**Base-case 10-year net-of-savings cost: EUR 152,117 across six scenarios ranging from EUR 75,006 (Optimistic A) to EUR 241,732 (Pessimistic). NPV = −EUR 228,707; discounted payback = None; simple payback = None; LCOS = EUR 0.4150/kWh. Generic 300 kWh farm-ESS template, EU agricultural site, 10-year horizon, 5.00% discount rate, evidence date 2026-09-22. This page is an illustrative TCO template — it is not tied to a specific named OEM, inverter, battery, or EMS product family, and it carries no verified certificates of conformity.**

Decision table — six scenarios | Scenario | DoD | cyc/day | Tariff EUR/kWh | Savings EUR/yr | TCO_10y EUR |
| --- | --- | --- | --- | --- | --- |
| Optimistic A | 0.92 | 1.1 | 0.22 | 27,724 | 75,006 |
| Optimistic B | 0.90 | 1.0 | 0.22 | 21,681 | 121,673 |
| Base | 0.90 | 1.0 | 0.18 | 17,739 | 152,117 |
| Conservative A | 0.80 | 1.0 | 0.18 | 15,768 | 167,320 |
| Conservative B | 0.90 | 0.5 | 0.18 | 8,870 | 220,601 |
| Pessimistic | 0.80 | 0.5 | 0.14 | 6,132 | 241,732 |

# Farm-ESS 300 kWh — Illustrative TCO Template (EU)

*Illustrative template only — no named OEM, inverter, battery, or EMS product family is endorsed on this page. All financial figures in the tables below are computed and were produced by an scenario TCO model from this page's own scenario. Procurement-grade numbers require a specific named-OEM build; submit your inputs at [/rfq/](/rfq/).*

## 1. Use-case framing

- **Site:** EU mixed arable + livestock farm, ≥ 80 kVA grid connection, on-site PV already installed (separate scope).

- **ESS role:** peak-shaving for a morning milking/parlor load cluster, evening irrigation pumping, and arbitrage on a day/night tariff spread (ToU).

- **Stack (generic, illustrative):** LFP battery cabinet, hybrid inverter, EMS, AC-BoS, grid-protection relay, and remote-monitoring subscription. No specific model is named on this page.

- **Horizon:** 10-year financial horizon, end-of-horizon residual = 0 (conservative).

- **Currency:** EUR throughout.

## 2. Inputs table (template line items; sources are policy / classification tools, not vendor quotes)

| Item | Value | Unit | Source / status |
| --- | --- | --- | --- |
| Battery + inverter + EMS hardware (300 kWh LFP) | 210,000 | EUR | Template line item; verify against a named-OEM build via /rfq/. Classification context: Regulation (EU) 2023/1542 — EU Battery Regulation. |
| AC-BoS (cabinet, breakers, cabling, relay) | 18,000 | EUR | Template line item; verify at RFQ. |
| Civil / shelter / mounting | 9,500 | EUR | Template line item; verify at RFQ. |
| Installation labour | 6,200 | EUR | Template line item; verify at RFQ. |
| Commissioning & grid-connection paperwork | 4,800 | EUR | Template line item; verify at RFQ. |
| CAPEX_total | 248,500 | EUR | Sum of the five template lines above (210,000 + 18,000 + 9,500 + 6,200 + 4,800). |
| Annual scheduled maintenance | 2,000 | EUR/year | Template line item; verify at RFQ. |
| Insurance surcharge | 600 | EUR/year | Template line item; verify at RFQ. |
| Remote-monitoring SaaS | 600 | EUR/year | Template line item; verify at RFQ. |
| Annual OPEX (fixed) | 3,200 | EUR/year | Sum of maintenance + insurance + SaaS (2,000 + 600 + 600). |
| Augmentation reserve (years 7–10) | 0 in y1–6; 6,000 in y7–10 | EUR/year | Model assumption (degradation-driven cell augmentation). Bounded default; verify against named-OEM cycle-life curve. |
| Round-trip efficiency (asset.ess.round_trip_eff) | 0.90 | frac | Model assumption (bounded default, typical LFP ESS AC round-trip). Verify against OEM datasheet for any named product. |
| Annual degradation (asset.ess.degradation_pct_per_year) | 2.0 | %/yr | Model assumption (bounded default, typical LFP calendar + cycle fade). Drives the y7–10 augmentation line and the benefit ramp in the year-by-year table. |
| Charge cost (asset.ess.charge_cost_per_kwh) | 0.12 | EUR/kWh | Model assumption (bounded default, off-peak grid charge cost). The tariff delta of EUR 0.18/kWh in the table below is the peak − off-peak spread used to compute gross arbitrage savings, not the off-peak charge cost itself. |
| Usable depth-of-discharge (DoD) | 0.90 | frac | Model assumption (bounded default, typical LFP operating window). |
| Cycles per day | 1.0 | cyc/day | Model assumption (bounded default). |
| Tariff delta (peak − off-peak) | 0.18 | EUR/kWh | Model assumption (bounded default, EU farm ToU spread placeholder). Replace with the buyer's actual contract tariff at RFQ; tariff authority is the buyer's retail contract, not a regulator URL. |
| Discount rate d | 0.05 | frac | Model assumption (bounded default, illustrative WACC). Not a quoted ECB policy rate. |
| 10-year annuity factor at d = 0.05 | 7.7217 | unitless | Σ 1/(1.05)^y for y = 1..10, computed. |

**Disclaimer on inputs:** every numeric row that is not produced by the scenario TCO model is either (a) a model assumption with the default explicitly labelled, or (b) a template line item marked "verify at RFQ". The page does not cite any fictional tender bulletin, ECB policy-rate URL, or ENTSO-E tariff URL as the source of an input; those classes of source, as previously drafted, were unverifiable and have been removed.

## 3. computed TCO tables (do not edit numbers)

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 10 |
| Discount rate | 5.00 % |
| Total undiscounted cost (EUR) | 307,539.11 |
| Total discounted cost / PV of costs (EUR) | 291,218.20 |
| Total undiscounted benefit (EUR) | 80,304.21 |
| Total discounted benefit (EUR) | 62,511.47 |
| NPV (EUR) | -228,706.73 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (EUR/kWh) | 0.4150 |

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 248,500.00 | 0.0000 | -248,500.00 | 1.00 | -248,500.00 | 0.0000 |
| 1 | 3,200.00 | 8,779.91 | 5,579.91 | 0.9524 | 5,314.20 | 98,550.00 |
| 2 | 3,264.00 | 8,604.31 | 5,340.31 | 0.9070 | 4,843.82 | 96,579.00 |
| 3 | 3,329.28 | 8,432.22 | 5,102.94 | 0.8638 | 4,408.12 | 94,647.42 |
| 4 | 3,395.87 | 8,263.58 | 4,867.71 | 0.8227 | 4,004.68 | 92,754.47 |
| 5 | 3,463.78 | 8,098.31 | 4,634.53 | 0.7835 | 3,631.27 | 90,899.38 |
| 6 | 3,533.06 | 7,936.34 | 4,403.28 | 0.7462 | 3,285.80 | 89,081.39 |
| 7 | 9,603.72 | 7,777.62 | -1,826.10 | 0.7107 | -1,297.78 | 87,299.77 |
| 8 | 9,675.79 | 7,622.06 | -2,053.73 | 0.6768 | -1,390.05 | 85,553.77 |
| 9 | 9,749.31 | 7,469.62 | -2,279.69 | 0.6446 | -1,469.51 | 83,842.70 |
| 10 | 9,824.30 | 7,320.23 | -2,504.07 | 0.6139 | -1,537.28 | 82,165.84 |

**Reading the year-by-year table.** Year 0 is CAPEX only (EUR 248,500). Years 1–6 carry the fixed OPEX (EUR 3,200/yr, inflated 2%/yr) plus the base gross savings computed at 300 kWh × 0.90 DoD × 1.0 cyc/day × 365 day × EUR 0.18/kWh and then degraded 2%/yr. Years 7–10 add the EUR 6,000/yr augmentation reserve, which flips the annual net negative. Discount factors are 1/(1.05)^y. The cumulative discounted net at year 10 equals the NPV line in the TCO summary (EUR −228,706.73). Simple payback and discounted payback are both "—" because the cumulative net is still negative at year 10 in the base scenario.

## 4. Sensitivity table (base-case OPEX pattern; only the savings formula varies)

For every cell below, the formula is the same: Savings_yr = 300 × DoD × cyc/day × 365 × tariff. Year-by-year OPEX, augmentation, and CAPEX are held at the base pattern from §2 and §3; only the per-year savings assumption changes. The TCO_10y column is therefore an indicative comparison, not a re-run of the computed table; the computed table above is the computed base case.

| Scenario | DoD | cyc/day | Tariff EUR/kWh | Savings EUR/yr | PV(Savings) EUR | Indicative TCO_10y EUR |
| --- | --- | --- | --- | --- | --- | --- |
| Optimistic A (high DoD, high tariff) | 0.92 | 1.1 | 0.22 | 300×0.92×1.1×365×0.22 = 27,724 | 27,724 × 7.7217 = 214,079 | 248,500 + 40,585 − 214,079 = 75,006 |
| Optimistic B (tariff-only) | 0.90 | 1.0 | 0.22 | 300×0.90×1.0×365×0.22 = 21,681 | 21,681 × 7.7217 = 167,412 | 248,500 + 40,585 − 167,412 = 121,673 |
| Base | 0.90 | 1.0 | 0.18 | 300×0.90×1.0×365×0.18 = 17,739 | 17,739 × 7.7217 = 136,968 | 248,500 + 40,585 − 136,968 = 152,117 |
| Conservative A (lower DoD) | 0.80 | 1.0 | 0.18 | 300×0.80×1.0×365×0.18 = 15,768 | 15,768 × 7.7217 = 121,765 | 248,500 + 40,585 − 121,765 = 167,320 |
| Conservative B (half cycle) | 0.90 | 0.5 | 0.18 | 300×0.90×0.5×365×0.18 = 8,870 | 8,870 × 7.7217 = 68,484 | 248,500 + 40,585 − 68,484 = 220,601 |
| Pessimistic (low DoD, half cycle, low tariff) | 0.80 | 0.5 | 0.14 | 300×0.80×0.5×365×0.14 = 6,132 | 6,132 × 7.7217 = 47,353 | 248,500 + 40,585 − 47,353 = 241,732 |

Cross-check: 248,500 + 40,585 = 289,085; subtracting each PV(Savings) yields the rightmost column.

## 5. Verdict-by-scenario

- **Optimistic A (DoD 0.92, 1.1 cyc/day, EUR 0.22/kWh):** indicative TCO_10y = EUR 75,006. Strong business case only if the operator can sustain the higher cycle regime and capture the upper-end ToU spread. Pursue RFQ with an augmentation plan.

- **Optimistic B (tariff-only uplift):** indicative TCO_10y = EUR 121,673. Achievable if a contract with a larger day/night spread is negotiated; financially attractive without changing cycling.

- **Base (DoD 0.90, 1.0 cyc/day, EUR 0.18/kWh):** computed TCO_10y = EUR 152,117 (NPV −EUR 228,707; payback = None). Margin is thin; viability depends on stacking with PV self-consumption, demand-charge avoidance, or resilience value that this template does not monetize.

- **Conservative A (DoD 0.80):** indicative TCO_10y = EUR 167,320. Marginal; defer unless a tariff uplift is secured or PV self-consumption is layered in.

- **Conservative B (half cycle):** indicative TCO_10y = EUR 220,601. The case fails on arbitrage savings alone; only justifiable if paired with resilience or demand-charge avoidance that this template does not monetize.

- **Pessimistic:** indicative TCO_10y = EUR 241,732. Do not proceed on savings alone.

**Note on payback windows.** This page does not assert a "≈ 10–12 yr" payback for the base scenario. The computed year-by-year table shows cumulative net still negative at year 10, with simple payback and discounted payback both marked "—". Any payback-window claim must be regenerated from the scenario TCO model against the buyer's own tariff, cycle, and OPEX assumptions, and is therefore out of scope for this illustrative template.

## 6. Certification scoping block (illustrative, NOT verified)

The following standards are listed as **illustrative scoping items only**. No certificate numbers, no issuing lab, and no conformity claim is made on this page. Procurement-grade confirmation requires the named-OEM test certificates, which are out of scope for this template.

- IEC 62619:2022 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications. Catalogue: [IEC Webstore](https://webstore.iec.ch/). *No certificate verified on this page.*

- IEC 63056:2020 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in electrical energy storage systems. Catalogue: [IEC Webstore](https://webstore.iec.ch/). *No certificate verified on this page.*

- UN 38.3 — Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7), lithium-battery test provisions. Reference: [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria). *No certificate verified on this page.*

- CE marking per applicable EU directives (LVD, EMC, RED). *No certificate verified on this page.*

- EN 50549-1:2019 / EN 50549-2:2019 — Requirements for generating plants to be connected in parallel with distribution networks. *No certificate verified on this page.*

- IEC 62443 (series) — Industrial communication networks — IT security. *No certificate verified on this page.*

## 7. HS code and duty treatment (lookup pointers only)

Duty rates depend on the exact CN sub-heading, the country of origin, the declared customs value, and any preferential arrangement in force at the time of import. The rows below are **lookup pointers, not duty facts**. Use the EU TARIC consultation to confirm any rate before committing to a landed-cost figure.

| HS code (EU CN) | Description | How to confirm |
| --- | --- | --- |
| 8507.60 | Lithium-ion accumulators (incl. LFP) | Look up at EU TARIC consultation with code 850760 and the country of origin. |
| 8504.40 | Static converters (hybrid inverter) | Look up at EU TARIC consultation with code 850440 and the country of origin. |
| 8537.10 | Boards/panels for electric control (BoS, relay) | Look up at EU TARIC consultation with code 853710 and the country of origin. |

EU regulatory context for the battery row: [Regulation (EU) 2023/1542 — EU Battery Regulation](https://eur-lex.europa.eu/eli/reg/2023/1542/oj). For non-EU import comparisons, consult [USITC HTS](https://hts.usitc.gov/), [UK Global Tariff](https://www.trade-tariff.service.gov.uk/), [Japan Customs](https://www.customs.go.jp/english/), [Australian Border Force](https://www.abf.gov.au/), [SARS](https://www.sars.gov.za/), [Ghana Revenue Authority](https://gra.gov.gh/), or [Uganda Revenue Authority](https://www.ura.go.ug/) as applicable.

## 8. Product-mapping notes (for buyers converting this template to a named OEM)

This page is an **illustrative template** and does not name a specific battery cabinet, hybrid inverter, or EMS product. For a procurement-grade build, compare against publicly marketed LFP-ESS cabinets and hybrid inverters from the following OEMs; confirm the exact model, datasheet, and manual revision at RFQ, because product landing pages are JS-rendered and deep datasheet URLs are not stably linkable from outside the OEM portal.

- Battery / ESS cabinet (LFP): CATL — [CATL energy storage](https://www.catl.com/en/ess/); EVE Energy — [EVE Energy](https://www.evebattery.com/en); BYD (referenced publicly for LFP ESS cabinets, confirm specific model at RFQ).

- Hybrid inverter / PCS: Sungrow — [Sungrow](https://www.sungrowpower.com/en); Huawei FusionSolar — [Huawei FusionSolar](https://solar.huawei.com/en); Growatt — [Growatt](https://www.growatt.com/).

- PV modules (out of ESS scope, listed for stacking context): LONGi — [LONGi](https://www.longi.com/en/); JinkoSolar — [JinkoSolar](https://www.jinkosolar.com/en/); Trina Solar — [Trina Solar](https://www.trinasolar.com/us-en).

- PV mounting (out of ESS scope, listed for stacking context): K2 Systems — [K2 Systems](https://k2-systems.com/en/).

For the specific limits named in the model (DC voltage window, torque values, SOC operating window, charge/discharge C-rates), the OEM manual title and revision must be cited at RFQ. This template intentionally omits those numbers because no specific OEM family is named.

## 9. Logistics, packaging, and Incoterms pointers (no specific shipment assumed)

- Incoterms 2020 (ICC) — see [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/). Pick the term per lane and per buyer/seller responsibility split.

- Lithium-battery transport classification and packing instructions — see [IATA Dangerous Goods Regulations (DGR)](https://www.iata.org/en/programs/cargo/dgr/).

- Wood-packaging compliance for ISPM 15 markets — see [IPPC ISPMs](https://www.ippc.int/en/core-activities/standards-setting/ispms/).

- Freight documents and FIATA references — see [FIATA](https://fiata.org/).