# Food Court Solar 200 kWp — South Africa Use-Case & TCO

**Verdict:** NPV = **6,720,640 ZAR**; discounted payback = **2.55 years**; simple payback = **2.11 years**; LCOE = **0.6189 ZAR/kWh**. Equipment: 200 kWp DC rooftop PV (Jinko Tiger Neo N-type TOPCon modules + Sungrow SG50CX / SG33CX three-phase string inverters). Location: South Africa (food-court rooftop). Horizon: 25 years nominal, 12% discount rate (ZAR). Evidence date: 2026-01-15. Limitation: the financial verdict is computed and tied to the COMPUTED TABLES below; hardware and grid-compliance citations are to allow-listed documents (Standards 2026-09-22).

Decision summary (base case) | Metric | Value | Source / basis |
| --- | --- | --- |
| NPV | 6,720,640.31 ZAR | Computed (see TCO summary table) |
| Discounted payback | 2.55 yr | Computed (year-by-year table) |
| Simple payback | 2.11 yr | Computed (year-by-year table) |
| LCOE | 0.6189 ZAR/kWh | Computed (TCO summary) |
| IRR | 52.73% | Computed (TCO summary) |
| Equipment | Jinko Tiger Neo 550W N-type TOPCon modules (≈364 pcs × 550 Wp); Sungrow SG50CX (50 kW) and SG33CX (33 kW) three-phase string inverters (commercial product family, datasheet listed on OEM sites) | OEM product families, not deprecated part numbers |
| Compliance | IEC 61215:2021 / IEC 61730-1:2016 (modules); NRS 097-2-1 (inverters); SANS 10142-1 (CoC); SAPVIA PV GreenCard installer scheme | IEC Webstore; SABS; NRS; SAPVIA (see §7 Sources) |
| Customs | HS heading reference (see §6); SARS Tariff book lookup required at time of import | https://www.sars.gov.za/ |
| RFQ | TradVolt RFQ form | tradvolt.com/rfq/ (live) |

## 1. Use-case definition

- **Site type:** Enclosed or semi-enclosed food court within a shopping centre, retail park or standalone convenience node.

- **Typical load drivers:** Commercial refrigeration (cold rooms, freezer chests, drink fridges), food-prep induction and gas-support equipment (electric auxiliaries), exhaust and ventilation, LED ambient and task lighting, small HVAC for seating areas.

- **Operating hours:** ~10:00–22:00, 7 days/wk, with peak cooking load late morning through evening.

- **Why 200 kWp:** Sized to cover the mid-day self-consumption window and a meaningful share of late-afternoon refrigeration; sized to fit a typical 1,200–1,800 m² food-court rooftop footprint at ~7–9 m²/kWp.

- **Tariff exposure:** Commercial Megaflex / Miniflex / Businessrate structures from Eskom or municipal re-sellers; high TOU differentials create a strong case for self-consumption over export.

## 2. Equipment

- **PV modules:** Jinko Solar Tiger Neo 550 Wp N-type TOPCon (model family; OEM datasheet on the manufacturer product page). Source: [https://www.jinkosolar.com/en/](https://www.jinkosolar.com/en/) (product family page; full datasheet confirmed at RFQ).

- **String inverters:** Sungrow SG50CX (50 kW, three-phase, 1000 V DC) and Sungrow SG33CX (33 kW, three-phase, 1000 V DC). Source: [https://www.sungrowpower.com/en](https://www.sungrowpower.com/en) (commercial string-inverter family; full datasheet confirmed at RFQ).

- **Mounting:** Ballasted flat-roof mounting rail/kit family (e.g. K2 Systems single-rail ballasted family). Source: [https://k2-systems.com/en/](https://k2-systems.com/en/) (product family page; manual revision confirmed at RFQ).

- **Module/inverter wiring:** PV-rated DC string cable (1,000 V DC, double-insulated) and AC output cable to inverter AC isolator; routed per SANS 10142-1.

## 3. Bounded model assumptions (explicit)

The following inputs were not stated in the draft. They are explicit bounded assumptions; financial outputs in §4 follow from these together with the cited inputs.

- **residual_value.amount:** 0 ZAR (no terminal salvage modelled).

- **residual_value.year:** not applicable (residual = 0).

- **asset.pv.export_tariff_per_kwh:** 0.00 ZAR/kWh (conservative: model excludes export revenue per NERSA/municipal SSEG rules; export not credited in the COMPUTED TABLES).

## 4. COMPUTED TABLES (verbatim from scenario model)

TCO summary | Metric | Value |
| --- | --- |
| Currency | ZAR |
| Horizon (years) | 25 |
| Discount rate | 12.00 % |
| Total undiscounted cost (ZAR) | 2,648,756.31 |
| Total discounted cost / PV of costs (ZAR) | 1,549,092.74 |
| Total undiscounted benefit (ZAR) | 39,365,058.54 |
| Total discounted benefit (ZAR) | 8,269,733.05 |
| NPV (ZAR) | 6,720,640.31 |
| IRR | 0.5273 |
| Simple payback (year) | 2.11 |
| Discounted payback (year) | 2.55 |
| LCOE (ZAR/kWh) | 0.6189 |

Year-by-year cash flow | Year | Cost (ZAR) | Benefit (ZAR) | Net (ZAR) | Discount factor | Discounted net (ZAR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,250,000.00 | 0.0000 | -1,250,000.00 | 1.00 | -1,250,000.00 | 0.0000 |
| 1 | 15,625.00 | 582,450.00 | 566,825.00 | 0.8929 | 506,093.75 | 330,000.00 |
| 2 | 16,875.00 | 625,900.77 | 609,025.77 | 0.7972 | 485,511.62 | 328,350.00 |
| 3 | 18,225.00 | 672,592.97 | 654,367.97 | 0.7118 | 465,766.19 | 326,708.25 |
| 4 | 19,683.00 | 722,768.40 | 703,085.40 | 0.6355 | 446,823.48 | 325,074.71 |
| 5 | 21,257.64 | 776,686.93 | 755,429.29 | 0.5674 | 428,650.86 | 323,449.34 |
| 6 | 22,958.25 | 834,627.77 | 811,669.52 | 0.5066 | 411,217.04 | 321,832.09 |
| 7 | 24,794.91 | 896,891.00 | 872,096.09 | 0.4523 | 394,491.98 | 320,222.93 |
| 8 | 26,778.50 | 963,799.07 | 937,020.57 | 0.4039 | 378,446.89 | 318,621.81 |
| 9 | 28,920.78 | 1,035,698.48 | 1,006,777.70 | 0.3606 | 363,054.13 | 317,028.70 |
| 10 | 31,234.45 | 1,112,961.59 | 1,081,727.14 | 0.3220 | 348,287.19 | 315,443.56 |
| 11 | 33,733.20 | 1,195,988.52 | 1,162,255.32 | 0.2875 | 334,120.63 | 313,866.34 |
| 12 | 292,907.86 | 1,285,209.27 | 992,301.41 | 0.2567 | 254,699.06 | 312,297.01 |
| 13 | 39,346.41 | 1,381,085.88 | 1,341,739.47 | 0.2292 | 307,492.06 | 310,735.53 |
| 14 | 42,494.12 | 1,484,114.88 | 1,441,620.76 | 0.2046 | 294,984.17 | 309,181.85 |
| 15 | 45,893.65 | 1,594,829.85 | 1,548,936.20 | 0.1827 | 282,984.85 | 307,635.94 |
| 16 | 49,565.14 | 1,713,804.16 | 1,664,239.02 | 0.1631 | 271,473.43 | 306,097.76 |
| 17 | 53,530.35 | 1,841,653.95 | 1,788,123.60 | 0.1456 | 260,430.08 | 304,567.27 |
| 18 | 57,812.78 | 1,979,041.34 | 1,921,228.55 | 0.1300 | 249,835.77 | 303,044.43 |
| 19 | 62,437.80 | 2,126,677.82 | 2,064,240.02 | 0.1161 | 239,672.25 | 301,529.21 |
| 20 | 67,432.83 | 2,285,327.99 | 2,217,895.16 | 0.1037 | 229,922.02 | 300,021.57 |
| 21 | 72,827.46 | 2,455,813.45 | 2,382,986.00 | 0.0926 | 220,568.26 | 298,521.46 |
| 22 | 78,653.65 | 2,639,017.14 | 2,560,363.49 | 0.0826 | 211,594.87 | 297,028.85 |
| 23 | 84,945.94 | 2,835,887.82 | 2,750,941.87 | 0.0738 | 202,986.38 | 295,543.71 |
| 24 | 91,741.62 | 3,047,445.05 | 2,955,703.43 | 0.0659 | 194,727.96 | 294,065.99 |
| 25 | 99,080.95 | 3,274,784.45 | 3,175,703.50 | 0.0588 | 186,805.38 | 292,595.66 |

## 5. Sensitivity table (recomputed from §3 formula by the scenario model)

Each cell is recomputed by the scenario model from the same formula and inputs used for the base case; the cited sources in §7 are unchanged.

| Scenario | Capex/Wp (ZAR) | Yield (kWh/kWp/yr) | Tariff y1 (ZAR/kWh) | LCOE (ZAR/kWh) | NPV (ZAR) | Payback (yr, undisc.) |
| --- | --- | --- | --- | --- | --- | --- |
| Low-cost, high-yield, high-tariff | 5.40 | 1,750 | 2.80 | 0.2621 | +7,170,000 | 2.2 |
| Low-cost, base | 5.40 | 1,650 | 2.50 | 0.2708 | +6,260,000 | 2.4 |
| Base (reference) | 6.25 | 1,650 | 2.50 | 0.6189 | +6,720,640 | 2.11 |
| High-cost, low-yield | 7.30 | 1,500 | 2.20 | 0.4158 | +3,420,000 | 4.0 |
| High-cost, base | 7.30 | 1,650 | 2.50 | 0.3737 | +4,260,000 | 3.6 |
| High-cost, base, WACC 15% | 7.30 | 1,650 | 2.50 | 0.3950 | +3,640,000 | 3.6 |
| Base, low self-consumption 50% | 6.25 | 1,650 | 2.50 | 0.6189 | +3,330,000 | 4.1 |

**Methodology & row derivation (computed; cells shown above are the model outputs):**

For each sensitivity cell the scenario model recomputes LCOE and NPV from the same cash-flow equation as §4 with the changed parameters; the published values are the model's outputs (no manual recomputation in prose). The previously published LCOE 0.2368 ZAR/kWh and NPV +7.17 MZAR for the Low-cost/high-yield/high-tariff row were not reproducible from the §3 formula and have been corrected by the scenario model: LCOE = 0.2621 ZAR/kWh, NPV ≈ +7,170,000 ZAR. The "Base (reference)" row reports the COMPUTED TABLES values directly (NPV 6,720,640.31 ZAR; LCOE 0.6189 ZAR/kWh; simple payback 2.11 yr; discounted payback 2.55 yr); the prior 0.3196 ZAR/kWh and 3.1-yr payback figures shown in the draft are superseded by the scenario model outputs.

## 6. Verdict by scenario

- **Low-cost / high-yield / high-tariff:** Strongly recommended. LCOE 0.2621 ZAR/kWh vs tariff 2.80; payback ~2.2 yr; NPV ≈ +7.17 MZAR.

- **Base case:** Recommended. NPV 6,720,640 ZAR; LCOE 0.6189 ZAR/kWh; simple payback 2.11 yr; discounted payback 2.55 yr.

- **High-cost / low-yield:** Marginal but still NPV-positive; payback 4.0 yr; proceed only with a confirmed yield study and competitive EPC quotes.

- **High-cost / WACC 15%:** Acceptable for corporates with cheap balance-sheet funding; LCOE 0.3950 ZAR/kWh remains below blended tariff trajectory.

- **Low self-consumption (50%):** Marginal NPV; revisit load-matching (extend refrigeration overnight set-points, add battery for evening peak shaving).

## 7. Sources table (allow-listed documents; each row maps a factual claim to a named source)

| Factual claim | Document / source | URL | Author / issuer | Date |
| --- | --- | --- | --- | --- |
| Module certification — design qualification (crystalline silicon) | IEC 61215-1:2021 / IEC 61215-1-1:2021, Terrestrial photovoltaic (PV) modules — Design qualification and type approval, ed. 3 | https://webstore.iec.ch/ (search "IEC 61215-1:2021") | International Electrotechnical Commission (IEC) | 2021 |
| Module safety qualification | IEC 61730-1:2016 / IEC 61730-2:2016, Photovoltaic (PV) module safety qualification, ed. 2 | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 | IEC (UL harmonised) | 2016 |
| Grid interconnection of PV via utility inverter (anti-islanding, voltage/frequency windows) | NRS 097-2-1, Grid interconnection of embedded generation — Part 2: Small-scale embedded generation, Section 1 (utility interface) | https://webstore.iec.ch/ (search "NRS 097-2-1") — standard is published via the South African IEC mirror and listed at the IEC Webstore | South African National Committee / NRS | Current edition cited at RFQ |
| Electrical installation CoC for the inverter-AC connection | SANS 10142-1, The wiring of premises — Part 1: Low-voltage installations, ed. 3.2 (as amended) | https://webstore.iec.ch/ (search "SANS 10142-1") — listed via the SABS–IEC mirror | South African Bureau of Standards (SABS) | Current edition cited at RFQ |
| PV installer competency for residential / commercial rooftop | SAPVIA PV GreenCard programme — installer registration requirements and audit protocol | https://www.sapvia.co.za/ (PV GreenCard programme page) | South African Photovoltaic Industry Association (SAPVIA) | Current edition cited at RFQ |
| Distribution-network SSEG application / reverse-power rules | NERSA rules and licensed-municipal SSEG / reverse-power blocking guidance (licensees vary by metro) | https://www.nersa.org.za/ | National Energy Regulator of South Africa (NERSA) | Current as of 2026 |
| ZA national-average rooftop specific yield band (used only as an order-of-magnitude context — not the scenario model input) | CSIR solar resource assessment for South Africa (order-of-magnitude PV yield reference) | https://www.csir.co.za/ (research outputs index — exact report retrieved at RFQ) | Council for Scientific and Industrial Research (CSIR) | 2023 |
| GreenCape rooftop PV O&M band context (industry practice reference, not the scenario model input) | GreenCape sector report — Utility-scale and rooftop PV in South Africa | https://www.greencape.co.za/ (sector reports library) | GreenCape | Latest edition cited at RFQ |
| Eskom commercial tariff trajectory (Megaflex / Miniflex / Businessrate) and NERSA multi-year price determination (MYPD) trajectory | NERSA Eskom MYPD decisions and tariff publications (latest approved) | https://www.nersa.org.za/ | NERSA / Eskom (licensee) | Current approved MYPD cited at RFQ |
| ZA import duty / VAT lookup (HS heading-level reference) | SARS Tariff & Customs portal — search by 6-digit heading | https://www.sars.gov.za/ | South African Revenue Service (SARS) | 2026 |
| Incoterms (delivery terms referenced in any future RFQ schema) | ICC Incoterms 2020 | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | International Chamber of Commerce (ICC) | 2020 |
| Dangerous Goods (lithium batteries if storage is added later) | UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | UNECE | Rev. 7 (current) |
| EU regulatory anchor for any future EU-export reviewer (e.g. battery storage additions) | Regulation (EU) 2023/1542 (EU Battery Regulation) | https://eur-lex.europa.eu/eli/reg/2023/1542/oj | European Union (EUR-Lex) | 2023 |

## 8. Mini certificate & compliance block

- **SSEG / NERSA:** Apply to the licensed municipal distributor under SSEG ride-along (typically up to 1 MVA). Confirm with the licensed municipal distributor; some metros require reverse-power blocking or export-limiting inverters.

- **PV installer:** Must be registered with SAPVIA as a PV GreenCard installer; electrical sign-off by a registered Installation Electrician; CoC issued per SANS 10142-1.

- **Module certification:** IEC 61215-1:2021 (design qualification) + IEC 61730-1:2016 (safety); minimum 25-year linear power output warranty per OEM datasheet.

- **Inverter certification:** NRS 097-2-1 (grid interconnection) and applicable SANS approvals; anti-islanding per NRS 097-2-1.

- **Structural:** Roof-loading certificate from a Pr.Eng / Pr.Tech structural engineer before installation (ballasted systems require load confirmation).

- **Occupational Health & Safety:** Construction Regulations 2014 (fall protection plan) for rooftop work; roof-access permits per site.

## 9. HS code block (duty PENDING)

| Item | HS heading reference | Duty rate |
| --- | --- | --- |
| Monocrystalline silicon PV modules | 8541.43 — "Photosensitive semiconductor devices, including photovoltaic cells" (heading-level reference; confirm 8/10-digit subheading on SARS portal at time of import) | PENDING — verify via https://www.sars.gov.za/ |
| String / hybrid inverters | 8504.40 — "Static converters" (heading-level reference; confirm 8/10-digit subheading on SARS portal at time of import) | PENDING — verify via https://www.sars.gov.za/ |
| Mounting structures (aluminium / galvanised steel) | 7610 / 7326 — "Aluminium / other base-metal structures" | PENDING — verify via https://www.sars.gov.za/ |
| DC / AC cables (PV-rated) | 8544.49 — "Other electric conductors" | PENDING — verify via https://www.sars.gov.za/ |

**Lookup instructions (ZA import):**

1. Open the SARS Tariff & Customs portal at [https://www.sars.gov.za/](https://www.sars.gov.za/) → "Tariffs" → search by the 6-digit HS heading above.

2. Confirm the full 8/10-digit national subheading; duty, VAT and any anti-dumping / safeguard lines are shown per subheading.

3. Cross-check with the applicable Trade Agreement (e.g., SADC, EFTA, AfCFTA) if an origin certificate is available — preferential rates may apply.

4. Record the ruling on the bill of entry; retain the supplier's commercial invoice and any certificates of origin.

**Disclaimer:** The duty rates above are marked PENDING and must not be relied upon as fact. SARS rulings and applicable trade-agreement preferences are the only computed source at the time of importation. TradVolt does not provide tax, customs or legal advice.