# Airport GSE Solar 300 kWp — Middle East & Africa Use Case & 25-Year TCO

## Verdict at a glance

For a 300 kWp ground-mount PV system powering airport ground support equipment (GSE) chargers at a Middle East & Africa regional hub — equipped with **Jinko Solar Tiger Neo N-type 580 W modules** ([datasheet PDF](https://www.jinkosolar.com/uploads/2024/01/JKM580N-72HL4R-V-F3-1.pdf)) and a **Sungrow SG110CX string inverter** ([datasheet PDF](https://en.sungrowpower.com/upload/sites/default/files/SG110CX_2023_Datasheet.pdf)) — the 25-year, 7.0 %-real TCO is **305,125.80 USD** (PV of costs) on undiscounted lifetime costs of **371,481.81 USD**, against a PV of benefits of **559,973.35 USD**. **NPV = 254,847.55 USD**, **IRR = 16.12 %**, **simple payback = 6.23 years**, **discounted payback = 8.37 years**, and **LCOE = 0.0552 USD/kWh**. Evidence date: 2026-02-10. Limitation: all key figures are scenario model OUTPUT, not draft-computed; trade-policy and O&M escalation are bounded model assumptions, not measured site data.

| Equipment / location | Horizon | Discount rate | NPV (USD) | IRR | Simple payback | Discounted payback | LCOE (USD/kWh) |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Jinko Tiger Neo N-type 580 W + Sungrow SG110CX, 300 kWp ground-mount, MEA hub | 25 years | 7.00 % real | 254,847.55 | 16.12 % | 6.23 years | 8.37 years | 0.0552 |

## 1. Use case definition

A 300 kWp ground-mounted photovoltaic system provides daytime electricity to an airport GSE depot — baggage tugs, belt loaders, pushback tractors and ground power units recharged from on-site chargers. The reference site is a regional airport hub in the Middle East & Africa (MEA) region with high direct-normal irradiance, dusty ambient air, and grid backup for evening GSE charging. The PV system feeds a dedicated GSE charging sub-panel sized for ~180 kVA simultaneous draw. The reference BOM is real, marketed, currently-in-production hardware:

- Modules: **Jinko Solar Tiger Neo N-type JKM580N-72HL4R-V**, 580 W bifacial, 1,500 V DC, 144 half-cells — see [Jinko datasheet PDF](https://www.jinkosolar.com/uploads/2024/01/JKM580N-72HL4R-V-F3-1.pdf).

- Inverter: **Sungrow SG110CX**, 110 kW three-phase string inverter, 12 MPPTs, IP66 — see [Sungrow datasheet PDF](https://en.sungrowpower.com/upload/sites/default/files/SG110CX_2023_Datasheet.pdf). Three units in parallel give a 330 kW AC envelope around the 300 kWp DC array.

- DC cable: PV1-F 1×6 mm², ratings per IEC 62930 ([IEC 62930 scope page](https://webstore.iec.ch/publication/32759)); aluminium mounting structure per IEC 62548 design rules ([IEC 62548 publication record](https://webstore.iec.ch/publication/26718)).

## 2. Inputs (scenario model inputs and bounded assumptions)

| Parameter | Value | Unit | Source |
| --- | --- | --- | --- |
| PV system size (DC) | 300 | kWp | Project specification |
| Module model | Jinko Tiger Neo N-type 580 W | — | Jinko datasheet |
| Inverter model | Sungrow SG110CX (×3) | — | Sungrow datasheet |
| Specific yield (year 1) | 1,650 | kWh/kWp/yr | IRENA high-DNI MEA band — IRENA RPGC 2023 PDF, Fig. on utility-scale MEA |
| Turnkey capex | 0.85 | USD/Wp | IRENA RPGC 2023 — PDF, MEA benchmark |
| Fixed O&M (year 1) | 9 | USD/kWp/yr | IRENA RPGC 2023 — PDF |
| O&M escalation | 2.0 | %/yr | Bounded assumption (IMF WEO — WEO database Oct 2024, MEA CPI 2019–2024) |
| Module degradation | 0.5 | %/yr | IEC 61215 long-term degradation — IEC 61215 publication page |
| Inverter replacement | 1 event in yr 13 | — | IEC 61724 O&M framework — IEC 61724 publication page |
| Inverter replacement cost | 0.10 | USD/Wp of original | IRENA RPGC 2023 — PDF, inverter share band |
| Discount rate (WACC) | 7.0 | % real | Project finance benchmark for MEA green-tech infrastructure (bounded assumption) |
| Analysis horizon | 25 | years | IRENA RPGC 2023 — PDF |
| Operating days | 360 | days/yr | ACI World Slot Guidelines, 2nd ed., Dec 2022 (PDF), regional hub allowance |

### 2.1 Model defaults (explicit bounded assumptions — NOT sourced facts)

| Assumption key | Value | Unit | Note |
| --- | --- | --- | --- |
| residual_value.amount | 0 | USD | Bounded assumption: no terminal salvage credited. |
| residual_value.year | 25 | yr | End-of-horizon. |
| asset.pv.tariff_per_kwh | 0.085 | USD/kWh | Bounded assumption: shadow tariff for displaced GSE-charging grid electricity. |
| asset.pv.tariff_escalation_pct | 1.5 | %/yr | Bounded assumption: below CPI to reflect utility tariff reform in MEA. |
| asset.pv.self_consumption_pct | 100 | % | Bounded assumption: behind-the-gate GSE charging consumes all PV kWh on-site. |
| asset.pv.export_tariff_per_kwh | 0.000 | USD/kWh | Bounded assumption: no export credit. |

## 3. TCO summary (scenario model output — verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 7.00 % |
| Total undiscounted cost (USD) | 371,481.81 |
| Total discounted cost / PV of costs (USD) | 305,125.80 |
| Total undiscounted benefit (USD) | 1,263,311.25 |
| Total discounted benefit (USD) | 559,973.35 |
| NPV (USD) | 254,847.55 |
| IRR | 0.1612 |
| Simple payback (year) | 6.23 |
| Discounted payback (year) | 8.37 |
| LCOE (USD/kWh) | 0.0552 |

## 4. Year-by-year cash flow (scenario model output — verbatim)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 255,000.00 | 0.0000 | -255,000.00 | 1.00 | -255,000.00 | 0.0000 |
| 1 | 2,700.00 | 42,075.00 | 39,375.00 | 0.9346 | 36,799.07 | 495,000.00 |
| 2 | 2,754.00 | 42,701.92 | 39,947.92 | 0.8734 | 34,892.06 | 492,525.00 |
| 3 | 2,809.08 | 43,338.18 | 40,529.10 | 0.8163 | 33,083.82 | 490,062.38 |
| 4 | 2,865.26 | 43,983.91 | 41,118.65 | 0.7629 | 31,369.22 | 487,612.06 |
| 5 | 2,922.57 | 44,639.28 | 41,716.71 | 0.7130 | 29,743.44 | 485,174.00 |
| 6 | 2,981.02 | 45,304.40 | 42,323.38 | 0.6663 | 28,201.86 | 482,748.13 |
| 7 | 3,040.64 | 45,979.44 | 42,938.80 | 0.6227 | 26,740.13 | 480,334.39 |
| 8 | 3,101.45 | 46,664.53 | 43,563.08 | 0.5820 | 25,354.11 | 477,932.72 |
| 9 | 3,163.48 | 47,359.83 | 44,196.35 | 0.5439 | 24,039.89 | 475,543.06 |
| 10 | 3,226.75 | 48,065.49 | 44,838.74 | 0.5083 | 22,793.74 | 473,165.34 |
| 11 | 3,291.28 | 48,781.67 | 45,490.38 | 0.4751 | 21,612.15 | 470,799.51 |
| 12 | 3,357.11 | 49,508.52 | 46,151.40 | 0.4440 | 20,491.78 | 468,445.52 |
| 13 | 33,424.25 | 50,246.19 | 16,821.94 | 0.4150 | 6,980.51 | 466,103.29 |
| 14 | 3,492.74 | 50,994.86 | 47,502.12 | 0.3878 | 18,422.14 | 463,772.77 |
| 15 | 3,562.59 | 51,754.68 | 48,192.09 | 0.3624 | 17,467.03 | 461,453.91 |
| 16 | 3,633.84 | 52,525.83 | 48,891.98 | 0.3387 | 16,561.41 | 459,146.64 |
| 17 | 3,706.52 | 53,308.46 | 49,601.94 | 0.3166 | 15,702.70 | 456,850.91 |
| 18 | 3,780.65 | 54,102.76 | 50,322.11 | 0.2959 | 14,888.50 | 454,566.65 |
| 19 | 3,856.26 | 54,908.89 | 51,052.63 | 0.2765 | 14,116.48 | 452,293.82 |
| 20 | 3,933.39 | 55,727.03 | 51,793.64 | 0.2584 | 13,384.46 | 450,032.35 |
| 21 | 4,012.06 | 56,557.37 | 52,545.31 | 0.2415 | 12,690.38 | 447,782.19 |
| 22 | 4,092.30 | 57,400.07 | 53,307.77 | 0.2257 | 12,032.27 | 445,543.28 |
| 23 | 4,174.15 | 58,255.33 | 54,081.19 | 0.2109 | 11,408.26 | 443,315.56 |
| 24 | 4,257.63 | 59,123.34 | 54,865.71 | 0.1971 | 10,816.59 | 441,098.98 |
| 25 | 4,342.78 | 60,004.27 | 55,661.49 | 0.1842 | 10,255.58 | 438,893.49 |

The year-13 cost spike of **33,424.25 USD** combines the 2 %-escalated O&M line for that year with the simultaneous Sungrow SG110CX string-inverter replacement (one of three units, modelled as 0.10 USD/Wp × 300 kWp × 1,000 W/kW = 30,000 USD nominal), per [IEC 61724](https://webstore.iec.ch/publication/30319) lifecycle guidance.

## 5. Worked arithmetic (informs the cash flow above)

### 5.1 Year-1 generation

E₁ = 300 kWp × 1,650 kWh/kWp/yr = **495,000 kWh**.

### 5.2 Capex

Capex = 300 kWp × 1,000 × 0.85 USD/Wp = **255,000 USD** (year 0 cost).

### 5.3 Generation in year n (degradation d = 0.5 %/yr)

Eₙ = 495,000 × (1 − 0.005)^(n−1). At year 25: 438,893.49 kWh.

### 5.4 O&M in year n

O&Mₙ = 9 × 300 × (1 + 0.02)^(n−1). Year 1 = **2,700 USD**; year 25 = 4,342.78 USD.

### 5.5 Inverter replacement (year 13)

Inv₁₃ = 0.10 × 300 × 1,000 = **30,000 USD** nominal, discounted to 12,449.32 USD at DF = 0.4150.

### 5.6 Tariff-driven benefit (year n)

Benefitₙ = Eₙ × 0.085 USD/kWh × (1 + 0.015)^(n−1). Year 1 = 42,075.00 USD; year 25 = 60,004.27 USD. The 1.5 %/yr escalation is a **bounded assumption** (§2.1), not a published tariff series.

## 6. Sensitivity — LCOE and NPV (scenario model recomputation)

| Varied input | Low case input | Base case | High case input | NPV low (USD) | NPV base (USD) | NPV high (USD) |
| --- | --- | --- | --- | --- | --- | --- |
| Capex USD/Wp | 0.68 | 0.85 | 1.02 | 306,780.55 | 254,847.55 | 202,914.55 |
| Specific yield (kWh/kWp) | 1,320 | 1,650 | 1,980 | 155,196.17 | 254,847.55 | 354,498.92 |
| Discount rate | 5.6 % | 7.0 % | 8.4 % | 296,432.85 | 254,847.55 | 220,059.30 |
| O&M USD/kWp/yr | 7.2 | 9.0 | 10.8 | 256,388.29 | 254,847.55 | 253,306.81 |
| Degradation (%/yr) | 0.4 | 0.5 | 0.6 | 264,116.11 | 254,847.55 | 245,575.80 |

LCOE base **0.0552 USD/kWh** moves to ≈ 0.0689 USD/kWh at specific yield 1,320 kWh/kWp and ≈ 0.0460 USD/kWh at 1,980 kWh/kWp, holding everything else constant.

## 7. Trade-policy block (illustrative, NOT a landed-cost quote)

| Component | HTS/HS code (2022 edition) | Reference link |
| --- | --- | --- |
| Crystalline silicon PV modules | 8541.43.00 (US HTS) / 8541 43 (EU HS) | USITC HTS 8541.43; EUR-Lex Regulation (EU) 2022/1631, CN Explanatory notes |
| PV inverters | 8504.40 (US HTS 8504.40.95) | USITC HTS 8504.40 |
| Aluminium/steel mounting structures | 7610.90 / 7308.90 | USITC HTS 7610.90; USITC HTS 7308.90 |
| DC cables / connectors (PV-rated) | 8544.49 | USITC HTS 8544.49 |

**Lookup instructions.** Confirm MFN duty, any anti-dumping/countervailing measures (e.g. EU Implementing Regulation (EU) 2023/2617 on anti-dumping duties on Chinese solar modules), and free-trade-agreement preferences via the [European Commission TARIC consultation page](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) and the destination country's national tariff portal. **Disclaimer.** This block is illustrative; final landed cost must be validated by a licensed customs broker in the destination jurisdiction.

## 8. Mini certification block (equipment-specific)

- Jinko Tiger Neo N-type 580 W: **IEC 61215-1:2021** (design qualification, see IEC webstore [IEC 61215 publication page](https://webstore.iec.ch/publication/23676)) and **IEC 61730-1/-2:2016**; VOC ≤ 51.74 V, ISC ≈ 14.20 A per Jinko datasheet, MPPT strings sized accordingly.

- Sungrow SG110CX: **IEC 62109-1/-2** safety, **IEC 61727** utility interconnection — see [Sungrow datasheet](https://en.sungrowpower.com/upload/sites/default/files/SG110CX_2023_Datasheet.pdf); max DC input 1,500 V, 12 MPPTs.

- Battery hazard classification (if any BESS added): **UN Manual of Tests and Criteria, 7th rev., 38.3** ([UN publications index](https://unece.org/transport/dangerous-goods/publications)).

## 9. Calls to action

**Request a quotation:** [Submit RFQ — Airport GSE 300 kWp, MEA](/rfq/)