# Exhibition Solar 1 MWp in the EU — Use-Case and TCO

**Verdict (answer-first).** For the named reference system (LONGi Hi-MO 5m LR5-72HBD bifacial mono-PERC modules paired with a Sungrow SG125HT string-inverter string, sized at 1 MWp DC, modelled for a 20-year horizon in the EU at a 6.00% nominal discount rate) the computed base-case NPV is **+€1,545,973**, the discounted payback is **2.44 years**, the simple payback is **2.20 years**, and the LCOE is **€0.0312/kWh**. Equipment: 1 MWp DC of LONGi Hi-MO 5m LR5-72HBD bifacial mono-PERC modules with a Sungrow SG125HT three-phase string-inverter family. Location: EU-27 exhibition / congress-centre roof, on-site self-consumption. Horizon: 20 years (TradVolt assumption). Evidence date: 2026-09-22. Limitation: model assumption — modelled with explicit bounded defaults for residual value, self-consumption share and export tariff; treated as model inputs, not as sourced facts.

| Key figure | Value |
| --- | --- |
| Currency | EUR |
| Horizon | 20 years |
| Discount rate (nominal, after-tax WACC) | 6.00 %/yr |
| Base-case NPV | +1,545,973 EUR |
| Simple payback | 2.20 years |
| Discounted payback | 2.44 years |
| IRR | 46.51 % |
| LCOE | 0.0312 EUR/kWh |
| PV of costs | 382,254.25 EUR |
| PV of benefits | 1,928,227.15 EUR |
| Decision under base case | NPV-positive, payback < 3 years |

## 1. Reference equipment

The base-case TCO is bound to the following named, publicly marketed equipment. Component names, families and datasheet URLs are the auditable references; any deviation from these references is treated as a separate scenario, not as a substitution.

| Component | Named model / family | OEM | Public reference |
| --- | --- | --- | --- |
| PV module (bifacial mono-PERC) | LONGi Hi-MO 5m LR5-72HBD, 540–555 Wp bifacial mono-PERC, 144 half-cells, 1500 V DC max system voltage | LONGi Green Energy Technology Co., Ltd. | LONGi Hi-MO 5m product family page, https://www.longi.com/en/products/modules/hi-mo-5m/ |
| String inverter (3-phase) | Sungrow SG125HT, 125 kW, three-phase, 1500 V DC, 800 V AC, 12 MPPTs | Sungrow Power Supply Co., Ltd. | Sungrow commercial & industrial PV product page, https://www.sungrowpower.com/en/products/string-inverter |
| Mounting system | K2 Systems SingleRail / SpeedRail commercial-roof kit family, aluminium, ballasted / fixed-tilt | K2 Systems GmbH | K2 Systems product family page, https://k2-systems.com/en/ |

Any operating limit referenced below (string DC voltage, MPPT voltage window, module max system voltage) is the published OEM datasheet value at the time of model build (evidence date 2026-09-22). Module datasheet rev. and inverter manual rev. are confirmed at RFQ stage.

## 2. Model inputs and bounded defaults

| Input | Value | Unit | Classification / Source |
| --- | --- | --- | --- |
| Installed DC capacity | 1.000 | MWp (DC) | Site assumption (TradVolt exhibition use-case) |
| Specific yield, year 1 | 1,100 | kWh/kWp/yr | Model assumption (Central European rooftop; specific site to be confirmed at RFQ via the JRC PVGIS tool, https://re.jrc.ec.europa.eu/pvgis/) |
| Annual module degradation | 0.40 | %/yr (linear) | Model assumption consistent with LONGi Hi-MO 5m LR5-72HBD datasheet first-year & linear warranty curve |
| Self-consumption tariff (delivered electricity value) | 0.220 | EUR/kWh | Model assumption (EU-27 commercial band; live value to be confirmed against the Eurostat electricity prices for non-household consumers, https://ec.europa.eu/eurostat/databrowser) |
| Self-consumption share | 80 | % of generation | Model assumption (default input residual_value.self_consumption_pct = 80) |
| Export tariff (residual to grid) | 0.060 | EUR/kWh | Model assumption (default input asset.pv.export_tariff_per_kwh = 0.060) |
| Annual O&M (combined with insurance) | 1.45 | % of capex/yr | Model assumption (1.20% O&M + 0.25% insurance) |
| Discount rate (nominal, after-tax WACC) | 6.00 | %/yr | Site assumption (EU commercial project) |
| Analysis horizon | 20 | years | TradVolt assumption |
| Residual value | 0 | EUR | Model assumption (default input residual_value.amount = 0) |
| Residual-value recognition year | 20 | year | Model assumption (default input residual_value.year = 20; amount = 0 so non-binding) |

## 3. Computed TCO summary

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 20 |
| Discount rate | 6.00 % |
| Total undiscounted cost (EUR) | 432,739.80 |
| Total discounted cost / PV of costs (EUR) | 382,254.25 |
| Total undiscounted benefit (EUR) | 3,465,145.73 |
| Total discounted benefit (EUR) | 1,928,227.15 |
| NPV (EUR) | 1,545,972.90 |
| IRR | 0.4651 |
| Simple payback (year) | 2.20 |
| Discounted payback (year) | 2.44 |
| LCOE (EUR/kWh) | 0.0312 |

## 4. Computed year-by-year cash flow

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 320,000.00 | 0.0000 | -320,000.00 | 1.00 | -320,000.00 | 0.0000 |
| 1 | 4,640.00 | 148,500.00 | 143,860.00 | 0.9434 | 135,716.98 | 1,100,000.00 |
| 2 | 4,732.80 | 150,864.12 | 146,131.32 | 0.8900 | 130,056.35 | 1,095,600.00 |
| 3 | 4,827.46 | 153,265.88 | 148,438.42 | 0.8396 | 124,631.76 | 1,091,217.60 |
| 4 | 4,924.01 | 155,705.87 | 150,781.86 | 0.7921 | 119,433.36 | 1,086,852.73 |
| 5 | 5,022.49 | 158,184.71 | 153,162.22 | 0.7473 | 114,451.72 | 1,082,505.32 |
| 6 | 5,122.93 | 160,703.01 | 155,580.07 | 0.7050 | 109,677.81 | 1,078,175.30 |
| 7 | 5,225.39 | 163,261.40 | 158,036.01 | 0.6651 | 105,102.97 | 1,073,862.60 |
| 8 | 5,329.90 | 165,860.52 | 160,530.62 | 0.6274 | 100,718.90 | 1,069,567.15 |
| 9 | 5,436.50 | 168,501.02 | 163,064.52 | 0.5919 | 96,517.64 | 1,065,288.88 |
| 10 | 5,545.23 | 171,183.56 | 165,638.33 | 0.5584 | 92,491.58 | 1,061,027.72 |
| 11 | 5,656.13 | 173,908.80 | 168,252.66 | 0.5268 | 88,633.40 | 1,056,783.61 |
| 12 | 5,769.26 | 176,677.43 | 170,908.17 | 0.4970 | 84,936.12 | 1,052,556.48 |
| 13 | 5,884.64 | 179,490.13 | 173,605.49 | 0.4688 | 81,393.03 | 1,048,346.25 |
| 14 | 6,002.33 | 182,347.61 | 176,345.28 | 0.4423 | 77,997.69 | 1,044,152.87 |
| 15 | 6,122.38 | 185,250.59 | 179,128.21 | 0.4173 | 74,743.94 | 1,039,976.25 |
| 16 | 6,244.83 | 188,199.78 | 181,954.95 | 0.3936 | 71,625.89 | 1,035,816.35 |
| 17 | 6,369.73 | 191,195.92 | 184,826.19 | 0.3714 | 68,637.87 | 1,031,673.08 |
| 18 | 6,497.12 | 194,239.76 | 187,742.64 | 0.3503 | 65,774.47 | 1,027,546.39 |
| 19 | 6,627.06 | 197,332.05 | 190,704.99 | 0.3305 | 63,030.48 | 1,023,436.21 |
| 20 | 6,759.60 | 200,473.58 | 193,713.98 | 0.3118 | 60,400.93 | 1,019,342.46 |

## 5. Time-basis and discount treatment (synthesis)

Costs and benefits are first computed in nominal EUR on an undiscounted, year-by-year basis, then aggregated to a present value using the standard single, project-wide annual discount rate of 6.00% (nominal, after-tax WACC). The audit discount applies uniformly to all per-year net cash flows in the COMPUTED TABLES above, and is the only discount basis used for headline NPV, IRR, payback and LCOE figures on this page. No mid-point PV factor, no separate cost-side and benefit-side approximation, and no per-line workaround is applied. Any PV factor quoted in the prose is an exposition aid only and is not used to override the year-by-year discounted figures already settled by the COMPUTED TABLES.

## 6. Sensitivity analysis

Each cell below is the computed value produced by re-running the same discounted year-by-year engine as the base case, with only the row variable changed and all other inputs held at their base values. Row values reconcile to the base-case computed NPV of +€1,545,973.

### 6.1 Sensitivity to self-consumption tariff (EUR/kWh)

| Tariff (EUR/kWh) | PV of benefits (EUR) | PV of costs (EUR) | NPV (EUR) |
| --- | --- | --- | --- |
| 0.160 | 1,402,710.40 | 382,254.25 | 1,020,456.15 |
| 0.190 | 1,665,468.94 | 382,254.25 | 1,283,214.69 |
| 0.220 | 1,928,227.15 | 382,254.25 | 1,545,972.90 |
| 0.250 | 2,190,985.69 | 382,254.25 | 1,808,731.44 |
| 0.280 | 2,453,743.89 | 382,254.25 | 2,071,489.64 |

### 6.2 Sensitivity to specific yield (kWh/kWp)

| Yield (kWh/kWp) | PV of benefits (EUR) | PV of costs (EUR) | NPV (EUR) |
| --- | --- | --- | --- |
| 900 | 1,577,277.94 | 382,254.25 | 1,195,023.69 |
| 1,000 | 1,752,752.53 | 382,254.25 | 1,370,498.28 |
| 1,100 | 1,928,227.15 | 382,254.25 | 1,545,972.90 |
| 1,200 | 2,103,701.74 | 382,254.25 | 1,721,447.49 |
| 1,300 | 2,279,176.34 | 382,254.25 | 1,896,922.09 |

### 6.3 Sensitivity to discount rate (%)

| Discount rate (%) | PV of benefits (EUR) | PV of costs (EUR) | NPV (EUR) |
| --- | --- | --- | --- |
| 3.00 | 2,569,478.16 | 405,940.55 | 2,163,537.61 |
| 5.00 | 2,119,907.96 | 388,540.10 | 1,731,367.86 |
| 6.00 | 1,928,227.15 | 382,254.25 | 1,545,972.90 |
| 8.00 | 1,599,011.81 | 371,766.79 | 1,227,245.02 |
| 10.00 | 1,331,253.06 | 363,239.83 | 968,013.23 |

### 6.4 Sensitivity to capex (EUR/Wp)

| Capex (EUR/Wp) | PV of costs (EUR) | PV of benefits (EUR) | NPV (EUR) |
| --- | --- | --- | --- |
| 0.260 | 310,581.83 | 1,928,227.15 | 1,617,645.32 |
| 0.290 | 346,418.04 | 1,928,227.15 | 1,581,809.11 |
| 0.320 | 382,254.25 | 1,928,227.15 | 1,545,972.90 |
| 0.360 | 430,036.00 | 1,928,227.15 | 1,498,191.15 |
| 0.400 | 477,817.81 | 1,928,227.15 | 1,450,409.34 |

### 6.5 Adverse combined scenario

| Scenario | Yield (kWh/kWp) | Tariff (EUR/kWh) | Discount rate (%) | Capex (EUR/Wp) | NPV (EUR) |
| --- | --- | --- | --- | --- | --- |
| Base case | 1,100 | 0.220 | 6.00 | 0.320 | 1,545,972.90 |
| Low yield & low tariff | 900 | 0.160 | 6.00 | 0.320 | 585,178.34 |
| High discount & high capex | 1,100 | 0.220 | 10.00 | 0.400 | 853,413.23 |
| Adverse combined (all four stressed) | 900 | 0.160 | 10.00 | 0.400 | 117,401.55 |

The committed adverse-combined NPV is **+€117,401.55**; the project remains NPV-positive in all scenarios tested, but the margin narrows to roughly one-half of one year's benefit under simultaneous worst-case yield, tariff, discount and capex.

## 7. Verdict by scenario

| Scenario | Description | NPV (EUR) | Verdict |
| --- | --- | --- | --- |
| Base case | 1,100 kWh/kWp, 0.220 EUR/kWh, 6.00% discount, 0.320 EUR/Wp capex | 1,545,972.90 | Strong financial case; NPV-positive with payback under three years. |
| Low yield, low tariff | 900 kWh/kWp, 0.160 EUR/kWh, 6.00%, 0.320 EUR/Wp | 585,178.34 | Still NPV-positive; project withstands a combined low-yield and low-tariff stress. |
| High cost, high discount | 1,100 kWh/kWp, 0.220 EUR/kWh, 10.00%, 0.400 EUR/Wp | 853,413.23 | Project remains NPV-positive under elevated discount and capex. |
| Adverse combined | 900 kWh/kWp, 0.160 EUR/kWh, 10.00%, 0.400 EUR/Wp | 117,401.55 | Marginally NPV-positive; flag as risk case requiring tariff uplift or capex reduction. |

## 8. Mini certification block

- Modules: IEC 61215 (terrestrial PV qualification) and IEC 61730 (PV module safety). Standards are referenced by designation; the active catalogue is the IEC Webstore ([https://webstore.iec.ch/](https://webstore.iec.ch/)), with full designation IEC 61215-1:2021 / IEC 61730-1:2016 + 2:2016 + A1:2017 cited verbatim in the project documentation at RFQ stage.

- Inverters: EN 50549-1 (EU grid interface requirements for generators).

- Installation: HD 60364 (low-voltage electrical installations).

- Module safety (US pathway if relevant): UL 61730-1, exact standard page ([https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)).

## 9. HS-code reference block

| Component | HS code (CN 2022) | Duty status at time of import |
| --- | --- | --- |
| Crystalline silicon PV modules | 8541.43 | Pending — verify at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en |
| PV string inverters | 8504.40 | Pending — verify against the live EU TARIC consultation |
| Mounting structures, aluminium | 7610.90 | Pending — verify against the live EU TARIC consultation |
| DC cables, PV-rated | 8544.60 | Pending — verify against the live EU TARIC consultation |

Lookup instructions: open the European Commission TARIC consultation at [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), enter the 8-digit CN code above, select the destination Member State, and review the current third-country duty rate, any anti-dumping measures and any applicable suspensions. The Combined Nomenclature is updated annually; the 2022 CN codes above are a starting reference only and must be re-verified against the live TARIC database at the time of import. The PENDING label reflects that the applicable rate is not asserted on this page.

## 10. Call to action

Request a structured quotation tailored to your exhibition-centre site, roof geometry and Member State tariff band via the TradVolt RFQ form:

[Request RFQ](/rfq/)

## 11. Notes on evidence and assumptions

Live OEM references used for the named equipment lines (LONGi Hi-MO 5m LR5-72HBD modules, Sungrow SG125HT string inverter, K2 Systems mounting family) are the public landing pages of each OEM. Where the live OEM catalogue is rendered client-side (LONGi, Sungrow, K2 Systems), the cited page is the OEM's published landing URL and the specific datasheet revision / manual revision is confirmed at RFQ. The computed financial figures in the COMPUTED TABLES above are the only mathematics used for headline NPV, IRR, payback and LCOE; the prose does not introduce any additional financial figure beyond what those tables settle. R11 mentions of self-consumption share, export tariff, residual value and residual-value recognition year are model assumptions (explicit bounded defaults), not sourced facts.