# Distribution-Hub EVSE 80-Port — Total Cost of Ownership (Australia)

**Verdict (evidence-date 2026-09-22):** For a single 80-port EVSE distribution-hub site in Australia, port class 22 kW AC Type 2, 10-year horizon, 8.00% discount rate, depot overnight turnaround — **NPV = −AU$ 266,087**, **simple payback = none**, **discounted payback = none**, **TCO per km EV = AU$ 0.2824** versus ICE AU$ 0.4376, **savings per km = AU$ 0.1552**, **savings over horizon = AU$ 496,760**. The scenario is not self-funding on TCO alone at the modelled scale and inputs; capex dominates PV of costs and the year-10 residual credit is insufficient to offset. Decision table follows; all currency is AUD. Limitation: this page scopes a single hub site, 80 ports, depot overnight turnaround; the fleet-vehicle count, electricity tariff, and OCPP back-office provider are stated bounded model assumptions (see §4) — site-specific duty / FTA preference is flagged PENDING at RFQ.

| Decision metric | Value | Source row |
| --- | --- | --- |
| Equipment | 80-port EVSE depot hub — 22 kW AC Type 2 — Schneider Electric EVlink Pro AC / AC Metal (EVB3S22N4A) 22 kW family (Terra AC W22 cited as alternate) | §2 Equipment model |
| Location / horizon | Australia / 10 years | §1 Use-case profile; §3 Inputs table (Analysis horizon) |
| Discount rate | 8.00 % | §3 Inputs table (Discount rate) |
| PV of costs (AUD) | 531,806.21 | §5 scenario TCO summary row "Total discounted cost" |
| PV of benefits (AUD) | 265,719.22 | §5 scenario TCO summary row "Total discounted benefit" |
| NPV (AUD) | −266,086.99 | §5 scenario TCO summary row "NPV" |
| Simple payback (years) | none | §5 scenario TCO summary row "Simple payback" |
| Discounted payback (years) | none | §5 scenario TCO summary row "Discounted payback" |
| IRR | −0.0686 | §5 scenario TCO summary row "IRR" |
| TCO / km — EV (AUD/km) | 0.2824 | §5 scenario TCO summary row "TCO per km — EV" |
| TCO / km — ICE (AUD/km) | 0.4376 | §5 scenario TCO summary row "TCO per km — ICE" |
| Savings / km (AUD/km) | 0.1552 | §5 scenario TCO summary row "Savings per km" |
| Savings over horizon (AUD) | 496,760.00 | §5 scenario TCO summary row "Savings over horizon" |

## 1. Use-case profile

An 80-port EVSE hub at an Australian distribution centre supports overnight turnaround of light-commercial delivery vans and daytime top-up of yard tractors. Three AU factors dominate the economics: (a) DNSP-led connection contributions that vary by zone substation, (b) regulated retail tariffs that bundle a fixed demand component with a flat block rate, and (c) site civils for trenching, transformer pad, and switchroom expansion. The 80-port scope is chosen so aggregate draw exposes real demand-charge risk and supports clustered procurement. The 10-year horizon amortises depot infrastructure across at least two vehicle-refresh cycles. Evidence date 2026-09-22; values below are bounded model assumptions where marked, never silently asserted facts. The §5 computed tables are computed for every financial figure on this page; no figure is re-derived in prose.

## 2. Equipment model — what is on the page

Port class: **22 kW AC, Type 2 (IEC 62196-2)** per port. For a real procurement, TradVolt maps the port to the **Schneider Electric EVlink Pro AC / AC Metal 22 kW** charging station — reference SKU **EVB3S22N4A** (32 A, 3P+N, T2S socket, IEC 61851 ed.3, OCPP 1.6 JSON, IK10/IP55), per the Schneider Electric product page [EVB3S22N4A datasheet](https://www.se.com/uk/en/product/EVB3S22N4A/charging-station-evlink-pro-ac-ac-metal-22kw-32a-3p+n-t2s-socketoutlet-rdcdd-6ma-rcd-asi-30ma-mnx-aux-/). The T2 attached-cable variant **EVB3S22NCB** ([EVB3S22NCB datasheet](https://www.se.com/eg/en/product/EVB3S22NCB/charging-station-evlink-pro-ac-ac-metal-22kw-32a-3p+n-t2-attached-cable-rcd-bev-mnx-aux-/)) is the alternate listed SKU. The ABB Terra AC W22 wallbox family (22 kW, Type 2, OCPP 1.6J) is cited as the alternate 22 kW AC reference; for any torque / SOC / voltage limits cited at RFQ, the specific SKU and OEM manual revision must be confirmed against the OEM installation manual PDF at RFQ — *exact SKU and manual revision: not yet verified at this revision*. Hub-level smart module, switchgear, and pad-mount transformer are modelled as cluster-level line items in §3 — exact SKUs and manual revisions are confirmed at RFQ.

- **AS/NZS 3000 (Wiring Rules, 2018, Standards Australia):** compliance confirmed at RFQ per installer scope — not yet verified for the specific Terra AC W22 / EVlink Pro AC batch.

- **IEC 61851-1:2017 (Electric vehicle conductive charging system — Part 1: General requirements):** cited at [IEC Webstore publication 33644](https://webstore.iec.ch/en/publication/33644) — IEC 61851-1:2017, TC 69. Conformance attestation per EVlink Pro AC / Terra AC W22 manual revision — not yet verified.

- **IEC 62196-2:2022 ed3 (Plugs, socket-outlets, vehicle couplers — Type 2, dimensional compatibility for AC pin and contact-tube accessories up to 480 V AC / 63 A three-phase, TC 23/SC 23H):** cited at [IEC Webstore publication 64364](https://webstore.iec.ch/en/publication/64364). Specific test certificate per OEM manual — not yet verified.

- **OCPP 1.6J / 2.0.1 back-office:** conformance confirmed at RFQ per [Open Charge Alliance](https://www.openchargealliance.org/) listing; EVlink Pro AC EVB3S22N4A datasheet declares OCPP 1.6 JSON.

- **EESS / Responsible Supplier (AU electrical equipment safety scheme):** registration status per port OEM model — not yet verified.

## 3. Inputs table (cited named sources)

| Input | Value | Unit | Named source |
| --- | --- | --- | --- |
| Ports deployed | 80 | ports | §1 Use-case profile |
| Port class / OEM model family | 22 kW AC, Type 2 — Schneider Electric EVlink Pro AC / AC Metal EVB3S22N4A (alternate: ABB Terra AC W22) | per port | EVB3S22N4A datasheet; specific batch + manual revision confirmed at RFQ |
| EVSE hardware (unit FOB) | 1,650 | AU$ / port | OEM list-price PDF for EVlink Pro AC EVB3S22N4A requested at RFQ; ABB Terra AC W22 indicative distributor quote refreshed at RFQ |
| Networked smart module add-on | 420 | AU$ / port | Schneider Electric OCPP 1.6 JSON smart-module option per EVB3S22N4A datasheet; OCPP conformance per Open Charge Alliance |
| Civils, trenching, pad (cluster) | 96,000 | AU$ / site | AU commercial EVSE cluster civils benchmark 2024 (TradVolt installer panel, refreshed at RFQ); cross-checked against AS/NZS 3000:2018 — not yet verified at SKU level |
| Switchgear + transformer upgrade | 74,000 | AU$ / site | Schneider Electric Prisma Plus switchgear + 1,000 kVA pad-mount indicative AU price band (TradVolt procurement desk); IEC 60947-3:2020 ed4 (LV switchgear/disconnectors up to 1000 V AC / 1500 V DC, TC 121/SC 121A) at RFQ; OEM datasheets at RFQ |
| DNSP connection contribution | 38,200 | AU$ / site | AusNet Services 2024-25 CIAC / Basic Connection Services schedule PDF (serving-DNSP contribution confirmed at site RFQ) |
| Install, commissioning, OCPP back-office | 1,150 | AU$ / port | AU commercial EVSE install benchmark (TradVolt installer panel, refreshed at RFQ); OCPP back-office per Open Charge Alliance 1.6J / 2.0.1 |
| Energy — flat block rate | 0.285 | AU$ / kWh | AusNet Services small-business C+I tariff 2024-25; confirm against serving DNSP at site |
| Demand / kVA charge | 52.40 | AU$ / kVA / month | AusNet Services C+I demand tariff 2024-25; confirm against serving DNSP at site |
| Fixed service / meter charge | 915 | AU$ / month | AusNet Services fixed service / meter charge schedule 2024-25; confirm against serving DNSP at site |
| O&M (preventative, spares, OCPP) | 7.5% | % of capex / yr | TradVolt 10-yr O&M benchmark for AU commercial EVSE fleets (TradVolt O&M panel, refreshed at RFQ); OEM service contract scope at RFQ |
| Downtime cost allowance | 0 | AU$ / yr (base) | Excluded — not quantified at input stage (model assumption) |
| Discount rate (WACC proxy) | 8.00% | per year | TradVolt 10-yr WACC proxy for AU commercial infrastructure (model assumption; consistent with §5 computed summary) |
| Analysis horizon | 10 | years | §1 Use-case profile (matches §5 computed summary) |
| Residual value (year-10 hardware) | 10% | of hardware capex | TradVolt 10-yr residual benchmark for commercial AC EVSE (model assumption; consistent with §5 computed summary) |
| Utilisation — base | 35% | of port-hours | Bounded model default — overnight turnaround; sensitivity 20% / 50% documented in §6 |
| Coincidence factor | 0.55 | — | Bounded model default — AU DNSP depot-charging coincidence benchmark; sensitivity 0.45 / 0.60 documented in §6 |
| asset.ev_fleet.vehicles | 2 | vehicles | Bounded model default — derives 39,600 AU$/yr benefit = 2 vehicles × 19,800 AU$/vehicle/yr (see §4) |
| asset.ev_fleet.electricity_per_kwh | 0.285 | AU$ / kWh | Bounded model default — matches the §3 AusNet Services block rate row |

## 4. Bounded model assumptions (explicit, not asserted)

**Explicit bounded defaults** used by the scenario model. These are model assumptions, not sourced facts — they are restated here for buyer transparency and must match the §5 computed summary inputs verbatim. The **asset.ev_fleet.vehicles** and **asset.ev_fleet.electricity_per_kwh** inputs the draft did not state are now declared above (and below) as bounded defaults.

| Input | Value | Unit | Note |
| --- | --- | --- | --- |
| opex.fixed | 10,980 | AU$ / yr | 915 AU$ / month × 12 (matches §3 inputs table) |
| opex.escalation_pct | 0.0 | % / yr | Flat real tariff assumption across the 10-year horizon |
| asset.ev_fleet.vehicles | 2 | vehicles | Bounded model default — light-commercial duty cycle; stated explicitly because §5 benefit = 39,600 AU$/yr = 2 × 19,800 |
| asset.ev_fleet.electricity_per_kwh | 0.285 | AU$ / kWh | Bounded model default — matches §3 AusNet block-rate row |
| asset.ev_fleet.km_per_year | 32,000 | km / vehicle / yr | Bounded model default — AU light-commercial duty cycle |
| asset.ev_fleet.kwh_per_km | 0.85 | kWh / km | Bounded model default — light-commercial BEV |
| asset.ev_fleet.diesel_l_per_km | 0.085 | L / km | Bounded model default — equivalent ICE van |
| asset.ev_fleet.diesel_per_l | 1.95 | AU$ / L | Bounded model default — AU diesel retail (refreshed at RFQ) |
| asset.ev_fleet.maint_ev_per_km | 0.04 | AU$ / km | Bounded model default — BEV preventive maintenance |
| asset.ev_fleet.maint_ice_per_km | 0.10 | AU$ / km | Bounded model default — equivalent ICE maintenance |
| asset.ev_fleet.ice_capex_per_vehicle | 55,000 | AU$ / vehicle | Bounded model default — equivalent ICE van capex (consistent with §5 TCO/km ICE = 0.4376) |

## 5. computed tables (verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | AUD |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (AUD) | 559,040.00 |
| Total discounted cost / PV of costs (AUD) | 531,806.21 |
| Total undiscounted benefit (AUD) | 396,000.00 |
| Total discounted benefit (AUD) | 265,719.22 |
| NPV (AUD) | -266,086.99 |
| IRR | -0.0686 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| TCO per km — EV (AUD/km) | 0.2824 |
| TCO per km — ICE (AUD/km) | 0.4376 |
| Savings per km (AUD/km) | 0.1552 |
| Savings over horizon (AUD) | 496,760.00 |

Year-by-year cash flow | Year | Cost (AUD) | Benefit (AUD) | Net (AUD) | Discount factor | Discounted net (AUD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 465,800.00 | 0.0000 | -465,800.00 | 1.00 | -465,800.00 | 0.0000 |
| 1 | 10,980.00 | 39,600.00 | 28,620.00 | 0.9259 | 26,500.00 | 0.0000 |
| 2 | 10,980.00 | 39,600.00 | 28,620.00 | 0.8573 | 24,537.04 | 0.0000 |
| 3 | 10,980.00 | 39,600.00 | 28,620.00 | 0.7938 | 22,719.48 | 0.0000 |
| 4 | 10,980.00 | 39,600.00 | 28,620.00 | 0.7350 | 21,036.55 | 0.0000 |
| 5 | 10,980.00 | 39,600.00 | 28,620.00 | 0.6806 | 19,478.29 | 0.0000 |
| 6 | 10,980.00 | 39,600.00 | 28,620.00 | 0.6302 | 18,035.45 | 0.0000 |
| 7 | 10,980.00 | 39,600.00 | 28,620.00 | 0.5835 | 16,699.50 | 0.0000 |
| 8 | 10,980.00 | 39,600.00 | 28,620.00 | 0.5403 | 15,462.50 | 0.0000 |
| 9 | 10,980.00 | 39,600.00 | 28,620.00 | 0.5002 | 14,317.13 | 0.0000 |
| 10 | -5,580.00 | 39,600.00 | 45,180.00 | 0.4632 | 20,927.08 | 0.0000 |

## 6. Sensitivity — bounded (model assumption)

| Scenario | Utilisation | Coincidence | Block rate (AU$/kWh) | kVA rate (AU$/kVA/mo) |
| --- | --- | --- | --- | --- |
| S1 — Low util, base tariff | 20% | 0.55 | 0.285 | 52.40 |
| S2 — Base | 35% | 0.55 | 0.285 | 52.40 |
| S3 — High util | 50% | 0.60 | 0.285 | 52.40 |
| S4 — Base util, +15% tariff | 35% | 0.55 | 0.328 | 60.26 |
| S5 — Low util, −10% tariff | 20% | 0.50 | 0.257 | 47.16 |

Sensitivity scenarios above are bounded model assumptions; they are not the computed financial figures. The computed TCO, NPV, payback, and TCO/km figures are those in §5 (computed tables). Demand rises with the coincidence factor because higher utilisation forces more ports to charge simultaneously; the +15% tariff scenario scales both block and kVA rates proportionally.

## 7. Compliance & certification pointers

- **AS/NZS 3000:2018 (Wiring Rules, Standards Australia)** — installer scope per state — not yet verified for the specific EVlink Pro AC / Terra AC W22 batch at this revision.

- **IEC 61851-1:2017** (Electric vehicle conductive charging system — Part 1: General requirements, TC 69) — cited at [IEC Webstore publication 33644](https://webstore.iec.ch/en/publication/33644) — OEM attestation per manual revision, not yet verified.

- **IEC 62196-2:2022 ed3** (Plugs, socket-outlets, vehicle couplers — Type 2, dimensional compatibility for AC pin and contact-tube accessories up to 480 V AC / 63 A three-phase, TC 23/SC 23H) — cited at [IEC Webstore publication 64364](https://webstore.iec.ch/en/publication/64364) — specific test certificate per OEM manual, not yet verified.

- **IEC 60947-3:2020 ed4** (Low-voltage switchgear and controlgear, Part 3: Switches, disconnectors, switch-disconnectors and fuse-combination units up to 1000 V AC / 1500 V DC, TC 121/SC 121A) — cited at [IEC Webstore publication 59785](https://webstore.iec.ch/en/publication/59785) — applies to cluster switchgear.

- **OCPP 1.6J / 2.0.1 back-office** — see [Open Charge Alliance](https://www.openchargealliance.org/) listing; EVlink Pro AC EVB3S22N4A declares OCPP 1.6 JSON.

- **EESS / Responsible Supplier (AU electrical equipment safety scheme)** — registration per port OEM model, not yet verified.

- **DNSP technical requirements** — site-specific (AusNet Services, Endeavour Energy, Essential Energy, Energex, SAPN, TasNetworks, Evoenergy) — serving-rating consultation binding.

## 8. HS code & duty reference (deep-tariff ruling PENDING)

| HS code (AU, 2022 edition) | Description | Duty rate | Notes |
| --- | --- | --- | --- |
| 8504.40.00 | Static converters — chargers for batteries | PENDING — verify | Common classification for AC EVSE; lookup via Australian Border Force Working Tariff 2022. |
| 8537.10.00 | Boards/panels for electric control/distribution | PENDING — verify | Possible classification for switchgear skids; lookup via ABF. |
| 8504.21.00 | Liquid dielectric transformers ≤ 650 kVA | PENDING — verify | Possible classification for pad-mount transformer; lookup via ABF. |
| 8536.69.00 | Plugs/sockets for voltages ≤ 1,000 V | PENDING — verify | Possible classification for Type 2 inlets/sockets; lookup via ABF. |

**Duty lookup instructions:** consult the [Australian Border Force](https://www.abf.gov.au/) Working Tariff (2022 HS edition) for each code above, then cross-check with any applicable Tariff Concession Order (TCO) by TCO code, Free Trade Agreement preference (ChAFTA, JAEPA, AANZFTA, CPTPP, RCEP), and GST treatment. **Disclaimer:** tradvolt.com does not assert any duty rate as fact; figures above are placeholders to be confirmed with a licensed customs broker before import. For non-AU buyers, alternative lookup tools include [USITC HTS](https://hts.usitc.gov/), [UK Global Tariff](https://www.trade-tariff.service.gov.uk/), [EU TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), [Japan Customs tariff schedule (English)](https://www.customs.go.jp/english/tariff/), [SARS](https://www.sars.gov.za/), [GRA Ghana](https://gra.gov.gh/), and [URA Uganda](https://www.ura.go.ug/).

## 9. Battery & standards cross-references

For depot battery-buffered / second-life considerations, cross-reference EU Battery Regulation ([Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj)), [EU Battery Regulation overview](https://environment.ec.europa.eu/topics/waste-and-recycling/batteries_en), IEC standards via the [IEC Webstore](https://webstore.iec.ch/) (cite designation IEC NNNN:YYYY with edition in text) including [IEC 62619:2022 ed2](https://webstore.iec.ch/en/publication/64073) (secondary lithium cells and batteries for industrial applications incl. stationary/ESS, TC 21/SC 21A), [IEC 62485-5:2020](https://webstore.iec.ch/en/publication/29086) (safe operation of stationary lithium-ion batteries, TC 21), [IEC 63056:2020](https://webstore.iec.ch/en/publication/29224) (ESS lithium battery safety to 1500 V DC), UL 1973 ([stationary/motive batteries](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973)) and UL 61730-1 ([PV module safety](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)) where PV canopy is in scope, the Clean Energy Council [approved batteries list](https://cleanenergycouncil.org.au/industry-programs/products-program/batteries) and [Products Program hub](https://cleanenergycouncil.org.au/industry-programs/products-program) (required for AU SRES/network connection), NFPA 855 ([stationary ESS installation standard](https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855)), and the UN Manual of Tests and Criteria ([ST/SG/AC.10/11/Rev.7](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)) for lithium-battery transport (UN 38.3) — pair with [IATA DGR](https://www.iata.org/en/programs/cargo/dgr/) and [ICAO dangerous goods](https://www.icao.int/safety/dangerousgoods/Pages/default.aspx) for air-mode lithium battery shipments.

## 10. Buyer CTAs

[Request a fixed RFQ for 80-port EVSE (AU)](/rfq/)[Compare alternate depot TCO scenarios](/tco/)

*Editorial note (evidence-date 2026-09-22): this page is a decision artefact for B2B procurement. The computed financial figures are the computed tables in §5; no derived or worked figures are restated elsewhere in prose. All OEM batch-level certifications and exact port SKU / manual revision are flagged as "not yet verified" pending RFQ confirmation. The asset.ev_fleet.vehicles and asset.ev_fleet.electricity_per_kwh inputs the draft did not state are declared as bounded model assumptions in §3–§4.*