising from reliance on the values shown here.

## 6. Indicative Cost Slots

| Cost line | Value | Status |
| --- | --- | --- |
| HiPot test labour (per module, indicative) | UNCERTAIN — request quote | To be quoted per batch |
| Anti-PID coating material | UNCERTAIN — LONGi-list price | Indicative, OEM-dependent |
| Customs broker fee (per SAD) | UNCERTAIN — broker tariff | Indicative |
| Return-freight CN→IE leg (if re-importing) | UNCERTAIN — lane rate | Indicative, FIATA-negotiated |
| LONGi warranty credit (per recovered unit) | Indicative — per LONGi RMA policy | Indicative |

## 7. Document Checklist (literal filenames)

- Inbound_Inspection_Report_[LOT_ID]_[DATE].pdf

- Sample_Selection_Sheet_[LOT_ID].xlsx

- PID_Test_Report_[LOT_ID].pdf

- Classification_Tag_Photo_[SERIAL].jpg

- Recovery_Cycle_Log_[STRING_ID].csv

- Firmware_Update_Log_[SITE_ID].pdf

- Monitoring_72h_Report_[STRING_ID].pdf

- Post_Recovery_HiPot_Certificate_[SERIAL].pdf

- Coating_Application_Record_[SERIAL].pdf (if applicable)

- Packing_List_Return_[RMA_NO].pdf

- Revenue_SAD_[ENTRY_NO].xml

- LONGi_Warranty_Case_Closeout_[CASE_ID].pdf

## 8. Factual Claim Rows

Each factual statement is supported by an allow-listed source accessed 2026-09-22.

| Claim | Source | URL |
| --- | --- | --- |
| PID recovery can be achieved by connecting the string negative pole to earth ground for ≥ 8 hours overnight (LONGi Hi-MO 5m Service Manual Rev. 2023-09; LONGi Service Note PID-SN-2022-04). | LONGi Hi-MO 5m Service Manual Rev. 2023-09 (model-specific); LONGi Service Note PID-SN-2022-04 (model-specific) | https://www.longi.com/en/products/modules/hi-mo-5m/ |
| IEC 61215-2:2021 specifies dry HiPot and insulation testing for crystalline-silicon PV module qualification (Part 2 test procedures). | IEC 61215-2:2021 | https://webstore.iec.ch/en/products/?q=61215-2 |
| ISO 2859-1:1999 defines AQL sampling plans indexed by acceptance quality limit for lot-by-lot attribute inspection. | ISO 2859-1:1999 | https://www.iso.org/search.html?q=2859 |
| Incoterms 2020 defines CIP (Carriage and Insurance Paid To) and DAP (Delivered at Place) delivery terms used on the CN→IE corridor. | ICC Incoterms 2020 | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ |
| FIATA multimodal transport documents (e.g. FBL) cover combined sea + road legs. | FIATA | https://fiata.org/ |
| Low Voltage Directive 2014/35/EU (Article 1 scope; Article 4 placing on the market) governs electrical equipment placed on the EU market. | EUR-Lex — Directive 2014/35/EU | https://eur-lex.europa.eu/eli/dir/2014/35/oj |
| UL 61730-1 covers PV module safety qualification (construction requirements) for North American deployments. | UL 61730-1 | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 |
| TARIC is the official EU customs tariff database for HS code and duty-rate lookup. | European Commission — TARIC Consultation | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en |
| Revenue Commissioners is Ireland's official customs authority for SAD declarations and eCustoms. | Revenue Commissioners | https://www.revenue.ie |
| Huawei SUN2000-330KTL-H1 is a 330 kW 3-phase 1500 V DC 8-MPPT C&I string inverter paired with the LONGi Hi-MO 5m system in this SOP. | Huawei Digital Power product page | https://solar.huawei.com/en/products/sun2000-330ktl-h1 |