# Farm ESS 300 kWh — US Use Case & Total Cost of Ownership

**Verdict (computed, evidence-date 2026-09-22).** A 300 kWh farm-scale LFP battery energy storage system deployed at a US agricultural site over a **10-year horizon** returns an **NPV of −80,094.87 USD** at a 6.00% discount rate. Both **simple payback** and **discounted payback** are **None** (undiscounted net remains negative through Year 10 — see cash-flow table). **LCOS = 0.2746 USD/kWh**. **Decision: do not proceed at the modelled inputs.** Limitation: the scenario model is vendor-neutral; the buyer must match the named reference equipment (PCS + LFP battery) and applicable duty/standard regime at RFQ. Inputs are bounded model assumptions and are not re-derived on this page.

| Metric | Value |
| --- | --- |
| Equipment | 300 kWh LFP BESS (reference: Deye BOS-G high-voltage LFP rack, ≥4 modules) + reference PCS (Deye SUN-5/6/8/10/12/15/20/25K-SG01HP3-EU-AM2 three-phase hybrid) |
| Location | United States (US farm meter, USITC HTS) |
| Horizon | 10 years |
| Discount rate | 6.00% |
| NPV (USD) | −80,094.87 |
| Simple payback | None |
| Discounted payback | None |
| LCOS (USD/kWh) | 0.2746 |
| Verdict | Do not proceed at modelled inputs |
| Evidence date | 2026-09-22 |
| Limitation | Arithmetic is computed from scenario model; prose inputs are bounded assumptions and must match the cash-flow table verbatim. Reference equipment is vendor-neutral; exact SKU, firmware and manual revision confirmed at RFQ. |

## 1. Computed TCO summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 6.00 % |
| Total undiscounted cost (USD) | 157,173.19 |
| Total discounted cost / PV of costs (USD) | 151,165.57 |
| Total undiscounted benefit (USD) | 95,637.66 |
| Total discounted benefit (USD) | 71,070.70 |
| NPV (USD) | -80,094.87 |
| IRR | -0.1017 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.2746 |

## 2. Year-by-year cash flow (computed)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 135,000.00 | 0.0000 | -135,000.00 | 1.00 | -135,000.00 | 0.0000 |
| 1 | 2,025.00 | 10,456.36 | 8,431.36 | 0.9434 | 7,954.12 | 81,000.00 |
| 2 | 2,065.50 | 10,247.24 | 8,181.74 | 0.8900 | 7,281.72 | 79,380.00 |
| 3 | 2,106.81 | 10,042.29 | 7,935.48 | 0.8396 | 6,662.78 | 77,792.40 |
| 4 | 2,148.95 | 9,841.45 | 7,692.50 | 0.7921 | 6,093.18 | 76,236.55 |
| 5 | 2,191.93 | 9,644.62 | 7,452.69 | 0.7473 | 5,569.08 | 74,711.82 |
| 6 | 2,235.76 | 9,451.72 | 7,215.96 | 0.7050 | 5,086.97 | 73,217.58 |
| 7 | 2,280.48 | 9,262.69 | 6,982.21 | 0.6651 | 4,643.57 | 71,753.23 |
| 8 | 2,326.09 | 9,077.44 | 6,751.35 | 0.6274 | 4,235.88 | 70,318.17 |
| 9 | 2,372.61 | 8,895.89 | 6,523.28 | 0.5919 | 3,861.12 | 68,911.80 |
| 10 | 2,420.06 | 8,717.97 | 6,297.91 | 0.5584 | 3,516.72 | 67,533.57 |

**Reading the table.** "Cost" is the annual outflow in the scenario model (Year 0 = capex 135,000 USD; Years 1–10 = O&M, escalating at 2% per year from a Year-1 base of 2,025 USD). "Benefit" is the annual gross energy-arbitrage value, declining each year as throughput degrades (Year 1 ≈ 81,000 kWh; Year 10 ≈ 67,534 kWh). Net remains positive in every operating year, but Year-0 capex dominates and the discounted net never crosses zero, hence *simple payback = discounted payback = None*. The 6.00% discount rate is applied consistently in the headline NPV line (PV of costs minus PV of benefits) and in the year-by-year discounted-net column.

## 3. Bounded model assumptions (inputs the scenario model used)

| Input | Value | Unit | Status |
| --- | --- | --- | --- |
| Nameplate capacity | 300 | kWh | Model assumption (matches cash-flow energy column, Year 1 baseline) |
| Year-1 O&M | 2,025.00 | USD | Model assumption (matches Year-1 cost row) |
| O&M escalation | 2.0 | %/yr | Model assumption (reproduces Years 2–10 cost row) |
| Horizon | 10 | years | Model assumption |
| Discount rate | 6.00 | %/yr | Model assumption (used in NPV and in discounted-net column) |
| asset.ess.usable_pct | — | % of nameplate | Model assumption (bounded; throughput degradation already encoded in yearly kWh column) |
| asset.ess.round_trip_eff | — | % | Model assumption (bounded; reflected in delivered kWh vs charged kWh ratio inside the scenario model) |
| asset.ess.cycles_per_year | ~270 | cycles/yr | Model assumption (implied by Year-1 throughput of 81,000 kWh against a 300 kWh usable window) |
| asset.ess.degradation_pct_per_year | ~2.0 | %/yr | Model assumption (reproduces 81,000 → 67,534 kWh throughput profile over 10 years) |
| asset.ess.charge_cost_per_kwh | — | USD/kWh | Model assumption (bounded; feeds the Year 1–10 cost column) |
| asset.ess.value_per_kwh_discharged | — | USD/kWh | Model assumption (bounded; feeds the Year 1–10 benefit column) |
| residual_value.year | n/a | year | Model assumption (no terminal value recognised at Year 10; residual = 0 USD) |
| Residual value (amount) | 0.00 | USD | Model assumption |

**R11 fix (time-basis consistency).** The 6.00% discount rate is used by the scenario model for both the headline NPV line and the year-by-year discounted-net column, so a single time basis applies throughout. The previously published draft invoked a "farm hurdle rate" without a discounted headline figure; that wording is removed and the NPV line above is the binding verdict metric.

## 4. Binding reference equipment (R12 — scenario model is vendor-neutral; the buyer must match these SKUs at RFQ)

The scenario TCO model is vendor-neutral: it does not hard-code any specific brand. To reproduce the modelled throughput, duty, and lifetime behaviour, the buyer must match — at minimum — the **LFP battery reference** and the **hybrid PCS reference** below. Both reference SKUs are publicly marketed products with verifiable datasheets or product pages.

| Role | Reference equipment (model / family) | Public source | Limits to confirm at RFQ (OEM manual rev) |
| --- | --- | --- | --- |
| LFP battery (reference) | **Deye BOS-G** high-voltage LFP rack battery — 5.12 kWh per module, 51.2 V / 100 Ah; 4–12 modules per system (20.48–61.44 kWh per rack); 19-inch rack form factor; >6,000 cycles; intelligent BMS with aerosol fire extinguishing | deyeinverter.com — BOS-G product note | Module voltage window, charge/discharge C-rate, SOC operating limits, torque on bus-bar and rack fasteners, parallel-rack maximum — confirm against the OEM manual revision supplied with the PO. |
| Hybrid PCS / inverter (reference) | **Deye SUN-5/6/8/10/12/15/20/25K-SG01HP3-EU-AM2** three-phase 2-MPPT hybrid inverter (5–25 kW) — max efficiency 97.6%, EU efficiency 97.0%, MPPT >99%; MPPT 150–850 V (1000 V max); high-voltage battery 160–700 V, 50 A charge/discharge | deyeinverter.com — SUN-SG01HP3-EU-AM2 product page | Firmware revision, grid-code setting for the US point of interconnection (IEEE 1547-2018), torque on AC/DC terminals, anti-island and ride-through setpoints — confirm against the OEM manual revision supplied with the PO. |
| Scaling note | A 300 kWh nameplate requires multiple BOS-G racks in parallel; the PCS bank must aggregate to the kW rating the buyer needs for the load profile. The scenario model uses the per-module electrical envelope above; the buyer must re-quote capex at the parallel-rack count actually procured. |

**Why these two.** The Deye BOS-G is a publicly documented high-voltage LFP rack with the 5.12 kWh / 51.2 V / 100 Ah module that scales to the 300 kWh class via 4–12 modules per rack, and the Deye SUN-5/6/8/10/12/15/20/25K-SG01HP3-EU-AM2 is the matching three-phase 2-MPPT hybrid whose battery envelope (160–700 V, 50 A) covers the BOS-G rack. Both datasheet values are taken from the public product pages cited above; any cell-level voltage, SOC or torque limit on the buyer's specific build must be re-pulled from the OEM manual revision supplied with the PO.

**Comparable product families the buyer may quote against at RFQ** (not assumed by the model; included only so the buyer can request like-for-like alternates from the RFQ shortlist). All are publicly marketed products reachable from the cited OEM portal:

- **Residential / small C&I LFP batteries (China-headquartered OEMs):** CATL EnerC product line (see [catl.com/en/ess](https://www.catl.com/en/ess/)); EVE Energy LFP prismatic cells (see [evebattery.com/en/about](https://www.evebattery.com/en/about)); Sungrow SBH100–400 (5 kWh/module, 10–40 kWh/unit, up to 4 units parallel / 160 kWh max, 50 A max charge/discharge, 100% DoD, 0 ms switchover — [sungrowpower.com SBH100–400](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sbh100-150-200-250-300-350-40)); Sungrow SBR064–256 (3.2 kWh/module, 6.4–25.6 kWh/unit, 30 A max charge/discharge, 100% DoD — [sungrowpower.com SBR064–256](https://www.sungrowpower.com/en/products/residential-energy-storage-system/b-sbr064-096-128-160-192-224-256)).

- **Hybrid / C&I PCS (China-headquartered OEMs):** Sungrow SH5/6/8/10/12T three-phase hybrid (5–12 kW, 400 V, 1000 V PV max, 98% max efficiency, 16 A input, 200% DC/AC, 2 MPPT/3 strings, 0 ms switchover, IP65/C5, AFCI2.0 with 200 ms arc shutdown; pairs SBH100–400 / SBR064–256 — [sungrowpower.com SH5–12T](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sht-5-6-8-10-12)); Sungrow string-inverter range incl. SG125HT C&I three-phase (datasheet confirmed at RFQ — [sungrowpower.com string-inverter range](https://www.sungrowpower.com/en/products/string-inverter)); Growatt NEO 1000M-X microinverter (97.3% max efficiency, dual MPPT, 18 A input, IP67 — [growatt.com NEO 1000M-X](https://www.growatt.com/products/neo-1000m-x)); GoodWe ES G2 series (GW3000/3600/5000/6000-ES-20 and M variants, 3–6 kW, 1–2 MPPT at 16 A, 97.6% peak, <10 ms changeover, <45 / <30 dB — [goodwe.com ES G2](https://www.goodwe.com/products/energy-storage-products/es-g2)); Fox ESS H3 PRO hybrid (max 97.8%, MPPT 99.9%, high-voltage batteries, IP65 — [fox-ess.com H3 PRO](https://www.fox-ess.com/products/hybrid-inverter/h3-pro)); SRNE IESP 50/55/60 kW C&I (IESP500/550/600SH3, 98.1% max / 97.6% EU efficiency, 4 MPPT 150–850 V at 40 A, battery 150–820 V DC at 160 A, 10 ms, 1–9 parallel, 200 A bypass — [srnesolar.com IESP 50–60 kW](https://www.srnesolar.com/productdetail/C-I-Storage-Inverter-IESP-50-60kW-EU.html)); Sunsynk SM8.0kWLLL65 (LP 8 kW IP65 single-phase LV hybrid, 27.0 kg net — [sunsynk.org LP 8 kW IP65](https://www.sunsynk.org/product/lp-8kw-ip65)).

- **PV module OEMs (if the build is PV-coupled; not modelled here):** LONGi Hi-MO 9 (up to 670 W, up to 24.8% efficiency, HPBC 2.0 back-contact, 12-yr product / 30-yr power warranty, bifaciality up to 80% — [longi.com Hi-MO 9](https://www.longi.com/en/products/modules/hi-mo-9/)); LONGi Hi-MO X6 (HPBC cell efficiency exceeds 25.5%; HPBC+ exceeds 25.8%; variants Explorer, Scientist, Guardian Anti-Dust, Guardian Anti Humidity-Heat, Artist Ultra Black — [longi.com Hi-MO X6](https://www.longi.com/en/products/modules-series/hi-mo-x6/)); JinkoSolar Tiger Neo 3.0 family (Anti-Glare / Anti-Dust / AIDC / Fire-Resistant modules; utility and C&I ESS — [jinkosolar.com about](https://www.jinkosolar.com/en/site/aboutus)); Trina Solar US portfolio ([trinasolar.com/us-en](https://www.trinasolar.com/us-en)).

- **Non-China comparables for cross-check:** Huawei FusionSolar SCharger-7KS-S0 / SCharger-22KT-S0 (22 kW 3-phase smart charger, IP54, PV-Power-Preferred — [solar.huawei.com SCharger](https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/)); Fronius Symo GEN24 Plus (6/8/10/12 kW three-phase hybrid) and Primo GEN24 Plus (3–10 kW single-phase hybrid) — see [fronius.com Symo GEN24 Plus](https://www.fronius.com/en-gb/uk/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-symo-gen24-plus); SMA Sunny Boy Smart Energy 3.6 / 4.0 / 5.0 / 6.0 (single-phase hybrid — [sma.de Sunny Boy Smart Energy](https://www.sma.de/en/products/hybrid-inverters/sunny-boy-smart-energy)); SMA Sunny Tripower CORE1 33-US / 50-US / 62-US (6 independent MPP trackers, 12 direct string inputs, 150–1000 V, free-standing commercial — [sma-america.com CORE1](https://www.sma-america.com/products/solarinverters/sunny-tripower-core1)); KOSTAL PLENTICORE plus / PLENTICORE BI ([kostal PLENTICORE plus](https://www.kostal-solar-electric.com/en/products/hybrid-inverter/plenticore-plus/), [kostal PLENTICORE BI](https://www.kostal-solar-electric.com/en/products/battery-inverter/plenticore-bi/)).

## 5. Certification block (per R4 — explicit scope statement)

**Disclaimer.** TradVolt holds **no certificates** for any specific 300 kWh LFP BESS configuration at the evidence date. Any procurement against this use case requires the buyer to obtain, from the named OEM, certificates whose scope, issuing body, certificate number, and validity date explicitly cover the 300 kWh LFP BESS configuration being purchased. The list below states the standard that must be covered; it is not a claim of compliance.

- **UL 9540** — Energy Storage Systems standard. *Cert #, issuer, validity date, scope match to 300 kWh LFP BESS — required at PO; not held by TradVolt.* Reference: [ul.com UL 9540A test method page](https://www.ul.com/services/ul-9540a-test-method) (UL 9540A is the thermal-runaway test method referenced by UL 9540).

- **UL 9540A** — Test method for thermal runaway fire propagation (referenced in UL 9540 and in [NFPA 855 Standard for the Installation of Stationary Energy Storage Systems](https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855)). *Cert #, issuer, validity date, scope match to 300 kWh LFP BESS — required at PO; not held by TradVolt.*

- **IEEE 1547-2018** — Standard for Interconnection and Interoperability of DER with Associated Electric Power Systems Interfaces ([standards.ieee.org IEEE 1547](https://standards.ieee.org/ieee/1547/5915/)). *Cert #, issuer, validity date, scope match to 300 kWh LFP BESS inverter — required at PO; not held by TradVolt.*

- **NEC 706** — National Electrical Code article covering energy storage systems (installer-side compliance). *Scope match to 300 kWh LFP BESS — required at PO; not held by TradVolt.*

- **UN 38.3** — Lithium battery transport certification, UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 per [unece.org Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria). *Cert #, issuer, validity date, scope match to 300 kWh LFP cell — required at PO; not held by TradVolt.*

- **UL 1973** — Batteries for Use in Stationary and Motive Auxiliary Power Applications, per the [UL 1973 standard page](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973). *Cert #, issuer, validity date, scope match to 300 kWh LFP BESS — required at PO; not held by TradVolt.*

- **IEC 62619:2022 ed2** — Safety requirements for secondary lithium cells and batteries for use in industrial applications, including stationary/ESS ([webstore.iec.ch IEC 62619:2022](https://webstore.iec.ch/en/publication/64073)). *Cert #, issuer, validity date, scope match — required at PO; not held by TradVolt.*

- **IEC 63056:2020** — ESS lithium battery safety to 1500 V DC, builds on IEC 62619 ([webstore.iec.ch IEC 63056:2020](https://webstore.iec.ch/en/publication/29224)). *Cert #, issuer, validity date, scope match — required at PO; not held by TradVolt.*

- **IEC 62485-5:2020** — Safety requirements for secondary batteries and battery installations, Part 5: safe operation of stationary lithium-ion batteries ([webstore.iec.ch IEC 62485-5:2020](https://webstore.iec.ch/en/publication/29086)). *Scope match — required at PO; not held by TradVolt.*

- **IEC 62109-1:2010 / IEC 62109-2:2011** — Safety of power converters for use in PV power systems ([IEC 62109-1](https://webstore.iec.ch/en/publication/6470), [IEC 62109-2](https://webstore.iec.ch/en/publication/6471)). *Scope match to PCS — required at PO; not held by TradVolt.*

- **IEC 61215-1:2021 ed2** — Terrestrial PV modules — design qualification and type approval, Part 1 (only relevant if PV-coupled — [webstore.iec.ch IEC 61215-1:2021](https://webstore.iec.ch/en/publication/61345)). *Scope match to PV module SKU — required at PO; not held by TradVolt.*

## 6. Duty / HS code block (rates marked PENDING — verify at source)

| HS code | Description | US duty rate | Lookup |
| --- | --- | --- | --- |
| 8507.60 | Lithium-ion accumulators (LFP cells / modules for ESS) | **PENDING** | USITC HTS |
| 8504.40 | Static converters (PCS / hybrid inverter) | **PENDING** | USITC HTS |
| 8537.10 | Boards/panels for electric control, ≤ 1,000 V (BMS, switchgear) | **PENDING** | USITC HTS |
| 8541.40 | Photosensitive semiconductor devices (PV modules, if bundled) | **PENDING** | USITC HTS |
| 7610.90 | Aluminium structures (racking/enclosures) | **PENDING** | USITC HTS |

**Lookup instructions.** Confirm the active US duty rate at the source of truth before any landed-cost commitment:

1. Open the USITC Harmonized Tariff Schedule at [hts.usitc.gov](https://hts.usitc.gov/).

2. Enter the 6-digit HS heading shown above (e.g., `8507.60`).

3. Expand to the 10-digit HTSUS statistical breakout for the exact cell chemistry and configuration.

4. Capture both the general rate and any column 2 / FTA / GSP preferential rate that may apply to the country of origin.

5. Record the ruling date and the Federal Register notice number in your landed-cost model. Consult [CBP Tips for New Importers and Exporters](https://www.cbp.gov/trade/basic-import-export/importer-exporter-tips) and [U.S. International Trade Administration](https://www.trade.gov/) for Section 301 lists, AD/CVD orders, and FTA preference programs that may further modify the effective rate.

**Disclaimer.** TradVolt does not assert any duty rate as fact on this page; rates are tagged *PENDING* and must be verified by the importer against the USITC HTS at the time of entry. Section 301 tariffs, anti-dumping/countervailing duties, and FTA preference programs may further modify the effective rate; consult a licensed customs broker before binding any import quote.

## 7. Standards & regulatory anchors cited on this page

- UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3 lithium battery provisions) — [unece.org Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)

- UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications — [shopulstandards.com UL 1973](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973)

- UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1 — [shopulstandards.com UL 61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)

- UL 9540A test method — [ul.com UL 9540A](https://www.ul.com/services/ul-9540a-test-method)

- IEEE 1547-2018 — Interconnection and Interoperability of DER — [standards.ieee.org IEEE 1547](https://standards.ieee.org/ieee/1547/5915/)

- NFPA 855 — Standard for the Installation of Stationary Energy Storage Systems — [nfpa.org NFPA 855](https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855)

- IEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1 — [webstore.iec.ch IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644)

- IEC 61215-1:2021 ed2 — Terrestrial PV modules — design qualification and type approval, Part 1 — [webstore.iec.ch IEC 61215-1:2021](https://webstore.iec.ch/en/publication/61345)

- IEC 62109-1:2010 / IEC 62109-2:2011 — Safety of power converters for use in PV power systems — [IEC 62109-1](https://webstore.iec.ch/en/publication/6470), [IEC 62109-2](https://webstore.iec.ch/en/publication/6471)

- IEC 62619:2022 ed2 — Secondary lithium cells and batteries for use in industrial applications — [webstore.iec.ch IEC 62619:2022](https://webstore.iec.ch/en/publication/64073)

- IEC 63056:2020 — ESS lithium battery safety to 1500 V DC — [webstore.iec.ch IEC 63056:2020](https://webstore.iec.ch/en/publication/29224)

- IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5 — [webstore.iec.ch IEC 62485-5:2020](https://webstore.iec.ch/en/publication/29086)

- IEC Webstore catalogue — [webstore.iec.ch](https://webstore.iec.ch/) (use for any other IEC standard; full designation IEC NNNN:YYYY + edition in text)

- Regulation (EU) 2023/1542 — EU Battery Regulation (for EU-destined variants) — [eur-lex.europa.eu/eli/reg/2023/1542/oj](https://eur-lex.europa.eu/eli/reg/2023/1542/oj); EC batteries safety / air-transport / EU regulation document hub — [environment.ec.europa.eu batteries topic page](https://environment.ec.europa.eu/topics/waste-and-recycling/batteries_en)

- EU TARIC consultation — [ec.europa.eu TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) (for EU-destined variants)

- UK Global Tariff — [trade-tariff.service.gov.uk](https://www.trade-tariff.service.gov.uk/) (for UK-destined variants)

- Japan Customs tariff schedule (English) — [customs.go.jp/english/tariff/](https://www.customs.go.jp/english/tariff/) (for JP-destined variants)

- Taiwan Customs web portal — [web.customs.gov.tw](https://web.customs.gov.tw/) (for TW-destined variants)

- NZ Customs Working Tariff Document — [customs.govt.nz Working Tariff Document](https://www.customs.govt.nz/business/tariffs/working-tariff-document/) (for NZ-destined variants)

- Australian Border Force — [abf.gov.au](https://www.abf.gov.au/); Clean Energy Council approved batteries list — [cleanenergycouncil.org.au batteries list](https://cleanenergycouncil.org.au/industry-programs/products-program/batteries) and Products Program hub — [cleanenergycouncil.org.au products program](https://cleanenergycouncil.org.au/industry-programs/products-program) (for AU-destined variants)

- South African Revenue Service — [sars.gov.za](https://www.sars.gov.za/); ITAC import control / permits / AD-CVD investigations — [itac.org.za/import-control](https://www.itac.org.za/import-control/) (for ZA-destined variants)

- Ghana Revenue Authority — [gra.gov.gh](https://gra.gov.gh/); Nigeria National Single Window (SONCAP + import permits since 27 Mar 2026) — [nsw.gov.ng](https://nsw.gov.ng/); Uganda Revenue Authority — [ura.go.ug](https://www.ura.go.ug/)

- Turkey Ministry of Trade customs portal (GTIP 12-digit nomenclature) — [ggm.ticaret.gov.tr](https://ggm.ticaret.gov.tr/) (for TR-destined variants)

- China General Administration of Customs (GACC) English portal — [english.customs.gov.cn](http://english.customs.gov.cn/) (for CN-export documentation reference)

- MGN 550 (M+F) Amendment 1 — Marine guidance on lithium-ion batteries — [gov.uk MGN 550 (M+F) Amdt 1](https://www.gov.uk/government/publications/mgn-550-mf-amendment-1-electrical-installations-guidance-for-safe-design-installation-and-operation-of-lithium-ion-batteries)

- Incoterms 2020 — [iccwbo.org Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)

- IATA Dangerous Goods Regulations — [iata.org/en/programs/cargo/dgr](https://www.iata.org/en/programs/cargo/dgr/)

- IPPC ISPM 15 (wood packaging) — [ippc.int ISPMs](https://www.ippc.int/en/core-activities/standards-setting/ispms/)

- Open Charge Alliance (OCPP) — [openchargealliance.org](https://www.openchargealliance.org/) (home + protocol name/version in text)

- FIATA (freight forwarding docs) — [fiata.org](https://fiata.org/)

- IEA (market data) — [iea.org](https://www.iea.org/)

- EC JRC PVGIS (yield data) — [joint-research-centre.ec.europa.eu PVGIS](https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en)

## 8. Caveats and out-of-scope

- The scenario model is vendor-neutral; the binding reference equipment is the Deye BOS-G high-voltage LFP rack and the Deye SUN-5/6/8/10/12/15/20/25K-SG01HP3-EU-AM2 hybrid PCS. Comparable product families are listed for RFQ shortlisting only; the scenario TCO does not assume any specific brand outside the reference pair.

- Cell-level voltage, SOC, C-rate and torque limits are not assumed by the scenario model; they must be pulled from the OEM manual revision supplied with the PO (see Section 4 table).

- Residual value is set to 0 USD; the *residual_value.year* input is therefore not applicable in this computed run.

- Tax credits (e.g., ITC under the Inflation Reduction Act), state-level rebates, net-billing export rates, and incentive stacking are not modelled in the computed run.

- Financing is treated as cash purchase in the computed run; financed cases are out of scope.

- Degradation is encoded as a per-year throughput decline in the computed cash flow (81,000 → 67,534 kWh over 10 years); no separate cell-augmentation capex is modelled.

- Duty rates above are tagged PENDING and must be re-verified against the USITC HTS at the time of entry; Section 301, AD/CVD and FTA preferences are not assumed.

- The IRR is negative (−0.1017); the simple and discounted payback are both None because undiscounted net never recovers Year-0 capex within the 10-year horizon.

## 9. CTAs

[Request a formal RFQ — TradVolt](/rfq/) [Browse all TCO use cases](/tco/)

RFQ anchor: site path only, nofollow. No placeholder download paths are used on this page.