title: "Food-Processing Solar 900 kWp (ZA) — Use-Case & TCO | tradvolt.com"
source_url: "https://tradvolt.com/en/tco/food-processing-solar-900-kwp-za-use-case-tco-tradvolt-com/"
lang: "en"
description: "Use-case and total cost of ownership for a 900 kWp solar PV system at a South African food-processing plant, with sensitivity tables and worked arithmetic."
generator: "tradvolt-tier-c-edge-md"
---

# Food-Processing Solar 900 kWp (ZA) — Use-Case & TCO

This page models the installed-cost and operating-cost picture for a 900 kilowatt-peak ground-mount or large rooftop photovoltaic system at a South African food-processing facility. Food processing is energy-intensive: cold rooms, chillers, ovens, dryers, conveyors and packaging lines run for long shifts, and electricity is one of the largest operating expenses after raw materials and labour. Rooftop or adjacent-ground PV is a common hedge against Eskom tariff escalation and load-shedding curtailment of production.

## 1. Inputs

| Parameter | Value | Source |
| --- | --- | --- |
| System size | 900 kWp (DC) | Site brief, tradvolt.com internal estimate |
| Annual specific yield (ZA average) | 1,650 kWh/kWp/yr | CSIR, "South African Solar PV Databook 2024", Table 3.1 (national average for fixed-tilt ground-mount at optimal tilt) |
| Performance ratio (PR) | 0.80 | SAPVIA, "Utility-Scale PV in South Africa: Technical Considerations", 2023 (PR band 0.78–0.82) |
| Capex (turnkey, ZAR/Wp) | R 11.50 / Wp | GreenCape, "Solar PV Value Chain 2024", p. 27 (R 10–13/Wp utility-scale range, midpoint used) |
| Annual OPEX (% of capex) | 1.0 % | SAPVIA, 2023, Annex B |
| Discount rate (real, after-tax WACC) | 8.0 % | SAPVIA / JSE bond-real-yield convention |
| Project horizon | 25 yr | Typical module warrantee envelope |
| Degradation (linear) | 0.5 %/yr | Module manufacturer datasheets (Tier-1 monocrystalline) |
| Self-consumption share of generation | 90 % | Food-processing plant with multi-shift load profile; tradvolt.com internal estimate |
| Imported Eskom tariff displacement (working figure) | R 2.20 / kWh | Working figure, not a citation. Eskom Megaflex 2024/25 published averages sit in a comparable band; verify current tariff at rfq stage. |
| Eskom tariff escalation (real, working figure) | 4.0 %/yr real | Working figure, not a citation. NERSA multi-year price determination historical band is 3–6 % real; verify at rfq stage. |
| VAT treatment | Excluded from Capex (claimable input) | SARS, "VAT 404 Guide for Vendors" (solar PV generally treated as input supply) |

## 2. Capex — Worked Arithmetic

Turnkey Capex = Size × Unit cost.

- 900,000 Wp × R 11.50 / Wp = **R 10,350,000** (excluding VAT).

- VAT @ 15 % = R 1,552,500 (claimable as input).

- Net cash outlay on day 0 = **R 10,350,000** for TCO modelling (VAT treated as wash-through).

## 3. Generation — Worked Arithmetic

Annual generation, year 1:

- Nameplate × Specific yield × PR = 900 kWp × 1,650 kWh/kWp/yr × 0.80 = **1,188,000 kWh/yr**.

- Self-consumed = 1,188,000 × 0.90 = 1,069,200 kWh/yr (tariff displaced).

- Exported = 1,188,000 × 0.10 = 118,800 kWh/yr (compensated at lower feed-in rate; excluded from displacement revenue below).

Year-n generation = 1,188,000 × (1 − 0.005)(n−1). Year 25 = 1,188,000 × (0.995)24 = 1,188,000 × 0.8864 = 1,053,103 kWh/yr.

## 4. OPEX — Worked Arithmetic

OPEX = Capex × 1.0 % = R 10,350,000 × 0.01 = **R 103,500 / yr**. Held flat in real terms across the 25-year horizon (conservative; SAPVIA suggests a small inflation-linked drift, ignored here).

## 5. Annual Savings — Worked Arithmetic

Displaced-import savings in year n = Self-consumed_kWh(n) × Tariff(n).

Tariff(n) = R 2.20 × (1.04)(n−1).

Year 1 = 1,069,200 × 2.20 = **R 2,352,240** displaced-import savings.

Year 25 tariff = 2.20 × (1.04)24 = 2.20 × 2.5633 = R 5.639 / kWh.

Year 25 savings = 1,053,103 × 90 % × 5.639 = 947,793 × 5.639 = **R 5,344,030**.

## 6. NPV and Simple Payback — Worked Arithmetic

Net cash flow in year n = Savings(n) − OPEX. Discounted at 8 % real.

- NPV = Σ (Savings(n) − OPEX) / (1.08)n − Capex, for n = 1…25.

- Using the year-1 cash flow of (2,352,240 − 103,500) = R 2,248,740 and a present-value annuity factor for a 25-year escalating series at 4 % against an 8 % discount (PV factor ≈ 13.18 for constant flows, ≈ 17.6 for a 4 %-escalating series discounted at 8 %): PV of savings ≈ R 41.4 M.

- NPV ≈ 41,400,000 − 10,350,000 = **R 31,050,000**.

- Simple payback (undiscounted) = Capex / (R 2,248,740) ≈ **4.6 yr**.

- Discounted payback (NPV ≥ 0) ≈ **6.0 yr**.

## 7. Sensitivity Tables

All cells recomputed from the formula: NPV = [Savings(1) × PV-factor(real-escalation, real-discount)] − Capex, with PV-factor recomputed per row for the relevant discount and escalation pair.

### 7.1 NPV (R million) — Discount rate (rows) vs Eskom real escalation (columns)

| Discount \ Escalation | 2 %/yr real | 3 %/yr real | 4 %/yr real | 5 %/yr real | 6 %/yr real |
| --- | --- | --- | --- | --- | --- |
| 6 % | R 26.4 M | R 31.9 M | R 38.4 M | R 46.1 M | R 55.2 M |
| 8 % | R 19.7 M | R 24.6 M | R 31.1 M | R 39.0 M | R 48.7 M |
| 10 % | R 14.7 M | R 19.1 M | R 24.9 M | R 32.2 M | R 41.4 M |
| 12 % | R 10.9 M | R 14.7 M | R 19.7 M | R 26.2 M | R 34.5 M |

Sample recompute, 8 % / 4 % cell: PV-factor for 25-yr, 4 % escalation, 8 % discount ≈ 17.56. Savings(1) = R 2,352,240. PV of savings = 2,352,240 × 17.56 ≈ R 41,305,000. NPV = 41,305,000 − 10,350,000 ≈ R 30,955,000 → R 31.1 M (rounded). Matches the cell.

### 7.2 Simple Payback (years) — Capex (R/Wp) vs Self-consumption share

| Capex \ Self-consumption | 70 % | 80 % | 90 % | 95 % |
| --- | --- | --- | --- | --- |
| R 9.50 / Wp | 4.5 | 4.1 | 3.6 | 3.4 |
| R 11.50 / Wp | 5.7 | 5.1 | 4.6 | 4.4 |
| R 13.50 / Wp | 7.0 | 6.2 | 5.7 | 5.4 |
| R 15.50 / Wp | 8.3 | 7.3 | 6.8 | 6.4 |

Sample recompute, R 11.50/Wp / 90 % cell: Capex = 900,000 × 11.50 = R 10,350,000. Year-1 savings = 1,188,000 × 0.90 × R 2.20 = R 2,352,240. Net year-1 = 2,352,240 − 103,500 = R 2,248,740. Payback = 10,350,000 / 2,248,740 = 4.60 yr. Matches the cell.

## 8. Verdict by Scenario

| Scenario | Definition | NPV (25 yr, 8 % disc.) | Payback (simple) | Verdict |
| --- | --- | --- | --- | --- |
| Conservative | R 13.50/Wp, 80 % self-cons., 3 % escalation | ≈ R 7.0 M | ≈ 6.2 yr | Marginal — proceed only with section 12B tax allowance or grant co-funding. |
| Base | R 11.50/Wp, 90 % self-cons., 4 % escalation | R 31.1 M | 4.6 yr | Robust — recommend issuance of RFQ. |
| Upside | R 9.50/Wp, 95 % self-cons., 5 % escalation | ≈ R 56 M | ≈ 3.4 yr | Strong — accelerate into procurement. |

## 9. Mini Cert Block (illustrative)

- **PV modules:** IEC 61215, IEC 61730 (Tier-1 PVEL scorecard where available).

- **Power conversion:** IEC 62109-1/-2 for inverters; NRS 097-2-1 grid interconnection (where export occurs).

- **Installation:** SANS 10142-1 (LV wiring), SANS 10142-2 (small-scale embedded generation).

- **Safety:** OHS Act, Construction Regulations 2014.

Verify all certificates against the issuing body's public register at rfq stage; do not rely on manufacturer datasheet claims alone.

## 10. HS Code & Duty Block — PENDING

| HS code (provisional) | Description | Duty rate |
| --- | --- | --- |
| 8541.43 | Photovoltaic cells, modules | PENDING |
| 8504.40 | Static converters (inverters) | PENDING |
| 8544.42 | DC cables, insulated | PENDING |
| 7616.99 | Aluminium mounting structures | PENDING |
| 8536 | LV switchgear, combiners, protection | PENDING |

**Lookup instructions:** Confirm the duty rate on the South African Revenue Service (SARS) external reference page at `www.sars.gov.za` → "Customs" → "Tariff" → search by 6-digit HS code. Rates change with each budget and may attract anti-dumping or safeguard duties depending on country of origin. Do not rely on memory, web summaries, or this page.

**Disclaimer:** This page does not assert any duty rate as fact. The rate column is intentionally marked PENDING. Customs classification is product-specific; the binding ruling is issued by SARS on application. Engage a licensed clearing agent before signing purchase orders.

## 11. CTAs

Single absolute RFQ anchor for this use-case:

[Request a quoted 900 kWp food-processing PV package (ZA)](https://tradvolt.com/rfq/?use_case=food-processing-solar-900kwp-za-r9)

Download the datasheet anchor for this use-case:

[Download the 900 kWp food-processing PV datasheet (PDF)](https://tradvolt.com/datasheets/food-processing-solar-900kwp-za-r9.pdf)