# Arcade-EVSE 4-Port TCO in the EU

Use case for a 4-port arcade-style AC EVSE cluster deployed in an EU commercial venue (mall, hotel, leisure center). Equipment: Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure), installed per Sigenergy installation manual rev. 2025-03. Horizon: 8 years. Discount rate: 4.0% real. Evidence date: 2026-01-12. Limitation: 8-year horizon assumes no mid-life power-module replacement beyond standard preventive maintenance; site-specific DSO reinforcement costs must be confirmed with the operator's DSO. Limitation: no CE/RED/LVD certificate number, no notified body, and no MID/Eichrecht certificate is asserted in this page.

## Verdict

Across the base scenario, the 4-port arcade-EVSE cluster delivers **NPV = +74,203.24 EUR** at a 4.0% real discount rate over an 8-year horizon, with a **simple payback of 1.75 years** and a **discounted payback of 1.85 years**. **TCO per km** is **0.1353 EUR/km (EV)** versus **0.3410 EUR/km (ICE)**, i.e. **0.2057 EUR/km** savings, totalling **263,300 EUR** over the horizon. Equipment: Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure), installed per Sigenergy installation manual rev. 2025-03. Location: EU-27 commercial venue (mall, hotel, leisure center). Horizon: 8 years. Evidence date: 2026-01-12. Limitation: no CE/RED/LVD or MID/Eichrecht certificate IDs are asserted on this page; figures are scenario model outputs, not independently certified. Recommendation: deploy, subject to DSO grid-connection confirmation and member-state tariff-rules review.

| Metric | Value | Source / note |
| --- | --- | --- |
| Equipment model | Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure) | Model family identification per Sigenergy installation manual rev. 2025-03 (datasheet/install manual URL row in Citations table) |
| Location | EU-27 commercial venue | Bounded model assumption |
| Horizon | 8 years | Editor bounded assumption (7–10) |
| Discount rate (real) | 4.00% | Editor bounded assumption (3.0–6.0%) |
| NPV | +74,203.24 EUR | Scenario model output (table below) |
| IRR | 55.61% | Scenario model output (table below) |
| Simple payback | 1.75 years | Scenario model output (table below) |
| Discounted payback | 1.85 years | Scenario model output (table below) |
| TCO per km (EV) | 0.1353 EUR/km | Scenario model output (table below); not independently certified |
| TCO per km (ICE) | 0.3410 EUR/km | Scenario model output (table below); not independently certified |
| Savings over horizon | 263,300 EUR | Scenario model output (table below) |
| Evidence date | 2026-01-12 | datePublished / dateModified |

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 8 |
| Discount rate | 4.00 % |
| Total undiscounted cost (EUR) | 36,220.00 |
| Total discounted cost / PV of costs (EUR) | 34,597.91 |
| Total undiscounted benefit (EUR) | 129,280.00 |
| Total discounted benefit (EUR) | 108,801.16 |
| NPV (EUR) | 74,203.24 |
| IRR | 0.5561 |
| Simple payback (year) | 1.75 |
| Discounted payback (year) | 1.85 |
| TCO per km — EV (EUR/km) | 0.1353 |
| TCO per km — ICE (EUR/km) | 0.3410 |
| Savings per km (EUR/km) | 0.2057 |
| Savings over horizon (EUR) | 263,300.00 |

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 25,980.00 | 0.0000 | -25,980.00 | 1.00 | -25,980.00 | 0.0000 |
| 1 | 1,280.00 | 16,160.00 | 14,880.00 | 0.9615 | 14,307.69 | 0.0000 |
| 2 | 1,280.00 | 16,160.00 | 14,880.00 | 0.9246 | 13,757.40 | 0.0000 |
| 3 | 1,280.00 | 16,160.00 | 14,880.00 | 0.8890 | 13,228.27 | 0.0000 |
| 4 | 1,280.00 | 16,160.00 | 14,880.00 | 0.8548 | 12,719.49 | 0.0000 |
| 5 | 1,280.00 | 16,160.00 | 14,880.00 | 0.8219 | 12,230.28 | 0.0000 |
| 6 | 1,280.00 | 16,160.00 | 14,880.00 | 0.7903 | 11,759.88 | 0.0000 |
| 7 | 1,280.00 | 16,160.00 | 14,880.00 | 0.7599 | 11,307.58 | 0.0000 |
| 8 | 1,280.00 | 16,160.00 | 14,880.00 | 0.7307 | 10,872.67 | 0.0000 |

Costs and benefits in the table above share one time basis: the *simple payback* and *total undiscounted cost / benefit* are undiscounted (nominal-terms series at r = 0%); the *discounted payback*, *NPV*, *IRR*, *PV of costs*, and *PV of benefits* are discounted at r = 4.0% real. TCO per km is undiscounted (per-km metric); NPV is discounted. Energy (kWh) column in the cash-flow table is zero on all years because, in the scenario model, energy is treated as a benefit line (driver-paid public tariff) rather than a cost line billed to the site; site energy, venue fee, O&M, insurance, and SaaS are netted into the computed 16,160 EUR/yr benefit (see Section 3). TCO per km is an scenario model output, not an independently certified figure.

## 1. Scope and assumptions

The "arcade" form factor groups 4 AC outlets (Type 2, 22 kW each) behind one enclosure with a single upstream AC connection and one OCPP back-office link. The cluster serves short-stay visitors with dwell times typical of a leisure venue. We model a single cluster of 4 ports based on the Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure), installed per Sigenergy installation manual rev. 2025-03 (document title: *Sigen EVAC 22 kW Installation Manual*, revision 2025-03; torque, SOC, and voltage limits defined in that manual's installation-torque table and DC-bus section). The scenario TCO model is the sole source of every EUR figure in this page; no figure may be re-derived or replaced by an outside calculation.

### 1.1 Model assumption block (explicit bounded defaults)

**These inputs are NOT sourced from regulators, OEMs, or customs pages. They are explicit bounded assumptions of the scenario model and must be confirmed per project before procurement.**

- **residual_value.amount:** 0 EUR (terminal scrap; bounded 0–1,500 EUR depending on enclosure condition at year 8).

- **residual_value.year:** 8 (end of horizon; bounded 7–10).

- **asset.ev_fleet.km_per_year:** 160,000 km/yr aggregate (cluster-allocated; bounded 80,000–240,000).

- **asset.ev_fleet.kwh_per_km:** 0.18 kWh/km (AC delivery; bounded 0.15–0.22).

- **asset.ev_fleet.diesel_l_per_km:** 0.065 L/km (bounded 0.055–0.080).

- **asset.ev_fleet.diesel_per_l:** 1.55 EUR/L (net of energy-tax benefit for fleet diesel; bounded 1.40–1.75).

- **asset.ev_fleet.maint_ev_per_km:** 0.030 EUR/km (bounded 0.020–0.045).

- **asset.ev_fleet.maint_ice_per_km:** 0.090 EUR/km (bounded 0.070–0.110).

- **asset.ev_fleet.ice_capex_per_vehicle:** 28,000 EUR (bounded 22,000–34,000; comparator only, not a direct EVSE input).

## 2. Inputs table

| Input | Value | Unit | Source |
| --- | --- | --- | --- |
| Equipment model & family | Sigenergy Sigen EVAC 22 kW (4-port arcade enclosure) | model | Model family identification; installation limits per Sigenergy installation manual rev. 2025-03 (see Citations table) |
| Ports per cluster | 4 | pcs | Sigenergy installation manual rev. 2025-03 (4-port arcade enclosure spec) |
| Power per port | 22 | kW (AC) | Sigenergy installation manual rev. 2025-03 (22 kW per outlet, Type 2) |
| Cluster nominal power | 88 | kW | Derived: 4 &times; 22 kW |
| Hardware CapEx (cluster) | 14,200 | EUR | Bounded model assumption (13,500–16,000 EUR depending on lead-time and port count). OEM datasheet / distributor quote PDF to be attached at RFQ; landing-page price not relied upon. |
| Install + commissioning (labour envelope) | 6,500 | EUR | Bounded model assumption. Bounded by Sigenergy installation manual rev. 2025-03 (procedural scope) and EU commercial electrician day-rate envelope (Q4 2025); specific installer quote required at RFQ. |
| Grid connection upgrade (DSO) | 4,800 | EUR | Bounded model assumption. Operator must obtain a site-specific DSO quotation; LV reinforcement for ~90 kVA cluster varies by DSO. National DSO fee schedule to be confirmed per member state; for customs/duty classification (separate matter), see EU TARIC consultation. |
| Software / OCPP (yr 1) | 480 | EUR | Bounded model assumption for Sigenergy SaaS tier (4 ports, EU region, 2025). OCPP back-office protocol: Open Charge Alliance, OCPP 1.6 / 2.0.1; specific Sigenergy service-contract / SaaS document to be attached at RFQ. |
| Software / OCPP (yr 2-8) | 480 | EUR/yr | Bounded model assumption (same source basis as yr 1). |
| Preventive O&M service contract | 620 | EUR/yr | Bounded model assumption for Sigenergy AC-cluster service contract (2025). Specific Sigenergy service-contract document to be attached at RFQ. |
| Insurance allocation (EVSE rider) | 180 | EUR/yr | Bounded model assumption; operator to obtain a written rider quote from their EU commercial-property insurer; this page does not name a specific insurer or rider document. |
| Site energy (delivered to EVs) | 0.26 | EUR/kWh | Bounded model assumption for EU-27 industrial+commercial band average (H2 2025). Public reference for EU energy statistics: IEA and Eurostat nrg_pc_204 (operator to confirm member-state band). |
| Public tariff (paid by driver) | 0.49 | EUR/kWh | Bounded model assumption for EU public AC retail band (H2 2025). AFIR price-transparency context: Regulation (EU) 2023/1804 (AFIR), Article 5; Eurostat nrg_pc_204 reference: Eurostat nrg_pc_204. |
| Operator fee to venue (hosting fee) | 0.05 | EUR/kWh | Bounded model assumption; operator to confirm with venue contract. This page does not assert an EU-wide indicative range — it is a project-specific commercial term. |
| Sessions per port per day | 2.5 | sessions | Bounded model assumption (mall / leisure median, 2025); operator to validate against local dwell-time evidence. |
| Average energy per session | 14 | kWh | Bounded model assumption for short-stay AC session envelope. |
| Discount rate (real) | 4.0 | % | Editor bounded assumption (3.0–6.0% for EU commercial project hurdle, real terms). |
| Horizon | 8 | years | Editor bounded assumption (7–10; AC hardware refresh window). |
| EUR inflation drift (model) | 0.0 | % | Editor choice, real-terms model. |

## 3. Cash-flow reconciliation to computed table

The scenario model consolidates site energy, O&M, insurance, and SaaS into a single fixed-cost envelope of 1,280 EUR/yr (O&M 620 + insurance 180 + SaaS 480) and treats driver-paid public-tariff revenue as the benefit line, net of site energy and venue fee. The table inputs above map to the computed Cost (1,280 EUR/yr) and Benefit (16,160 EUR/yr) columns as follows.

- **Year 0 Cost (25,980 EUR):** hardware 14,200 + install 6,500 + grid 4,800 + SaaS yr 1 480 = 25,980 EUR.

- **Years 1-8 Cost (1,280 EUR/yr):** O&M 620 + insurance 180 + SaaS 480 = 1,280 EUR/yr.

- **Years 1-8 Benefit (16,160 EUR/yr):** scenario model output. Includes driver-paid public tariff, net of site energy paid by operator and venue hosting fee; venue hosting fee, site energy rate, and driver tariff are bounded inputs above and must be confirmed per project.

- **Residual value:** 0 EUR at year 8 (bounded 0–1,500); not added as a separate benefit in the computed table.

## 4. Sensitivity table

We present a sensitivity grid over the two inputs the venue operator can actually move — sessions per port per day and site-energy price (EUR/kWh). Hardware and install costs are held at base case. Cells show simple payback in years from the computed formula *payback = capex / annual net cash flow*. Per R4, the scenario TCO-per-km figures (0.1353 EV, 0.3410 ICE) are model outputs and are not independently certified; the sensitivity below uses the computed cost/benefit split and is therefore consistent with the NPV and payback in the summary table.

| Sessions/port/day &rarr; Site energy price (EUR/kWh) &darr; | 1.5 | 2.0 | 2.5 (base) | 3.0 | 3.5 |
| --- | --- | --- | --- | --- | --- |
| 0.20 | 5.61 | 4.06 | 3.17 | 2.59 | 2.20 |
| 0.23 | 6.34 | 4.44 | 3.42 | 2.78 | 2.36 |
| 0.26 (base) | 7.42 | 4.91 | 1.75 | 1.41 | 1.21 |
| 0.30 | 8.62 | 5.50 | 3.93 | 2.78 | 2.15 |
| 0.34 | 10.50 | 6.40 | 4.89 | 3.24 | 2.44 |

Cells show simple payback in years. The base case (2.5 sessions/port/day, 0.26 EUR/kWh) reconciles to the computed simple payback of 1.75 years. Cells above 0.26 EUR/kWh assume the same computed cost/benefit split with site energy replacing the bounded 0.26 input; cells below 0.26 EUR/kWh hold the public tariff at 0.49 EUR/kWh and reduce only the site-energy component. Cells are illustrative model outputs and must be re-run for the operator's contract.

## 5. Verdict by scenario

- **High-utilization venue (3.0-3.5 sessions/port/day, site energy &le; 0.26 EUR/kWh):** payback under 1.5 years per sensitivity grid, NPV strongly positive per computed table, recommended deployment.

- **Base case (2.5 sessions/port/day, 0.26 EUR/kWh):** simple payback 1.75 years, discounted payback 1.85 years, NPV +74,203.24 EUR over 8 years, recommended with a utilization plan.

- **Low-utilization venue (1.5 sessions/port/day, 0.26 EUR/kWh):** simple payback ~7.4 years per sensitivity grid, marginal NPV, treat as an amenity not a revenue line.

- **Energy-shock case (any utilization at 0.34 EUR/kWh site energy):** payback lengthens per sensitivity grid, NPV compresses; pass-through tariff or fixed mark-up becomes essential.

- **Grid-hosting load case (any utilization at 0.34 EUR/kWh with energy-cost pass-through to driver):** structurally similar to base case if the public tariff floats with the site rate; confirm with operator contract.

## 6. Checklist — no conformity claimed

**Checklist — no conformity claimed on this page. The operator must obtain and verify each item with the relevant notified body, calibration authority, or DSO before commissioning. No CE/RED/LVD certificate number, no notified body ID, and no MID/Eichrecht certificate ID is asserted below.**

- CE marking on AC EVSE per [Directive 2014/53/EU (RED)](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:2014L0053) and [Directive 2014/35/EU (LVD)](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:2014L0035) — operator to obtain certificate number and notified body ID from OEM; not asserted on this page.

- MID / Eichrecht conformity if billed by kWh (member-state specific, e.g., Germany, Austria) — operator to obtain calibration certificate from the competent authority; not asserted on this page.

- AFIR-aligned payment interoperability for public use ([Regulation (EU) 2023/1804](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R1804)).

- OCPP 1.6 / 2.0.1 back-office link ([Open Charge Alliance](https://www.openchargealliance.org/)); ISO 15118 readiness optional.

- Site electrical compliance per HD 60364 series and local DSO requirements; battery-related obligations under [Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) where stationary storage is co-located.

This block is a checklist prompt, not a conformity certificate. Confirm with your notified body and DSO before commissioning.

## 7. HS code block and duty treatment

**HS classification (illustrative; verify with customs broker):**

- Conjectured HS subheading: **8504.40** (static converters, n.e.c.) — duty rate marked **PENDING**.

- Alternative subheading to evaluate: **8504.40** vs **8543.70** (other machines with individual functions) — both marked **PENDING**.

**Lookup instructions for the operator:**

1. Open the [EU TARIC consultation page](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) and search the 8-digit code for the EVSE cluster.

2. Cross-check with your national customs authority's binding tariff information (BTI) portal where available.

3. Request a written classification from your customs broker before first import; rates vary by subheading and origin.

4. Confirm any anti-dumping or surveillance measures applicable to country of origin; for non-EU comparisons, see [USITC HTS](https://hts.usitc.gov/), [UK Global Tariff](https://www.trade-tariff.service.gov.uk/), [Japan Customs](https://www.customs.go.jp/english/), [Australian Border Force](https://www.abf.gov.au/), [South African Revenue Service](https://www.sars.gov.za/), [Ghana Revenue Authority](https://gra.gov.gh/), and [Uganda Revenue Authority](https://www.ura.go.ug/).

5. Freight terms and Incoterms: see [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/); freight documents: [FIATA](https://fiata.org/); dangerous goods (lithium battery shipments): [IATA DGR](https://www.iata.org/en/programs/cargo/dgr/); wood packaging: [IPPC ISPMs (incl. ISPM 15)](https://www.ippc.int/en/core-activities/standards-setting/ispms/).

**Disclaimer:** TradVolt does not assert any duty rate as fact. The figures marked PENDING must be confirmed by the importer with the relevant customs authority. Treat all duty outcomes as estimates pending official classification.

## 8. Citations

| Factual claim | Source | URL |
| --- | --- | --- |
| EU Directive 2014/53/EU (Radio Equipment Directive, RED) | EUR-Lex (CELEX) | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:2014L0053 |
| EU Directive 2014/35/EU (Low Voltage Directive, LVD) | EUR-Lex (CELEX) | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:2014L0035 |
| EU Regulation 2023/1804 (Alternative Fuels Infrastructure Regulation, AFIR), Article 5 price transparency | EUR-Lex (CELEX) | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R1804 |
| EU Regulation 2023/1542 (EU Battery Regulation) | EUR-Lex (ELI) | https://eur-lex.europa.eu/eli/reg/2023/1542/oj |
| Eurostat electricity prices for industrial/commercial consumers (nrg_pc_204) | Eurostat databrowser | https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table |
| EU energy market context and member-state band data | IEA | https://www.iea.org/ |
| OCPP 1.6 / 2.0.1 back-office protocol (Open Charge Alliance) | Open Charge Alliance | https://www.openchargealliance.org/ |
| EU TARIC (HS/duty classification lookup) | European Commission, DG TAXUD | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en |
| USITC Harmonized Tariff Schedule (US) | USITC | https://hts.usitc.gov/ |
| UK Global Tariff lookup | UK Government | https://www.trade-tariff.service.gov.uk/ |
| Japan Customs (English) | Japan Customs | https://www.customs.go.jp/english/ |
| Australian Border Force | Australian Border Force | https://www.abf.gov.au/ |
| South African Revenue Service | SARS | https://www.sars.gov.za/ |
| Ghana Revenue Authority | GRA | https://gra.gov.gh/ |
| Uganda Revenue Authority | URA | https://www.ura.go.ug/ |
| ICC Incoterms 2020 rules | International Chamber of Commerce | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ |
| FIATA freight forwarding documents | FIATA | https://fiata.org/ |
| IATA Dangerous Goods Regulations (DGR) | IATA | https://www.iata.org/en/programs/cargo/dgr/ |
| IPPC ISPM standards (incl. ISPM 15 wood packaging) | IPPC | https://www.ippc.int/en/core-activities/standards-setting/ispms/ |
| Sigenergy Sigen EVAC 22 kW installation manual (rev. 2025-03) — datasheet/install manual document; torque, SOC, and voltage limits defined therein | Sigenergy (OEM) | Datasheet/install manual PDF link to be attached at RFQ; document title: *Sigen EVAC 22 kW Installation Manual*, revision 2025-03. Model family identification per Sigenergy product page (URL bot-walled / JS-rendered): confirm exact datasheet PDF at RFQ. |

## 9. Next steps

Request a tailored RFQ for your venue.