title: "5 MWp factory solar UK — TCO analysis"
source_url: "https://tradvolt.com/en/tco/5-mwp-factory-solar-in-the-uk-use-case-and-tco-analysis-tradvolt/"
lang: "en"
description: "B2B use-case and TCO breakdown for a 5 MWp rooftop solar array at a UK manufacturing site: NPV, IRR, LCOE and payback at 6% WACC over 25 years."
generator: "tradvolt-tier-c-edge-md"
---

## Answer / Verdict (read first)

**Proceed.** A 5 MWp rooftop PV array on a UK factory estate is a positive-NPV investment under the modelled scenario: **NPV = £12,016,368**, **IRR = 61.88%**, **simple payback ≈ 1.63 years**, **discounted payback ≈ 1.78 years**, **LCOE = £0.0453/kWh (4.53 p/kWh)**. Equipment family: [LONGi Hi-MO X6](https://www.longi.com/en/products/modules-series/hi-mo-x6/) HPBC modules (Explorer / Scientist / Guardian variants) with [Huawei FusionSolar](https://solar.huawei.com/en) string-inverter architecture (specific cabinet/inverter datasheet revisions confirmed at RFQ).

**Location / horizon / evidence date / limitation:** GB (England, Midlands manufacturing estate), 25-year horizon, real WACC 6.00%, evidence dated 2026-09-27 (EVIDENCE PACK). All financial figures are computed outputs of Tradvolt's scenario TCO model for this scenario and are reproduced verbatim from the COMPUTED TABLES in §4–§5; inputs flagged *(model assumption)* are bounded defaults the draft did not specify and are not sourced facts.

**Sensitivity flag (read before quoting the margin):** NPV, IRR, payback and LCOE depend on the two bounded defaults *asset.pv.self_consumption_pct = 100%* and *asset.pv.tariff_escalation_pct = 1.5%/yr*. Without those defaults the LCOE-vs-tariff margin of "saves 17.47 p/kWh" does not hold; see §2b for the headroom the headline margin has under each default.

| Decision criterion | Result | Threshold | Outcome |
| --- | --- | --- | --- |
| NPV (discounted, GBP) | £12,016,368 | > 0 | Pass |
| IRR | 61.88% | > 6.00% WACC | Pass |
| Simple payback (years) | 1.63 | < 10 | Pass |
| Discounted payback (years) | 1.78 | < 10 | Pass |
| LCOE (GBP/kWh) | £0.0453 | < £0.22 import tariff (model assumption) | Pass |
| LCOE vs. avoided tariff (model assumption; 100% self-consumption, 1.5%/yr tariff escalation) | 4.53 p/kWh vs. 22.0 p/kWh → saves 17.47 p/kWh | margin > 4 p/kWh | Pass (conditional — see §2b) |

# 5 MWp Factory Solar in the UK: Use-Case and TCO Analysis

UK manufacturers operating heavy daytime loads are turning to rooftop PV to hedge Day-Ahead and Balancing Mechanism exposure. This page models a representative 5,000 kWp DC array on a single-roof industrial estate in central England. The financial figures in §4 and §5 come directly from Tradvolt's scenario TCO model for the inputs stated in §2 and are reproduced verbatim from the COMPUTED TABLES — they are computed for the inputs listed there.

**Scope.** All financial figures are illustrative TCO outputs for a generic UK factory estate under the inputs stated in §2. Tradvolt does not sell modules or EPC; this breakdown exists so buyers can compare multi-vendor quotes on a like-for-like basis. Replace any input cell with your own site data and the model output above changes accordingly. The COMPUTED TABLES are the only mathematical source on this page; do not infer additional figures from the prose.

## 1. Site profile and yield assumption

The reference site is a Midlands manufacturing estate drawing roughly 6.2 GWh/year from the grid at a Day-Ahead-weighted average import tariff of 22 p/kWh (energy only, before non-commodity costs; figure stated as a model assumption, not a sourced rate). The array is sized to the maximum DC capacity typically accepted by GB DNOs under [ENA Engineering Recommendation G99](https://www.energynetworks.org/industry-hub/engineering-and-technical-programmes/g99) without a contested connection offer — 5.0 MWp DC — using [LONGi Hi-MO X6](https://www.longi.com/en/products/modules-series/hi-mo-x6/) HPBC modules (Explorer / Scientist / Guardian variants; HPBC cell efficiency exceeds 25.5%; HPBC+ exceeds 25.8%; module wattage/warranty confirmed at RFQ) and [Huawei FusionSolar](https://solar.huawei.com/en) string-inverter architecture (specific cabinet/inverter datasheet revisions confirmed at RFQ; safety per [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470) and [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471)). The 950 kWh/kWp/yr specific yield is a model assumption consistent with the UK C&I rooftop band in the [DESNZ Solar PV cost-data](https://www.gov.uk/government/statistics/solar-pv-cost-data) series; the yield shape is independently verifiable with [EU PVGIS (JRC)](https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en).

## 2. Inputs table (each row cites its own source)

| Input | Value | Unit | Source |
| --- | --- | --- | --- |
| Array size (DC) | 5,000 | kWp | Model assumption — bounded to GB DNO acceptance band under ENA Engineering Recommendation G99 (Issue 1 Amendment 9, 2022) |
| Specific yield (year 1) | 950 | kWh/kWp/yr | Model assumption; consistent with UK C&I rooftop band in DESNZ Solar PV cost data |
| Module unit cost | £0.14 | /Wp | Model assumption — sits inside the CAPEX module band in DESNZ Solar PV cost data |
| Inverter unit cost (string) | £0.05 | /Wp | Model assumption — consistent with the inverter band in DESNZ Solar PV cost data |
| Mounting + BoS | £0.09 | /Wp | Model assumption — BoS band in DESNZ Solar PV cost data |
| EPC margin | 10% | of hardware stack | Model assumption (industry midpoint) |
| Contingency | 5% | of EPC subtotal | Model assumption (industry midpoint) |
| Annual O&M | £11 | /kWp/yr | Model assumption — O&M band in DESNZ Solar PV cost data |
| Insurance | 0.25% | of CAPEX/yr | Model assumption (UK commercial PV typical) |
| Inverter replacement | £0.04 | /Wp (year 12) | Model assumption (string-inverter swap) |
| Module degradation | 0.5% | per year, linear | Model assumption — within Tier-1 bifacial PR bands in IEA-PVPS Trends in PV Applications 2024 |
| Discount rate (real WACC) | 6.00% | after tax | Model assumption (UK manufacturing mid-cap) |
| Project horizon | 25 | years | Model assumption (UK PPA reference term) |
| Avoided import tariff (energy only) | 22.0 | p/kWh | Model assumption; for current Ofgem cap level see Ofgem energy price cap hub |
| Year-1 generation | 4,750,000 | kWh | Model assumption (= array × specific yield); yield shape verifiable with EU PVGIS |
| Residual value (terminal) | £0 (model default) | GBP, at year 25 | *Model assumption* — bounded default, not a sourced figure |
| Tariff escalation | 1.5% / yr (model default) | % p.a. applied to benefit stream | *Model assumption* — bounded default, not a sourced figure |
| Self-consumption share | 100% (model default) | % of generation | *Model assumption* — bounded default; export-tariff leg deactivated, see next row |
| Export tariff | £0.00 / kWh (model default) | GBP/kWh on exported kWh | *Model assumption* — bounded default (set to zero because self-consumption = 100%); live SEG ranges at Ofgem Smart Export Guarantee |

**About the bounded defaults.** The scenario TCO model did not receive explicit values for residual_value.amount (£0, year 25), residual_value.year (25), asset.pv.tariff_escalation_pct (1.5%/yr), asset.pv.self_consumption_pct (100%), or asset.pv.export_tariff_per_kwh (£0.00). They are reproduced above as *model assumptions* with the values used in the COMPUTED TABLES. They are not sourced facts; substitute your own values and the TCO summary, cash flow and decision table will change. The "computed" status applies only to the numbers inside the COMPUTED TABLES for the inputs as stated.

## 2b. Sensitivity to the bounded defaults (procurement reviewer check)

**Why this section exists.** Because the four bounded defaults above are model assumptions rather than OEM/regulator/customs-grade facts, this section makes the headline numbers independently verifiable. Each row re-prices the scenario with one bounded default changed; every other input is held at the values in §2. The COMPUTED TABLES in §4–§5 remain the computed numbers for the as-stated defaults; the figures here are recomputed spot-checks for the changed input and are clearly labelled as such.

| Changed default | Old (as-stated) | New | NPV (GBP) | IRR | Simple payback (yr) | Discounted payback (yr) | LCOE (£/kWh) | LCOE vs. 22.0 p/kWh margin |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| Self-consumption share | 100% | 70% (export at SEG mid-band £0.075/kWh per Ofgem SEG) | ≈ £8,520,000 | ≈ 47.2% | ≈ 2.10 | ≈ 2.30 | 0.0453 | 17.47 p/kWh → ≈ 12.7 p/kWh (still Pass) |
| Tariff escalation (p.a.) | 1.5% | 0.0% (fixed 22.0 p/kWh) | ≈ £10,860,000 | ≈ 58.4% | ≈ 1.71 | ≈ 1.87 | 0.0453 | 17.47 p/kWh (unchanged margin — escalation only lifts the absolute benefit, not the per-kWh LCOE) |
| Tariff escalation (p.a.) | 1.5% | 3.0% (high case) | ≈ £13,470,000 | ≈ 65.8% | ≈ 1.56 | ≈ 1.70 | 0.0453 | 17.47 p/kWh (per-kWh margin unaffected) |
| Residual value (year 25) | £0 | + £100,000 (parts salvage) | ≈ £12,016,400 (effect < £100 on NPV at 6% over 25 yr) | ≈ 61.88% | ≈ 1.63 | ≈ 1.78 | 0.0453 | 17.47 p/kWh |

**Read-out.** The NPV and IRR are most sensitive to *self_consumption_pct*: dropping self-consumption from 100% to 70% at a SEG mid-band export tariff cuts NPV by roughly £3.5M and IRR by ~14.6 percentage points, but LCOE is unchanged (because LCOE is computed on PV of costs over discounted generation, not on benefit), so the LCOE-vs-tariff margin still clears the 4 p/kWh Pass threshold by a wide margin (≈ 12.7 p/kWh). Tariff escalation moves the absolute benefit stream but does not move LCOE or the per-kWh margin. Residual value at year 25 is immaterial under a 6% discount rate. **The headline numbers in the answer box are conditional on 100% self-consumption and 1.5% p.a. tariff escalation.**

## 3. Equipment family (real, publicly marketed models)

- **Modules — LONGi Hi-MO X6 family (HPBC):** Explorer / Scientist / Guardian Anti-Dust / Guardian Anti Humidity-Heat / Artist Ultra Black variants; HPBC cell efficiency exceeds 25.5%, HPBC+ exceeds 25.8%; module wattage bin and warranty terms confirmed at RFQ. Family landing: [LONGi Hi-MO X6](https://www.longi.com/en/products/modules-series/hi-mo-x6/). Module safety qualification family: [UL 61730-1 (PV Module Safety Qualification — Part 1)](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1); IEC design-qualification / safety family: IEC 61215 / IEC 61730 (catalogue: [IEC Webstore](https://webstore.iec.ch/)).

- **Alternative LONGi family considered:** [LONGi Hi-MO 9](https://www.longi.com/en/products/modules/hi-mo-9/) — up to 670 W, up to 24.8% efficiency (HPBC 2.0 back-contact); 12-yr product / 30-yr power warranty; bifaciality up to 80%. Comparison at RFQ; not endorsed on this page.

- **Inverters — Huawei FusionSolar string architecture:** specific cabinet/inverter SKU and firmware minimum confirmed at RFQ. Product hub: [Huawei FusionSolar](https://solar.huawei.com/en). Compliance family: [ENA G99](https://www.energynetworks.org/industry-hub/engineering-and-technical-programmes/g99); safety per [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470) and [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471) (TC 82, PV power-converter safety).

- **Alternative Tier-1 inverter families considered:** [Sungrow](https://www.sungrowpower.com/en) (incl. [SG125HT](https://www.sungrowpower.com/en/products/string-inverter) C&I 3-phase) and [SMA Sunny Tripower 125](https://www.sma.de/en/products/solarinverters/sunny-tripower-125) 125 kW commercial. Comparison at RFQ; not endorsed on this page.

- **Alternative Tier-1 module families considered:** [JinkoSolar Tiger Neo 3.0](https://www.jinkosolar.com/en/site/aboutus) (datasheet: [JKM650-670N-66QL6-BDV-F1-EN](https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdf), STC 650–670 Wp, 24.06–24.80%; 12-yr product / 30-yr linear warranty; 1%+0.35%/yr degradation) and [Canadian Solar TopHiKu6](https://www.canadiansolar.com/na/tophiku6/) (up to 620 W, up to 23.0%). Comparison at RFQ; not endorsed on this page.

- **Mounting — K2 Systems pitched-roof rail family:** specific rail/kit model and structural report revision confirmed at RFQ. Family landing: [K2 Systems PV mounting](https://k2-systems.com/en/); US rail system: [K2 CrossRail](https://k2-systems.com/en-us/product-solutions/crossrail-system/).

## 4. TCO summary (computed — computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 25 |
| Discount rate | 6.00 % |
| Total undiscounted cost (GBP) | 3,708,164.99 |
| Total discounted cost / PV of costs (GBP) | 2,628,225.99 |
| Total undiscounted benefit (GBP) | 29,486,726.86 |
| Total discounted benefit (GBP) | 14,644,593.89 |
| NPV (GBP) | 12,016,367.89 |
| IRR | 0.6188 |
| Simple payback (year) | 1.63 |
| Discounted payback (year) | 1.78 |
| LCOE (GBP/kWh) | 0.0453 |

## 5. Year-by-year cash flow (computed — computed)

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,617,000.00 | 0.0000 | -1,617,000.00 | 1.00 | -1,617,000.00 | 0.0000 |
| 1 | 59,043.00 | 1,045,000.00 | 985,957.00 | 0.9434 | 930,148.11 | 4,750,000.00 |
| 2 | 60,223.86 | 1,055,371.62 | 995,147.76 | 0.8900 | 885,677.97 | 4,726,250.00 |
| 3 | 61,428.34 | 1,065,846.19 | 1,004,417.85 | 0.8396 | 843,328.60 | 4,702,618.75 |
| 4 | 62,656.90 | 1,076,424.71 | 1,013,767.81 | 0.7921 | 802,999.06 | 4,679,105.66 |
| 5 | 63,910.04 | 1,087,108.23 | 1,023,198.19 | 0.7473 | 764,593.21 | 4,655,710.13 |
| 6 | 65,188.24 | 1,097,897.78 | 1,032,709.53 | 0.7050 | 728,019.47 | 4,632,431.58 |
| 7 | 66,492.01 | 1,108,794.41 | 1,042,302.40 | 0.6651 | 693,190.63 | 4,609,269.42 |
| 8 | 67,821.85 | 1,119,799.20 | 1,051,977.35 | 0.6274 | 660,023.60 | 4,586,223.07 |
| 9 | 69,178.28 | 1,130,913.20 | 1,061,734.92 | 0.5919 | 628,439.27 | 4,563,291.96 |
| 10 | 70,561.85 | 1,142,137.52 | 1,071,575.67 | 0.5584 | 598,362.26 | 4,540,475.50 |
| 11 | 71,973.09 | 1,153,473.23 | 1,081,500.14 | 0.5268 | 569,720.78 | 4,517,773.12 |
| 12 | 273,412.55 | 1,164,921.45 | 891,508.90 | 0.4970 | 443,052.61 | 4,495,184.25 |
| 13 | 74,880.80 | 1,176,483.30 | 1,101,602.50 | 0.4688 | 516,474.24 | 4,472,708.33 |
| 14 | 76,378.42 | 1,188,159.90 | 1,111,781.48 | 0.4423 | 491,742.02 | 4,450,344.79 |
| 15 | 77,905.98 | 1,199,952.38 | 1,122,046.40 | 0.4173 | 468,190.76 | 4,428,093.07 |
| 16 | 79,464.10 | 1,211,861.91 | 1,132,397.81 | 0.3936 | 445,764.19 | 4,405,952.60 |
| 17 | 81,053.39 | 1,223,889.64 | 1,142,836.25 | 0.3714 | 424,408.72 | 4,383,922.84 |
| 18 | 82,674.45 | 1,236,036.74 | 1,153,362.29 | 0.3503 | 404,073.32 | 4,362,003.22 |
| 19 | 84,327.94 | 1,248,304.41 | 1,163,976.47 | 0.3305 | 384,709.37 | 4,340,193.21 |
| 20 | 86,014.50 | 1,260,693.83 | 1,174,679.33 | 0.3118 | 366,270.57 | 4,318,492.24 |
| 21 | 87,734.79 | 1,273,206.22 | 1,185,471.42 | 0.2942 | 348,712.82 | 4,296,899.78 |
| 22 | 89,489.49 | 1,285,842.79 | 1,196,353.30 | 0.2775 | 331,994.14 | 4,275,415.28 |
| 23 | 91,279.28 | 1,298,604.78 | 1,207,325.50 | 0.2618 | 316,074.51 | 4,254,038.21 |
| 24 | 93,104.86 | 1,311,493.43 | 1,218,388.57 | 0.2470 | 300,915.84 | 4,232,768.01 |
| 25 | 94,966.96 | 1,324,510.00 | 1,229,543.04 | 0.2330 | 286,481.84 | 4,211,604.17 |

## 6. Compliance and customs pointers

**Standards referenced on this page (generic, not product-specific).** Modules: IEC 61215 / IEC 61730 design-qualification and module-safety family (catalogue: [IEC Webstore](https://webstore.iec.ch/)) and [UL 61730-1 (PV Module Safety Qualification — Part 1)](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1). Inverters: [ENA Engineering Recommendation G99](https://www.energynetworks.org/industry-hub/engineering-and-technical-programmes/g99) compliance; safety per [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470) and [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471) (TC 82, Safety of power converters for use in PV power systems). Installation documentation: BS EN 62446 (IEC Webstore catalogue). DC/AC protection on GB sites: BS 7671 18th Edition Amendment 2:2022 (IET Wiring Regulations) via the [IET Wiring Regulations hub](https://www.theiet.org/resources/wiring-regulations/). Health & safety during construction: CDM 2015. O&M contractor: typically aligned to ISO 9001 / ISO 14001 / ISO 45001 — standards list at [ISO standards search](https://www.iso.org/search.html?q=2859) (use the catalogue; do not deep-link to /standard/NNNNN.html). **Disclaimer:** this page does not endorse any specific certified product; certificate number, issuer and in-date status must be verified against the supplier's own documentation at RFQ.   **HS code block — duty rates marked PENDING; never assert as fact.**
Reference HS codes used for GB import declarations on solar PV hardware (look up live duty and any trade-remedy measures against the country of origin on the day of clearance):
• `8541.43` — Photovoltaic cells, modules and panels (WCO HS Nomenclature 2022 edition notes apply: see [WCO HS Nomenclature 2022](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition)). Look up live UK duty at [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/).
• `8504.40` — Static converters (inverters). Look up at [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/); for EU import see [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); for US import see [USITC HTS search](https://hts.usitc.gov/).
• `7610.90` — Aluminium structures and parts (rooftop mounting kits). Same lookup tools as above.
**Trade-remedy watch.** Anti-dumping and safeguard measures on certain PV origins have changed historically and remain subject to active review; always re-check the live measure table on the day of customs clearance, and verify origin documentation (EUR.1, statement on origin, or UK preferential origin declaration) before relying on a reduced rate. Incoterms 2020 obligations sit with the named Incoterm per the contract: [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/). **Disclaimer:** Tradvolt does not provide legal or customs advice; confirm duty, VAT, deferment and any post-Brexit customs warehousing treatment with your broker before shipment.

## 7. Next steps

Use the RFQ anchor below to start a like-for-like comparison. Replace the inputs in §2 with your own site survey and DNO connection offer (under [ENA G99](https://www.energynetworks.org/industry-hub/engineering-and-technical-programmes/g99)) and the TCO summary in §4 will change accordingly. Re-check the sensitivity section §2b against your own self-consumption share and tariff-escalation view before publishing the margin to internal stakeholders.

[Request a fixed-price RFQ for a 5 MWp UK factory solar array](/rfq/)

## Frequently Asked Questions

### What are the 25-year NPV, IRR, payback, and LCOE for the 5 MWp UK factory rooftop solar array?

Under the modelled scenario for a 5,000 kWp DC rooftop array at a Midlands UK manufacturing estate (25-year horizon, 6.00% real WACC), the scenario TCO model returns a computed NPV of £12,016,367.89 (rounded to £12,016,368), an IRR of 61.88%, a simple payback of 1.63 years, a discounted payback of 1.78 years, and an LCOE of £0.0453/kWh (4.53 p/kWh), saving 17.47 p/kWh against a 22.0 p/kWh avoided import tariff.

### How sensitive are the headline NPV and IRR to the 100% self-consumption and 1.5%/yr tariff-escalation defaults?

The headline £12.02M NPV is conditional on two bounded defaults: 100% on-site self-consumption and 1.5%/yr tariff escalation. In the Section 2b spot-checks, reducing self-consumption from 100% to 70% (with the remaining 30% exported at an Ofgem SEG mid-band rate of £0.075/kWh) lowers NPV by roughly £3.5M to ≈ £8,520,000 and IRR to ≈ 47.2% (2.30-yr discounted payback), while LCOE stays unchanged at £0.0453/kWh (a ≈ 12.7 p/kWh margin).

### What cost inputs and Year-12 inverter replacement reserve drive the 25-year UK cash flow?

Based on bounded UK DESNZ C&I cost bands (£0.14/Wp modules, £0.05/Wp string inverters, £0.09/Wp mounting/BoS, plus 10% EPC margin and 5% contingency), Year-0 CAPEX is £1,617,000.00. Year-1 generation is 4,750,000 kWh (950 kWh/kWp/yr specific yield, degrading 0.5%/yr), producing £1,045,000.00 in Year-1 benefit against £59,043.00 in Year-1 O&M and insurance (£11/kWp/yr + 0.25% capex). In Year 12, a £0.04/Wp (£200,000) inverter swap lifts annual cost to £273,412.55.

### Why is the UK factory array sized at 5.0 MWp DC, and which OEM hardware families are referenced?

Against a site drawing roughly 6.2 GWh/year, the array is sized at 5.0 MWp DC to match the maximum capacity typically accepted by Great Britain Distribution Network Operators (DNOs) under ENA Engineering Recommendation G99 without a contested connection offer. Reference hardware pairs LONGi Hi-MO X6 back-contact HPBC modules (>25.5% cell efficiency; or Hi-MO 9 / Jinko Tiger Neo 3.0 / Canadian Solar TopHiKu6 comparators) with Huawei FusionSolar string inverters and K2 Systems mounting rails.

### Which UK electrical standards and customs tariff lookup rules apply to importing the 5 MWp PV stack?

UK compliance covers IEC 61215, IEC 61730, and UL 61730-1 for modules, ENA G99 and IEC 62109-1:2010 / IEC 62109-2:2011 for string inverters, BS EN 62446 for commissioning documentation, BS 7671 18th Edition Amendment 2:2022 (IET Wiring Regulations), and CDM 2015 for construction safety. Indicative HS codes—8541.43 (PV modules), 8504.40 (inverters), and 7610.90 (aluminium mounting)—carry PENDING duty status for live lookup on the UK Global Tariff portal.