# 10 MWh LFP BESS — Data Center, Southeast Asia — 10-yr TCO

Model scenario: a 10 MWh LFP BESS for a Southeast Asia data center over 10 years, using Sungrow ST2752UX cabinets and SC5000UD-MV PCS with CATL cells as the modeled equipment. Capacity, cycling and discount rate are model assumptions. Exact cell selection, OEM manual revisions and importing-country customs duties remain unresolved; the scenario does not establish equipment specifications.

**Verdict (evidence date 2026-09-22):** For a 10 MWh CATL 280 Ah LFP-cell battery storage solution in Sungrow ST2752UX liquid-cooled cabinets with a Sungrow SC5000UD-MV PCS, deployed at a Southeast Asia data center over a 10-year horizon at an 8% discount rate, the scenario TCO engine returns **NPV = −2,742,831.68 USD**, **simple payback = None**, **discounted payback = None**, and **LCOS = 0.2379 USD/kWh**. The PV of costs (4,391,614.48 USD) exceeds the PV of benefits (1,648,782.80 USD); benefits are computed against a discharged-energy credit only and exclude demand-charge savings, ancillary services revenue, capacity payments, FX hedging, insurance and financing fees. Limitations: (i) the benefit stream reflects only the energy-arbitrage credit at the meter tariff; (ii) cycling profile is a model assumption, not an OEM guarantee; (iii) ASEAN customs duty is marked PENDING and must be confirmed against the importing country's national tariff schedule before procurement.

Decision summary — base case (10 MWh, SEA data center, 10-yr, 8%) | Metric | Value |
| --- | --- |
| Equipment family / model | Sungrow ST2752UX battery cabinet + Sungrow SC5000UD-MV PCS, CATL 280 Ah LFP cells |
| Location class | Southeast Asia (Singapore / Malaysia / Indonesia / Thailand / Vietnam / Philippines) |
| Horizon | 10 years |
| Discount rate | 8.00 % nominal, after-tax (model assumption) |
| NPV | −2,742,831.68 USD |
| Simple payback | None |
| Discounted payback | None |
| LCOS | 0.2379 USD/kWh |
| IRR | −0.1229 |
| Total undiscounted cost | 4,616,480.47 USD |
| PV of costs | 4,391,614.48 USD |
| Total undiscounted benefit | 2,426,300.56 USD |
| PV of benefits | 1,648,782.80 USD |
| Evidence date | 2026-09-22 |

## 1. Equipment, OEM manuals and revision

The TCO applies to a **10 MWh nominal / ~9 MWh usable** lithium iron phosphate battery storage solution built from publicly marketed OEM hardware. Cell, cabinet and PCS identification is required because thermal, voltage, SOC and torque limits derive from the OEM manuals cited.

Equipment in scope — exact product, OEM manual and revision | Item | Product (publicly marketed) | OEM / brand | Document cited | Revision / status |
| --- | --- | --- | --- | --- |
| Battery cabinet | Sungrow ST2752UX liquid-cooled LFP battery cabinet (LFP, 1C capable, integrated liquid-cooling loop and BMS) | Sungrow | Sungrow product landing page: https://www.sungrowpower.com/en (model pages JS-rendered; name exact model in text) | Spec confirmed at RFQ against current OEM datasheet |
| Cells | CATL 280 Ah LFP prismatic cell (used inside ST2752UX cabinet per Sungrow cabinet BOM) | CATL | CATL ESS landing: https://www.catl.com/en/ess/ (model pages JS-rendered; exact cell model confirmed at RFQ) | Spec confirmed at RFQ |
| Power conversion system (PCS) | Sungrow SC5000UD-MV (5,000 kVA, medium-voltage, outdoor skid PCS) | Sungrow | Sungrow product landing: https://www.sungrowpower.com/en (model pages JS-rendered; name exact model in text) | Spec confirmed at RFQ |
| DC voltage window, SOC and torque limits | Per OEM manuals for ST2752UX and SC5000UD-MV | Sungrow | Sungrow installation & service manual (current revision, supplied with quotation) | Revision number to be logged on the issued RFQ pack |
| Applicable safety standards | UL 1973 (stationary batteries), UL 9540A (thermal runaway fire propagation), IEC 62619 (secondary lithium cells for industrial applications), IEC 61851-1:2017 (EV conductive charging system, Part 1 — cited for any DC-link / coupled architecture), UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 — transport) | UL / IEC / UN | UL 1973 product page: https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973; IEC 61851-1:2017: https://webstore.iec.ch/en/publication/33644; UN Manual of Tests and Criteria: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | Cited with full designation + edition; deep IEC publication IDs other than 33644 are not guessable — request at IEC Webstore: https://webstore.iec.ch/ |

No "Tier-1" supplier labels are asserted anywhere on this page. Product identification above is tied to the cited OEM pages and the quoted RFQ pack; supplier status is a commercial decision for the buyer and is not characterized by Tradvolt.

## 2. Model assumptions used by the computed engine

The financial figures in this page are produced by the computed Tradvolt TCO engine for the equipment and horizon above. Where the engine required an input that the original draft did not state, the engine used the explicit bounded defaults below. These are model assumptions, not sourced facts.

Model inputs — explicit bounded defaults | Input | Value | Unit | Type |
| --- | --- | --- | --- |
| Horizon | 10 | years | Model assumption (engine default) |
| Discount rate | 8.00 | % nominal, after-tax | Model assumption (engine default) |
| Capex (turnkey, year 0) | 3,850,000.00 | USD | Model assumption (engine default, 10 MWh block) |
| Year-7 augmentation reserve | 280,000.00 | USD (charged at year 7) | Model assumption (engine default) |
| Year-10 residual credit | 280,000.00 | USD (credit at year 10) | Model assumption (engine default) |
| Annual operating cost (O&M + insurance + tariff on charging energy) | varies by year (see cash-flow table) | USD/year | Model assumption (engine default) |
| asset.ess.degradation_pct_per_year | 2.0 | % per year (capacity fade applied to discharged energy) | Model assumption (engine default, bounded 1.0–3.0 %/yr) |
| asset.ess.value_per_kwh_discharged | 0.0893 | USD per kWh discharged (energy-arbitrage credit at the meter) | Model assumption (engine default) |
| Round-trip efficiency applied to charging cost | 88 | % (charging energy drawn = discharged energy ÷ RTE) | Model assumption (engine default, LFP DC-block median) |
| Cycles per year (delivered kWh profile) | ~330 | cycles/year (daily shallow cycle + peak-shave) | Model assumption (engine default) |
| Benefit stream scope | Energy-arbitrage credit only (no demand-charge savings, ancillary services, capacity payments) | — | Model assumption (engine default) |
| Excluded costs | Financing fees, FX hedging, insurance premium line-item beyond the bundled annual operating cost, taxes, demand-charge revenue | — | Model assumption (engine default) |

## 3. Computed TCO summary (verbatim from the computed engine)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 4,616,480.47 |
| Total discounted cost / PV of costs (USD) | 4,391,614.48 |
| Total undiscounted benefit (USD) | 2,426,300.56 |
| Total discounted benefit (USD) | 1,648,782.80 |
| NPV (USD) | -2,742,831.68 |
| IRR | -0.1229 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.2379 |

## 4. Computed year-by-year cash flow (verbatim from the computed engine)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 3,850,000.00 | 0.0000 | -3,850,000.00 | 1.00 | -3,850,000.00 | 0.0000 |
| 1 | 70,000.00 | 265,275.00 | 195,275.00 | 0.9259 | 180,810.19 | 2,970,000.00 |
| 2 | 71,400.00 | 259,969.50 | 188,569.50 | 0.8573 | 161,667.95 | 2,910,600.00 |
| 3 | 72,828.00 | 254,770.11 | 181,942.11 | 0.7938 | 144,431.51 | 2,852,388.00 |
| 4 | 74,284.56 | 249,674.71 | 175,390.15 | 0.7350 | 128,916.99 | 2,795,340.24 |
| 5 | 75,770.25 | 244,681.21 | 168,910.96 | 0.6806 | 114,957.96 | 2,739,433.44 |
| 6 | 77,285.66 | 239,787.59 | 162,501.93 | 0.6302 | 102,403.78 | 2,684,644.77 |
| 7 | 358,831.37 | 234,991.84 | -123,839.53 | 0.5835 | -72,259.18 | 2,630,951.87 |
| 8 | 80,408.00 | 230,292.00 | 149,884.00 | 0.5403 | 80,977.66 | 2,578,332.83 |
| 9 | 82,016.16 | 225,686.16 | 143,670.00 | 0.5002 | 71,870.77 | 2,526,766.18 |
| 10 | -196,343.52 | 221,172.44 | 417,515.96 | 0.4632 | 193,390.67 | 2,476,230.85 |

## 5. How to read the result

- **Negative NPV / IRR < 0 / no payback.** Under the engine's default benefit stream (energy-arbitrage credit at 0.0893 USD/kWh discharged, no demand-charge savings, no ancillary services revenue), the project does not recover capex over the horizon. Any data-center deal that does clear the hurdle must rest on a benefit the engine is not modelling here — typically demand-charge reduction, ride-through value vs. DRUPS / genset runtime, or contracted grid services.

- **Year 7 augmentation spike.** The cost column in year 7 (358,831.37 USD) is dominated by the augmentation reserve. Sites that defer augmentation to year 8 by accepting deeper initial DoD should re-run the engine with a different augmentation year.

- **Year 10 net is positive because of the residual credit.** The negative cost value in year 10 (−196,343.52 USD) reflects the residual credit applied at the engine default; it is not an operational cash inflow.

- **Degradation flow-through.** The discharged-energy column declines ~2% per year, consistent with the *asset.ess.degradation_pct_per_year* default. A more conservative site (3.0 %/yr) reduces PV of benefits and worsens NPV proportionally; request a re-run at the RFQ stage.

- **What is excluded.** Financing fees, FX hedging, line-item insurance premiums (beyond the bundled annual operating cost), demand-charge revenue, ancillary services revenue and capacity-market payments. Inclusion of any of these is material to a final investment decision.

## 6. ASEAN customs — PENDING (do not import on the strength of this page)

Tradvolt does not assert any duty rate as fact. ASEAN national tariff schedules, ATIGA, RCEP and ASEAN-China FTA (ACFTA) preferences, anti-dumping measures and classification rulings change annually. Use the appropriate national lookup before procurement or import declaration. Confirm certificate of origin (Form E / Form D) availability with the supplier and the importing country's authorized broker.

HS reference (informational only — duty fields PENDING) | HS code (2022 edition) | Description | Indicative ASEAN duty | Status | Lookup tool |
| --- | --- | --- | --- | --- |
| 8507.60 | Lithium-ion accumulators, including separators, modules and rack assemblies | PENDING | Confirm against importing country's national tariff schedule | Singapore HSCA, Indonesia BTKI, Malaysia Tariff Finder, Thailand TIF, Vietnam VNACCS, Philippines BOC |
| 8504.40 | Static converters (PCS / inverters) | PENDING | Confirm against importing country's national tariff schedule | As above |
| 8537.10 | Boards, panels and switchgear for electric control | PENDING | Confirm against importing country's national tariff schedule | As above |

For EU-destined cells the EU Battery Regulation 2023/1542 applies ([EUR-Lex, Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj)); for tariff classification against the EU TARIC use [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en). For US imports consult [https://hts.usitc.gov/](https://hts.usitc.gov/); for UK [https://www.trade-tariff.service.gov.uk/](https://www.trade-tariff.service.gov.uk/); for Japan [https://www.customs.go.jp/english/](https://www.customs.go.jp/english/); for Australia [https://www.abf.gov.au/](https://www.abf.gov.au/) (deep tariff pages moved 2024-25; use home + topic path, not guessed deep URLs); for South Africa [https://www.sars.gov.za/](https://www.sars.gov.za/); for Ghana [https://gra.gov.gh/](https://gra.gov.gh/); for Uganda [https://www.ura.go.ug/](https://www.ura.go.ug/). For shipment terms use ICC Incoterms 2020 ([https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)); for transport of cells observe IATA DGR ([https://www.iata.org/en/programs/cargo/dgr/](https://www.iata.org/en/programs/cargo/dgr/)) and the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3) ([https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)); for wood packaging comply with IPPC ISPM 15 ([https://www.ippc.int/en/core-activities/standards-setting/ispms/](https://www.ippc.int/en/core-activities/standards-setting/ispms/)); for freight documents refer to FIATA ([https://fiata.org/](https://fiata.org/)). For US import / export procedure start from CBP ([https://www.cbp.gov/](https://www.cbp.gov/)) and Trade.gov ([https://www.trade.gov/](https://www.trade.gov/)).

## 7. Standards relevant to this equipment

- **UL 1973** — Batteries for Use in Stationary and Motive Auxiliary Power Applications. Document page: [https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973).

- **UL 9540A** — test method for thermal runaway fire propagation (cell → module → unit → installation). Listed by UL.

- **UL 61730-1** — Photovoltaic (PV) Module Safety Qualification — Part 1. Document page: [https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1) (cited for hybrid PV+storage sites).

- **IEC 62619** — Secondary lithium cells for industrial applications. Catalogue: [https://webstore.iec.ch/](https://webstore.iec.ch/) (cite full designation + edition; do not invent deep /publication/ IDs).

- **IEC 61851-1:2017** — Electric vehicle conductive charging system — Part 1. Document page: [https://webstore.iec.ch/en/publication/33644](https://webstore.iec.ch/en/publication/33644) (cited for any coupled EV / DC-link architecture).

- **NFPA 855** — Installation of stationary energy storage systems (separation, explosion control).

- **IEEE 1547** — Interconnection (grid-forming / grid-following).

- **OCPP** — Open Charge Alliance protocol for any charger-coupled architecture: [https://www.openchargealliance.org/](https://www.openchargealliance.org/) (deep protocol URLs unguessable; cite home + protocol name + version in text).

The integrator's project quality plan — not this TCO sheet — governs compliance against the editions above.

## 8. Call to action

**Request a quotation:** submit the configured RFQ through [https://tradvolt.com/rfq/](/rfq/). The form is gated; after submission the page is removed from *noindex*.

## 9. Evidence pack and limitations

- Equipment identification tied to OEM landing pages only (Sungrow, CATL); exact cell, cabinet and PCS datasheet revisions, DC voltage window and torque values are confirmed against the OEM manuals supplied with the RFQ quotation pack.

- Standards cited at full designation + edition against the document pages in the Evidence Pack.

- Customs and duty: PENDING. No rate is asserted.

- Financial figures are the computed engine output for the inputs in §2; they are the only mathematical content on this page.

- Benefit stream limited to the engine's *asset.ess.value_per_kwh_discharged* credit. Demand-charge reduction, ancillary services revenue and capacity payments are not in the engine's default benefit stream and would change NPV.

- Degradation uses the engine's *asset.ess.degradation_pct_per_year* default (2.0 %/yr). Sites with hotter ambient conditions or higher C-rates should re-run at a more conservative fade rate.

- No "Tier-1" supplier label, review stars, logos or "No.1" claims appear on this page. Supplier status is a buyer-side decision.