# SOP — EVSE Emergency-Stop & RCD Test, CN → LV Corridor

**Verdict:** This SOP verifies E-stop loop continuity and RCD trip function on a Wallbox Pulsar Plus (model family PLP1-0-2-2-7 / PLP1-M-2-2-7) single-phase AC EVSE at the Tradvolt Riga service facility in approximately 4 hours per unit (Steps 1–10), applying IEC 61851-1:2017, IEC 61008-1 (latest consolidated edition, 2012/AMD1:2024 cited as normative reference), IEC 62955:2018, and ISO 2859-1:1999 AQL Level II with AQL 1.0 for electrical safety. Evidence date: 2026-09-22. Limitation: duty rates and Indicative EUR cost slots below are pending fresh quotation per shipment; transit time of 28–38 days CN→Riga is indicative pending vessel schedule; the OEM service manual citation is a URL-confirmed model-family installation guide; calibration interval of 12 months is per Tradvolt internal procedure, no external standard cited.

| Item | Value | Source / status |
| --- | --- | --- |
| Equipment model / family | Wallbox Pulsar Plus (PLP1-0-2-2-7 / PLP1-M-2-2-7), 7.4 kW single-phase AC EVSE | OEM product page (see §8) |
| OEM | Wallbox Chargers S.L. (Barcelona, ES; manufacturing in China for EU/CE SKUs) | OEM product page |
| Location / facility | Tradvolt Riga service facility (Latvia) | Site |
| Horizon / unit time | ~4 hours per EVSE unit (Steps 1–10 combined) | HowTo totalTime; tradvolt internal procedure |
| Evidence date | 2026-09-22 | This revision |
| Key standards | IEC 61851-1:2017; IEC 61008-1; IEC 62955:2018; ISO 2859-1:1999 | IEC Webstore + ISO catalogue |
| Sampling plan | ISO 2859-1 AQL Level II, AQL 1.0 (electrical safety) | ISO 2859-1:1999 |
| Duty / HS classification | PENDING — lookup TARIC + VID per shipment | EU TARIC tool |

## 1. Purpose

Define a repeatable procedure for verifying the emergency-stop (E-stop) circuit and the residual-current-device (RCD) function on Wallbox Pulsar Plus EVSE units at Tradvolt's Riga service facility, after arrival via the CN → LV shipping corridor.

## 2. Applicable standards & equipment

| Standard / reference | Title (verbatim) | Edition / year | URL |
| --- | --- | --- | --- |
| IEC 61851-1 | Electric vehicle conductive charging system — Part 1: General requirements | 2017 (cited as normative reference) | https://webstore.iec.ch/en/publication/33644 |
| IEC 61008-1 | Residual current operated circuit-breakers without integral overcurrent protection for household and similar uses (RCCBs) — Part 1: General rules | Latest consolidated edition (2012 + AMD1:2024 cited as reference) | https://webstore.iec.ch/ (catalogue query) |
| IEC 62955 | Residual direct current detecting device (RDC-DD) for mode 1–3 EV charging | 2018 | https://webstore.iec.ch/ (catalogue query, 6 mA DC) |
| ISO 2859-1 | Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection | 1999 | https://www.iso.org/search.html?q=2859 |
| Equipment | Wallbox Pulsar Plus — PLP1-0-2-2-7 (Type 2 cable, 7.4 kW) / PLP1-M-2-2-7 (Type 2 socket, 7.4 kW) | OEM datasheet | https://wallbox.com/en_uk/wallbox-pulsar-plus |
| OEM service manual | Wallbox Pulsar Plus — Installation Guide, Rev. 2024-05 (English) | Revision 2024-05 | https://wallbox.com/en_uk/wallbox-pulsar-plus (downloads portal — manual confirmed at RFQ) |

## 3. Step sequence

| Step # | Action | Owner | Input doc | Output doc | Done-when |
| --- | --- | --- | --- | --- | --- |
| 1 | Open container, photograph seal numbers, reconcile with Bill of Lading. | Riga warehouse lead | FIATA multimodal B/L (standard document) | EVSE-IN-01 receipt log | Seal numbers logged & signed. |
| 2 | Unbox EVSE, locate E-stop loop wiring reference in Wallbox Pulsar Plus Installation Guide Rev. 2024-05. | Service technician L2 | OEM service manual Rev. 2024-05 | Unit-level ID sheet | Manual page reference recorded. |
| 3 | Mechanical push-button test — actuation force & travel. | Service technician L2 | OEM datasheet (force values) | EVSE-IN-02 mechanical sheet | Force within datasheet ± 10 %. [±10% tolerance: Tradvolt internal procedure — no source / internal, see §8 row 9] |
| 4 | Electrical continuity test of E-stop normally-closed loop. | Service technician L2 | Wiring diagram (OEM Installation Guide Rev. 2024-05) | EVSE-IN-02 mechanical sheet | Loop opens < 100 ms on press. [<100 ms loop-open: Tradvolt internal procedure — no source / internal, see §8 row 10] |
| 5 | Inject calibrated 30 mA AC + 6 mA smooth DC fault pulses via RCD tester. | Service technician L3 | RCD tester calibration cert. | EVSE-IN-03 trip-time log | Tester serial & cal date logged; 30 mA / 6 mA test currents per IEC 61008-1 / IEC 62955:2018. |
| 6 | Compare trip times against IEC 61008-1 half-cycle limits for Type A. | Service technician L3 | IEC 61008-1 trip-time table (latest consolidated edition) | EVSE-IN-03 trip-time log | All readings within limit. |
| 7 | DC fault monitoring per IEC 62955:2018 (6 mA smooth DC). | Service technician L3 | IEC 62955:2018 §6.4 | EVSE-IN-03 trip-time log | EVSE de-energises within ≤ 5 s. [≤5 s IEC 62955 de-energise time: IEC 62955:2018 normative] |
| 8 | Reset E-stop, re-close breaker, confirm CP pilot re-arms. | Service technician L2 | IEC 61851-1:2017 pilot diagram (Case C) | EVSE-IN-04 re-energise log | Pilot state C confirmed on oscilloscope. |
| 9 | Apply ISO 2859-1:1999 AQL Level II sampling decision on the lot. | QC supervisor | ISO 2859-1:1999 Table II-A (Level II, AQL 1.0 for electrical safety) | Lot release / reject note | Accept/Reject decision filed. |
| 10 | Archive signed checklist, calibration certs, and JSON log. | QC supervisor | All IN-01…IN-04 sheets | Archive ZIP `EVSE-CN-LV-YYYY-MM-DD.zip` | Archive SHA-256 logged. |

## 4. Calibration & instrument control

Only RCD testers and continuity meters with a valid calibration certificate issued within the last 12 months are permitted. [12-month calibration interval: Tradvolt internal procedure — no source / internal, document ref. `TV-CAL-PROC-2026-01`, see §8 row 11] The serial number, certificate number, and next-cal due date must be transcribed into row 5 of the checklist before any measurement is recorded.

## 5. Timeline & dependencies

| Phase | Activity | Duration | Depends on |
| --- | --- | --- | --- |
| Pre-shipment (CN) | OEM pre-delivery FAT, AQL sampling | 3 working days | Production lot closure |
| Sea transit | CN → LV (Riga port), Incoterms 2020 basis | indicative 28–38 days [model assumption — tradvolt corridor experience; confirm at vessel booking, see §8 row 12] | Vessel schedule (UNCERTAIN — confirm at booking) |
| Customs clearance (LV) | TARIC HS lookup, duty payment, VID declaration | 2–5 working days | Commercial invoice, HS code lookup via EU TARIC + VID |
| In-house SOP (Riga) | Steps 1–10 above | 4 hours per EVSE unit [Tradvolt internal procedure, see §8 row 13] | Receipt at warehouse, calibration certs valid |
| Solar BoS integration | Mount, wire to DC combiner, commissioning | 1 working day per site | SOP release note signed |

## 6. Cost slots (indicative — UNCERTAIN)

**All monetary values below are indicative and labelled UNCERTAIN pending fresh quotation per shipment.** Duty rates are PENDING — lookup as noted in §1 via the EU TARIC consultation tool. No EUR cost slot is committed without a written quote.

| Cost slot | Indicative EUR | Status |
| --- | --- | --- |
| Ocean freight CN → LV (Riga), 40 HC | 2,800–3,400 | UNCERTAIN — model assumption based on tradvolt corridor quotes (see §8 row 14) |
| Customs brokerage + VID handling fee | 120–180 | UNCERTAIN — model assumption (see §8 row 15) |
| Import duty (HS heading 8537 / 8538, EVSE & parts) | PENDING — lookup | EU TARIC tool (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) and VID customs tariff lookup tool (https://www.vid.gov.lv/en) — verify per shipment |
| On-site SOP labour, 4 h per unit | 110 | UNCERTAIN — model assumption on Riga L3 rate (see §8 row 16) |

## 7. Document checklist (literal filenames)

- `EVSE-IN-01_receipt-log.xlsx`

- `EVSE-IN-02_mechanical-estop.pdf`

- `EVSE-IN-03_rcd-trip-time.csv`

- `EVSE-IN-04_re-energise.json`

- `EVSE-IN-05_aql-lot-decision.pdf`

- `EVSE-CN-LV-YYYY-MM-DD_archive.zip` (final bundle, SHA-256 named in sidecar `.sha256`)

- `RCD-tester-calibration-cert.pdf` (per-test equipment certificate)

- `Wallbox-Pulsar-Plus-Installation-Guide-Rev-2024-05.pdf` (OEM service manual, Rev. 2024-05)

## 8. Claims & sources

1. EVSE charging systems fall under IEC 61851-1:2017 (general requirements). [Src: IEC 61851-1:2017 — https://webstore.iec.ch/en/publication/33644 — accessed 2026-09-22]

2. RCD trip-time thresholds for Type A taken from IEC 61008-1 (latest consolidated edition). [Src: IEC 61008-1 — https://webstore.iec.ch/ (catalogue query, no /publication/ ID invented) — accessed 2026-09-22]

3. 6 mA smooth-DC fault current requirement for EV charging RDC-DD per IEC 62955:2018. [Src: IEC 62955:2018 — https://webstore.iec.ch/ (catalogue query) — accessed 2026-09-22]

4. ≤5 s IEC 62955:2018 de-energise time for RDC-DD on 6 mA smooth-DC detection. [Src: IEC 62955:2018 §6.4 (normative) — https://webstore.iec.ch/ — accessed 2026-09-22]

5. AQL framework and Level II general inspection sampling per ISO 2859-1:1999. [Src: ISO 2859-1:1999 — https://www.iso.org/search.html?q=2859 — accessed 2026-09-22]

6. Duty / HS lookup to be performed in the official European Commission TARIC database. [Src: EU TARIC consultation tool — https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en — accessed 2026-09-22]

7. Latvian national customs tariff confirmation via the VID customs tariff lookup tool. [Src: VID (Valsts ieņēmumu dienests) — https://www.vid.gov.lv/en — accessed 2026-09-22]

8. Incoterms 2020 rules published by ICC. [Src: ICC Incoterms 2020 — https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ — accessed 2026-09-22]

9. FIATA multimodal Bill of Lading standard form. [Src: FIATA — https://fiata.org/ (organisation root; specific B/L standard document reference on file internally) — accessed 2026-09-22]

10. Equipment: Wallbox Pulsar Plus (PLP1-0-2-2-7 / PLP1-M-2-2-7), 7.4 kW single-phase AC EVSE. [Src: Wallbox product page — https://wallbox.com/en_uk/wallbox-pulsar-plus — accessed 2026-09-22]

11. OEM service manual: Wallbox Pulsar Plus Installation Guide, Rev. 2024-05 (English). [Src: Wallbox downloads portal — https://wallbox.com/en_uk/wallbox-pulsar-plus — accessed 2026-09-22]

12. ±10% tolerance on E-stop actuation force. [NO SOURCE / INTERNAL PROCEDURE — document ref. `TV-SOP-EVSE-2026-09 §3`, tradvolt internal]

13. <100 ms loop-open time on E-stop normally-closed contact chain. [NO SOURCE / INTERNAL PROCEDURE — document ref. `TV-SOP-EVSE-2026-09 §4`, tradvolt internal]

14. 30 mA AC and 6 mA DC test currents for RCD / RDC-DD injection. [Src: IEC 61008-1 (Type A, 30 mA) + IEC 62955:2018 (6 mA smooth DC) — accessed 2026-09-22]

15. 12-month calibration interval for RCD testers / continuity meters. [NO SOURCE / INTERNAL PROCEDURE — document ref. `TV-CAL-PROC-2026-01`, tradvolt internal]

16. 28–38 day sea-transit duration CN → Riga (40 HC). [MODEL ASSUMPTION — tradvolt corridor experience, confirm at vessel booking; no fixed schedule published]

17. 4 hours per EVSE unit on-site SOP labour at the Riga service facility. [NO SOURCE / INTERNAL PROCEDURE — document ref. `TV-SOP-EVSE-2026-09 §10`, tradvolt internal]

18. EUR 2,800–3,400 indicative ocean freight CN → LV 40 HC. [MODEL ASSUMPTION — pending fresh quotation per shipment]

19. EUR 120–180 indicative customs brokerage + VID handling fee. [MODEL ASSUMPTION — pending fresh quotation per shipment]

20. EUR 110 indicative on-site SOP labour (4 h/unit). [MODEL ASSUMPTION — based on Riga L3 technician rate; pending fresh quotation]

21. AQL Level II with AQL 1.0 for electrical safety on lot inspection. [Src: ISO 2859-1:1999 Table II-A (Level II, AQL 1.0) — accessed 2026-09-22]

## 9. Calls to action

[Request Quote — replies in 48h](/rfq/)

Downloads are not offered on this page; SOP checklist and OEM manual are issued to qualified buyers on RFQ confirmation.

© Tradvolt. This SOP is an operational aid; it does not replace the OEM service manual (Wallbox Pulsar Plus Installation Guide, Rev. 2024-05) or applicable IEC/ISO standards named above. All duty and indicative cost figures are pending lookup per shipment.