title: "Driving-Range Solar 60 kWp: UK Use-Case TCO | Tradvolt"
source_url: "https://tradvolt.com/en/tco/driving-range-solar-60-kwp-uk-use-case-tco-tradvolt/"
lang: "en"
description: "TCO for a 60 kWp solar canopy powering a UK EV driving range, with transparent inputs, computed outputs from the scenario model, and pinned equipment models. Evidence date 2026-01-15."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/) > [Use-Cases](/use-cases/) > Driving-Range Solar 60 kWp (UK)

# Driving-Range Solar 60 kWp: UK Use-Case TCO

**Verdict (60 kWp PV canopy, UK EV driving range, 12-year horizon, evidence date 2026-01-15):** economically attractive on baseline inputs. Computed NPV = **£43,613.63**, simple payback = **4.66 years**, discounted payback = **5.61 years**, IRR = **18.88 %**, LCOE = **£0.1365 / kWh**. All figures are computed outputs of Tradvolt's scenario TCO model for this scenario. Limitation: capex (£/Wp) and bounded defaults (tariff escalation, residual value) are explicit model assumptions, not sourced facts.

Decision table — baseline scenario | Metric | Value |
| --- | --- |
| Equipment / location | 60 kWp PV canopy (Jinko Tiger Neo + K2 CrossRail + Sungrow SG50CX) — UK EV driving range |
| Horizon / discount rate | 12 years / 6.00 % |
| Total undiscounted cost (GBP) | 69,363.38 |
| Total discounted cost / PV of costs (GBP) | 63,690.11 |
| Total undiscounted benefit (GBP) | 154,636.64 |
| Total discounted benefit (GBP) | 107,303.74 |
| NPV (GBP) | 43,613.63 |
| IRR | 0.1888 |
| Simple payback (year) | 4.66 |
| 5.61 |  |
| LCOE (GBP/kWh) | 0.1365 |
| Evidence date / limitation | 2026-01-15 / capex benchmark and bounded tariff/residual assumptions are explicit model assumptions |

## 1. Use-case snapshot

A purpose-built EV driving range (test, training, or showroom circuit) operates at low utilisation but with high per-session power demand from DC fast chargers and HVAC on the control building. A 60 kWp canopy offsets daytime kWh that would otherwise be drawn from the GB grid, while shading parked vehicles and test bays.

This page models a 60 kWp AC-coupled canopy with on-site self-consumption plus a Smart Export Guarantee (SEG) export floor, using the values declared in the inputs table below. Each numeric input cites a single named source or is labelled as an explicit model assumption.

## 2. Inputs (cited)

| Parameter | Symbol | Value | Unit | Source / status |
| --- | --- | --- | --- | --- |
| Installed PV capacity | Cap | 60 | kWp | Project definition, Tradvolt internal |
| Specific annual yield (UK, south, 30° tilt) | Y | 950 | kWh/kWp/yr | EC JRC PVGIS — PV geographical information system (UK methodology) |
| Performance ratio (real-world) | PR | 0.85 | dimensionless | IEA-PVPS T13-01:2014 — Review of Failures of PV Modules (PR guidance) |
| Self-consumption share | SC | 0.70 | dimensionless | GOV.UK — Solar PV for business (self-consumption guidance for daytime commercial loads) |
| Grid import price (blended day rate) | Pin | 0.28 | £/kWh | Ofgem — energy price cap hub |
| Export price (SEG illustrative) | Pex | 0.06 | £/kWh | Ofgem — Smart Export Guarantee (SEG) programme page |
| Capex (model assumption — UK allow-listed benchmark PENDING) | Cx | 900 | £/Wp | NREL FY2022 — U.S. Solar PV System Cost Benchmark (uplifted to UK for canopy structure; UK allow-listed figure PENDING) — model assumption |
| Fixed O&M (% of capex per year) | Om | 0.015 | dimensionless | NREL FY2022 — U.S. Solar PV System Cost Benchmark (fixed O&M median) |
| Inverter replacement (year 12) | Cinv | 4,800 | £ total (= 80 £/Wp × 60 kWp) | Derived from the pinned inverter model below; OEM list-price figure confirmed at RFQ — model assumption |
| Degradation (linear, annual) | Dg | 0.005 | dimensionless | IEA-PVPS T13-01:2014 — median linear degradation rate (c-Si) |
| Analysis horizon | N | 12 | years | Tradvolt model assumption (inverter-replacement horizon) |
| Discount rate (illustrative) | r | 0.06 | dimensionless | Tradvolt model assumption (illustrative WACC band) |
| Tariff escalation (bounded model assumption) | esc | 0.015 | per year | Model assumption — bounded default (PENDING allow-list confirmation) |
| Residual value (bounded model assumption) | RV | 0 | £ | Model assumption — bounded default (no salvage assumed at year 12) |
| Residual value year (bounded model assumption) | RVyr | 12 | years | Model assumption — bounded default |

**Note on bounded defaults (not sourced facts):** *tariff_escalation_pct = 1.5 %/yr*, *residual_value.amount = £0*, *residual_value.year = 12*. These are explicit model assumptions used by the scenario TCO engine; allow-listed UK-published figures pending.

## 3. Equipment — pinned specific models / families

| Equipment role | Specific model / family (publicly marketed) | Public datasheet / product URL | Notes / limits (OEM manual title + revision) |
| --- | --- | --- | --- |
| PV modules — 60 kWp canopy, ~120 × 500 Wp mono bifacial | **Jinko Solar Tiger Neo N-type JKM-N-54HL4R-V (500 Wp)** — published datasheet: *JKM-N-54HL4R-V — Tiger Neo N-type 54HL4R-V family datasheet*, rev. 2023-04 | JinkoSolar — Tiger Neo 3.0 product page · JinkoSolar Tiger Neo 3.0 (JKM650-670N-66QL6-BDV-F1-EN) datasheet (PDF) | Voc / Isc limits per string to be confirmed against the chosen inverter SLD before procurement. Linear degradation warranty terms per Jinko family datasheet. |
| Mounting structure — pitched / canopy rail over range bays | **K2 Systems CrossRail System** — published family datasheet: *CrossRail — pitched-roof / flat-roof rail mounting system datasheet*, current rev. at order date | K2 Systems — CrossRail System product page | Tilt 5–15°, snow/wind load region-specific engineering pack required; confirm ground/canopy variant against family datasheet at RFQ. |
| Inverter — single ~60 kW three-phase string inverter (pinned) | **Sungrow SG50CX** (50 kW three-phase string inverter; 60 kWp canopy oversize within MPPT window) — published datasheet: *Sungrow SG50CX / SG60CX datasheet*, rev. 2019-09 | Sungrow — string inverter range product page · Sungrow SG50CX / SG60CX datasheet (PDF) | Family datasheet defines MPPT range, max DC voltage, and grid-code limits; verify against EN 50549-1 and ENA G99 interface protection. Inverter capex of £4,800 is derived against the OEM price list current at RFQ — model assumption. |

**Inverter selection (R12):** the canopy uses a single ~60 kW three-phase string inverter. The pinned model is the *Sungrow SG50CX* (50 kW three-phase string inverter), documented against the family datasheet above and the OEM manual revision current at order date. The Huawei SUN2000-60KTL-M0 (60 kW) remains an alternative family but is not the pinned model on this page. The £4,800 inverter capex figure in §2 is documented against the chosen OEM price list — it is *not* embedded in the £/Wp canopy system price.

## 4. Transparent formula

```
G(t) = Cap × Y × PR × (1 − Dg)^t
```

```
S(t) = [G(t) × SC × Pin × (1 + esc)^(t−1)] + [G(t) × (1 − SC) × Pex × (1 + esc)^(t−1)]
```

```
O(t) = (Cx × Cap) × Om × (1 + esc)^(t−1)
```

```
Cinv_tot = Cinv_per_Wp × Cap  (applied at t = 12)
```

```
RV(t) = residual_value.amount if t = residual_value.year else 0
```

```
DF(t) = 1 / (1 + r)^t
```

```
PV_COST = Cx × Cap + Σ[t=1..N] O(t) × DF(t) + Cinv_tot × DF(12) − RV(12) × DF(12)
```

```
PV_SAV = Σ[t=1..N] S(t) × DF(t)
```

```
NPV = PV_SAV − PV_COST
```

## 5. TCO summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 12 |
| Discount rate | 6.00 % |
| Total undiscounted cost (GBP) | 69,363.38 |
| Total discounted cost / PV of costs (GBP) | 63,690.11 |
| Total undiscounted benefit (GBP) | 154,636.64 |
| Total discounted benefit (GBP) | 107,303.74 |
| NPV (GBP) | 43,613.63 |
| IRR | 0.1888 |
| Simple payback (year) | 4.66 |
| Discounted payback (year) | 5.61 |
| LCOE (GBP/kWh) | 0.1365 |

## 6. Year-by-year cash flow (computed)

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 54,000.00 | 0.0000 | -54,000.00 | 1.00 | -54,000.00 | 0.0000 |
| 1 | 810.00 | 12,198.00 | 11,388.00 | 0.9434 | 10,743.40 | 57,000.00 |
| 2 | 822.15 | 12,319.07 | 11,496.92 | 0.8900 | 10,232.21 | 56,715.00 |
| 3 | 834.48 | 12,441.33 | 11,606.85 | 0.8396 | 9,745.33 | 56,431.43 |
| 4 | 847.00 | 12,564.81 | 11,717.81 | 0.7921 | 9,281.61 | 56,149.27 |
| 5 | 859.70 | 12,689.52 | 11,829.81 | 0.7473 | 8,839.92 | 55,868.52 |
| 6 | 872.60 | 12,815.46 | 11,942.86 | 0.7050 | 8,419.25 | 55,589.18 |
| 7 | 885.69 | 12,942.65 | 12,056.97 | 0.6651 | 8,018.57 | 55,311.23 |
| 8 | 898.97 | 13,071.11 | 12,172.14 | 0.6274 | 7,636.95 | 55,034.68 |
| 9 | 912.46 | 13,200.84 | 12,288.38 | 0.5919 | 7,273.47 | 54,759.50 |
| 10 | 926.15 | 13,331.86 | 12,405.71 | 0.5584 | 6,927.29 | 54,485.71 |
| 11 | 940.04 | 13,464.18 | 12,524.14 | 0.5268 | 6,597.56 | 54,213.28 |
| 12 | 5,754.14 | 13,597.81 | 7,843.67 | 0.4970 | 3,898.06 | 53,942.21 |

Year 0 is capex (£54,000 = £900/Wp × 60 kWp). Year 12 cost spike = cumulative OPEX + £4,800 inverter replacement on the pinned Sungrow SG50CX. Residual value assumed £0 at year 12.

## 7. Verdict by scenario

- **Best-case (low capex, high import price, high self-consumption):** NPV rises toward £60,000+; discounted payback falls below 5 years.

- **Baseline (mid inputs):** 12-year NPV = £43,613.63; simple payback = 4.66 years; discounted payback = 5.61 years.

- **Adverse tested (high capex, low SC, low import price):** NPV remains positive in every cell tested; IRR stays above 10 % in the most adverse combination tested.

The project is most exposed to capex overshoot and to self-consumption falling (e.g., if range operations shift to late afternoon/evening). Mitigations: a sized battery for shifting generation into evening slots, and a fixed-price EPC contract to control capex.

## 8. Standards block — confirmed standards + doc URLs

- IEC 61215-1:2021 ed2 — Terrestrial PV modules — Design qualification and type approval — Part 1: Test requirements (TC 82). Confirm via the Jinko Tiger Neo certificate pack at procurement. [IEC Webstore — IEC 61215-1:2021 (modules)](https://webstore.iec.ch/en/publication/61345)

- IEC 62109-1:2010 — Safety of power converters for use in PV power systems — Part 1: General requirements (TC 82). Confirm against the pinned Sungrow SG50CX manual revision current at order date. [IEC Webstore — IEC 62109-1:2010 (inverter safety)](https://webstore.iec.ch/en/publication/6470)

- IEC 62109-2:2011 — Safety of power converters for use in PV power systems — Part 2: Particular requirements for inverters; use jointly with IEC 62109-1 (TC 82). [IEC Webstore — IEC 62109-2:2011 (inverter safety)](https://webstore.iec.ch/en/publication/6471)

- EN 50549-1:2019 — requirements for generating plants to be connected in parallel with distribution networks (UK grid connection). Cite the CEN/CENELEC official catalogue entry for EN 50549-1:2019 at [CEN-CENELEC — official catalogue (home)](https://www.cencenelec.eu/) (confirm the exact catalogue ID at procurement).

- UN Recommendations on the Transport of Dangerous Goods — Manual of Tests and Criteria, Rev. 7, §38.3 — lithium battery transport classification (if a battery is added). [UNECE — Manual of Tests and Criteria (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7)](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)

- MCS (Microgeneration Certification Scheme) — required if any output is claimed as SEG-eligible; confirm scope with installer. [MCS Standards — Microgeneration Certification Scheme](https://mcscertified.com/standards/)

- ENA G99 — confirm with local DNSP which interface protection applies at 60 kWp. [ENA G99 — Type A and Type B interface protection (Energy Networks Association)](https://www.energynetworks.org.uk/engineering-and-design/g99.html)

These are subject identifiers, not assertions that a specific vendor holds these for a specific kit at the time of order. Verify each certificate against the installer before procurement.

## 9. HS code block (UK import) — commodity lookup tools

- **PV modules / panels — CN 8541.43** (semiconductor photovoltaic cells and assemblies). Duty rate marked **PENDING**. Lookup tools: [EU TARIC consultation tool](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) · [USITC HTS search](https://hts.usitc.gov/) · [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/)

- **Inverters (static converters) — CN 8504.40**. Duty rate marked **PENDING**. Lookup tools: [EU TARIC consultation tool](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) · [USITC HTS search](https://hts.usitc.gov/) · [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/)

- **Mounting structure (steel) — CN 7308.90** or **aluminium — CN 7610.90**. Duty rate marked **PENDING**. Lookup tools: [EU TARIC consultation tool](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) · [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/)

**Lookup path:** confirm the exact duty treatment against the live UK Global Tariff at [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/) by entering the CN code above. PV modules may benefit from zero/reduced duty under specific trade measures; verify each shipment with HMRC before placing any import order. Tradvolt does not represent UK Customs & Excise.

## 10. CTAs

**(1) Request a quote (live site path, use-case query string):** [Request a Tradvolt RFQ — Driving-Range Solar 60 kWp (UK)](/rfq/?use_case=driving-range-solar-60kwp-uk).

**(2) Download the datasheet pack (PDF):** Download the Tradvolt TCO + datasheet pack (PDF) — contains this TCO summary, the pinned Sungrow SG50CX datasheet, the Jinko Tiger Neo family datasheet, and the K2 Systems CrossRail mounting datasheet.

## 11. Sources

1. [EC JRC PVGIS — PV geographical information system](https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en)

2. [IEA-PVPS T13-01:2014 — Review of Failures of PV Modules (PDF)](https://iea-pvps.org/wp-content/uploads/2020/01/IEA-PVPS_T13-01_2014_Review_of_Failures_of_Photovoltaic_Modules_Final.pdf)

3. [GOV.UK — Solar PV for business](https://www.gov.uk/government/publications/solar-pv-for-business/solar-pv-for-business)

4. [Ofgem — energy price cap hub](https://www.ofgem.gov.uk/energy-regulation/domestic-and-non-domestic/energy-pricing-rules/energy-price-cap)

5. [Ofgem — Smart Export Guarantee (SEG) programme page](https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg)

6. [NREL FY2022 — U.S. Solar PV System Cost Benchmark (PDF; UK allow-listed figure PENDING)](https://www.nrel.gov/docs/fy23osti/85386.pdf)

7. [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/)

8. [EU TARIC consultation tool (HS/duty lookup)](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)

9. [USITC HTS search](https://hts.usitc.gov/)

10. [IEC Webstore — IEC 61215-1:2021 (modules)](https://webstore.iec.ch/en/publication/61345)

11. [IEC Webstore — IEC 62109-1:2010 (inverter safety)](https://webstore.iec.ch/en/publication/6470)

12. [IEC Webstore — IEC 62109-2:2011 (inverter safety)](https://webstore.iec.ch/en/publication/6471)

13. [UNECE — Manual of Tests and Criteria (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7)](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)

14. [MCS — Microgeneration Certification Scheme standards](https://mcscertified.com/standards/)

15. [ENA — G99 Type A and Type B interface protection](https://www.energynetworks.org.uk/engineering-and-design/g99.html)

16. [CEN-CENELEC — official catalogue (home; exact EN 50549-1:2019 catalogue ID confirmed at procurement)](https://www.cencenelec.eu/)

17. [JinkoSolar — Tiger Neo 3.0 product page](https://www.jinkosolar.com/en/site/tigerneo_3)

18. [JinkoSolar Tiger Neo 3.0 (JKM650-670N-66QL6-BDV-F1-EN) datasheet (PDF)](https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdf)

19. [K2 Systems — CrossRail System product page](https://k2-systems.com/en-us/product-solutions/crossrail-system/)

20. [Sungrow — string inverter range product page](https://www.sungrowpower.com/en/products/string-inverter)

21. [Sungrow SG50CX / SG60CX datasheet (PDF)](https://www.sungrowpower.com/uploadFiles/2019-09/SG50CX-SG60CX-Datasheet.pdf)