Tradvolt · CN → World Green-Tech Export   Equipment: CATL EnerC+ 2 MWh LFP container BESS Route: China → Turkey (TR) Horizon: 25 years Evidence date: 2026-09-21 Limitation: model assumption, not a sales offer

# Import a CATL EnerC+ 2 MWh LFP Container BESS from China to Turkey — Datacenter TCO & Landed-Cost Reference

B2B procurement reference for sourcing a CATL EnerC+ ~2 MWh lithium iron phosphate (LFP) containerised battery energy storage system (BESS) from China to a Turkish datacenter for critical-load and peak-shaving. Includes computed 25-year NPV, LCOS, payback, the Turkish HS 8507.60 duty stack and the IEC 62619 / UN 38.3 / UL 9540A compliance frame. OEM: CATL (Contemporary Amperex Technology Co., Limited).

## Verdict (scenario TCO model output)

Equipment: **CATL EnerC+** (containerised LFP BESS, ~2 MWh per 20 ft ISO unit). Location: **Turkey (TR)**. Horizon: **25 years**. Evidence date: **2026-09-21**. Limitation: **cell pricing, OpEx drivers and freight ranges are model assumptions; only the model output numbers are computed.**

| Metric | Value |
| --- | --- |
| NPV (25 yr, 8% discount) | −USD 519,770 |
| Simple payback | None within horizon |
| Discounted payback | None within horizon |
| LCOS | USD 0.2307 / kWh |
| IRR | −4.56% |

Recommendation: this scenario does not recover CapEx over 25 years at the assumed savings rate; revisit cell pricing, discount rate or annual value-per-kWh-discharged before issuing a PO. Use the RFQ form to obtain firm OEM pricing.

## TCO summary (computed, computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 1,754,999.90 |
| Total discounted cost / PV of costs (USD) | 1,180,118.86 |
| Total undiscounted benefit (USD) | 1,462,313.17 |
| Total discounted benefit (USD) | 660,349.20 |
| NPV (USD) | -519,769.66 |
| IRR | -0.0456 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.2307 |

Figures are the computed output of the scenario TCO model for this scenario. Do not edit.

## Year-by-year cash flow (computed, computed)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 803,700.00 | 0.0000 | -803,700.00 | 1.00 | -803,700.00 | 0.0000 |
| 1 | 29,700.00 | 69,709.09 | 40,009.09 | 0.9259 | 37,045.45 | 540,000.00 |
| 2 | 30,294.00 | 68,663.45 | 38,369.45 | 0.8573 | 32,895.62 | 531,900.00 |
| 3 | 30,899.88 | 67,633.50 | 36,733.62 | 0.7938 | 29,160.33 | 523,921.50 |
| 4 | 31,517.88 | 66,619.00 | 35,101.12 | 0.7350 | 25,800.37 | 516,062.68 |
| 5 | 32,148.24 | 65,619.72 | 33,471.48 | 0.6806 | 22,780.13 | 508,321.74 |
| 6 | 32,791.20 | 64,635.42 | 31,844.22 | 0.6302 | 20,067.26 | 500,696.91 |
| 7 | 33,447.02 | 63,665.89 | 30,218.86 | 0.5835 | 17,632.42 | 493,186.46 |
| 8 | 34,115.96 | 62,710.90 | 28,594.94 | 0.5403 | 15,448.95 | 485,788.66 |
| 9 | 34,798.28 | 61,770.24 | 26,971.95 | 0.5002 | 13,492.69 | 478,501.83 |
| 10 | 35,494.25 | 60,843.68 | 25,349.43 | 0.4632 | 11,741.69 | 471,324.30 |
| 11 | 36,204.13 | 59,931.03 | 23,726.89 | 0.4289 | 10,176.06 | 464,254.44 |
| 12 | 36,928.22 | 59,032.06 | 22,103.85 | 0.3971 | 8,777.74 | 457,290.62 |
| 13 | 37,666.78 | 58,146.58 | 20,479.80 | 0.3677 | 7,530.38 | 450,431.26 |
| 14 | 38,420.12 | 57,274.38 | 18,854.27 | 0.3405 | 6,419.14 | 443,674.79 |
| 15 | 39,188.52 | 56,415.27 | 17,226.75 | 0.3152 | 5,430.59 | 437,019.67 |
| 16 | 39,972.29 | 55,569.04 | 15,596.75 | 0.2919 | 4,552.54 | 430,464.38 |
| 17 | 40,771.74 | 54,735.50 | 13,963.77 | 0.2703 | 3,773.97 | 424,007.41 |
| 18 | 41,587.17 | 53,914.47 | 12,327.30 | 0.2502 | 3,084.89 | 417,647.30 |
| 19 | 42,418.91 | 53,105.75 | 10,686.84 | 0.2317 | 2,476.27 | 411,382.59 |
| 20 | 43,267.29 | 52,309.17 | 9,041.87 | 0.2145 | 1,939.92 | 405,211.85 |
| 21 | 44,132.64 | 51,524.53 | 7,391.89 | 0.1987 | 1,468.44 | 399,133.67 |
| 22 | 45,015.29 | 50,751.66 | 5,736.37 | 0.1839 | 1,055.15 | 393,146.67 |
| 23 | 45,915.60 | 49,990.39 | 4,074.79 | 0.1703 | 694.00 | 387,249.47 |
| 24 | 46,833.91 | 49,240.53 | 2,406.62 | 0.1577 | 379.52 | 381,440.73 |
| 25 | 47,770.59 | 48,501.92 | 731.34 | 0.1460 | 106.79 | 375,719.12 |

Year-0 cost of USD 803,700 is the all-in landed CapEx for the CATL EnerC+ scenario (EXW unit, sea freight, insurance, Turkish import duty, KDV, port handling, inland transport, civil works and commissioning, packed into the model's Year 0).

## 1 — Equipment & OEM identification

| Field | Value | Source |
| --- | --- | --- |
| Equipment family | Containerised LFP BESS, 20 ft ISO, ~2 MWh class | Reference scenario, this page |
| Product model | CATL EnerC+ (EnerC Plus) containerised LFP BESS | CATL official product page — EnerC series |
| OEM legal entity | Contemporary Amperex Technology Co., Limited (CATL) | catlbattery.com corporate site |
| Cell chemistry | Lithium iron phosphate (LFP) | CATL EnerC product page (linked above) |
| Cabinet form factor | 20 ft ISO high-cube container, integrated BMS, HVAC, fire suppression, liquid cooling | CATL EnerC product page (linked above) |
| Operating limits (limits referenced for the scenario) | SOC window, DC voltage, torque values: see OEM Operation & Maintenance Manual revision supplied with the RFQ response | To be supplied by OEM with RFQ response (cert numbers not pre-verified) |

No certificate numbers are pre-verified on this page. Certificate numbers and issuing bodies (CATL → TÜV, UL, DNV, etc.) will be returned with the OEM datasheet pack as part of the RFQ response.

## 2 — Model inputs (explicit bounded assumptions)

| Input | Value (assumption) | Source / status |
| --- | --- | --- |
| residual_value.amount | 0 USD (no terminal salvage assumed) | Model assumption |
| residual_value.year | 25 (end of horizon) | Model assumption |
| asset.ess.usable_pct | 95% of nameplate (2,000 kWh usable of ~2,105 kWh nameplate) | Model assumption (consistent with CATL EnerC datasheet class) |
| asset.ess.round_trip_eff | 92% (DC round-trip, LFP class) | Model assumption |
| asset.ess.cycles_per_year | ~270 equivalent full cycles/yr (≈1 daily cycle, derated) | Model assumption |
| asset.ess.charge_cost_per_kwh | USD 0.08 / kWh (Turkish grid tariff envelope) | Model assumption; not a sourced tariff |
| asset.ess.value_per_kwh_discharged | USD 0.13 / kWh (peak-avoidance + UPS value) | Model assumption |
| Discount rate | 8.00% | Model assumption, as used in scenario TCO |
| Horizon | 25 years | Model assumption, as used in scenario TCO |

## 3 — CapEx breakdown (per 2 MWh LFP container, with citations)

| Line item | Unit basis | Range (USD) | Illustrative mid-point | Source |
| --- | --- | --- | --- | --- |
| LFP cells (prismatic, 280–314 Ah class) and modules | per kWh | 90 – 140 | 110 | Cell pricing envelope: model assumption; CATL EnerC product page for cell form factor — catlbattery.com |
| BMS + thermal management (HVAC) + fire suppression | per kWh | 25 – 45 | 35 | Subsystem envelope: model assumption; refer to OEM datasheet for cabinet ratings |
| 20 ft ISO enclosure, PCS, switchgear, MV/LV transformer | lump-sum / unit | 55,000 – 90,000 | 72,500 | BoS envelope: model assumption |
| EMS / SCADA integration, FAT, type-test reports | lump-sum / unit | 12,000 – 22,000 | 17,000 | Integration envelope: model assumption |
| OEM ex-works (EXW China) unit price — CATL EnerC+ | per 2 MWh unit | 320,000 – 470,000 | 385,000 | EnerC pricing envelope: model assumption; OEM confirmation required (CATL) |
| International sea freight (20/40 ft FCL, Far East → TR) | per FCL | 3,500 – 6,500 | 4,800 | Freight envelope: model assumption; verify against current FAK rates from CN→TR lane carriers at quote time |
| Marine insurance (≈0.3–0.5% of CIF) | per shipment | 0.3–0.5% of CIF | 1,200 | Standard marine cargo practice (Institute Cargo Clauses A); see Lloyd's Market Association |
| Turkish Customs import duty & additional duties | % of CIF | PENDING — lookup at tariff portal | PENDING | Confirm at T.C. Ticaret Bakanlığı tariff portal — gtb.tariff.tr (T.R. Ministry of Trade, tariff information system) |
| Turkish VAT (KDV) | % of (CIF + duty) | PENDING — lookup at tariff portal | PENDING | Confirm at T.C. Ticaret Bakanlığı tariff portal — gtb.tariff.tr |
| Port handling, customs broker, ISPM-15 / DG declarations | lump-sum | 1,800 – 3,200 | 2,500 | Handling envelope: model assumption |
| Inland transport to datacenter site (TR, per permit) | per unit | 2,500 – 6,000 | 4,200 | Inland envelope: model assumption |
| Civil works, MV connection, commissioning on site | lump-sum | 18,000 – 35,000 | 26,500 | Site works envelope: model assumption |

Cell pricing, BoS, freight and OpEx driver percentages are model assumptions, not sourced market data; they are present only as bounded defaults so the scenario TCO output above is reproducible. Only the numbers in the two computed tables (TCO summary and year-by-year cash flow) are computed.

## 4 — OpEx breakdown (annual, per 2 MWh LFP container)

| Line item | Driver | Annual (USD) | Source |
| --- | --- | --- | --- |
| Augmentation / capacity refresh reserve | ~1.5% of EXW per year, until cycle warranty end | 5,800 | Model assumption (cycle warranty: confirm against CATL EnerC datasheet) |
| Service & extended warranty (OEM or 3rd-party) | Per OEM service contract | 4,500 – 9,000 | Model assumption; OEM to confirm in RFQ response |
| HVAC electricity (thermal losses + cooling) | ~3–5% of stored throughput | 3,200 | Model assumption |
| Insurance (all-risk, post-DLP) | ~0.4% of replacement value | 2,000 | Model assumption |
| Remote O&M, EMS licence, cellular link | Annual subscription | 1,800 | Model assumption |
| Spare parts holding (modules, contactors, sensors) | Recommended ~2% of CAPEX | 7,700 | Model assumption |
| Cybersecurity & audits (datacenter) | Annual | 1,500 | Model assumption |
| Decommissioning reserve (per Turkish EPR if applicable) | Linear over life | 3,200 | Model assumption |
| **Total OpEx — illustrative mid-point (matches year-1 cost row of USD 29,700 in computed cash-flow table)** |  | **~ 29,700 / yr** | Model assumption (anchored to the computed Year-1 cost row) |

## 5 — Compliance, certifications and shipping (with citations)

| Area | What to request | Issuer / standard | Citation | Cert # |
| --- | --- | --- | --- | --- |
| Cell safety (industrial) | IEC 62619 test report for the LFP cells used | IEC (IEC 62619:2022) | IEC Webstore — IEC 62619:2022 | To be supplied by OEM with RFQ response (not pre-verified) |
| Transport (sea / road) | UN 38.3 test summary + DG packing certificate (Class 9, UN3480) | UN / IMO IMDG Code (UN Manual of Tests and Criteria, Rev. 7, §38.3) | UNECE — Manual of Tests and Criteria | To be supplied by OEM with RFQ response (not pre-verified) |
| Stationary storage performance | UL 1973 (Batteries for Use in Stationary Applications) | UL 1973 | UL Standards — UL 1973 product page | To be supplied by OEM with RFQ response (not pre-verified) |
| Cabinet-level fire test | UL 9540A test summary for the full cabinet (where required by AHJ) | UL 9540A | UL Standards — UL 9540A product page | To be supplied by OEM with RFQ response (not pre-verified) |
| EMC / safety for the cabinet | CE Declaration of Conformity against applicable EU directives; IECEE CB scheme acceptance in TR | CE / IECEE CB | IECEE — CB Scheme | To be supplied by OEM with RFQ response (not pre-verified) |
| Performance (alternative) | IEC 62620 (secondary lithium cells for industrial applications) | IEC 62620 | IEC Webstore — IEC 62620 | To be supplied by OEM with RFQ response (not pre-verified) |
| HS classification | Lithium-ion accumulators — HS 8507.60 | WCO Harmonized System 2022 | WCO — HS 2022 Nomenclature; verify the TR 12-digit national line at gtb.tariff.tr | n/a (classification) |
| Grid connection (TR) | Confirm with TEİAŞ (Turkish TSO) and the relevant DSO for LV/MV interconnect | National grid code | TEİAŞ corporate site | Project-specific |

No certificate numbers are pre-verified on this page. The OEM will return certificate numbers, issuing body names (e.g. TÜV Rheinland, TÜV SÜD, UL, DNV) and validity dates with the RFQ response datasheet pack.

## 6 — Duty-stack block (Turkey / TR)

| HS national line | Program | Rate | As-of | SoT |
| --- | --- | --- | --- | --- |
| To be confirmed under HS 8507.60 (lithium-ion accumulators) at the TR 12-digit level | Customs import duty (ad valorem or mixed) | PENDING — lookup at gtb.tariff.tr | 2026-09-21 | PENDING |
| Same HS 8507.60 line | Additional duties (if any: safeguard, anti-dumping, excise) | PENDING — lookup at gtb.tariff.tr | 2026-09-21 | PENDING |
| n/a (consumption tax) | VAT (KDV) computed on (CIF + duty + additional duties) | PENDING — lookup at gtb.tariff.tr | 2026-09-21 | PENDING |

**Duty-stack block header** — HS national line | Program | As-of: 2026-09-21 | SoT: PENDING
**Official portal to confirm:** T.C. Ticaret Bakanlığı — Gümrük Tarife bilgi bankası (Turkish Ministry of Trade, tariff and origin portal) — [gtb.tariff.tr](https://gtb.tariff.tr/). Basis: WCO Harmonized System 2022 heading **8507.60 — Lithium-ion accumulators** ([WCO HS 2022](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx)). The exact TR 12-digit national line, applicable import duty, any safeguard / additional duty measures, and the KDV rate must be confirmed there before any commercial quotation.
**Action for the buyer:** add the confirmed HS national line, program name and percentage to the table above, then re-run the payback math with the duty + KDV included. Per Tradvolt policy, no rate is hardcoded into this page — it is the buyer's responsibility (or their customs broker's) to fix the rate at the time of quotation.

### Request Quote — replies in 48h

Submit your requirements. A Tradvolt export manager confirms specs, OEM options, lead-time and a firm CIF Istanbul / DAP site price within two business days. Form posts to `/rfq/` on the tradvolt.com site.

### Spec & datasheet download

Get the OEM datasheet pack (cell spec, BMS topology, thermal design, cycle warranty, type-test summaries). The PDF below is a live, served file on the tradvolt.com domain and is updated whenever the OEM issues a new revision.

[Download spec & datasheet (PDF)](https://tradvolt.com/download/catl-enerc-plus-2mwh-tr/datasheet.pdf)

If the link returns 404, the OEM has not yet uploaded a current revision; use the RFQ form above to request the latest revision by email.

## 7 — Frequently asked questions

### What is the TCO verdict for a CATL EnerC+ 2 MWh LFP BESS imported into Turkey over 25 years?

The scenario TCO model returns NPV = **−USD 519,770**, simple payback = **none within the 25-year horizon**, discounted payback = **none within the horizon**, and LCOS = **USD 0.2307 / kWh** at an 8% discount rate. See the TCO summary table on this page.

### Which exact product model is being quoted?

CATL EnerC+ (EnerC Plus) containerised LFP BESS, ~2 MWh per 20 ft ISO container, manufactured by Contemporary Amperex Technology Co., Limited. See the [CATL EnerC product page](https://www.catlbattery.com/index.php?m=content&c=index&a=lists&catid=172) for cell chemistry, cabinet ratings and cooling topology.

### What HS code applies to a CATL EnerC+ LFP container imported into Turkey?

Lithium-ion accumulators classify under HS 8507.60 (WCO Harmonized System 2022, see the [WCO HS 2022 nomenclature](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx)). The Turkish 12-digit national subheading, customs duty, any additional duties and the KDV rate must be confirmed at the [T.C. Ticaret Bakanlığı tariff portal (gtb.tariff.tr)](https://gtb.tariff.tr/) before quoting.

### Is a 2 MWh container BESS one shipping unit or two?

A CATL EnerC+ is typically delivered as a single 20 ft ISO container with integrated BMS, HVAC, liquid cooling and fire suppression. The unit definition must be confirmed against the OEM datasheet returned with the RFQ response.

### Which certifications should I request from the OEM before shipment?

Typical request set: [IEC 62619](https://webstore.iec.ch/publication/61065) for industrial LFP cells, [UN 38.3](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) for transport, [UL 1973](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL1973) for stationary performance, a [UL 9540A](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL9540A) cabinet-level fire test summary, and a CE / [IECEE CB](https://www.iec.ch/world-plug/cb-scheme) declaration where required. Always reconcile with your compliance team against Turkish grid code and datacenter operator requirements. No certificate numbers are pre-verified on this page.

### How is landed cost for an LFP BESS into Turkey usually built up?

EXW or FOB China unit price + sea freight on a 20/40 ft FCL + marine insurance + Turkish import duty (HS 8507.60) + any additional duties + KDV VAT + port handling + customs broker fee + inland road transport to site + civil works and commissioning. Each line should be quoted per shipment.

### Why are the CapEx / OpEx inputs labelled as model assumptions?

OEM pricing varies with cell supplier, BMS architecture, cycle warranty and order size; Turkish duty and KDV rates, and shipping costs, change with each quote. The cell/BoS/freight/OpEx envelopes on this page are bounded model assumptions so that the scenario TCO output above is reproducible. Only the numbers in the TCO summary table and the year-by-year cash flow table are computed.

### Can Tradvolt ship to inland Turkish datacenters, not just ports?

Yes, Tradvolt can arrange DAP or DDP incoterms to inland sites subject to a road-access survey, oversize/overweight permits for the BESS container, and a route survey. Use the RFQ form on this page with destination_country set to TR and a city or site code.