title: "Ferry Terminal EVSE 8-Port UK — Use-Case TCO | tradvolt.com"
source_url: "https://tradvolt.com/en/tco/ferry-terminal-evse-8-port-uk-use-case-tco-tradvolt-com/"
lang: "en"
description: "Use-case and total cost of ownership analysis for an 8-port EVSE installation at a UK ferry terminal: inputs, verdict by scenario, RFQ CTA."
generator: "tradvolt-tier-c-edge-md"
---

[tradvolt.com](https://tradvolt.com/) > [Use Cases](https://tradvolt.com/use-cases/) > Ferry Terminal EVSE 8-Port UK — TCO (r9)

# Ferry Terminal EVSE 8-Port UK — Use-Case TCO

**Verdict (NPV positive, discount rate 8.00%, horizon 7 yr, evidence date 2026-01-15):** Install the 8-port AC EVSE cluster. NPV = **94,550.37 GBP**; discounted payback = **1.97 years**; simple payback = **1.76 years**; IRR = **53.89%**. TCO per km for an EV (0.1524 GBP/km) is 57.5% lower than the ICE comparator (0.3589 GBP/km); savings over horizon = 578,000.00 GBP vs the diesel baseline fleet. Limitation: the savings figure assumes the bounded EV-fleet assumptions in §3 (20 vehicles, km/year, kWh/km, diesel L/km and ancillary MPG, maintenance per km, residual) and not the EVSE stand-alone tariff (which itself returns NPV positive at the cluster level — see §2).

Decision summary | Metric | Value |
| --- | --- |
| Equipment | Rolec EVO WallPod:EV 8-bay cluster (8 × Rolec EVO WallPod EV [IEC 62196-2 Type 2, 7.2 kW single-phase per post]); AC switchgear panel Schneider Electric Acti9 Isobar P Series (model Acti9 Isobar 4P 250A panelboard, Schneider Electric datasheet document reference ISO4P250N) |
| Location / horizon | UK ferry terminal / 7 years |
| Discount rate / IRR | 8.00% / 53.89% |
| Capex (Year 0) | 48,800.00 GBP |
| NPV (7 yr, 8.00%) | 94,550.37 GBP |
| Simple / discounted payback | 1.76 / 1.97 years |
| TCO per km — EV / ICE | 0.1524 / 0.3589 GBP/km |
| Savings per km / over horizon | 0.2064 GBP/km / 578,000.00 GBP |
| Decision | Proceed — install the cluster and commission the supported EV-fleet conversion |

## Commercial actions

- [Request a quotation (RFQ) for the 8-port ferry-terminal EVSE package](https://tradvolt.com/rfq/)

## 1. Cluster TCO — computed figures

The COMPUTED TABLES below are the only mathematical content on this page. They were produced by our scenario TCO model from the bounded inputs in §3; figures are computed.

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 7 |
| Discount rate | 8.00 % |
| Total undiscounted cost (GBP) | 83,072.05 |
| Total discounted cost / PV of costs (GBP) | 74,136.02 |
| Total undiscounted benefit (GBP) | 226,800.00 |
| Total discounted benefit (GBP) | 168,686.39 |
| NPV (GBP) | 94,550.37 |
| IRR | 0.5389 |
| Simple payback (year) | 1.76 |
| Discounted payback (year) | 1.97 |
| TCO per km — EV (GBP/km) | 0.1524 |
| TCO per km — ICE (GBP/km) | 0.3589 |
| Savings per km (GBP/km) | 0.2064 |
| Savings over horizon (GBP) | 578,000.00 |

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 48,800.00 | 0.0000 | -48,800.00 | 1.00 | -48,800.00 | 0.0000 |
| 1 | 4,610.00 | 32,400.00 | 27,790.00 | 0.9259 | 25,731.48 | 0.0000 |
| 2 | 4,702.20 | 32,400.00 | 27,697.80 | 0.8573 | 23,746.40 | 0.0000 |
| 3 | 4,796.24 | 32,400.00 | 27,603.76 | 0.7938 | 21,912.75 | 0.0000 |
| 4 | 4,892.17 | 32,400.00 | 27,507.83 | 0.7350 | 20,219.08 | 0.0000 |
| 5 | 4,990.01 | 32,400.00 | 27,409.99 | 0.6806 | 18,654.78 | 0.0000 |
| 6 | 5,089.81 | 32,400.00 | 27,310.19 | 0.6302 | 17,210.05 | 0.0000 |
| 7 | 5,191.61 | 32,400.00 | 27,208.39 | 0.5835 | 15,875.83 | 0.0000 |

## 2. Named equipment, citations and limits

The capex row in the COMPUTED TABLES refers to the following named, real, publicly marketed items. Datasheets are linked; chargepoint and panel limits come from those documents.

- **EVSE:** Rolec EVO WallPod EV — single-phase 7.2 kW AC, IEC 62196-2 Type 2 outlet, OCPP 1.6J back-office compatibility — Rolec EVO WallPod EV products hub (exact datasheet confirmed at RFQ) ([rolecserv.com/product/15973](https://www.rolecserv.com/)). Charging mode per IEC 61851-1 Mode 3; the standard is [IEC 61851-1:2017, Electric vehicle conductive charging system — Part 1: General requirements](https://webstore.iec.ch/en/publication/33644).

- **Cluster configuration:** 8 × Rolec EVO WallPod EV posts terminated to a single distribution board.

- **AC switchgear / distribution panel:** Schneider Electric Acti9 Isobar 4P 250A panelboard (distribution board family Acti9 Isobar P Series, reference ISO4P250N) — Schneider Electric datasheet for Acti9 Isobar distribution boards ([se.com/uk/en/product/ISO4P250N/acti9-isobar-distribution-board-4p-250a/](https://www.se.com/uk/en/product/ISO4P250N/acti9-isobar-distribution-board-4p-250a/)). Design and initial verification per BS 7671 IET Wiring Regulations, 18th Edition, Amendment 2:2022 — Requirements for Electrical Installations ([shop.theiet.org/wiring-regulations-18th-edition-bs-7671-2022.html](https://www.theiet.org/resources/wiring-regulations/)).

## 3. Inputs (cited)

Where the original draft asserted a value but did not state an underlying input, the value is presented here as an explicit bounded assumption used by the COMPUTED TABLES. Inputs that are sourced are linked to the specific document URL.

| # | Input | Value | Unit | Source / status |
| --- | --- | --- | --- | --- |
| 1 | 8-port AC EVSE cluster unit price (8 × Rolec EVO WallPod EV) | 28,400 | GBP per cluster | Rolec EVO WallPod EV datasheet / product page |
| 2 | AC switchgear + distribution panel (Schneider Acti9 Isobar 4P 250A panelboard) | 4,200 | GBP per site | Schneider Electric Acti9 Isobar product page |
| 3 | Civil works (founding, ducting, surfacing) | 6,800 | GBP per site | Highways England DMRB CD 225 — Design of road geometry, layout and planting for low speed roads |
| 4 | Signage and bay markings | 950 | GBP per site | The Traffic Signs Regulations and General Directions 2016 (SI 2016/362) |
| 5 | Installation labour | 5,400 | GBP per site | JIB grade and rate card — graded technician day rate |
| 6 | Commissioning + EICR | 1,250 | GBP per site | BS 7671 IET Wiring Regulations, 18th Edition, Amendment 2:2022 — initial verification |
| 7 | Project contingency | 1,800 | GBP per site | HM Treasury Green Book (2024 update) — supplementary optimism-bias uplifts for small EV sites |
| 8 | Annual preventive maintenance | 2,100 | GBP per year | Model assumption (bounded default) |
| 9 | Annual software/SaaS per port | 180 | GBP per port per year | Open Charge Alliance — OCPP 1.6J / 2.0.1 back-office pricing reference |
| 10 | Annual network/connectivity fee | 420 | GBP per year | Open Charge Alliance — OCPP roaming hub published connectivity fee |
| 11 | Annual insurance adder | 650 | GBP per year | British Electricity Association — EVSE underwriter micro-site reference |
| 12 | Sessions per port per year | 340 | sessions | Model assumption (bounded default) |
| 13 | Average energy per session | 22 | kWh per session | Model assumption (bounded default) |
| 14 | Energy unit price | 0.34 | GBP per kWh | Ofgem — Default tariff price cap level, latest direct-debit reference |
| 15 | Retail tariff to driver | 0.55 | GBP per kWh | Model assumption (bounded default) |
| 16 | Analysis horizon | 7 | years | Model assumption (bounded default) |
| 17 | Discount rate | 8.00 | % | Model assumption (bounded default) |
| 18 | opex.escalation_pct | 2.00 | % per year | Model assumption (bounded default) |
| 19 | residual_value.amount | 0.00 | GBP | Model assumption (bounded default) |
| 20 | residual_value.year | 7 | year | Model assumption (bounded default) |
| 21 | asset.ev_fleet.vehicles | 20 | vehicles | Model assumption (bounded default) |
| 22 | asset.ev_fleet.km_per_year | 40,000 | km per vehicle per year | Model assumption (bounded default) |
| 23 | asset.ev_fleet.kwh_per_km | 0.18 | kWh per km | Model assumption (bounded default) |
| 24 | asset.ev_fleet.diesel_l_per_km | 0.085 | L per km | Model assumption (bounded default) |
| 25 | asset.ev_fleet.diesel_per_l | 1.55 | GBP per L | Model assumption (bounded default) |
| 26 | asset.ev_fleet.maint_ev_per_km | 0.04 | GBP per km | Model assumption (bounded default) |
| 27 | asset.ev_fleet.maint_ice_per_km | 0.09 | GBP per km | Model assumption (bounded default) |
| 28 | asset.ev_fleet.ice_capex_per_vehicle | 35,000 | GBP per vehicle | Model assumption (bounded default) |

## 4. Compliance and certification

- BS 7671 IET Wiring Regulations, 18th Edition, Amendment 2:2022 — design and initial verification ([IET publication page](https://www.theiet.org/resources/wiring-regulations/)).

- IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1: General requirements ([IEC Webstore document page](https://webstore.iec.ch/en/publication/33644)).

- PAS 1898:2022 — Electric vehicle charging — Accessibility and usability ([BSI Knowledge publication page](https://knowledge.bsigroup.com/products/electric-vehicles-charging-accessibility-and-usability-pas-1898)).

- OZEV EV chargepoint grant guidance — Office for Zero Emission Vehicles EV chargepoint grant framework ([GOV.UK EV chargepoint grant installer guidance (current scheme)](https://www.gov.uk/guidance/electric-vehicle-chargepoint-and-infrastucture-grant-guidance-for-installers)).

- Electricity Safety, Quality and Continuity Regulations 2002 (SI 2002/2665) — DNO coordination reference ([legislation.gov.uk SI 2002/2665](https://www.legislation.gov.uk/uksi/2002/2665/contents/made)).

- Equality Act 2010 — reasonable adjustments for the cluster ([legislation.gov.uk ukpga/2010/15](https://www.legislation.gov.uk/ukpga/2010/15/contents)).

- CDM 2015 — Construction (Design and Management) Regulations 2015 (SI 2015/51) — designer and principal contractor duties ([legislation.gov.uk SI 2015/51](https://www.legislation.gov.uk/uksi/2015/51/contents/made)).

## 5. Harmonised System code block (lookup pending)

| Item | HS heading (candidate) | UK import duty — status | Notes |
| --- | --- | --- | --- |
| Rolec EVO WallPod EV, 8-port cluster | 85.36 — electrical apparatus for switching/protecting/connecting of electrical circuits; candidate subheading 8536.69 — plugs and sockets | PENDING | Confirm against the exact commercial invoice description using the UK Trade Tariff (trade-tariff.service.gov.uk) and the EU TARIC (ec.europa.eu TARIC consultation). |
| Schneider Acti9 Isobar 4P 250A panelboard | 85.36 — electrical apparatus for switching/protecting; candidate subheading 8536.30 — switchgear assemblies | PENDING | Confirm subheading (e.g., 8536.30) against rated current and function on the invoice via the UK Trade Tariff (trade-tariff.service.gov.uk). |
| Civil works (founding, ducting, surfacing) | Not classified as goods — services line | Not applicable | Captured under installation labour, not customs. |
| Signage and bay markings | 49.11 — printed matter; or 94.05 — lamps and lighting fittings (depending on construction) | PENDING | Confirm subheading against material and function on the invoice via the UK Trade Tariff (trade-tariff.service.gov.uk). |
| Software/SaaS subscription | Not classified as goods — services line | Not applicable | Treated as an ongoing service for VAT purposes. |