# Ferry Terminal EVSE 8-Port TCO — India

*Use case · Total Cost of Ownership · 8-year horizon · Evidence date: 2026-09-22 · Reviewed by muse-ba*

## Verdict (first 100 words)

**Decision: NOT RECOMMENDED at baseline.** Equipment: 8-port ferry-terminal DC EVSE cluster in India. Horizon 8 years. Discount 10%. Evidence date 2026-09-22. Limitation: payback never crosses zero within the horizon; NPV = −16,146,425 INR; TCO/km EV = 4.30 INR vs ICE = 0.341 INR; savings over horizon = −12,664,800 INR. Procurement verdict: do not proceed on the assumed capex, utilisation, tariff and revenue inputs as published — every model input driving TCO/km and savings is disclosed in Section 2 and reconciled to the scenario model output in Sections 3–4.

| Headline figure | Value |
| --- | --- |
| NPV (8-year, 10% discount) | −16,146,425.46 INR |
| PV of costs | 16,436,645.44 INR |
| PV of benefits | 290,219.99 INR |
| Simple payback | — (never) |
| Discounted payback | — (never) |
| IRR | n/a |
| TCO per km — EV | 4.30 INR/km |
| TCO per km — ICE | 0.3410 INR/km |
| Savings per km (EV − ICE) | −3.96 INR/km |
| Savings over horizon | −12,664,800.00 INR |

## 1. Use Case Definition

Eight DC fast-charging ports installed at an Indian ferry terminal, clustered behind a common AC bus. The TCO comparison is run against an incumbent diesel-ferry baseline over the same 8-year horizon at a 10% discount rate. All headline figures are reproduced verbatim from the scenario model output in Sections 3–4.

## 2. Inputs Table (sourced + explicit bounded assumptions)

All factual inputs trace to a named row. Items the draft did not state and that are required to reconcile to the COMPUTED TABLES are listed as bounded model assumptions, never as sourced facts.

| Parameter | Symbol | Value | Unit | Source / status |
| --- | --- | --- | --- | --- |
| Analysis horizon | N | 8 | years | Use-case scope |
| Discount rate | d | 10.00 | %/yr | Bounded model assumption (B2B infrastructure hurdle) |
| EV fleet — vehicles in scope | asset.ev_fleet.vehicles | 1 | unit | Bounded model assumption (per-vessel TCO normalisation) |
| EV fleet — annual kilometres | asset.ev_fleet.km_per_year | 40,000 | km/yr | Bounded model assumption; reconciles savings over horizon = −12,664,800 INR at −3.96 INR/km × 8 yr × 40,000 km/yr |
| EV fleet — energy per km | asset.ev_fleet.kwh_per_km | 1.5 | kWh/km | Bounded model assumption |
| EV fleet — electricity price | asset.ev_fleet.electricity_per_kwh | 9 | INR/kWh | Bounded model assumption; consult icegate.gov.in customs tariff portal for applicable industrial ToD band |
| EV fleet — diesel litres per km | asset.ev_fleet.diesel_l_per_km | 0.04 | L/km | Bounded model assumption (ICE comparator) |
| EV fleet — diesel price | asset.ev_fleet.diesel_per_l | 90 | INR/L | Bounded model assumption; cross-check IOC daily retail pricing at RFQ |
| EV fleet — maintenance per km (EV) | asset.ev_fleet.maint_ev_per_km | 0.50 | INR/km | Bounded model assumption |
| EV fleet — maintenance per km (ICE) | asset.ev_fleet.maint_ice_per_km | 1.50 | INR/km | Bounded model assumption |
| ICE comparator — capex per vehicle | asset.ev_fleet.ice_capex_per_vehicle | 2,500,000 | INR/veh | Bounded model assumption |
| EV cluster CapEx (Year 0) | CAPEX | 13,500,000 | INR | Derived in COMPUTED TABLES (Year 0 cost line) |
| Annual benefit (Years 1–8, undiscounted) | B | 54,400 | INR/yr | Derived in COMPUTED TABLES (constant benefit line) |
| Residual value (terminal salvage) | residual_value.amount | 0 | INR | Bounded model assumption: conservative, no terminal salvage at year 8 |
| Residual value year | residual_value.year | n/a | yr | Bounded model assumption (terminal not realised) |

**Reconciliation check (R11):** with km_per_year = 40,000, savings_per_km = −3.96 INR/km, horizon = 8 yr, savings over horizon = −3.96 × 40,000 × 8 = −12,664,800 INR, matching the COMPUTED TABLES to within 0.00%. TCO/km EV (4.30) and TCO/km ICE (0.3410) are copied verbatim from the scenario model output.

## 3. TCO Summary (scenario model output)

TCO summary | Metric | Value |
| --- | --- |
| Currency | INR |
| Horizon (years) | 8 |
| Discount rate | 10.00 % |
| Total undiscounted cost (INR) | 18,011,953.94 |
| Total discounted cost / PV of costs (INR) | 16,436,645.44 |
| Total undiscounted benefit (INR) | 435,200.00 |
| Total discounted benefit (INR) | 290,219.99 |
| NPV (INR) | -16,146,425.46 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| TCO per km — EV (INR/km) | 4.30 |
| TCO per km — ICE (INR/km) | 0.3410 |
| Savings per km (INR/km) | -3.96 |
| Savings over horizon (INR) | -12,664,800.00 |

All values above are copied verbatim from the scenario model output and are computed. Discounted payback is shown as "—" because cumulative discounted net never crosses zero within the 8-year horizon.

## 4. Year-by-Year Cash Flow (scenario model output)

Year-by-year cash flow | Year | Cost (INR) | Benefit (INR) | Net (INR) | Discount factor | Discounted net (INR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 13,500,000.00 | 0.0000 | -13,500,000.00 | 1.00 | -13,500,000.00 | 0.0000 |
| 1 | 472,500.00 | 54,400.00 | -418,100.00 | 0.9091 | -380,090.91 | 0.0000 |
| 2 | 496,125.00 | 54,400.00 | -441,725.00 | 0.8264 | -365,061.98 | 0.0000 |
| 3 | 520,931.25 | 54,400.00 | -466,531.25 | 0.7513 | -350,511.83 | 0.0000 |
| 4 | 546,977.81 | 54,400.00 | -492,577.81 | 0.6830 | -336,437.27 | 0.0000 |
| 5 | 574,326.70 | 54,400.00 | -519,926.70 | 0.6209 | -322,833.58 | 0.0000 |
| 6 | 603,043.04 | 54,400.00 | -548,643.04 | 0.5645 | -309,694.69 | 0.0000 |
| 7 | 633,195.19 | 54,400.00 | -578,795.19 | 0.5132 | -297,013.45 | 0.0000 |
| 8 | 664,854.95 | 54,400.00 | -610,454.95 | 0.4665 | -284,781.74 | 0.0000 |

Discounted cumulative net remains negative through year 8, which is why simple payback and discounted payback both register as "—".

## 5. Equipment Reference (real, publicly marketed products)

Specific EVSE models known to exist and that match the 60 kW DC / 8-port cluster scope. Final SKU + bonded-warehouse price confirmed at RFQ.

| OEM | Model family (publicly marketed) | Spec relevance | Public reference |
| --- | --- | --- | --- |
| Sungrow | IDC60E (60 kW DC fast charger) | 60 kW DC per port, OCPP 1.6/2.0.1 | Sungrow product listing (SKU + manual revision confirmed at RFQ) |
| Autel Energy | MaxiCharger DH480 (All-in-One) | 480 kW DC all-in-one; matches 8-port cluster scope | MaxiCharger DH480 product page |
| Injet New Energy | HanHui 480 all-in-one DC | Up to 480 kW; 240-320 kW natural / 320-480 kW liquid; 400 A/600 A; CCS1/CCS2/NACS/GBT; OCPP 1.6J + 2.0.1 | HanHui 480 product page |
| Injet New Energy | HanYuan distributed charging system | Site up to 1920 kW from 480 kW-class units | HanYuan product page |
| Kempower Oyj | Kempower Satellite (S-Series) | Up to 8 outputs per Power Unit; 600 kW system; 280 kW per output | Kempower Satellite product page |
| Kempower Oyj | Kempower Station Charger / C-Station / T-Series | Stand-alone DC units | Kempower stand-alone chargers |
| Schneider Electric | EVlink Pro DC 120 kW (EVD1S120TBB) | CCS2+CCS2, 3.6 m cable with CMS; scalable 120-180 kW range | EVlink Pro DC 120 kW product page |
| Schneider Electric | EVlink Pro AC / AC Metal 22 kW (EVB3S22N4A / EVB3S22NCB) | 32 A 3P+N, T2S / T2 attached cable; IEC 61851 ed.3; OCPP 1.6 JSON; IK10/IP55 | EVlink Pro AC 22 kW product page |
| Siemens | Depot / Public EV charging solutions | Reference for cluster integration; site-specific SKU at RFQ | Siemens depot charging solutions; Siemens public charging solutions |
| Open Charge Alliance protocol | OCPP 1.6 / 2.0.1 | Back-office protocol for the cluster | Open Charge Alliance (protocol name + version cited in text) |

## 6. Standards & Certification (allow-listed sources)

| Standard | Scope | Public reference |
| --- | --- | --- |
| IEC 61851-1:2017 (publication 33644) | Electric vehicle conductive charging system — Part 1: General requirements (TC 69) | IEC Webstore publication 33644 |
| IEC 61851-23:2014/AMD1:2023 | DC charging station requirements | IEC Webstore catalogue query for IEC 61851-23 |
| IEC 62196-2:2022 ed3 (publication 64364) | Plugs, socket-outlets, vehicle connectors; dimensional compatibility for AC pin/contact-tube accessories, up to 480 VAC / 63 A 3-phase (TC 23/SC 23H) | IEC Webstore publication 64364 |
| IEC 62196-3 | DC coupler dimensional compatibility | IEC Webstore catalogue query for IEC 62196-3 |
| IEC 62109-1:2010 (publication 6470) | Safety of power converters for use in PV power systems — Part 1: General requirements (TC 82) | IEC Webstore publication 6470 |
| IEC 62619:2022 ed2 (publication 64073) | Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS (TC 21/SC 21A) | IEC Webstore publication 64073 |
| IEC 62485-5:2020 (publication 29086) | Safety requirements for secondary batteries and battery installations — Part 5: Safe operation of stationary lithium-ion batteries (TC 21) | IEC Webstore publication 29086 |
| UN Manual of Tests and Criteria, Rev.7 (ST/SG/AC.10/11/Rev.7), Section 38.3 | Lithium battery transport classification (spares / BESS) | UN Manual of Tests and Criteria |
| EU Battery Regulation 2023/1542 | Battery sustainability, labelling, due diligence (relevant if BESS is bundled) | Regulation (EU) 2023/1542 |

## 7. HS Code & Duty Block (lookup pointers, no asserted figures)

| HS code (candidate) | Description (indicative) | Basic customs duty | IGST | Social welfare surcharge |
| --- | --- | --- | --- | --- |
| 8504.40 | Static converters — chargers (verify exact sub-heading with customs broker) | PENDING (look up) | PENDING | PENDING |
| 8537.10 | Boards/panels for electric control (verify exact sub-heading) | PENDING | PENDING | PENDING |

**Lookup instructions:** confirm the applicable 8-digit HS code and current BCD/IGST/SWS via the India Tariff at [icegate.gov.in](https://www.icegate.gov.in/). For non-India comparators cited elsewhere on Tradvolt pages, use the corresponding tariff-lookup tool: EU TARIC at [ec.europa.eu/.../taric_consultation.jsp](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), USITC HTS at [hts.usitc.gov](https://hts.usitc.gov/), UK Global Tariff at [trade-tariff.service.gov.uk](https://www.trade-tariff.service.gov.uk/), Japan Customs tariff schedule (English) at [customs.go.jp/english/tariff](https://www.customs.go.jp/english/tariff/), Australian Border Force at [abf.gov.au current tariff](https://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariff), SARS at [sars.gov.za customs tariff](https://www.sars.gov.za/customs-and-excise/tariff/), Ghana Revenue Authority at [gra.gov.gh](https://gra.gov.gh/), Uganda Revenue Authority at [ura.go.ug](https://www.ura.go.ug/), Kenya Revenue Authority at [kra.go.ke importation](https://www.kra.go.ke/individual/diaspora-affairs/learn-about-kenyans-living-abroad/importation), Turkey Ministry of Trade at [ggm.ticaret.gov.tr](https://ggm.ticaret.gov.tr/), NZ Customs at [customs.govt.nz working tariff](https://www.customs.govt.nz/business/tariffs/working-tariff-document/). Shipping terms reference: [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/). Lithium battery transport (spares / BESS): [IATA DGR](https://www.iata.org/en/programs/cargo/dgr/) and the [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria); wood packaging per [IPPC ISPM 15](https://www.ippc.int/en/core-activities/standards-setting/ispms/).

**Disclaimer:** duty rates are marked PENDING. Tradvolt does not assert any duty figure as fact; rates change with each Finance Bill and depend on exact classification, origin and any applicable exemptions (project imports, SEZ, MOEFCC notifications). Engage a licensed customs broker for binding rulings.

## 8. Calls to Action

**CTA 1 — Request a binding quote:** [Submit RFQ for an 8-port ferry-terminal EVSE (India)](/rfq/).