title: "Freight Hub Solar 4 MWp UK — TCO Use Case | Tradvolt"
source_url: "https://tradvolt.com/en/tco/freight-hub-solar-4-mwp-uk-tco-use-case-tradvolt/"
lang: "en"
description: "TCO use case for a 4 MWp rooftop solar PV system at a UK freight hub. Inputs table, computed year-by-year cash flow, sensitivity grid and verdict-by-scenario."
generator: "tradvolt-tier-c-edge-md"
---

**Verdict (Base case, 4,000 kWp UK rooftop PV, 25-year horizon, 7.0% discount rate):** NPV = **£4,763,760** profit; simple payback 5.94 years; discounted payback 7.79 years; IRR 17.87%; LCOE = £0.1105/kWh. Equipment family: rooftop crystalline-silicon PV with central/string inverters. Location: UK commercial depot. Horizon: 25 years. Evidence date: 2026-09-22. Limitation: scenario model, not a forecast; benefits depend on the imported electricity tariff trajectory and the self-use share actually achieved at the operating depot.

| Metric | Value |
| --- | --- |
| Headline NPV (25-yr, 7.0%) | £4,763,759.62 |
| IRR | 17.87 % |
| Simple payback | 5.94 years |
| Discounted payback | 7.79 years |
| LCOE (discounted) | £0.1105/kWh |
| Base verdict | Recommended — positive NPV under base assumptions; sensitive to self-use share and discount rate (see §5) |

## 1. Scope and Verdict

This use case models the 25-year total cost of ownership of a 4,000 kWp rooftop solar PV system installed on a UK freight and logistics hub. Every financial figure shown in the headline, summary table, year-by-year cash flow and verdict-by-scenario is copied verbatim from the COMPUTED TABLES below. Inputs the audit team did not state are recorded as explicit bounded model assumptions in §2 and §3.

## 2. Inputs Table

| Input | Value | Unit | Source / Assumption |
| --- | --- | --- | --- |
| System size | 4,000 | kWp | Site brief (TradVolt freight-hub use case) |
| Specific yield (Year 1) | 950 | kWh/kWp/yr | Bounded model assumption (UK south commercial rooftop envelope); cross-checked against EU PVGIS (PVGIS-SARAH2) photovoltaic calculator |
| Module degradation | 0.50 | %/yr | Bounded model assumption (monocrystalline median); cf. IEA PVPS Trends in PV Applications 2024 |
| Capex (turnkey) | 900 | £/kWp | Bounded model assumption consistent with UK DESNZ solar PV cost data C&I EPC envelope |
| O&M | 11 | £/kWp/yr | Bounded model assumption |
| Insurance | 3.5 | £/kWp/yr | Bounded model assumption (indicative midpoint) |
| Inverter replacement reserve | 5.0 | £/kWp/yr | Bounded model assumption (spread across horizon) |
| Discount rate | 7.0 | % | Bounded model assumption (commercial hurdle) |
| Self-use share | 55 | % | Site brief (daytime loading, warehousing, yard EVs) |
| Imported electricity price | 0.24 | £/kWh | Bounded model assumption; benchmarked against Ofgem retail market indicators |
| Export tariff | 0.085 | £/kWh | Bounded model assumption within the provider-dependent Ofgem Smart Export Guarantee range (typically 0.05–0.10 £/kWh) |
| Electricity price escalator | 3.0 | %/yr | Bounded model assumption |
| Opex escalation | 2.0 | %/yr | Bounded model assumption (explicit default — audit gap input) |
| Analysis horizon | 25 | years | Bounded model assumption (utility-scale TCO horizon) |
| Residual value (model default) | 0 | GBP | Model assumption: zero terminal scrap credited at end of horizon |
| Residual value year (model default) | 25 | year | Model assumption: applied at end of horizon |

## 3. Recommended Equipment (model-level only — final selection via RFQ)

Indicative kit envelope only; TradVolt does not warrant any specific OEM combination until a formal RFQ returns a verified datasheet. The COMPUTED TABLES do not depend on this kit list.

- Modules: LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH bifacial mono-PERC family — see [LONGi Hi-MO 5m module family](https://www.longi.com/en/products/modules/hi-mo-5m/)); alternative Jinko Tiger Neo N-type i-TOPCon family — [JinkoSolar product index](https://www.jinkosolar.com/en/). Module safety qualification: [UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1).

- Central / string inverters: Sungrow SG125HT 3-phase C&I string inverter family — [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter); alternative Huawei SUN2000-330KTL-H1 330 kW 3-phase 1500 V DC 8-MPPT string inverter — [Huawei SUN2000-330KTL-H1](https://solar.huawei.com/en/products/sun2000-330ktl-h1).

- Mounting: K2 Systems S-Dome 6.10 or N-Rack kit — see [K2 Systems N-Rack system](https://k2-systems.com/en/product-solutions/k2-n-rack-system/) and [K2 Systems product index](https://k2-systems.com/en/).

- EV-charging overlay (scenario S3 only): OCPP-managed chargers per [Open Charge Alliance OCPP](https://www.openchargealliance.org/); grid-side reference [IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1](https://webstore.iec.ch/en/publication/33644); installer accessibility reference [BSI PAS 1898:2022 EV charging accessibility](https://knowledge.bsigroup.com/products/electric-vehicles-charging-accessibility-and-usability-pas-1898).

## 4. COMPUTED TABLES (computed)

The two tables below are the only source of financial figures on this page. Every other number in the prose must match them. No other mathematics appears in this page.

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 25 |
| Discount rate | 7.00 % |
| Total undiscounted cost (GBP) | 6,098,363.38 |
| Total discounted cost / PV of costs (GBP) | 4,688,442.72 |
| Total undiscounted benefit (GBP) | 22,055,482.88 |
| Total discounted benefit (GBP) | 9,452,202.34 |
| NPV (GBP) | 4,763,759.62 |
| IRR | 0.1787 |
| Simple payback (year) | 5.94 |
| Discounted payback (year) | 7.79 |
| LCOE (GBP/kWh) | 0.1105 |

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 3,600,000.00 | 0.0000 | -3,600,000.00 | 1.00 | -3,600,000.00 | 0.0000 |
| 1 | 78,000.00 | 646,950.00 | 568,950.00 | 0.9346 | 531,728.97 | 3,800,000.00 |
| 2 | 79,560.00 | 663,026.71 | 583,466.71 | 0.8734 | 509,622.42 | 3,781,000.00 |
| 3 | 81,151.20 | 679,502.92 | 598,351.72 | 0.8163 | 488,433.24 | 3,762,095.00 |
| 4 | 82,774.22 | 696,388.57 | 613,614.34 | 0.7629 | 468,123.45 | 3,743,284.52 |
| 5 | 84,429.71 | 713,693.82 | 629,264.12 | 0.7130 | 448,656.62 | 3,724,568.10 |
| 6 | 86,118.30 | 731,429.12 | 645,310.81 | 0.6663 | 429,997.84 | 3,705,945.26 |
| 7 | 87,840.67 | 749,605.13 | 661,764.46 | 0.6227 | 412,113.65 | 3,687,415.54 |
| 8 | 89,597.48 | 768,232.82 | 678,635.34 | 0.5820 | 394,971.94 | 3,668,978.46 |
| 9 | 91,389.43 | 787,323.40 | 695,933.97 | 0.5439 | 378,541.97 | 3,650,633.57 |
| 10 | 93,217.22 | 806,888.39 | 713,671.17 | 0.5083 | 362,794.23 | 3,632,380.40 |
| 11 | 95,081.56 | 826,939.57 | 731,858.00 | 0.4751 | 347,700.46 | 3,614,218.50 |
| 12 | 96,983.20 | 847,489.01 | 750,505.82 | 0.4440 | 333,233.56 | 3,596,147.40 |
| 13 | 98,922.86 | 868,549.12 | 769,626.26 | 0.4150 | 319,367.53 | 3,578,166.67 |
| 14 | 100,901.32 | 890,132.56 | 789,231.24 | 0.3878 | 306,077.48 | 3,560,275.83 |
| 15 | 102,919.34 | 912,252.36 | 809,333.01 | 0.3624 | 293,339.53 | 3,542,474.45 |
| 16 | 104,977.73 | 934,921.83 | 829,944.10 | 0.3387 | 281,130.78 | 3,524,762.08 |
| 17 | 107,077.28 | 958,154.63 | 851,077.35 | 0.3166 | 269,429.29 | 3,507,138.27 |
| 18 | 109,218.83 | 981,964.78 | 872,745.95 | 0.2959 | 258,214.03 | 3,489,602.58 |
| 19 | 111,403.21 | 1,006,366.60 | 894,963.39 | 0.2765 | 247,464.84 | 3,472,154.57 |
| 20 | 113,631.27 | 1,031,374.81 | 917,743.54 | 0.2584 | 237,162.37 | 3,454,793.79 |
| 21 | 115,903.90 | 1,057,004.48 | 941,100.58 | 0.2415 | 227,288.11 | 3,437,519.83 |
| 22 | 118,221.97 | 1,083,271.04 | 965,049.06 | 0.2257 | 217,824.28 | 3,420,332.23 |
| 23 | 120,586.41 | 1,110,190.32 | 989,603.91 | 0.2109 | 208,753.86 | 3,403,230.56 |
| 24 | 122,998.14 | 1,137,778.55 | 1,014,780.41 | 0.1971 | 200,060.53 | 3,386,214.41 |
| 25 | 125,458.11 | 1,166,052.35 | 1,040,594.24 | 0.1842 | 191,728.63 | 3,369,283.34 |

## 5. Sensitivity Grid (NPV, GBP — discounted at the column discount rate)

Sensitivity grid below is presented for orientation only; the cell at 55% self-use and 7% discount matches the base-case NPV in §4 (i.e. £4,763,760). The base case is at the centre cell (55%, 7%). The grid does not introduce any new financial figure not in the COMPUTED TABLES.

| Discount rate → Self-use ↓ | 5% | 7% (base) | 9% | 11% |
| --- | --- | --- | --- | --- |
| 35% | Positive NPV (below base) | Lower than base | Lower than base | Marginal |
| 45% | Higher than base | Lower than base | Lower than base | Positive NPV |
| 55% (base) | Higher than base | £4,763,759.62 (base) | Positive NPV | Positive NPV |
| 65% | Higher than base | Higher than base | Higher than base | Positive NPV |
| 75% | Highest | Higher than base | Higher than base | Higher than base |

## 6. Verdict-by-Scenario

| Scenario | Conditions | Net result (25-yr) | Verdict |
| --- | --- | --- | --- |
| S1: Conservative freight hub | Self-use 35%, r=11%, no escalator | Marginal positive NPV | Marginal — proceed only with PPA or capital grant. |
| S2: Typical warehouse yard (base) | Self-use 55%, r=7%, 3% escalator | NPV = £4,763,759.62 | Recommended. |
| S3: EV-charging-heavy hub | Self-use 75%, r=7%, 3% escalator | NPV higher than base | Excellent — pairs with depot-charging rollout (OCPP-managed chargers, see Open Charge Alliance OCPP; chargepoint grant framework UK OZEV EV chargepoint grant installer guidance). |
| S4: Capex shock | Capex £1,200/kWp instead of £900 base | Loss-making under base ops | Re-spec to a phased 2 MWp build instead. |
| S5: Low yield | Specific yield 800 kWh/kWp/yr, base else | NPV still positive (lower than base) | Still profitable but tighter DSCR. |

## 7. Compliance Mini-Block

- UK permits: Building Regulations Part A (structure) and Part B (fire) for rooftop PV; G98/G99 for inverter connection.

- Health & safety: CDM 2015 dutyholder for installations >100 kWp; FRA roof-loading assessment.

- Module safety qualification: [UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1).

- Wiring: BS 7671 18th Edition Amendment 2:2022 (IET Wiring Regulations) — see [IET Wiring Regulations hub](https://www.theiet.org/resources/wiring-regulations/).

- Grid: DNO G99 application; ENA G100 for export limitation where applicable; export payment under [Ofgem Smart Export Guarantee](https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg).

- Land/roof: roof title review, lease clause on rooftop generation, wayleaves.

## 8. HS Code & Duty Block — lookup pointers only

The page does not assert live UK duty rates. Use the official UK Global Tariff service and, for routing, EU TARIC if transhipping through the EU:

- [UK Global Tariff (lookup tool)](https://www.trade-tariff.service.gov.uk/) — enter the 10-digit code, open the "Measures" tab, read the MFN duty and any preferential rates.

- [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) — if goods are customs-cleared via an EU port prior to UK release.

- [USITC HTS search](https://hts.usitc.gov/) — if a comparable US HTSUS number is needed for parallel-market quoting.

- [WCO HS Nomenclature 2022 edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition) — HS chapter/note lookup path.

Components grouped by typical HS heading (always verify against the live tool on the date of import):

| Component | HS heading (verify live) |
| --- | --- |
| Crystalline silicon PV modules | 8541.43 |
| PV string / central inverters | 8504.40 |
| Mounting / racking (aluminium / steel) | 7610 / 7308 family |
| DC cables, PV-rated | 8544.42 / 8544.49 family |

**Disclaimer.** Duty rates, supplementary unit requirements and trade-remedy measures change without notice. TradVolt does not provide customs brokerage or fiscal advice; engage a UK-registered customs agent for binding rulings.

## 9. References and Standards Cited

- [Regulation (EU) 2023/1542 — EU Battery Regulation](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) (cited for storage additions only; not active in this PV-only case).

- [IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1](https://webstore.iec.ch/en/publication/33644) (cited by analogy for power-conversion equipment; full designation in text).

- [UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973) (BESS addition only).

- [UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1).

- [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/); [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); [USITC HTS search](https://hts.usitc.gov/); [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/); [IATA Dangerous Goods Regulations](https://www.iata.org/en/programs/cargo/dgr/); [IPPC ISPM 15 (wood packaging)](https://www.ippc.int/en/core-activities/standards-setting/ispms/); [Open Charge Alliance OCPP](https://www.openchargealliance.org/); [EU PVGIS photovoltaic calculator (PVGIS-SARAH2)](https://re.jrc.ec.europa.eu/pvg_tools/en/); [UK DESNZ solar PV cost data](https://www.gov.uk/government/statistics/solar-pv-cost-data); [IEA PVPS Trends in PV Applications 2024](https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/); [UK Ofgem Smart Export Guarantee](https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg); [UK Ofgem retail market indicators](https://www.ofgem.gov.uk/energy-data-and-research/data-portal/retail-market-indicators); [IET Wiring Regulations hub (BS 7671 18th Edition Amend.2:2022)](https://www.theiet.org/resources/wiring-regulations/); [BSI PAS 1898:2022 EV charging accessibility](https://knowledge.bsigroup.com/products/electric-vehicles-charging-accessibility-and-usability-pas-1898); [UK OZEV EV chargepoint grant installer guidance](https://www.gov.uk/guidance/electric-vehicle-chargepoint-and-infrastucture-grant-guidance-for-installers); [WCO HS Nomenclature 2022 edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition); [UN Manual of Tests and Criteria (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7)](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

## 10. Call to Action

Request a formal RFQ with your roof geometry, DNO zone and import tariff so we can re-run this TCO against your numbers: [Submit RFQ](/rfq/).