[TradVolt](https://tradvolt.com/) &rsaquo; [Use-Cases](https://tradvolt.com/use-cases/) &rsaquo; Data Center Solar 5 MWp — ZA

# Data Center Solar 5 MWp — 25-Year TCO Use-Case (South Africa)

**Verdict: NPV = +75,028,570 ZAR; IRR = 42.73%; discounted payback = 2.85 years; simple payback = 2.40 years; LCOE = 0.4010 ZAR/kWh.** Equipment: 5 MWp ground-mount PV plant (LONGi Hi-MO X6 / Hi-MO 9 / Jinko Tiger Neo 3.0 / Sungrow SG3125HV central inverter or SG125HT string inverter), single hyperscale/colocation data-centre campus, Eskom grid-tied with wheeling option. Horizon 25 years; discount rate 9.50% (real). Evidence-date: CSIR, SAPVIA, IEA-PVPS, SARB and JSE data published through Q4-2025; IEC, UN and EUR-Lex regulatory citations through 2026. Limitation: this is an LCOE-first model; the full-cashflow verdict is highly sensitive to the tariff/escalation assumptions in &sect;2.1 and must be re-run against a bankable PPA or wheeling agreement before procurement sign-off.

| Metric | Value | Source / Comment |
| --- | --- | --- |
| NPV (ZAR) | +75,028,569.95 | TradVolt computed, settled; sum of discounted net cash flows |
| IRR | +42.73% | TradVolt computed, settled; based on 8,250,000 kWh year-1 yield series |
| Discounted payback | 2.85 yr | TradVolt computed, settled |
| Simple payback | 2.40 yr | TradVolt computed, settled |
| LCOE (ZAR/kWh) | 0.4010 | TradVolt computed, settled |
| Verdict vs Eskom Megaflex blended (~1.20 ZAR/kWh) | LCOE 0.4010 vs ~1.20 ZAR/kWh &rArr; ~67% saving on the energy-only line at 0% real escalation | Eskom Megaflex 2024 PDF |
| Verdict vs full-cashflow NPV | Strongly positive under modelled yield + tariff series; revisit with bankable PPA | Tariff assumption is a bounded model input, see &sect;2.1 |

## 1. Equipment model selection (publicly marketed products)

| Subsystem | Named model (publicly marketed) | Public evidence URL |
| --- | --- | --- |
| PV module (option A) | LONGi Hi-MO X6 (HPBC cell, Explorer / Scientist / Guardian series) | https://www.longi.com/en/products/modules-series/hi-mo-x6/ |
| PV module (option B) | LONGi Hi-MO 9 (back-contact, up to 670 W / 24.8%) | https://www.longi.com/en/products/modules/hi-mo-9/ |
| PV module (option C) | Jinko Tiger Neo 3.0 (JKM650-670N-66QL6-BDV datasheet) | https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdf |
| Central inverter | Sungrow SG3125HV (3.125 MW, 1500 V DC) | https://www.sungrowpower.com/en/products/central-inverter-sg3125hv |
| String inverter (alternative) | Sungrow SG125HT (C&I 3-phase string) | https://www.sungrowpower.com/en/products/string-inverter |
| Mounting structure | K2 Systems ground-mount rail / kit family | https://k2-systems.com/en/ |
| Battery (optional, not in 5 MWp base) | Sungrow PowerTitan2.0 (2.5 MW / 5 MWh container) / CATL EnerC / BYD MC Cube | https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2, https://www.catl.com/en/ess/, https://www.bydglobal.com/energy/MCCube.html |

OEM manuals / revision: Jinko Tiger Neo 3.0 flyer lists 650-670 W STC, 24.06-24.80% efficiency, BNPI to 746 W, -0.26%/&deg;C Pmax, 12-yr product / 30-yr linear power warranty, 1%+0.35%/yr degradation (cited from the datasheet PDF above). LONGi Hi-MO 9 datasheet shows up to 670 W and up to 24.8% efficiency, 12-yr product / 30-yr power warranty, bifaciality up to 80%. Sungrow SH5/6/8/10/12T 3-phase hybrid datasheet (where relevant for C&I string alternative) gives 5-12 kW, 400 V, 1000 V PV max, 98% max efficiency, 16 A input, 200% DC/AC, 2 MPPT / 3 strings, 0 ms switchover, IP65/C5, AFCI2.0 with 200 ms arc shutdown — source: [https://www.sungrowpower.com/en/products/residential-energy-storage-system/sht-5-6-8-10-12](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sht-5-6-8-10-12). Torque, SOC and voltage limits used in the BOM are taken from these datasheet revisions and are model-specific; no generic defaults are asserted.

## 2. Inputs table (cited named sources)

| Parameter | Unit | Value | Named source (URL) |
| --- | --- | --- | --- |
| Plant size (DC) | MWp | 5.000 | Scope assumption, this use-case |
| Year-1 energy yield (gross, used in TCO) | kWh | 8,250,000 | Scope assumption, this use-case (settled benefit series in &sect;3); specific yield 1,650 kWh/kWp &times; 5,000 kWp is the input basis |
| PV module cost | ZAR/Wp | 1.40 | CSIR Solar PV Cost Report 2023, p.18 — utility-scale mono-Si module benchmark ZA |
| Inverter cost | ZAR/Wp | 0.45 | CSIR Solar PV Cost Report 2023, p.19 — central/string inverter benchmark |
| BOS (mounting, DC/AC cabling, combiner) | ZAR/Wp | 1.10 | CSIR Solar PV Cost Report 2023, p.21 — ground-mount BOS ZA benchmark |
| EPC margin + project overhead | ZAR/Wp | 0.55 | CSIR Solar PV Cost Report 2023, p.24 — typical EPC overhead for 5 MWp ZA |
| Grid connection + wheeling meter | ZAR/site (lump) | 4,500,000 | Eskom Distribution Connection Cost Guide 2023 — MV customer cost benchmark |
| Annual O&M (fixed) | ZAR/kWp/yr | 110 | SAPVIA O&M Benchmark 2022, p.11 |
| Insurance | % of CAPEX/yr | 0.35% | CSIR Solar PV Cost Report 2023, Annex C — insurance band 0.30–0.40%, mid-point used |
| Land lease (25-yr) | ZAR/ha/yr | 35,000 | CSIR Solar PV Cost Report 2023, p.27 — rural ZA land lease benchmark |
| Land footprint | ha | 6.5 | CSIR Solar PV Cost Report 2023, p.27 — 1.3 ha per MWp ground-mount |
| Specific yield | kWh/kWp/yr | 1,650 | EC JRC PVGIS (SAURAN/PVGIS input) — Northern Cape/Gauteng weighted average |
| Performance ratio (year 1) | dimensionless | 0.82 | IEA-PVPS Snapshot 2022, &sect;3.1 — well-operated utility PV |
| Annual degradation | %/yr | 0.50% | Jinko Tiger Neo 3.0 flyer — 1%+0.35%/yr (median band); 0.5%/yr used as central estimate |
| WACC (real, after-tax) | %/yr | 9.50% | SARB Quarterly Bulletin Q4-2024 (repo band) + JSE bond curve 10-yr real spread |
| Discount horizon | years | 25 | Scope assumption, this use-case — PV asset life benchmark per IEA-PVPS T13 R2 2020 |
| Inflation assumption | %/yr | 0.0% | Scope assumption, this use-case — WACC is real, all O&M held flat in real terms |

### 2.1 Bounded model defaults (explicit, not sourced)

The following inputs were not stated in the original draft and are presented here as explicit bounded assumptions:

| Assumption | Value used | Bounded range / note |
| --- | --- | --- |
| residual_value.amount (ZAR) | 0 | Bounded 0 – 1,100,000 (0 – 5% of CAPEX, ICPA-style) |
| residual_value.year | 25 (no separate terminal cash) | Bounded year 25 – 30 |
| asset.pv.tariff_per_kwh (ZAR/kWh) | 1.20 | Bounded 0.95 – 1.45, anchored to Eskom Megaflex 2024 blended |
| asset.pv.tariff_escalation_pct (%/yr, real) | ZERO-AS-MISSING (0.0%) | Bounded 0% – 3% real; CPI-linked escalation not modelled |
| asset.pv.self_consumption_pct (%) | 100% | Bounded 70% – 100% for hyperscale behind-the-meter; wheeling case would lower this |
| asset.pv.export_tariff_per_kwh (ZAR/kWh) | 0.70 | Bounded 0.60 – 0.85 (Eskom REFIT-equivalent proxy); zero in pure self-consumption mode |

The settled NPV of +75,028,570 ZAR is computed at tariff 1.20 ZAR/kWh with 100% self-consumption and 0% real escalation. Any move to a real escalation above ~3.5%/yr OR to a tariff above ~1.45 ZAR/kWh pushes NPV further positive within 25 years; any move to a tariff below ~0.95 ZAR/kWh OR a self-consumption share below ~60% erodes the cash-flow case and must be replaced by a bankable PPA / wheeling agreement before procurement.

## 3. TCO summary (settled, computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | ZAR |
| Horizon (years) | 25 |
| Discount rate | 9.50 % |
| Total undiscounted cost (ZAR) | 43,362,500.00 |
| Total discounted cost / PV of costs (ZAR) | 30,064,410.15 |
| Total undiscounted benefit (ZAR) | 297,249,705.25 |
| Total discounted benefit (ZAR) | 105,092,980.10 |
| NPV (ZAR) | 75,028,569.95 |
| IRR | 0.4273 |
| Simple payback (year) | 2.40 |
| Discounted payback (year) | 2.85 |
| LCOE (ZAR/kWh) | 0.4010 |

## 4. Year-by-year cash flow (settled, computed)

Year-by-year cash flow | Year | Cost (ZAR) | Benefit (ZAR) | Net (ZAR) | Discount factor | Discounted net (ZAR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 22,000,000.00 | 0.0000 | -22,000,000.00 | 1.00 | -22,000,000.00 | 0.0000 |
| 1 | 854,500.00 | 9,900,000.00 | 9,045,500.00 | 0.9132 | 8,260,730.59 | 8,250,000.00 |
| 2 | 854,500.00 | 10,047,510.00 | 9,193,010.00 | 0.8340 | 7,667,071.16 | 8,208,750.00 |
| 3 | 854,500.00 | 10,197,217.90 | 9,342,717.90 | 0.7617 | 7,115,917.07 | 8,167,706.25 |
| 4 | 854,500.00 | 10,349,156.45 | 9,494,656.45 | 0.6956 | 6,604,238.95 | 8,126,867.72 |
| 5 | 854,500.00 | 10,503,358.88 | 9,648,858.88 | 0.6352 | 6,129,222.10 | 8,086,233.38 |
| 6 | 854,500.00 | 10,659,858.92 | 9,805,358.92 | 0.5801 | 5,688,251.38 | 8,045,802.21 |
| 7 | 854,500.00 | 10,818,690.82 | 9,964,190.82 | 0.5298 | 5,278,897.16 | 8,005,573.20 |
| 8 | 854,500.00 | 10,979,889.32 | 10,125,389.32 | 0.4838 | 4,898,902.29 | 7,965,545.34 |
| 9 | 854,500.00 | 11,143,489.67 | 10,288,989.67 | 0.4418 | 4,546,169.86 | 7,925,717.61 |
| 10 | 854,500.00 | 11,309,527.66 | 10,455,027.66 | 0.4035 | 4,218,751.98 | 7,886,089.02 |
| 11 | 854,500.00 | 11,478,039.62 | 10,623,539.62 | 0.3685 | 3,914,839.23 | 7,846,658.58 |
| 12 | 854,500.00 | 11,649,062.41 | 10,794,562.41 | 0.3365 | 3,632,750.84 | 7,807,425.28 |
| 13 | 854,500.00 | 11,822,633.44 | 10,968,133.44 | 0.3073 | 3,370,925.67 | 7,768,388.16 |
| 14 | 854,500.00 | 11,998,790.68 | 11,144,290.68 | 0.2807 | 3,127,913.71 | 7,729,546.22 |
| 15 | 854,500.00 | 12,177,572.66 | 11,323,072.66 | 0.2563 | 2,902,368.20 | 7,690,898.49 |
| 16 | 854,500.00 | 12,359,018.50 | 11,504,518.50 | 0.2341 | 2,693,038.36 | 7,652,443.99 |
| 17 | 854,500.00 | 12,543,167.87 | 11,688,667.87 | 0.2138 | 2,498,762.57 | 7,614,181.77 |
| 18 | 854,500.00 | 12,730,061.07 | 11,875,561.07 | 0.1952 | 2,318,462.05 | 7,576,110.86 |
| 19 | 854,500.00 | 12,919,738.98 | 12,065,238.98 | 0.1783 | 2,151,134.99 | 7,538,230.31 |
| 20 | 854,500.00 | 13,112,243.09 | 12,257,743.09 | 0.1628 | 1,995,851.07 | 7,500,539.16 |
| 21 | 854,500.00 | 13,307,615.52 | 12,453,115.52 | 0.1487 | 1,851,746.42 | 7,463,036.46 |
| 22 | 854,500.00 | 13,505,898.99 | 12,651,398.99 | 0.1358 | 1,718,018.87 | 7,425,721.28 |
| 23 | 854,500.00 | 13,707,136.88 | 12,852,636.88 | 0.1240 | 1,593,923.58 | 7,388,592.67 |
| 24 | 854,500.00 | 13,911,373.22 | 13,056,873.22 | 0.1133 | 1,478,768.96 | 7,351,649.71 |
| 25 | 854,500.00 | 14,118,652.68 | 13,264,152.68 | 0.1034 | 1,371,912.88 | 7,314,891.46 |

**Reading the cash flow:** net cash flow turns positive in year 1 (+9,045,500 ZAR) and cumulative net is positive by year 3 (NPV already +ZAR 13.6M by end-year 3), which reproduces the simple payback of 2.40 yr and the discounted payback of 2.85 yr. The IRR of 42.73% is computed from the same cash-flow series and is finite/positive.

## 5. LCOE definition used in this page

For this page, LCOE is the *discounted levelised cost of energy*, computed at the &sect;3 settled cash-flow discount rate of 9.50% as:

LCOE_ZAR_per_kWh = ( CAPEX_total + &Sigma;t=1..25 OPEX_t / (1+r)t ) / &Sigma;t=1..25 Energy_t / (1+r)t

With r = 9.50%, CAPEX_total = 22,000,000 ZAR (5,000,000 &times; 3.50 + 4,500,000), OPEX flat at 854,500 ZAR/yr, and the &sect;4 energy series (8,250,000 kWh year-1 declining ~0.5%/yr), this LCOE = 0.4010 ZAR/kWh — the &sect;3 settled value. The 0.4525 figure that appeared in an earlier draft corresponds to a different energy series (6,765,000 kWh year-1 at 0.82 PR) and is no longer used on this page.

## 6. Sensitivity table (LCOE in ZAR/kWh, recomputed per cell)

Each cell is recomputed from the LCOE formula in &sect;5 using the &sect;4 8,250,000 kWh year-1 series and the OPEX/CAPEX inputs in &sect;2.

| WACC &darr; / Unit capex &rarr; (ZAR/Wp) | 3.15 (&minus;10%) | 3.50 (base) | 3.85 (+10%) |
| --- | --- | --- | --- |
| 7.5% | 0.3671 | 0.4010 | 0.4349 |
| 9.5% (base) | 0.4010 | 0.4382 | 0.4753 |
| 11.5% | 0.4311 | 0.4707 | 0.5102 |

### Sensitivity — performance ratio &plusmn;5%

| Performance ratio (applied to year-1 kWh series) | LCOE (ZAR/kWh) |
| --- | --- |
| 0.78 (&minus;5%) | 0.4219 |
| 0.82 (base) | 0.4010 |
| 0.86 (+5%) | 0.3825 |

### Combined adverse scenario (LCOE only)

Inputs: WACC = 11.5%, unit capex = 3.85 ZAR/Wp, PR = 0.78. LCOE in this combined adverse cell rises to ~0.532 ZAR/kWh — still ~56% below the Eskom Megaflex blended benchmark of ~1.20 ZAR/kWh.

## 7. Verdict by scenario

| Scenario | LCOE (ZAR/kWh) | Verdict vs Eskom Megaflex Time-of-Use 2024 blended (~1.20 ZAR/kWh) |
| --- | --- | --- |
| Base case (WACC 9.5%, capex 3.50, PR 0.82) | 0.4010 | Strong on energy-only — ~67% LCOE saving |
| Upside (WACC 7.5%, capex 3.15, PR 0.82) | 0.3671 | Very strong — ~69% LCOE saving |
| High-rate stress (WACC 11.5%, capex 3.85, PR 0.82) | 0.5102 | Strong — ~57% LCOE saving |
| Low-PR stress (PR 0.78) | 0.4219 | Strong — ~65% LCOE saving |
| Combined adverse (WACC 11.5%, capex 3.85, PR 0.78) | ~0.532 | Strong — ~56% LCOE saving |
| Full-cashflow NPV (base assumptions) | n/a | NPV +75.03M ZAR; IRR 42.73%; discounted payback 2.85 yr — project pays back inside year 3 |

**Reading the two verdicts together:** the LCOE lens (*energy-only cost of generation*) shows a 56–69% saving versus the Eskom blended tariff across every realistic scenario. The full-cashflow NPV lens is strongly positive under the bounded tariff/escalation assumptions in &sect;2.1, with payback well inside the 25-yr horizon. Procurement sign-off still requires a bankable PPA, wheeling agreement or captive-tariff schedule so the bounded defaults in &sect;2.1 are replaced by contractual values before contract signature.

## 8. Mini cert block (issuer + certificate number, or explicit illustrative disclaimer)

All certifications below are illustrative pending OEM selection. No certificate number is asserted as fact.

- **Modules:** IEC 61215-1:2021 (design qualification) and IEC 61730-1:2016 (safety) — illustrative; actual certificate number and issuer (e.g., T&Uuml;V Rheinland / T&Uuml;V S&Uuml;D / VDE / UL) to be confirmed against the chosen LONGi Hi-MO X6 / Hi-MO 9 / Jinko Tiger Neo 3.0 datasheet revision. Reference: [IEC 61215-1:2021 webstore page](https://webstore.iec.ch/en/publication/61345), [IEC 61730-1:2016 webstore page](https://webstore.iec.ch/en/publication/25674).

- **Inverters:** IEC 62109-1:2010 / IEC 62109-2:2011 (PCE safety) and NRS 097-2-1 (ZA grid code) — illustrative; certificate to be supplied by Sungrow, Huawei or Growatt against the actual serial range. Reference: [IEC 62109-1:2010 webstore page](https://webstore.iec.ch/en/publication/6470), [IEC 62109-2:2011 webstore page](https://webstore.iec.ch/en/publication/6471).

- **Transport (battery, if added):** UN Manual of Tests and Criteria Rev.7, &sect;38.3 (lithium battery transport) — [UN Rev.7 landing page](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria); specific &sect;38.3 test summary to be supplied by CATL / BYD / Sungrow per battery model.

- **EPC contractor:** SAPVIA PV Green Card registration preferred — [SAPVIA PV Green Card page](https://www.sapvia.org.za/pv-green-card/); contractor name and PV Green Card number to be added at RFQ stage.

## 9. HS code block (rates marked PENDING — verified URLs only)

| Commodity | HS code (ZA customs tariff) | Duty rate | Source URL |
| --- | --- | --- | --- |
| Crystalline silicon PV modules | 8541.43 | PENDING | SARS Customs & Excise Tariff browser — Schedule 1, Chapter 85 |
| Central / string inverters | 8504.40 | PENDING | SARS Customs & Excise Tariff browser — Schedule 1, Chapter 85 |
| DC cable, PV-rated | 8544.60 | PENDING | SARS Customs & Excise Tariff browser — Schedule 1, Chapter 85 |
| Mounting structure, aluminium/galvanised steel | 7610.90 / 7326.20 | PENDING | SARS Customs & Excise Tariff browser — Schedule 1, Chapters 76 / 73 |

EU-side cross-reference for the EU&harr;ZA landed-cost workflow: [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) lookup tool. US-side cross-reference: [USITC HTS search](https://hts.usitc.gov/) (lookup tool; entry 8541.43 for crystalline PV modules). UK-side cross-reference: [UK Global Tariff](https://www.trade-tariff.service.gov.uk/) lookup. Battery-side regulatory context: [Regulation (EU) 2023/1542 (EU Battery Regulation)](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) on EUR-Lex.

*Disclaimer:* TradVolt never asserts a duty rate as fact. The applicable customs duty, VAT, anti-dumping measures and any ITAC rebate must be confirmed with a licensed clearing agent against the actual commercial invoice and the latest SARS schedule on the day of shipment.