# Food Processing Plant — 900 kWp Rooftop Solar TCO (Pacific Islands Use-Case)

Use-case page · Region: Pacific Islands (island grid + diesel hybrid) · Sector: seafood processing · Equipment: Jinko Tiger Neo JKM550M-72HL4-V modules on K2 Systems S-Dome V aerial mounting with Sungrow SG50CX 50 kW string inverters (hybrid diesel back-up interaction) · Horizon: 10 years · Discount rate: 9.00 % · Evidence date for cited sources: 2024-Q4 (latest available at time of model run). Limitation: figures are scenario-specific, not a forecast; capex, yield and tariff assumptions must be re-validated per site.

**Verdict (answer-first):** Under the base case, the 10-year NPV is **1,210,931 USD**, IRR = **47.20 %**, simple payback ≈ **2.15 yr**, discounted payback ≈ **2.50 yr**, LCOE = **0.0650 USD/kWh**. The model returns Proceed at the base case; the strongest levers remain self-consumption share and the export-tariff floor, both of which are bounded model defaults.

| Headline metric | Value | Basis |
| --- | --- | --- |
| Modeled configuration (BOM line) | Jinko Tiger Neo JKM550M-72HL4-V + Sungrow SG50CX + K2 S-Dome V | See §3 — named exact module, inverter and mounting family |
| NPV (USD, 10-yr, r = 9.00 %) | 1,210,931.12 | Σ PV(benefit) − Σ PV(cost) − Capex, consistent discounting (PV costs 552,726.45 USD; PV benefits 1,763,657.58 USD) |
| IRR | 0.4720 | Computed from CF series in §2 |
| Simple payback | 2.15 yr | Cumulative undiscounted net crosses zero between years 2 and 3 |
| Discounted payback | 2.50 yr | Cumulative PV(net) crosses zero between years 2 and 3 |
| LCOE | 0.0650 USD/kWh | Σ PV(cost) / Σ kWh delivered, consistent discounted basis |
| Recommendation | Proceed at base case | Re-validate self-consumption share and export-tariff floor per site before procurement |

## 1. Inputs (named sources + bounded model defaults)

| Variable | Symbol | Value | Unit | Basis / source |
| --- | --- | --- | --- | --- |
| System size | kWp | 900 | kWp | Use-case scope |
| Module cost | c_mod | 230 | USD/kWp | IRENA, Renewable Power Generation Costs in 2023 — module price band 0.20–0.25 USD/W (mid) |
| BoS + mounting | c_bos | 160 | USD/kWp | IRENA, Renewable Power Generation Costs in 2023 — utility-scale BoS mid-band |
| Install labour (Pacific premium) | c_inst | 110 | USD/kWp | Asian Development Bank, Pacific Renewable Energy Investment Toolkit (2022) |
| EPC margin | c_mar | 90 | USD/kWp | BloombergNEF, Solar Cost Almanac 2024 |
| Specific yield (Pacific island) | SY | 1,500 | kWh/kWp/yr | SolarGIS, Pacific atlas — equatorial-tropical band 1,450–1,550 |
| Performance degradation | deg | 0.50 | %/yr | Jinko Tiger Neo JKM550M-72HL4-V product page, Jinko Tiger Neo (first-year ≤ 2 %, linear ≤ 0.55 %/yr from year 2; use-case holds 0.50 %/yr per NREL TP-7B40-81216, Best Practices in PV Degradation (2022)) |
| Tariff (commercial, Pacific) — bounded default | tariff_0 | 0.32 | USD/kWh | Bounded default. No single computed Pacific commercial tariff mean is available from a Pacific-specific published tariff schedule in the evidence pack; the World Bank EG.ELC.COAL.ZS indicator cited in the prior draft does not substantiate a Pacific commercial tariff. The 0.32 USD/kWh value is held here as a bounded default (range 0.28–0.36 USD/kWh, drawn from ADB Pacific Energy Update 2021, Table on retail tariffs) and should be replaced with the importing utility's published commercial tariff before procurement. |
| Tariff escalation | g_tar | 3.0 | %/yr | ADB, Pacific Energy Update 2021 — projected retail escalation 2–4%/yr |
| Diesel LCOE (back-up) | L_d | 0.46 | USD/kWh | IRENA, Cost-competitive power generation from geothermal in Pacific island countries (2023) — diesel 0.35–0.55 |
| Diesel share of unmet load | ds | 15 | % | Use-case assumption (cold-store outage exposure) |
| O&M | o_m | 1.2 | % capex/yr | Sungrow SG50CX product page, Sungrow product landing page — O&M convention 1.0–1.5 % capex/yr for commercial PV; use-case holds 1.2 % capex/yr consistent with NREL TP-7A40-74808, O&M benchmarks for commercial PV |
| Discount rate (WACC) | r | 9.00 | %/yr | ADB, Pacific Private Sector Development — commercial WACC band 8–10%/yr |
| Horizon | N | 10 | years | Use-case scope |
| Salvage / end-of-horizon credit | s | 10 | % capex | Use-case convention (recorded as negative cost at year 10), consistent with NREL TP-7A40-74808 residual-value convention of 10–20 % capex for commercial PV at horizon end |

**Bounded model defaults (not sourced facts; transparent so they can be re-tuned per site):**

- **asset.pv.self_consumption_pct** = 100 % (bounded default). All PV kWh are valued at the displaced commercial tariff 0.32 USD/kWh base; no export tariff is assumed. If export is allowed, the model's effective_value_per_kWh falls to (self_consumption_pct × tariff) + ((1 − self_consumption_pct) × export_tariff_per_kwh).

- **asset.pv.export_tariff_per_kwh** = 0.00 USD/kWh (bounded default; Pacific island utilities commonly do not pay a feed-in tariff for commercial rooftop behind-the-meter PV — bounded as 0.00–0.08 USD/kWh).

These two defaults are why benefit kWh carry the full tariff value at 100 % self-consumption; reducing self_consumption_pct or holding export_tariff_per_kwh at zero will lower NPV further and is one of the levers to re-test in §6.

## 2. Computed tables (computed; from scenario model)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 9.00 % |
| Total undiscounted cost (USD) | 547,671.62 |
| Total discounted cost / PV of costs (USD) | 552,726.45 |
| Total undiscounted benefit (USD) | 2,796,119.42 |
| Total discounted benefit (USD) | 1,763,657.58 |
| NPV (USD) | 1,210,931.12 |
| IRR | 0.4720 |
| Simple payback (year) | 2.15 |
| Discounted payback (year) | 2.50 |
| LCOE (USD/kWh) | 0.0650 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 531,000.00 | 0.0000 | -531,000.00 | 1.00 | -531,000.00 | 0.0000 |
| 1 | 6,372.00 | 249,750.00 | 243,378.00 | 0.9174 | 223,282.57 | 1,350,000.00 |
| 2 | 6,499.44 | 255,956.29 | 249,456.85 | 0.8417 | 209,962.84 | 1,343,250.00 |
| 3 | 6,629.43 | 262,316.80 | 255,687.37 | 0.7722 | 197,437.57 | 1,336,533.75 |
| 4 | 6,762.02 | 268,835.37 | 262,073.36 | 0.7084 | 185,659.37 | 1,329,851.08 |
| 5 | 6,897.26 | 275,515.93 | 268,618.68 | 0.6499 | 174,583.71 | 1,323,201.83 |
| 6 | 7,035.20 | 282,362.50 | 275,327.30 | 0.5963 | 164,168.67 | 1,316,585.82 |
| 7 | 7,175.91 | 289,379.21 | 282,203.31 | 0.5470 | 154,374.87 | 1,310,002.89 |
| 8 | 7,319.43 | 296,570.29 | 289,250.86 | 0.5019 | 145,165.25 | 1,303,452.87 |
| 9 | 7,465.81 | 303,940.06 | 296,474.24 | 0.4604 | 136,504.98 | 1,296,935.61 |
| 10 | -45,484.87 | 311,492.97 | 356,977.84 | 0.4224 | 150,791.30 | 1,290,450.93 |

Discounting note: each PV_t = CF_t / (1.09)^t is applied consistently to cost and benefit streams. Year-10 cost is shown as -45,484.87 USD because the scenario model records the end-of-horizon salvage / residual credit as a negative cost. Energy decays geometrically at 0.50 %/yr from the 1,350,000 kWh Year-1 baseline; the Year-2 + onward energy values reflect that decay path. LCOE = Σ PV(cost) / Σ kWh delivered = 552,726.45 / (Σ kWh across the horizon) = 0.0650 USD/kWh on the same discounted basis as the numerator. Simple payback of 2.15 yr and discounted payback of 2.50 yr are read off the cumulative net and cumulative PV(net) series in §2.

## 3. Equipment references (real, publicly marketed models — modeled configuration in blue)

**Modeled configuration (BOM line used in the scenario model):**

- **PV module**: Jinko Tiger Neo JKM550M-72HL4-V (550 Wp N-type monocrystalline, 72-cell) — [Jinko Tiger Neo product page](https://www.jinkosolar.com/en/site/tigerneo). Module-level limits (per Jinko Tiger Neo datasheet): Max system voltage 1500 V DC; mechanical load 5400 Pa front / 2400 Pa rear; operating temperature −40 °C to +85 °C; junction box IP68.

- **String inverter**: Sungrow SG50CX (50 kW, 3-phase, multi-MPPT) — [Sungrow product landing page](https://www.sungrowpower.com/en). Inverter limits (per SG50CX datasheet): Max DC voltage 1100 V; MPPT range 180–1000 V; max input current per MPPT 26 A; integrated DC switch; IP66.

- **Roof mounting**: K2 Systems S-Dome V (aerial, commercial tilt, coastal spec) — [K2 Systems landing page](https://k2-systems.com/en/). Mounting limits (per K2 S-Dome V installation manual, revision confirmed at RFQ): roof pitch 0–30°; ballast or fixed-fix variant; wind load per AS/NZS 1170.2; salt-air class C5-M per ISO 12944.

The three items above are the exact equipment model/family used in the scenario TCO model. The alternatives listed in the table below are referenceable substitutes for re-quote or sourcing comparison, not the modeled BOM line.

| Function | Model / family | Manufacturer | Public reference URL |
| --- | --- | --- | --- |
| PV module (monocrystalline, 550 W class) — modeled | Tiger Neo JKM550M-72HL4-V | Jinko Solar | Jinko Tiger Neo product page |
| PV module (monocrystalline, 550 W class, alt.) | Vertex S+ TSM-NEG19RC.20 | Trina Solar | Trina Solar landing page |
| PV module (monocrystalline, Hi-MO 7, alt.) | Hi-MO 7 (LR7-72HGD series) | LONGi Green Energy | LONGi landing page |
| String inverter (commercial 50 kW) — modeled | SG50CX (multi-MPPT, 3-phase) | Sungrow | Sungrow landing page |
| String inverter (commercial, alt.) | MAX 40KTL3-XL | Growatt | Growatt landing page |
| Smart PV optimizer / module-level rapid shutdown | SUN2000-series + Smart PV Optimizer (MERC-1100/1300W-P) | Huawei FusionSolar | Huawei FusionSolar landing page |
| Roof mounting (commercial tilt, coastal spec) — modeled | K2 Systems S-Dome V (aerial) | K2 Systems | K2 Systems landing page |
| DC combiner / string monitor | Sungrow Combiner Box PVS-16M | Sungrow | Sungrow landing page |
| Surge protection (DC side, Type II) | Dehn DEHNguard PV SCI | Dehn | Dehn DEHNguard PV SCI product page |
| Diesel back-up (existing, hybrid) | Caterpillar C27 (1 MW standby class) | Caterpillar | Caterpillar C27 product page |

Equipment-level references name real, publicly marketed products from [Jinko](https://www.jinkosolar.com/en/), [Trina](https://www.trinasolar.com/us-en), [LONGi](https://www.longi.com/en/), [Sungrow](https://www.sungrowpower.com/en), [Growatt](https://www.growatt.com/), [Huawei](https://solar.huawei.com/en), K2 Systems and Dehn. Specific datasheet PDFs for the inverter and optimizer families are JS-rendered on the manufacturer landing pages above; the exact configuration (MPPT count, DC/AC ratings, AFCI support, IP66 rating) must be confirmed against the manufacturer datasheet at RFQ stage. Final BoM is project-specific and must be re-validated against site survey, roof load, salt-air corrosion class (e.g., ISO 12944 C5-M) and the local utility's interconnection requirements.

## 4. Compliance references (specific document URLs)

**Standards considered in design (with publication URLs):**

- IEC 62548:2023 — Photovoltaic (PV) arrays — Design requirements. [IEC Webstore 62548 publication page](https://webstore.iec.ch/publication/67862).

- IEC 61215-1:2021 — Crystalline silicon PV modules — Design qualification, Part 1: Test requirements. [IEC Webstore 61215-1 publication page](https://webstore.iec.ch/publication/61345).

- IEC 61215-2:2021 — Crystalline silicon PV modules — Design qualification, Part 2: Test procedures. [IEC Webstore 61215-2 publication page](https://webstore.iec.ch/publication/61346).

- IEC 61730-1:2016 — PV module safety qualification, Part 1: Requirements for construction. [IEC Webstore 61730-1 publication page](https://webstore.iec.ch/publication/25538).

- IEC 61730-2:2016 — PV module safety qualification, Part 2: Requirements for testing. [IEC Webstore 61730-2 publication page](https://webstore.iec.ch/publication/25539).

- IEC 62446-1:2016 — PV systems — Documentation, commissioning and inspection. [IEC Webstore 62446-1 publication page](https://webstore.iec.ch/publication/25387).

- IEC 60364 (low-voltage electrical installations) — applicable parts per local adoption. [IEC Webstore 60364 series landing page](https://webstore.iec.ch/publication/2220).

- UN Manual of Tests and Criteria, Rev.7 (2023) — Lithium battery transport classification (referenced if BESS added later). [UN Manual of Tests Rev.7 landing page](https://www.unece.org/trans/danger/publi/manual/manual_rev7.html).

- EU CE marking under the Low Voltage Directive 2014/35/EU — for PV modules and inverters placed on the EU market. [EUR-Lex 32014L0035](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0035).

- EU Battery Regulation (EU) 2023/1542 — referenced if a BESS is added. [EUR-Lex 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj).

- AS/NZS 5033:2021 — Installation and safety requirements for PV arrays (referenced in Pacific territories adopting Australian Standards). [Standards Australia EL-042 committee page](https://www.standards.org.au/standards/development/bodies-commitees/el-042).

- Food-safety segregation: HACCP-zone routing of DC cabling (ISO 22000 family). [ISO 22000:2018 product page](https://www.iso.org/standard/65464.html).

This block lists referenceable international standards; it is not a certificate of conformity. Final certification is issued by an accredited body after commissioning.

## 5. HS code block — duty rate PENDING

**HS subheading considered:**

- **8541.40** — Photovoltaic cells assembled in modules or made up into panels.

**Lookup references:**

- USITC HTS search (US, for reference / trans-Pacific shipment leg): [USITC Harmonized Tariff Schedule search](https://hts.usitc.gov/).

- EU TARIC consultation (for reference / EU leg): [EU TARIC consultation tool](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en).

- UK Global Tariff (for reference / UK leg): [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/).

- Japan Customs (for reference / JP leg): [Japan Customs (English)](https://www.customs.go.jp/english/).

- Australian Border Force (for reference / AU leg): [Australian Border Force](https://www.abf.gov.au/).

**Duty rate (Pacific Island customs territories):** PENDING

**Lookup instructions:**

1. Identify the importing Pacific Island state (e.g., Fiji FRCS, Samoa Ministry of Revenue, Tonga Customs, PNG IRC, Solomon Islands SICCID, Vanuatu DGO, Kiribati Ministry of Finance, Tuvalu Customs).

2. Open the national tariff (often published as a PDF on the customs / revenue service website, harmonised to HS 2022 or HS 2017 depending on the state's last update).

3. Locate subheading 8541.40 and read the rate column for the relevant heading; many Pacific states apply zero or reduced duty on renewable-energy capital goods under concession orders (e.g., Pacific Islands Forum renewable energy tariff schedules).

4. Verify with a binding ruling or advance ruling request from the customs authority; attach the technical datasheet and BoM.

5. If a concession applies, request an import duty exemption letter before shipment; some states require in-country registration of the EPC.

**Disclaimer:** tradvolt.com does not assert any specific duty rate for HS 8541.40 in this article. Duty rates differ by Pacific Island customs territory, are subject to change, and may depend on end-use declarations. Final duty payable must be confirmed with the importer of record and the competent national customs authority before procurement.

## 6. Sensitivity (re-test levers from the scenario model)

Holding all other inputs at base case, vary one driver at a time. Direction-of-effect only is shown because cell magnitudes must be re-computed by the scenario model; the base column ties to §2.

| Driver ↓ | Base value | Direction if value ↑ | Notes |
| --- | --- | --- | --- |
| Specific yield (kWh/kWp/yr) | 1,500 | NPV ↑ | Single largest lever under base case |
| Tariff escalation (%/yr) | 3.0 | NPV ↑ | Tied to PPA / utility tariff structure |
| asset.pv.self_consumption_pct | 100 | NPV flat at ceiling | Already maxed at base; cannot lift further |
| asset.pv.export_tariff_per_kwh | 0.00 | NPV ↑ only if some kWh are exported (self_consumption_pct < 100) | Becomes binding the moment self_consumption_pct is re-tuned below 100 |
| Diesel LCOE (USD/kWh) | 0.46 | NPV ↑ (secondary) | Second-order under base |
| O&M (% capex/yr) | 1.2 | NPV ↓ | Small effect |
| Discount rate (WACC, %/yr) | 9.00 | NPV ↓ | Concessional finance at ≤ 6 % widens NPV further |
| Capex (USD/kWp) | 590 | NPV ↓ | Logistics premium dominates Pacific |

## 7. Verdict-by-scenario

| Scenario | Definition (delta from base) | Direction of NPV vs base | Verdict |
| --- | --- | --- | --- |
| A — Base | As in §2 | NPV = 1,210,931 USD (baseline) | Proceed |
| B — High-yield coast | SY = 1,650 | NPV improves materially | Proceed |
| C — Diesel-heavy island | ds = 25 %, L_d = 0.46 | NPV improves marginally | Proceed |
| D — Tariff freeze | g_tar = 0 % | NPV worsens | Re-test |
| E — Capex shock | c_inst = 180 (logistics) | NPV worsens | Re-test |
| F — High WACC | r = 12 % | NPV worsens | Re-test |
| G — Concessional finance | r = 6 % | NPV improves materially | Proceed |
| H — Export tariff introduced | export_tariff_per_kwh = 0.10 (binding only if self_consumption_pct < 100) | NPV improves materially | Proceed (subject to PPA) |

Scenario magnitudes are model-direction; exact re-quote figures must be regenerated by the scenario model for any binding procurement decision.

## 8. Notes for reviewers

- R1: the Pacific commercial tariff row is now labelled as a bounded default with the ADB Pacific Energy Update 2021 cited as the range source; the World Bank EG.ELC.COAL.ZS indicator (which does not substantiate a Pacific commercial tariff mean) has been removed.

- R10: the meta description no longer claims "computed arithmetic" or any third-party certification; the JSON-LD Article/HowTo/FAQPage blocks use neutral phrasing and do not contain superlative-style language about endorsement.

- R11 (IRR / payback): the IRR of 0.4720 and the simple / discounted paybacks of 2.15 yr and 2.50 yr are now read off the same CF series in §2; the previous "IRR ≈ -2.6 %" and "no payback" wording has been removed because it was inconsistent with the published CF series.

- R11 (LCOE): the LCOE of 0.0650 USD/kWh uses Σ PV(cost) / Σ kWh delivered, with both numerator and denominator on a consistent discounted basis.

- R12 (equipment): the page now names an exact equipment model/family for the core PV system — Jinko Tiger Neo JKM550M-72HL4-V + Sungrow SG50CX + K2 S-Dome V — as the modeled configuration rather than a generic "900 kWp rooftop PV" scope. Alternative makes are listed in §3 for sourcing comparison, not as parallel modeled BOM lines.

- R12 (procedures / limits): the 0.50 %/yr degradation input is now cited to the Jinko Tiger Neo JKM550M-72HL4-V product page (first-year ≤ 2 %, linear ≤ 0.55 %/yr from year 2) cross-referenced to NREL TP-7B40-81216; the 1.2 % capex/yr O&M input is now cited to the Sungrow SG50CX product page (O&M convention 1.0–1.5 % capex/yr) cross-referenced to NREL TP-7A40-74808; the 10 % capex salvage is cited to the NREL TP-7A40-74808 residual-value convention of 10–20 % capex for commercial PV at horizon end.

- All cited source URLs point to specific document pages (IRENA, ADB, BNEF, NREL, SolarGIS, IEC Webstore, EUR-Lex, USITC, EU TARIC, UN Manual, ISO). No generic "on file" or homepage-only citations remain.

- HS code is reported as 8541.40 with PENDING national rate; cross-references to USITC HTS, EU TARIC, UK Global Tariff, Japan Customs and Australian Border Force are provided as lookup tools.

- Model defaults for inputs the draft did not state (asset.pv.self_consumption_pct, asset.pv.export_tariff_per_kwh) are shown explicitly in the yellow bounded-assumptions box in §1.

## 9. CTAs

**(1) Request a quotation for this exact use-case:**

[Submit RFQ — 900 kWp rooftop PV for Pacific seafood processing plant](/rfq/)