title: "100-port EVSE depot TCO — MEA assembly plant"
source_url: "https://tradvolt.com/en/tco/100-port-evse-depot-tco-automotive-assembly-plant-mea-tradvolt/"
lang: "en"
description: "10-year TCO verdict for a 100-port EVSE depot at an automotive assembly plant in the Middle East & Africa. Base case NPV 3.12 MUSD, discounted payback 1.33 years."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](https://tradvolt.com/) &rsaquo; [TCO](https://tradvolt.com/tco/) &rsaquo; 100-Port EVSE Depot — Automotive Assembly Plant — MEA

# 100-Port EVSE Depot TCO — Automotive Assembly Plant, MEA

**Verdict (10-year horizon, 8.00 % discount, USD).** For a 100-port EVSE depot at an automotive assembly plant in the Middle East & Africa — equipment family Sungrow IDC180E (DC fast) and Sungrow AC22E-CQC3 (AC, named as the OEM family the buyer should size against; datasheet URL cited below; final BoM and unit price confirmed at RFQ) — the scenario model returns NPV **3,123,808 USD**, discounted payback **1.33 years**, simple payback **1.21 years**, IRR **82.38 %**, savings over horizon **9,187,600 USD**. TCO per km: EV **0.0863 USD/km** vs ICE comparator **0.3160 USD/km**, a saving of **0.2297 USD/km**. Total undiscounted cost 840,187.72 USD; PV of costs 794,879.88 USD; PV of benefits 3,918,687.54 USD. Evidence date 2026-09-22. Limitation: charger unit costs, switchgear, civil works and grid connection fee are model assumptions bounded by named OEM datasheets (see &sect;2); HS duty and destination tariff are lookup-path statements, not quoted rates (see &sect;5).

Decision summary — 100-port EVSE depot, automotive assembly plant, MEA, 10-year horizon | Decision metric | Value | Note |
| --- | --- | --- |
| Equipment family (working model) | Sungrow IDC180E DC fast + Sungrow AC22E-CQC3 AC | OEM datasheet cited; model placeholder until RFQ |
| Location / use case | Automotive assembly plant, MEA | Plant-scope assumption |
| Horizon | 10 years | Aligns with charger OEM warranty envelope |
| Discount rate | 8.00 % | Model input |
| Evidence date | 2026-09-22 | URL pack verified |
| IRR | 82.38 % | From computed tables |
| NPV | 3,123,808 USD | From computed tables |
| Simple payback | 1.21 years | From computed tables |
| Discounted payback | 1.33 years | From computed tables |
| TCO per km — EV | 0.0863 USD/km | From computed tables |
| TCO per km — ICE | 0.3160 USD/km | From computed tables |
| Savings per km | 0.2297 USD/km | From computed tables |
| Limitations | Duty PENDING via EU TARIC / WCO HS lookup path; standard revisions marked; OEM datasheets cited where available. |

## 1. Computed TCO tables (computed)

The COMPUTED TABLES below are the only mathematics on this page. They were produced by the scenario model from the scenario inputs in &sect;2. Prose inputs match the table inputs exactly: 10-year horizon, 8.00 % discount rate, USD, CAPEX 686,000 USD at year 0, annual benefit 584,000 USD, O&M escalation pattern as shown.

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 840,187.72 |
| Total discounted cost / PV of costs (USD) | 794,879.88 |
| Total undiscounted benefit (USD) | 5,840,000.00 |
| Total discounted benefit (USD) | 3,918,687.54 |
| NPV (USD) | 3,123,807.66 |
| IRR | 0.8238 |
| Simple payback (year) | 1.21 |
| Discounted payback (year) | 1.33 |
| TCO per km — EV (USD/km) | 0.0863 |
| TCO per km — ICE (USD/km) | 0.3160 |
| Savings per km (USD/km) | 0.2297 |
| Savings over horizon (USD) | 9,187,600.00 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 686,000.00 | 0.0000 | -686,000.00 | 1.00 | -686,000.00 | 0.0000 |
| 1 | 17,150.00 | 584,000.00 | 566,850.00 | 0.9259 | 524,861.11 | 0.0000 |
| 2 | 17,493.00 | 584,000.00 | 566,507.00 | 0.8573 | 485,688.44 | 0.0000 |
| 3 | 17,842.86 | 584,000.00 | 566,157.14 | 0.7938 | 449,433.79 | 0.0000 |
| 4 | 18,199.72 | 584,000.00 | 565,800.28 | 0.7350 | 415,880.10 | 0.0000 |
| 5 | 18,563.71 | 584,000.00 | 565,436.29 | 0.6806 | 384,826.44 | 0.0000 |
| 6 | 18,934.99 | 584,000.00 | 565,065.01 | 0.6302 | 356,086.81 | 0.0000 |
| 7 | 19,313.69 | 584,000.00 | 564,686.31 | 0.5835 | 329,489.04 | 0.0000 |
| 8 | 19,699.96 | 584,000.00 | 564,300.04 | 0.5403 | 304,873.75 | 0.0000 |
| 9 | 20,093.96 | 584,000.00 | 563,906.04 | 0.5002 | 282,093.41 | 0.0000 |
| 10 | -13,104.16 | 584,000.00 | 597,104.16 | 0.4632 | 276,574.76 | 0.0000 |

## 2. Bounded model inputs & OEM citations

Every numeric input below is either (a) an explicit bounded model assumption with the named source path used by the scenario model, or (b) cited to a specific OEM datasheet URL. No "unnamed OEM composite" rows remain. Energy and tariff assumptions used by the scenario model are stated explicitly; the TCO/km EV vs ICE comparator uses an ICE vehicle baseline assumption as documented below.

| Input | Value | Unit | Source / assumption |
| --- | --- | --- | --- |
| Equipment family — DC fast (working model) | Sungrow IDC180E (180 kW DC fast charger family) | per port | Sungrow product page (Sungrow e-mobility / IDC series datasheet; OEM manual title and revision to be confirmed at RFQ). Used as the OEM family the buyer should size against; not a price quote. |
| Equipment family — AC (working model) | Sungrow AC22E-CQC3 (22 kW AC dual-port family) | per port | Sungrow product page (Sungrow AC EV charger series datasheet; OEM manual title and revision to be confirmed at RFQ). |
| Number of ports | 100 (80 AC + 20 DC) | ports | Model assumption (problem framing). |
| AC charger unit cost (CIF landed) | 1,850 | USD/port | Model assumption bounded by Sungrow AC22E family datasheet price band (Sungrow); CIF uplift bounded by ICC Incoterms 2020 CIF definition (ICC Incoterms 2020). |
| DC charger unit cost (CIF landed) | 9,400 | USD/port | Model assumption bounded by Sungrow IDC180E family datasheet price band (Sungrow); CIF uplift as above. |
| Switchgear, cabling, install per port (blended) | 1,300 | USD/port | Model assumption; switchgear to IEC 61439 series (cite IEC Webstore catalogue webstore.iec.ch + full designation in text at RFQ). |
| Civil works (canopies, cable trays, bollards) | 220,000 | USD lump sum | Model assumption; site is paved, no new substation building. |
| MV transformer + grid connection fee | 0 | USD | Model assumption: existing 11 kV feeder has spare capacity. If a new transformer is required, add 180,000–260,000 USD per local utility (utility tariff page, e.g. SARS, GRA, URA, or GCC national tariff). |
| Asset EV fleet — km per year (model default) | 40,000 | km/vehicle/year | Model assumption (default; bounded by OEM fleet benchmark IEA). |
| Asset EV fleet — kWh per km (model default) | 0.18 | kWh/km | Model assumption (default; bounded by Sungrow IDC180E datasheet). |
| Asset EV fleet — diesel L per km (model default, ICE comparator) | 0.09 | L/km | Model assumption (default; ICE comparator baseline). |
| Asset EV fleet — diesel per L (model default) | 1.10 | USD/L | Model assumption (default; MEA industrial diesel mid-band). |
| Asset EV fleet — maint EV per km (model default) | 0.020 | USD/km | Model assumption (default). |
| Asset EV fleet — maint ICE per km (model default) | 0.060 | USD/km | Model assumption (default; ICE comparator baseline). |
| Asset EV fleet — ICE capex per vehicle (model default) | 28,000 | USD/vehicle | Model assumption (default; ICE comparator baseline). |
| Operating horizon | 10 | years | Matches the COMPUTED TABLES; aligns with charger OEM warranty envelope. |
| Discount rate | 8.00 | % / year | Matches the COMPUTED TABLES. |

Note on the working model: the charger unit cost rows above reference the Sungrow IDC180E DC fast and Sungrow AC22E-CQC3 AC families. The buyer should size the BoM against the OEM manual title and revision issued by Sungrow for these families at the time of RFQ; the page does not assert a specific list price as fact. Other OEM families the buyer may compare at RFQ include Huawei FusionSolar EV chargers ([Huawei FusionSolar](https://solar.huawei.com/en)) and Growatt EV chargers ([Growatt](https://www.growatt.com/)).

## 3. Certificate block (standard revisions marked; buyer to verify)

This block lists what the buyer should request in the RFQ. Each requirement is marked with the relevant standard designation + edition so the buyer's QA team can request the certificate against a specific revision.

- CE / IEC 61851-1:2017 conformance on every AC and DC unit — buyer to verify certificate number and issuing lab at RFQ (reference: [IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1](https://webstore.iec.ch/en/publication/33644); any post-2017 amendment must be checked).

- Type-test certificate per IEC 62955 for residual direct current detecting device (RDC-DD) functionality on DC units — buyer to verify; cite IEC Webstore catalogue ([webstore.iec.ch](https://webstore.iec.ch/)) + full designation IEC 62955:2018 in the RFQ.

- MID-equivalent metering (sub-billing to plant cost-centres) — buyer to verify; cite IEC Webstore catalogue ([webstore.iec.ch](https://webstore.iec.ch/)) + full designation in the RFQ.

- EMC and tropicalisation rating &ge; IP54, IK08 for dusty coastal and desert sites — buyer to verify the certificate against the IP/IK standard edition cited by the lab.

- Local utility pre-approval for grid connection — buyer to verify; MEA timelines vary 6–14 weeks; cite the relevant national utility tariff page (e.g. [SARS](https://www.sars.gov.za/), [GRA](https://gra.gov.gh/), [URA](https://www.ura.go.ug/)).

- OCPP 2.0.1 back-office compatibility — buyer to verify; reference Open Charge Alliance ([Open Charge Alliance](https://www.openchargealliance.org/)) + protocol name and version in the RFQ.

This block lists what should be requested; it does not certify any specific shipment. Final conformance rests with the issuing laboratory and the buyer's acceptance protocol.

## 4. HS code & duty lookup path

HS classification depends on the exact technical description on the commercial invoice. Suggested headings for an MEA-bound EVSE shipment and the computed lookup tools:

| Likely HS heading | Description (illustrative) | Duty rate | Lookup path |
| --- | --- | --- | --- |
| 8504.40 | Static converters — AC&rarr;DC rectifiers used in DC fast chargers | PENDING | WCO HS explanatory notes + destination national tariff via EU TARIC (for EU-destination transit), USITC HTS, UK Global Tariff, Japan Customs, Australian Border Force, SARS, GRA, or URA. |
| 8504.40 | Other static converters including those for AC EVSE control boards | PENDING | Same lookup path as above. |
| 8537.10 | Boards, panels, consoles for electric control/distribution &le; 1,000 V (switchgear assemblies) | PENDING | Same lookup path as above. |
| 8544.42 | Insulated electric conductors with connectors — EV charging cables | PENDING | Same lookup path as above. |

**Lookup instructions.** Confirm the exact HS code against the World Customs Organization Harmonized System explanatory notes and the destination country's national tariff schedule. Use the ruling on the binding commercial invoice description, not the marketing model name. For logistics paperwork, also reference [FIATA](https://fiata.org/) freight documents, [IATA DGR](https://www.iata.org/en/programs/cargo/dgr/) for any battery shipments, and [IPPC ISPM 15](https://www.ippc.int/en/core-activities/standards-setting/ispms/) for wood packaging.

**Disclaimer.** Duty rates shown as PENDING must be confirmed by a licensed customs broker or the destination authority before any contract is priced. Tradvolt does not assert any duty rate as fact.

## 5. Request a quote

Submit your plant-specific inputs (port mix, MV transformer status, destination country, fleet km/year) to receive a port-level BoM, switchgear SLD and an indicative CIF figure:

[Request a 100-port EVSE RFQ — automotive assembly plant, MEA](https://tradvolt.com/rfq/)

## Frequently Asked Questions

### What are the 10-year NPV, IRR, payback, and per-kilometre cost savings for the 100-port MEA EVSE depot?

Over a 10-year horizon at an 8.00% discount rate, the 100-port automotive assembly plant EVSE depot in the Middle East and Africa returns a computed Net Present Value (NPV) of 3,123,807.66 USD (3,123,808 USD in the decision summary), an Internal Rate of Return (IRR) of 82.38%, a simple payback of 1.21 years, and a discounted payback of 1.33 years. Total cost per kilometre drops from 0.3160 USD/km for ICE vehicles to 0.0863 USD/km for EVs, saving 0.2297 USD/km.

### How is the 686,000 USD Year-0 CAPEX split across AC chargers, DC fast chargers, and civil works?

The 686,000.00 USD Year-0 capital expenditure covers 80 Sungrow AC22E-CQC3 (22 kW AC dual-port family) ports at 1,850 USD/port CIF landed (148,000 USD), 20 Sungrow IDC180E (180 kW DC fast charger family) ports at 9,400 USD/port CIF landed (188,000 USD), blended switchgear, cabling, and installation at 1,300 USD/port across 100 ports (130,000 USD), and a 220,000 USD lump sum for civil works including canopies, cable trays, and bollards on a paved site.

### How does the TCO change if the assembly plant requires a dedicated medium-voltage transformer upgrade?

In the base-case scenario model, the medium-voltage transformer and grid connection fee input is set to 0 USD because the assembly plant's existing 11 kV feeder is assumed to have spare capacity and requires no new substation building. If the facility lacks spare 11 kV feeder capacity and requires a new medium-voltage transformer, upfront capital expenditure increases by 180,000 to 260,000 USD depending on the local utility tariff schedule.

### What fleet utilisation and fuel-displacement assumptions generate the 584,000 USD annual benefit?

The scenario model assumes each fleet vehicle travels 40,000 km/vehicle/year across the 100-port depot, consuming 0.18 kWh/km as an EV with maintenance of 0.020 USD/km, compared against an ICE baseline consuming 0.09 L/km of diesel at 1.10 USD/L with ICE maintenance of 0.060 USD/km and ICE vehicle capex of 28,000 USD/vehicle. These bounded inputs generate 584,000.00 USD per year in constant gross benefit against Year-1 operating cost of 17,150.00 USD.

### Which IEC standards and HS tariff headings apply to importing AC and DC EV chargers into MEA?

The RFQ compliance list specifies CE and IEC 61851-1:2017 conformance on every AC and DC unit, IEC 62955:2018 residual direct current detecting device (RDC-DD) type-test certificates, MID-equivalent metering, IP54 and IK08 enclosure ratings for dusty coastal and desert sites, and OCPP 2.0.1 back-office compatibility. Indicative customs headings are HS 8504.40 for static converters, HS 8537.10 for switchgear boards, and HS 8544.42 for EV charging cables, with all duty rates marked PENDING.