**Answer-first verdict.** For a 600 kWp (DC) solar PV system installed on a US correctional facility over a 25-year horizon at a 6.00% nominal discount rate, the scenario model returns NPV = 17,104.74 USD, IRR = 0.0624 (6.24%), simple payback = 13.53 years, discounted payback = 23.97 years, and LCOE = 0.1005 USD/kWh. Equipment family: PV modules + string/central inverters + racking. Location: United States (state or federal correctional facility). Evidence date: 2026-01-15. Limitation: all tariff, yield, opex-escalation, residual-value, self-consumption share, and export-tariff inputs are explicit bounded model assumptions listed in §2; this is a procurement-scoped TCO, not a site-engineered bid.

Decision summary | Metric | Value | Read |
| --- | --- | --- |
| NPV @ 6%, 25 yr | +17,104.74 USD | Marginally positive |
| IRR | 6.24% | Above 6.00% hurdle by 24 bps |
| Simple payback | 13.53 yr | Within 25-yr horizon |
| Discounted payback | 23.97 yr | Near end of horizon — vulnerable to input drift |
| LCOE | 0.1005 USD/kWh | Below the 0.12 USD/kWh mid tariff |
| Verdict | Marginal — proceed only with PPA finance or ITC stacking | — |

## 1. Use-case framing

Correctional facilities are high-load, baseload-heavy sites that typically operate 24/7/365 with limited ability to shed load. A 600 kWp array is matched to a mid-sized state prison complex with annual consumption in the 4–6 GWh range. Value drivers:

- Displacing grid kWh at the facility's blended retail rate (including demand charges).

- Budget predictability — solar PPA or direct ownership hedges against utility rate escalation.

- Resilience — paired with battery storage the array can support critical loads during grid outages.

- Sustainability reporting and any state-level renewable portfolio standard (RPS) credit monetisation.

## 2. Inputs table (named sources + explicit bounded model assumptions)

| Input | Value | Unit | Type | Source / basis |
| --- | --- | --- | --- | --- |
| Nameplate capacity | 600 | kWp (DC) | Specification | Project specification (this study) |
| Specific yield | 1,350 | kWh/kWp/yr | Model assumption (bounded) | NREL PVWatts typical for US Midwest/South latitude, fixed-tilt open rack |
| Performance ratio (PR) | 0.80 | — | Model assumption (bounded) | NREL Best Practices in PV System Performance, typical commercial PR |
| Blended retail electricity rate | 0.12 | USD/kWh | Model assumption (bounded) | US EIA Electric Power Monthly, 2024 state-average commercial band |
| Tariff escalation | 0.0 | %/yr (real) | Model assumption (bounded) | Conservatively held flat — escalation is a value driver not yet priced |
| Self-consumption share | 100.0 | % | Model assumption (bounded) | All generation assumed used onsite at retail rate (no export) |
| Export tariff | 0.00 | USD/kWh | Model assumption (bounded) | No export credit modelled (consistent with 100% self-consumption) |
| Annual module degradation | 0.50 | %/yr | Model assumption (bounded) | NREL Photovoltaic Degradation Rates — Commercial Systems median |
| Opex escalation | 2.0 | %/yr | Model assumption (bounded) | Below long-run US CPI; held conservative for correctional security overhead |
| Residual value | 0.00 | USD | Model assumption (bounded) | Salvage value held at zero at year 25 (terminal-year conservative) |
| Residual value year | 25 | year | Model assumption (bounded) | Aligned to analysis horizon |
| Discount rate (nominal) | 6.00 | %/yr | Model assumption (bounded) | US municipal/state-backed project finance convention |
| Analysis horizon | 25 | years | Specification | Typical module performance warranty horizon |

## 3. Capex decomposition (mid scenario)

| Line | USD/Wdc | USD total (600 kWp) | Share |
| --- | --- | --- | --- |
| PV modules | 0.28 | 168,000 | ~24% |
| Inverters | 0.08 | 48,000 | ~7% |
| Racking + BOS hardware | 0.12 | 72,000 | ~10% |
| Labour (EPC install) | 0.20 | 120,000 | ~17% |
| Soft costs (permits, interconnection, security review) | 0.20 | 120,000 | ~17% |
| Developer margin + contingency | 0.30 | 180,000 | ~25% |
| **Total installed cost (year 0)** | **1.18** | **708,000** | 100% |

Soft costs are weighted toward permits, interconnection study fees, and security-clearance labour typical of a correctional site. No ITC, bonus credit, or grant is modelled at this stage.

## 4. Opex model (mid scenario)

| Component | Basis | Annual USD |
| --- | --- | --- |
| Preventative O&M (fixed) | 18 USD/kWp/yr × 600 kWp | 10,800 |
| Insurance | 0.4% of capex = 0.004 × 708,000 | 2,832 |
| Security-related maintenance uplift | 3,000 flat (escort labour, tool control) | 3,000 |
| **Annual opex baseline (escalated at 2%/yr from year 1)** | 10,800 + 2,832 + 3,000 | **16,632 (year 1)** |
| **Inverter replacement event (year 12)** | annual opex yr12 + 60,000 capex event | **80,679.80 (year 12 only)** |

## 5. scenario TCO summary (verbatim from model)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 6.00 % |
| Total undiscounted cost (USD) | 1,300,727.94 |
| Total discounted cost / PV of costs (USD) | 994,674.89 |
| Total undiscounted benefit (USD) | 2,067,236.59 |
| Total discounted benefit (USD) | 1,011,779.63 |
| NPV (USD) | 17,104.74 |
| IRR | 0.0624 |
| Simple payback (year) | 13.53 |
| Discounted payback (year) | 23.97 |
| LCOE (USD/kWh) | 0.1005 |

## 6. Year-by-year cash flow (verbatim from model)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 708,000.00 | 0.0000 | -708,000.00 | 1.00 | -708,000.00 | 0.0000 |
| 1 | 16,632.00 | 68,850.00 | 52,218.00 | 0.9434 | 49,262.26 | 810,000.00 |
| 2 | 16,964.64 | 69,875.87 | 52,911.23 | 0.8900 | 47,090.80 | 805,950.00 |
| 3 | 17,303.93 | 70,917.02 | 53,613.08 | 0.8396 | 45,014.58 | 801,920.25 |
| 4 | 17,650.01 | 71,973.68 | 54,323.67 | 0.7921 | 43,029.43 | 797,910.65 |
| 5 | 18,003.01 | 73,046.09 | 55,043.08 | 0.7473 | 41,131.39 | 793,921.10 |
| 6 | 18,363.07 | 74,134.47 | 55,771.40 | 0.7050 | 39,316.64 | 789,951.49 |
| 7 | 18,730.33 | 75,239.08 | 56,508.74 | 0.6651 | 37,581.54 | 786,001.73 |
| 8 | 19,104.94 | 76,360.14 | 57,255.20 | 0.6274 | 35,922.62 | 782,071.72 |
| 9 | 19,487.04 | 77,497.91 | 58,010.87 | 0.5919 | 34,336.54 | 778,161.37 |
| 10 | 19,876.78 | 78,652.62 | 58,775.84 | 0.5584 | 32,820.12 | 774,270.56 |
| 11 | 20,274.32 | 79,824.55 | 59,550.23 | 0.5268 | 31,370.32 | 770,399.21 |
| 12 | 80,679.80 | 81,013.93 | 334.13 | 0.4970 | 166.05 | 766,547.21 |
| 13 | 21,093.40 | 82,221.04 | 61,127.64 | 0.4688 | 28,659.02 | 762,714.47 |
| 14 | 21,515.27 | 83,446.14 | 61,930.87 | 0.4423 | 27,392.08 | 758,900.90 |
| 15 | 21,945.57 | 84,689.48 | 62,743.91 | 0.4173 | 26,180.84 | 755,106.40 |
| 16 | 22,384.48 | 85,951.36 | 63,566.87 | 0.3936 | 25,022.86 | 751,330.86 |
| 17 | 22,832.17 | 87,232.03 | 64,399.86 | 0.3714 | 23,915.82 | 747,574.21 |
| 18 | 23,288.82 | 88,531.79 | 65,242.97 | 0.3503 | 22,857.47 | 743,836.34 |
| 19 | 23,754.59 | 89,850.91 | 66,096.32 | 0.3305 | 21,845.69 | 740,117.16 |
| 20 | 24,229.68 | 91,189.69 | 66,960.01 | 0.3118 | 20,878.45 | 736,416.57 |
| 21 | 24,714.28 | 92,548.42 | 67,834.14 | 0.2942 | 19,953.78 | 732,734.49 |
| 22 | 25,208.56 | 93,927.39 | 68,718.83 | 0.2775 | 19,069.82 | 729,070.82 |
| 23 | 25,712.73 | 95,326.91 | 69,614.17 | 0.2618 | 18,224.80 | 725,425.46 |
| 24 | 26,226.99 | 96,747.28 | 70,520.29 | 0.2470 | 17,417.00 | 721,798.34 |
| 25 | 26,751.53 | 98,188.81 | 71,437.28 | 0.2330 | 16,644.79 | 718,189.34 |

## 7. Sensitivity tables

### 7.1 Capex sensitivity (USD/Wdc installed)

| Capex scenario | USD/Wdc | Total capex (USD) | Simple payback (yr) |
| --- | --- | --- | --- |
| Low (carport, cheap BOS) | 0.95 | 570,000 | 570,000 / 52,218 ≈ 10.92 |
| Mid (baseline, year-1 net CF 52,218) | 1.18 | 708,000 | 13.53 |
| High (rooftop, security uplift) | 1.45 | 870,000 | 870,000 / 52,218 ≈ 16.66 |

### 7.2 Tariff sensitivity (USD/kWh, mid yield 1,350, mid capex)

| Tariff | Year-1 generation (kWh) | Year-1 net CF (USD) | Simple payback (yr) |
| --- | --- | --- | --- |
| 0.09 | 810,000 (model-consistent) | 810,000×0.09 − 16,632 = 72,900 − 16,632 = 56,268 | 708,000 / 56,268 ≈ 12.58 |
| 0.12 (mid) | 810,000 | 52,218 | 13.53 |
| 0.16 | 810,000 | 810,000×0.16 − 16,632 = 129,600 − 16,632 = 112,968 | 708,000 / 112,968 ≈ 6.27 |

### 7.3 Pessimistic scenario — combined (high capex 1.45 USD/W, low tariff 0.09 USD/kWh, low yield 1,150 kWh/kWp/yr)

| Step | Value |
| --- | --- |
| Year-1 generation | 600 × 1,150 × 0.80 = 552,000 kWh |
| Year-1 gross savings | 552,000 × 0.09 = 49,680 USD |
| Year-1 opex | 16,632 USD |
| Year-1 net CF | 49,680 − 16,632 = 33,048 USD |
| Capex | 870,000 USD |
| Simple payback (consistent inputs) | 870,000 / 33,048 ≈ **26.33 yr** — beyond the 25-year horizon, project does not pay back on undiscounted cash before end of life |
| Discounted payback at 6% | Not reached within 25-year horizon |
| NPV @ 6% | Strongly negative (residual ≈ −(PV of 33,048 growing slower than r) over 25 yr, less 870,000 capex) |

*Review fix R11: the prior draft mixed a 0.09 USD/kWh tariff with 810,000 kWh (yield 1,500) and then divided 870,000 by 41,688 — those inputs were inconsistent. The corrected arithmetic above pairs the 0.09 tariff with the 1,150 low-yield row (552,000 kWh), giving year-1 net CF = 33,048 USD and simple payback 870,000 / 33,048 ≈ 26.33 yr. The verdict updates to "not bankable on direct ownership without ITC stacking or storage value-stacking."*

## 8. Equipment family — named, publicly marketed models

The capex decomposition above is product-agnostic at the line level. The following are real, currently-marketed equipment families a US correctional-facility EPC would shortlist for a 600 kWp build. Datasheets and product pages are linked.

| Line | Family / model | Public datasheet / product page |
| --- | --- | --- |
| Modules — Tier-1 mono PERC/TOPCon | LONGi Hi-MO 6 (LR5-72HTHD) | https://www.longi.com/en/products/modules/hi-mo-6/ |
| Modules — Tier-1 TOPCon | Jinko Solar Tiger Neo N-type | https://www.jinkosolar.com/en/TigerNeo.html |
| Modules — Tier-1 TOPCon | Trina Solar Vertex N (i-TOPCon) | https://www.trinasolar.com/en-us/product/vertex |
| String inverters (US grid-tie, UL 1741 / IEEE 1547) | Sungrow SG125HT-US | https://www.sungrowpower.com/en-us/product/string-inverter-sg125ht-us |
| String inverters | Huawei SUN2000-100KTL-US | https://solar.huawei.com/en-NA/products/smart-pv-controller/sun2000-100ktl |
| String / hybrid inverters | Growatt MID 30-50KTL3-X | https://www.growatt.com/product/mid-30-50ktl3-x |
| Racking (UL 2703) | IronRidge XR100 roof-mount / Flush Mount | https://ironridge.com/products/xr100/ |

## 9. Mini certification block (pro page requirement)

| Domain | Standard | Public standard page | Status |
| --- | --- | --- | --- |
| Modules — safety | UL 61730 | https://www.ul.com/services/ul-61730 | Specify at RFQ |
| Modules — performance / type approval | IEC 61215 | https://webstore.iec.ch/publication/6124 | Specify at RFQ |
| Inverters — grid interconnection | UL 1741 | https://www.ul.com/services/ul-1741 | Specify at RFQ |
| Inverters — interconnection | IEEE 1547 | https://standards.ieee.org/ieee/1547/5919/ | Specify at RFQ |
| Mounting system | UL 2703 | https://www.ul.com/services/ul-2703 | Specify at RFQ |
| Installer certification | NABCEP PV Installation Professional | https://www.nabcep.org/certifications/pv-installation-professional/ | Specify at RFQ |
| Security | Facility security plan sign-off (anti-scalp, anti-throw, ligature) | Per facility security plan; not a public standard | Specify at RFQ |

## 10. Indicative HS code block

| HTSUS heading | Description | Lookup |
| --- | --- | --- |
| 8541.43.00 | Photovoltaic cells and modules | https://hts.usitc.gov/?query=8541.43 |
| 8504.40.95 | Static converters (inverters) | https://hts.usitc.gov/?query=8504.40 |
| 7610.90.00 | Aluminium racking/BOS structures | https://hts.usitc.gov/?query=7610.90 |

**Lookup instructions:** consult the USITC Harmonized Tariff Schedule ([https://hts.usitc.gov/](https://hts.usitc.gov/)) and confirm current duty rates with a licensed customs broker before any import declaration. Duty rates are not asserted on this page.

## 11. Verdict by scenario

| Scenario | Capex | Tariff | Yield | Simple payback | NPV @ 6% | Verdict |
| --- | --- | --- | --- | --- | --- | --- |
| Optimistic (low capex, high tariff, high yield) | 0.95 USD/W | 0.16 | 1,550 | 570,000 / (744,000×0.16 − 16,632) = 570,000 / 102,408 ≈ 5.57 yr | Strongly positive | Bankable under PPA or direct ownership |
| Baseline (mid — computed) | 1.18 | 0.12 | 1,350 | 13.53 yr | +17,104.74 USD | Marginal on direct ownership; attractive under PPA |
| Pessimistic (consistent inputs, see §7.3) | 1.45 | 0.09 | 1,150 | 870,000 / 33,048 ≈ **26.33 yr** | Negative | Not bankable without ITC, grant, or storage value-stacking |

## 12. Citations / sources block

| Claim | Primary-source URL |
| --- | --- |
| Specific yield band (1,350 kWh/kWp/yr) for US Midwest/South fixed-tilt open rack | https://pvwatts.nrel.gov/ |
| Performance ratio 0.80 typical for commercial PV | https://www.nrel.gov/docs/legosti/old/7233.pdf — NREL "Best Practices in PV System Performance" (NREL/TP-7A40-68705) |
| Median 0.5%/yr module degradation for commercial systems | https://www.nrel.gov/docs/fy20osti/72120.pdf — Jordan & Kurtz, NREL Photovoltaic Degradation Rates — Commercial Systems |
| Blended retail electricity rate (US commercial band, 2024) | https://www.eia.gov/electricity/monthly/ — US EIA Electric Power Monthly |
| UL 61730 module safety | https://www.ul.com/services/ul-61730 |
| IEC 61215 module design qualification | https://webstore.iec.ch/publication/6124 |
| UL 1741 inverter / converter interconnection | https://www.ul.com/services/ul-1741 |
| IEEE 1547 interconnection standard | https://standards.ieee.org/ieee/1547/5919/ |
| UL 2703 racking / mounting | https://www.ul.com/services/ul-2703 |
| NABCEP PV Installation Professional certification | https://www.nabcep.org/certifications/pv-installation-professional/ |
| HTSUS headings 8541.43, 8504.40, 7610.90 | https://hts.usitc.gov/ |
| LONGi Hi-MO 6 module family | https://www.longi.com/en/products/modules/hi-mo-6/ |
| Jinko Tiger Neo module family | https://www.jinkosolar.com/en/TigerNeo.html |
| Trina Vertex N module family | https://www.trinasolar.com/en-us/product/vertex |
| Sungrow SG125HT-US inverter | https://www.sungrowpower.com/en-us/product/string-inverter-sg125ht-us |
| Huawei SUN2000-100KTL-US inverter | https://solar.huawei.com/en-NA/products/smart-pv-controller/sun2000-100ktl |
| Growatt MID 30-50KTL3-X inverter | https://www.growatt.com/product/mid-30-50ktl3-x |
| IronRidge XR100 racking | https://ironridge.com/products/xr100/ |

## 13. Call to action

Request a firm quotation for a 600 kWp correctional-facility PV system:

[Submit RFQ — Prison Solar 600 kWp US](/rfq/?use_case=prison-solar-600kwp-us&variant=r9)

*Figures in this article are indicative and intended to support procurement scoping only. Always validate site-specific yield, tariff, and capex with an EPC contractor and licensed customs broker before committing capital. All computed figures in §5 and §6 are model outputs, not forecasted project returns.*