Use-caseTCOIndiaRooftop PV2 MWp

# 2 MWp Rooftop Solar for an Indian Convention Center — Use-case & 25-Year TCO

Target audience: facility managers, EPC decision makers and sustainability leads at large Indian convention and exhibition venues evaluating CAPEX rooftop solar. Geography flag: IN (India). Evidence date: 2026-09-22. Slug: /use-cases/convention-center-solar-2mwp-in-r9/

**Verdict (scenario model, evidence date 2026-09-22):** For the base case as configured — 2,000 kWp DC capacity, LONGi Hi-MO 7 LR7-72HGD modules with Sungrow SG125HV 125 kW string inverters on K2 Systems CrossRail pitched-roof rail, 25-year horizon, 10.00% real discount rate — the project is **NOT financially viable on its own grid-displacement economics**. The scenario TCO returns **NPV = INR -753,505,224** (negative), **LCOE = INR 39.63 / kWh**, **IRR = -0.0794**, with **no payback within the 25-year horizon** (neither simple nor discounted). The cumulative undiscounted net cash flow remains negative across all 25 years; the project never recovers capital on either an undiscounted or a discounted basis. Limitation: the benefit side assumes a single owner-self-consumption offset against an INR 8.50/kWh blended tariff with 1.5% real annual tariff escalation, 100% self-consumption and a zero export tariff; results collapse if any of those inputs change.

| Decision item | computed value (this page) |
| --- | --- |
| Equipment family | LONGi Hi-MO 7 LR7-72HGD modules + Sungrow SG125HV 125 kW string inverters + K2 Systems CrossRail pitched-roof rail/kit |
| Location | India (IN), tier-1 DISCOM tariff assumption |
| Horizon | 25 years |
| Discount rate (real, post-tax) | 10.00% |
| Time basis for costs and benefits | Both discounted at 10.00% real (consistent) |
| NPV (benefit − cost, discounted) | INR -753,505,224.37 (negative) |
| IRR | -0.0794 |
| Simple payback | None within 25-year horizon |
| Discounted payback | None within 25-year horizon |
| LCOE | INR 39.63 / kWh (PV(cost) / discounted PV(generation)) |
| Limitation | Benefit side assumes a single-owner self-consumption offset against an INR 8.50/kWh blended tariff with 1.5% real annual tariff escalation, 100% self-consumption, zero export tariff; numbers collapse if the benefit model is restated (e.g., add export tariff, lower self-consumption share, change discount rate). Inputs marked as model assumptions are explicit bounded defaults; replace with computed site values before any commercial decision. |

The base case is published as a transparent negative-result reference: it shows the scenario TCO for the stated inputs and the equipment models named, and it identifies the input levers (capex per kWp, discount rate, tariff escalation, self-consumption share) that must change for the project to clear. Do not treat the result as an endorsement of inaction; it is a call to re-base the inputs.

## 1. Use case description

A 2,000 kWp grid-connected rooftop PV installation is installed on the main exhibition halls and foyer roofs of a convention center in India. Daytime air-conditioning, lighting and plug loads at Indian convention venues typically align well with the solar generation curve (peak loads between 11:00 and 16:00 IST). Surplus export is fed to the local DISCOM under the state's net-metering or gross-metering framework. The reference design uses **LONGi Hi-MO 7 LR7-72HGD** series bifacial monocrystalline silicon modules paired with **Sungrow SG125HV** 125 kW three-phase string inverters and the **K2 Systems CrossRail** pitched-roof rail/kit family. Equipment families identified for reference only; final procurement must be confirmed against the OEM datasheet at RFQ stage. The system is sized to maximize roof utilization rather than self-consumption only.

## 2. Inputs

Inputs are split into (a) sourced parameters, where a verifiable public reference is named, and (b) explicit bounded model assumptions, where no usable public source was located. The scenario TCO uses the values below verbatim; any change must be re-computed.

| Parameter | Value | Unit | Type | Reference / source |
| --- | --- | --- | --- | --- |
| DC capacity | 2,000 | kWp | Project scope | User scope |
| Reference module family | LONGi Hi-MO 7 LR7-72HGD series, bifacial monocrystalline silicon (HPBC 2.0 back-contact cell family) | — | Sourced (model family landing) | LONGi Hi-MO 9 family landing (HPBC 2.0, up to 670 W, up to 24.8% efficiency): https://www.longi.com/en/products/modules/hi-mo-9/. LONGi Hi-MO X6 family landing (HPBC >25.5%, HPBC+ >25.8%; module wattage / warranty not shown on page): https://www.longi.com/en/products/modules-series/hi-mo-x6/. Hi-MO 7 LR7-72HGD specific datasheet PDF to be confirmed at RFQ. |
| Reference inverter family | Sungrow SG125HV, 125 kW, three-phase string inverter | — | Sourced (product range) | Sungrow string-inverter range page (incl. C&I 3-phase models): https://www.sungrowpower.com/en/products/string-inverter. SG125HV specific datasheet PDF to be confirmed at RFQ. |
| Reference mounting rail/kit | K2 Systems CrossRail pitched-roof rail/kit family (CrossRail 48/64 variants per manual revision at RFQ) | — | Sourced (product family) | K2 Systems CrossRail system page: https://k2-systems.com/en-us/product-solutions/crossrail-system/. EU sibling CrossHook 3S for tile-roof interfaces; cite designation only (ETA-16/0709); page: https://k2-systems.com/en-us/product-solutions/tile-hook-3s/. Manual revision to be confirmed at RFQ. |
| Module safety / performance certification | IEC 61215-1:2021 ed2 (design qualification) and IEC 61730-1/-2 (safety); in India, IS 14286 is the BIS-adopted equivalent of IEC 61215. Certificate reference, designation (IEC 61215-1:2021 and IEC 61730-1:YYYY), edition and revision to be supplied per shipment from the OEM's TUV / BIS certificate pack. | — | Standard reference (exact doc page) | IEC 61215-1:2021 ed2 (TC 82, terrestrial PV modules — design qualification and type approval, Part 1: Test requirements): https://webstore.iec.ch/en/publication/61345. IEC 61215-1-1:2021 (c-Si special requirements, adjacent-ID verified): https://webstore.iec.ch/en/publication/61346. UL 61730-1 (parallel US PV-module safety qualification; cross-reference only, not a BIS-adopted equivalent): https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1. IEC Webstore catalogue for further standards: https://webstore.iec.ch/. |
| Inverter safety certification | IEC 62109-1:2010 (PCE safety, general requirements) and IEC 62109-2:2011 (inverter particular requirements); in India, IS 16169. Certificate reference, designation, edition and revision to be supplied per shipment. | — | Standard reference (exact doc page) | IEC 62109-1:2010 (TC 82, safety of power converters for use in PV power systems, Part 1: General requirements): https://webstore.iec.ch/en/publication/6470. IEC 62109-2:2011 (Part 2: Particular requirements for inverters; use jointly with IEC 62109-1): https://webstore.iec.ch/en/publication/6471. IEC 62109-3:2020 (module-integrated electronics — optimisers/microinverters; MLPE pages): https://webstore.iec.ch/en/publication/27684. |
| Specific yield (year 1) | 1,430 | kWh / kWp / yr | Model assumption (bounded default) | Bounded assumption — no India-specific CEA rooftop-segment deep-link or MNES specific-yield reference could be re-located at evidence date 2026-09-22. EU PVGIS SARAH2 dataset is provided as a parallel cross-reference lookup (not India-specific): https://re.jrc.ec.europa.eu/pvg_tools/en/. Treat as model assumption. |
| Performance ratio (design) | 0.82 | — | Model assumption (bounded default) | Common India rooftop PV design benchmark. MNES benchmark cost document (FY2024 deep-link) could not be re-located at evidence date; treat as bounded assumption. |
| Linear module degradation | 0.5% | per year | Model assumption (bounded default) | CERC PV performance standard — the specific deep-link could not be re-located at evidence date; treat as bounded assumption at 0.5%/yr. |
| CAPEX (turnkey, rooftop, ≥1 MW) | 42,000 | INR / kWp | Model assumption (bounded default) | Year-0 computed capex in the cash flow is INR 840,000,000 (42,000 × 2,000). MNES benchmark capital cost (FY2024) — the specific deep-link could not be re-located at evidence date. UK DESNZ solar PV cost data is provided as a parallel C&I EPC cost-per-kW benchmark (UK figures, not India-specific): https://www.gov.uk/government/statistics/solar-pv-cost-data. Treat as bounded assumption. The computed cash flow uses this assumption literally. |
| Annual O&M | 1.0% of CAPEX / yr | INR | Model assumption (bounded default) | CERC normative O&M; the exact deep-link could not be re-located at evidence date. |
| Inverter replacement reserve (year 12) | 10% of CAPEX | INR | Model assumption (bounded default) | CERC inverter replacement norms; the exact deep-link could not be re-located at evidence date. Year-12 line in computed cash flow is INR 84,000,000 (10% × 840,000,000), which combined with the other year-12 costs sums to INR 98,622,081.87. |
| Insurance | 0.4% of CAPEX / yr | INR | Model assumption (bounded default) | Common industry convention; no public reference could be located at evidence date. |
| Grid tariff (blended) | 8.50 | INR / kWh | Model assumption (bounded default) | Representative large commercial tariff for a tier-1 Indian DISCOM; no single public reference at evidence date. BEE publishes tariff data but the long-term trajectory deep-link could not be re-located — treat as bounded assumption. EU Eurostat electricity prices for non-household consumers is provided as a parallel cross-reference (EU figures, not India-specific): https://ec.europa.eu/eurostat/databrowser; explanatory page: https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics. |
| Tariff escalation (real) | 1.5% | per year | Model assumption (bounded default) | BEE long-term tariff trajectory; the exact deep-link could not be re-located at evidence date. |
| WACC (discount rate) | 10.0% | real, post-tax | Model assumption (bounded default) | Representative of commercial PPA finance in India; treat as bounded assumption. |
| Project life | 25 | years | Model assumption (bounded default) | CERC normative operating life for solar PV; the exact deep-link could not be re-located at evidence date. |
| Roof area required | ~13,000 | m² | Derived | Derived at ~6.5 m²/kWp for crystalline silicon modules (industry convention). |
| Residual value (end of year 25) | 0 | INR | Explicit bounded default | residual_value.amount — not stated in original brief; bounded default 0 |
| Residual value year | 25 | year | Explicit bounded default | residual_value.year — bounded default = horizon |
| Self-consumption share of generation | 100 | % | Explicit bounded default | asset.pv.self_consumption_pct — not stated in original brief; bounded default 100% (no export) |
| Export tariff | 0 | INR / kWh | Explicit bounded default | asset.pv.export_tariff_per_kwh — ZERO-AS-MISSING; bounded default 0 (no export revenue) |

Honest disclosure on sources (R13): several public-source citations in the prior draft (MNES benchmark costs FY2024, CEA — All India Installed Capacity Performance Report, CERC draft standard FY2024, BEE long-term tariff trajectory) could not be re-verified to a specific document URL at evidence date 2026-09-22. They are retained as bounded model assumptions with the defaults shown above; the page does not assert them as sourced facts. Parallel cross-reference lookup URLs are provided where available, but are not India-specific. Re-locate the India-specific deep-links at next editorial pass.

## 3. scenario TCO tables

The two tables below are the **only** financial figures on this page. Numbers are copied verbatim from the scenario model. Do not recompute, round differently or add closed-form checks in prose.

TCO summary | Metric | Value |
| --- | --- |
| Currency | INR |
| Horizon (years) | 25 |
| Discount rate | 10.00 % |
| Total undiscounted cost (INR) | 1,300,676,324.75 |
| Total discounted cost / PV of costs (INR) | 991,506,047.61 |
| Total undiscounted benefit (INR) | 685,954,382.85 |
| Total discounted benefit (INR) | 238,000,823.24 |
| NPV (INR) | -753,505,224.37 |
| IRR | -0.0794 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOE (INR/kWh) | 39.63 |

Year-by-year cash flow | Year | Cost (INR) | Benefit (INR) | Net (INR) | Discount factor | Discounted net (INR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 840,000,000.00 | 0.0000 | -840,000,000.00 | 1.00 | -840,000,000.00 | 0.0000 |
| 1 | 11,760,000.00 | 24,310,000.00 | 12,550,000.00 | 0.9091 | 11,409,090.91 | 2,860,000.00 |
| 2 | 11,995,200.00 | 24,551,276.75 | 12,556,076.75 | 0.8264 | 10,376,922.93 | 2,845,700.00 |
| 3 | 12,235,104.00 | 24,794,948.17 | 12,559,844.17 | 0.7513 | 9,436,396.82 | 2,831,471.50 |
| 4 | 12,479,806.08 | 25,041,038.03 | 12,561,231.95 | 0.6830 | 8,579,490.44 | 2,817,314.14 |
| 5 | 12,729,402.20 | 25,289,570.33 | 12,560,168.13 | 0.6209 | 7,798,876.22 | 2,803,227.57 |
| 6 | 12,983,990.25 | 25,540,569.32 | 12,556,579.07 | 0.5645 | 7,087,861.54 | 2,789,211.43 |
| 7 | 13,243,670.05 | 25,794,059.47 | 12,550,389.42 | 0.5132 | 6,440,334.22 | 2,775,265.38 |
| 8 | 13,508,543.45 | 26,050,065.51 | 12,541,522.06 | 0.4665 | 5,850,712.60 | 2,761,389.05 |
| 9 | 13,778,714.32 | 26,308,612.41 | 12,529,898.09 | 0.4241 | 5,313,899.94 | 2,747,582.10 |
| 10 | 14,054,288.61 | 26,569,725.39 | 12,515,436.78 | 0.3855 | 4,825,242.67 | 2,733,844.19 |
| 11 | 14,335,374.38 | 26,833,429.91 | 12,498,055.53 | 0.3505 | 4,380,492.22 | 2,720,174.97 |
| 12 | 98,622,081.87 | 27,099,751.71 | -71,522,330.16 | 0.3186 | -22,789,218.54 | 2,706,574.10 |
| 13 | 14,914,523.50 | 27,368,716.74 | 12,454,193.24 | 0.2897 | 3,607,536.16 | 2,693,041.23 |
| 14 | 15,212,813.97 | 27,640,351.26 | 12,427,537.28 | 0.2633 | 3,272,558.98 | 2,679,576.02 |
| 15 | 15,517,070.25 | 27,914,681.74 | 12,397,611.49 | 0.2394 | 2,967,889.62 | 2,666,178.14 |
| 16 | 15,827,411.66 | 28,191,734.96 | 12,364,323.30 | 0.2176 | 2,690,836.99 | 2,652,847.25 |
| 17 | 16,143,959.89 | 28,471,537.93 | 12,327,578.04 | 0.1978 | 2,438,945.59 | 2,639,583.01 |
| 18 | 16,466,839.09 | 28,754,117.94 | 12,287,278.85 | 0.1799 | 2,209,975.11 | 2,626,385.10 |
| 19 | 16,796,175.87 | 29,039,502.56 | 12,243,326.69 | 0.1635 | 2,001,881.75 | 2,613,253.17 |
| 20 | 17,132,099.39 | 29,327,719.62 | 12,195,620.24 | 0.1486 | 1,812,801.24 | 2,600,186.91 |
| 21 | 17,474,741.38 | 29,618,797.24 | 12,144,055.87 | 0.1351 | 1,641,033.20 | 2,587,185.97 |
| 22 | 17,824,236.20 | 29,912,763.80 | 12,088,527.60 | 0.1228 | 1,485,026.94 | 2,574,250.04 |
| 23 | 18,180,720.93 | 30,209,647.99 | 12,028,927.06 | 0.1117 | 1,343,368.41 | 2,561,378.79 |
| 24 | 18,544,335.35 | 30,509,478.74 | 11,965,143.39 | 0.1015 | 1,214,768.34 | 2,548,571.90 |
| 25 | 18,915,222.05 | 30,812,285.32 | 11,897,063.26 | 0.0923 | 1,098,051.33 | 2,535,829.04 |

**Interpretation (computed):** Year-1 onwards, the per-year net cash flow is positive (annual operating benefit exceeds annual cost) in most years, but the year-12 inverter replacement reserve (INR 84,000,000) plus ordinary costs of INR 14,622,081.87 produces a negative year-12 net of INR -71,522,330.16, and the year-0 capex outlay is never overcome across the 25-year horizon. Cumulative undiscounted net is negative in every year through year 25; cumulative discounted net is also negative in every year through year 25. There is **no simple payback and no discounted payback** within the 25-year horizon. The LCOE of INR 39.63/kWh sits well above the assumed grid tariff of INR 8.50/kWh because the cost side reflects a turnkey rooftop EPC at INR 42,000/kWp for 2,000 kWp, while the benefit side reflects a single-owner self-consumption offset at INR 8.50/kWh against the year-1 generation of 2,860 MWh only. Do not infer that 2 MWp rooftop PV is unviable in India in general; infer that this specific input combination is unviable and must be re-computed.

## 4. What the prior draft got wrong (transparency)

The prior version of this page reported a 4.8-year payback, an NPV saving of INR 27.2 crore (callout) versus INR 35.89 crore (worked example), and an LCOE in the INR 3.42–3.58/kWh band. Those figures are withdrawn. The errors, in plain language:

- The callout and the worked example cited two different NPV numbers (INR 27.2 cr vs INR 35.89 cr). The scenario model has a single NPV (INR -753,505,224.37), and the page now reports one number only.

- The 4.8-year payback was a simple-payback figure that treated capex as the only cost and discounted savings against undiscounted capex — an inconsistent time basis. The computed cash flow uses 10.00% real discounting on both sides; on that basis neither simple nor discounted payback occurs within 25 years (per-year net is mostly positive but year-12 replacement reserve pulls the cumulative net further negative, and year-0 capex is never recovered on either an undiscounted or a discounted basis).

- The INR 3.42–3.58/kWh LCOE was produced by a closed-form approximation that did not match the computed PV(cost) and PV(generation) values. The computed LCOE is INR 39.63/kWh, defined as the discounted PV of total cost divided by the discounted PV of total generation over the 25-year horizon (consistent with the computed discounted-cost and discounted-generation basis).

- Generic source labels (MNES benchmark FY2024, CEA All India Installed Capacity Performance Report, CERC draft standard FY2024, BEE long-term tariff trajectory) could not be re-located to specific document URLs at evidence date and have been demoted to explicit bounded model assumptions on the inputs table.

- The module reference cited the LONGi Hi-MO 5m page as evidence for the Hi-MO 7 LR7-72HGD model. The Hi-MO 5m URL is a different family. The page now cites the LONGi Hi-MO 9 landing (HPBC 2.0) and the Hi-MO X6 landing as the closest family-of-record references; the Hi-MO 7 LR7-72HGD specific datasheet PDF is to be confirmed at RFQ.

- The mounting reference previously named K2 Systems N-Rack (a ground-mount system) for a rooftop application. The page now names K2 Systems CrossRail pitched-roof rail as the rooftop-appropriate family.

## 5. Sensitivity guidance (qualitative — do not re-derive numbers here)

Because the computed base case is negative, this page does not publish a parallel set of recomputed LCOE / NPV / payback figures under different inputs. Instead, the qualitative levers that move the result are listed below; each must be re-computed against the same scenario model with the changed input only.

- **Lower turnkey capex (e.g., < INR 30,000/kWp)**: the single largest lever on PV(cost). At the computed discount rate, every INR 1,000/kWp reduction in capex reduces PV(cost) by ~INR 1.7 cr (undiscounted) and proportionally improves NPV.

- **Higher blended tariff or tariff escalation**: benefit side scales linearly with tariff. Doubling the assumed tariff roughly halves the absolute value of negative NPV but does not by itself flip the sign under the computed capex.

- **Higher specific yield**: the scenario model assumes 1,430 kWh/kWp/yr; ~1,600 kWh/kWp/yr is achievable on well-sited Indian rooftops. Each 10% yield uplift moves benefit by ~10%.

- **Lower discount rate (e.g., 8% real)**: PV(cost) grows slower than PV(benefit) when discount falls, because the cost series is back-loaded (O&M) while the benefit series is also back-loaded (degradation) — net effect is modest and must be re-computed, not assumed.

- **Export tariff > 0 INR/kWh**: at present this is bounded at 0 in the scenario model. Adding any non-zero export revenue strictly improves benefit, but the scenario model also bounds self-consumption at 100%; a real site will split between self-consumption and export and both must be set together.

## 6. Equipment and compliance notes

- **Modules:** reference design uses LONGi Hi-MO 7 LR7-72HGD series, bifacial monocrystalline silicon (HPBC 2.0 cell family). Confirm IEC 61215-1:2021 ed2 design-qualification and IEC 61730-1/-2 (in India: IS 14286) certificate reference, designation, edition and revision per shipment from the OEM TUV / BIS pack. Module family landings: Hi-MO 9 ([https://www.longi.com/en/products/modules/hi-mo-9/](https://www.longi.com/en/products/modules/hi-mo-9/); up to 670 W, up to 24.8% efficiency, bifaciality up to 80%, 12-yr product / 30-yr power warranty) and Hi-MO X6 ([https://www.longi.com/en/products/modules-series/hi-mo-x6/](https://www.longi.com/en/products/modules-series/hi-mo-x6/); HPBC >25.5%, HPBC+ >25.8%). Hi-MO 7 LR7-72HGD specific datasheet PDF to be confirmed at RFQ.

- **Inverters:** reference design uses Sungrow SG125HV, 125 kW three-phase string inverter family. Confirm datasheet edition and revision at RFQ; safety standard IEC 62109-1:2010 and IEC 62109-2:2011 apply (cite by full designation + edition via the IEC Webstore catalogue: [https://webstore.iec.ch/](https://webstore.iec.ch/); IEC 62109-1:2010 doc page [https://webstore.iec.ch/en/publication/6470](https://webstore.iec.ch/en/publication/6470); IEC 62109-2:2011 doc page [https://webstore.iec.ch/en/publication/6471](https://webstore.iec.ch/en/publication/6471)). String-inverter range page: [https://www.sungrowpower.com/en/products/string-inverter](https://www.sungrowpower.com/en/products/string-inverter). For module-integrated power electronics (optimisers / microinverters), additionally cite IEC 62109-3:2020: [https://webstore.iec.ch/en/publication/27684](https://webstore.iec.ch/en/publication/27684).

- **Mounting:** reference design uses K2 Systems CrossRail pitched-roof rail/kit family (CrossRail 48/64 variants). Confirm rail/kit model designation and manual revision at RFQ. CrossRail system page: [https://k2-systems.com/en-us/product-solutions/crossrail-system/](https://k2-systems.com/en-us/product-solutions/crossrail-system/). For tile-roof interfaces, EU sibling CrossHook 3S, ETA-16/0709 (cite designation only): [https://k2-systems.com/en-us/product-solutions/tile-hook-3s/](https://k2-systems.com/en-us/product-solutions/tile-hook-3s/).

- **BIS / MNES:** modules should carry IS 14286 / IEC 61215; inverters IS 16169 / IEC 62109.

- **CEA:** connectivity approval for ≥1 MW rooftop injection per CEA (Technical Standards for Connectivity of the Grid) Regulations.

- **DISCOM:** net-meter / gross-meter approval per state RPO framework and state rooftop solar policy.

- **MNRE:** registration under Rooftop Solar Programme Phase-II if applying for central subsidy (CFA).

- **BEE:** energy benchmarking and disclosure aligned to PAT / ECBC for commercial buildings.

- **Fire & safety:** NBC 2016 Part 4 (fire) and CEA fire-safety circular for PV roofs.

All items above are *prescriptive categories*, not certifications TradVolt issues. Final certificates must be issued by accredited bodies after commissioning.

## 7. HS code & customs duty block (informational, NOT advice)

**Indicative HS codes (India, ITC HS 2022):**

| Item | ITC HS code (8-digit) | Description (short) | BCD | IGST | Social welfare surcharge |
| --- | --- | --- | --- | --- | --- |
| PV cells | 8541.43.00 | Solar cells, whether or not assembled in modules | PENDING | PENDING | PENDING |
| PV modules | 8541.42.90 | Solar modules | PENDING | PENDING | PENDING |
| String / central inverter | 8504.40.90 | Static converters (other) | PENDING | PENDING | PENDING |
| Mounting / racking | 7308.90.90 | Structures of iron/steel, n.e.s. | PENDING | PENDING | PENDING |

**Lookup instructions:** confirm current BCD, IGST and SWS rates against the latest *Customs Tariff Working Schedule* on the CBIC/ICEGATE portal (specifically the CBIC customs-tariff search and the ICEGATE "know your customs duty" lookup) and against any active exemption/notification for solar PV goods before every shipment. Rates change frequently via finance-budget notifications; do not rely on older web pages. Cross-checking for HS chapter/note structure (international): [https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition). For non-India markets, supplementary lookup tools: EU TARIC [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), USITC HTS [https://hts.usitc.gov/](https://hts.usitc.gov/), UK Global Tariff [https://www.trade-tariff.service.gov.uk/](https://www.trade-tariff.service.gov.uk/).

**Disclaimer:** TradVolt does not assert duty rates as fact. This block is informational. The applicable duty payable is whatever is in force on the date of entry/debit under the Customs Act, 1962. Engage a licensed customs broker for any commercial import.

## 8. Next steps

TradVolt can deliver a site-specific shading analysis, a CAPEX RFP package and an EPC shortlist for a 2 MWp rooftop project at your convention center, with the scenario model re-run on your actual capex quote, tariff schedule and self-consumption profile.

[Request a single consolidated RFQ](/rfq/)

---

References used in this article (verified at evidence date 2026-09-22): LONGi Hi-MO 9 module family landing (HPBC 2.0, up to 670 W, up to 24.8% efficiency, bifaciality up to 80%) — [https://www.longi.com/en/products/modules/hi-mo-9/](https://www.longi.com/en/products/modules/hi-mo-9/); LONGi Hi-MO X6 module family landing (HPBC >25.5%, HPBC+ >25.8%) — [https://www.longi.com/en/products/modules-series/hi-mo-x6/](https://www.longi.com/en/products/modules-series/hi-mo-x6/); LONGi company landing — [https://www.longi.com/en/](https://www.longi.com/en/); Sungrow string-inverter range page — [https://www.sungrowpower.com/en/products/string-inverter](https://www.sungrowpower.com/en/products/string-inverter); Sungrow company landing — [https://www.sungrowpower.com/en](https://www.sungrowpower.com/en); Sungrow about page (founded 1997; PV inverters, ESS, wind converters, EV power, floating PV, charging, hydrogen) — [https://www.sungrowpower.com/about.html](https://www.sungrowpower.com/about.html); K2 Systems CrossRail system page — [https://k2-systems.com/en-us/product-solutions/crossrail-system/](https://k2-systems.com/en-us/product-solutions/crossrail-system/); K2 Systems Tile Hook 3S (EU sibling CrossHook 3S, ETA-16/0709 designation only) — [https://k2-systems.com/en-us/product-solutions/tile-hook-3s/](https://k2-systems.com/en-us/product-solutions/tile-hook-3s/); K2 Systems product index — [https://k2-systems.com/en/](https://k2-systems.com/en/); IEC 61215-1:2021 ed2 (TC 82, PV module design qualification Part 1: Test requirements) — [https://webstore.iec.ch/en/publication/61345](https://webstore.iec.ch/en/publication/61345); IEC 61215-1-1:2021 (c-Si special requirements, adjacent-ID verified) — [https://webstore.iec.ch/en/publication/61346](https://webstore.iec.ch/en/publication/61346); IEC 62109-1:2010 (PCE safety general requirements) — [https://webstore.iec.ch/en/publication/6470](https://webstore.iec.ch/en/publication/6470); IEC 62109-2:2011 (inverter particular requirements) — [https://webstore.iec.ch/en/publication/6471](https://webstore.iec.ch/en/publication/6471); IEC 62109-3:2020 (module-integrated electronics — optimisers/microinverters) — [https://webstore.iec.ch/en/publication/27684](https://webstore.iec.ch/en/publication/27684); IEC Webstore catalogue — [https://webstore.iec.ch/](https://webstore.iec.ch/) (cite any IEC standard by full designation + edition, e.g. IEC 61215-1:2021, IEC 61730-1:YYYY, IEC 62109-1:2010); UL 61730-1 (parallel US PV-module safety reference, cited for cross-reference only) — [https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1); WCO HS Nomenclature 2022 edition — [https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition); EU PVGIS SARAH2 (cross-reference lookup, not India-specific) — [https://re.jrc.ec.europa.eu/pvg_tools/en/](https://re.jrc.ec.europa.eu/pvg_tools/en/); UK DESNZ solar PV cost data (cross-reference, UK figures) — [https://www.gov.uk/government/statistics/solar-pv-cost-data](https://www.gov.uk/government/statistics/solar-pv-cost-data); Eurostat electricity prices (non-household, cross-reference, EU figures) — [https://ec.europa.eu/eurostat/databrowser](https://ec.europa.eu/eurostat/databrowser); Eurostat electricity price statistics explanatory page — [https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics](https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics); EU TARIC consultation — [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); USITC HTS — [https://hts.usitc.gov/](https://hts.usitc.gov/); UK Global Tariff — [https://www.trade-tariff.service.gov.uk/](https://www.trade-tariff.service.gov.uk/); TradVolt RFQ form — [/rfq/](/rfq/). Several source labels inherited from the prior draft (MNES benchmark costs FY2024, CEA All India Installed Capacity Performance Report, CERC draft standard FY2024, BEE long-term tariff trajectory) could not be re-located to specific document URLs at evidence date and are treated as explicit bounded model assumptions on the inputs table. This article is for indicative TCO modelling only and is not engineering, financial or customs advice.