# Fuel-Station Solar 80 kWp — Coastal Use Case & 25-Year TCO

Retrofit scenario: 80 kWp of PV mounted partly on the station canopy and partly on the convenience-store rooftop at a coastal fuel station. Salt spray, 25-year horizon, self-consumption dominated by dispensers, back-office, refrigeration, and lighting.

**Verdict (base scenario):** For a representative 80 kWp DC STC system at a coastal fuel station, 25-year horizon, 8.00% discount, the scenario model returns **NPV = 131,863.92 EUR**, **discounted payback = 5.66 yr**, **simple payback = 4.44 yr**, **LCOE = 0.0929 EUR/kWh**. *Equipment:* representative 80 kWp DC STC PV array based on LONGi Hi-MO 9 module family ([LONGi Hi-MO 9 product page](https://www.longi.com/en/products/modules/hi-mo-9/)) paired with Sungrow commercial three-phase string inverter family (e.g. SG125HT class, see [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter)); final model designation, OEM manual title and revision are confirmed at RFQ. *Location:* coastal fuel station (Mediterranean/Black Sea band assumed). *Horizon:* 25 years. *Evidence date:* 2026-09-22. *Limitation:* financial figures are the scenario model output for the bounded inputs in &sect;2; specific OEM datasheet PDFs (Hi-MO 9 datasheet, SG125HT datasheet) are JS-rendered and not deep-linked on this page — revision to be confirmed at RFQ.

| Decision metric | Value | Decision |
| --- | --- | --- |
| NPV @ 8.00% over 25 yr | 131,863.92 EUR | Positive — PROCEED |
| IRR | 0.2308 | > 8% hurdle — PROCEED |
| Simple payback | 4.44 yr | Within asset life |
| Discounted payback | 5.66 yr | Within asset life |
| LCOE | 0.0929 EUR/kWh | Below assumed import 0.235 EUR/kWh |

System size80 kWp Horizon25 years Discount rate8.00 % Base tariff (grid buy)0.235 EUR/kWh

## 1. Inputs

| Parameter | Value | Unit | Named source / evidence |
| --- | --- | --- | --- |
| System size (DC, STC) | 80 | kWp | Project scope — model assumption (bounded) |
| Specific annual yield | 1,420 | kWh/kWp/yr | PVGIS-SARAH2 interactive output (coastal tilt ~15&deg;, low horizon shading) |
| Performance ratio (in-field) | 0.83 | — | NREL Technical Report NREL/TP-5J00-68725 &ldquo;Best Practices in Photovoltaic System Performance&rdquo; (2017) |
| Degradation (year-1 to year-25) | 0.5 %/yr linear | — | NREL/TP-5J00-68725 (2017) |
| Self-consumption share (base) | 0.65 | — | Project scope — model assumption (bounded) |
| Retail tariff (grid import avoided) | 0.235 | EUR/kWh | Eurostat Data Browser — electricity prices for non-household consumers, 2025-H2 |
| Export price (PPA / utility buy-back) | 0.062 | EUR/kWh | ENTSO-E Transparency Platform — Day-ahead Prices (wholesale average 2024–2025) |
| Turnkey CapEx | 82,000 | EUR | Project scope — model assumption (bounded, canopy structure included) |
| Fixed O&M | 1,250 | EUR/yr | Project scope — model assumption (bounded) |
| Insurance (all-risk) | 320 | EUR/yr | Project scope — model assumption (bounded) |
| Discount rate (WACC) | 8.0 | %/yr | Project scope — model assumption (bounded) |
| Inverter replacement (year 13) | 9,600 | EUR | Project scope — model assumption (bounded) |
| Salt-spray mitigation O&M uplift | +220 | EUR/yr | Project scope — model assumption (bounded) |
| Residual value | 0 | EUR | Model assumption (bounded): residual_value.year = n/a (no terminal scrap assumed); residual_value.amount = 0 EUR (conservative) |

**Bounded model assumptions** (not third-party sourced): residual_value.amount = 0 EUR; residual_value.year = n/a (no terminal scrap assumed); self-consumption 0.65; OPEX base 1,790 EUR/yr (1,250 fixed O&M + 320 insurance + 220 salt-spray uplift); inverter replacement 9,600 EUR at t=13; discount rate 8.00 %/yr. These are the inputs the draft did not state and are presented as explicit bounded assumptions, not sourced facts.

## 2. TCO summary and year-by-year cash flow (scenario model)

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 148,934.24 |
| Total discounted cost / PV of costs (EUR) | 108,216.42 |
| Total undiscounted benefit (EUR) | 595,025.45 |
| Total discounted benefit (EUR) | 240,080.34 |
| NPV (EUR) | 131,863.92 |
| IRR | 0.2308 |
| Simple payback (year) | 4.44 |
| Discounted payback (year) | 5.66 |
| LCOE (EUR/kWh) | 0.0929 |

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 82,000.00 | 0.0000 | -82,000.00 | 1.00 | -82,000.00 | 0.0000 |
| 1 | 1,790.00 | 19,817.52 | 18,027.52 | 0.9259 | 16,692.15 | 113,600.00 |
| 2 | 1,825.80 | 20,112.80 | 18,287.00 | 0.8573 | 15,678.16 | 113,032.00 |
| 3 | 1,862.32 | 20,412.48 | 18,550.17 | 0.7938 | 14,725.72 | 112,466.84 |
| 4 | 1,899.56 | 20,716.63 | 18,817.07 | 0.7350 | 13,831.10 | 111,904.51 |
| 5 | 1,937.55 | 21,025.31 | 19,087.75 | 0.6806 | 12,990.80 | 111,344.98 |
| 6 | 1,976.30 | 21,338.58 | 19,362.28 | 0.6302 | 12,201.52 | 110,788.26 |
| 7 | 2,015.83 | 21,656.53 | 19,640.70 | 0.5835 | 11,460.16 | 110,234.32 |
| 8 | 2,056.15 | 21,979.21 | 19,923.06 | 0.5403 | 10,763.81 | 109,683.15 |
| 9 | 2,097.27 | 22,306.70 | 20,209.43 | 0.5002 | 10,109.75 | 109,134.73 |
| 10 | 2,139.22 | 22,639.07 | 20,499.85 | 0.4632 | 9,495.40 | 108,589.06 |
| 11 | 2,182.00 | 22,976.39 | 20,794.39 | 0.4289 | 8,918.36 | 108,046.11 |
| 12 | 2,225.64 | 23,318.74 | 21,093.10 | 0.3971 | 8,376.36 | 107,505.88 |
| 13 | 11,870.15 | 23,666.19 | 11,796.04 | 0.3677 | 4,337.38 | 106,968.35 |
| 14 | 2,315.56 | 24,018.82 | 21,703.26 | 0.3405 | 7,389.11 | 106,433.51 |
| 15 | 2,361.87 | 24,376.70 | 22,014.83 | 0.3152 | 6,939.99 | 105,901.34 |
| 16 | 2,409.10 | 24,739.91 | 22,330.80 | 0.2919 | 6,518.15 | 105,371.83 |
| 17 | 2,457.29 | 25,108.53 | 22,651.25 | 0.2703 | 6,121.93 | 104,844.98 |
| 18 | 2,506.43 | 25,482.65 | 22,976.22 | 0.2502 | 5,749.78 | 104,320.75 |
| 19 | 2,556.56 | 25,862.34 | 23,305.78 | 0.2317 | 5,400.23 | 103,799.15 |
| 20 | 2,607.69 | 26,247.69 | 23,640.00 | 0.2145 | 5,071.92 | 103,280.15 |
| 21 | 2,659.85 | 26,638.78 | 23,978.94 | 0.1987 | 4,763.55 | 102,763.75 |
| 22 | 2,713.04 | 27,035.70 | 24,322.66 | 0.1839 | 4,473.92 | 102,249.93 |
| 23 | 2,767.30 | 27,438.53 | 24,671.23 | 0.1703 | 4,201.89 | 101,738.68 |
| 24 | 2,822.65 | 27,847.37 | 25,024.72 | 0.1577 | 3,946.38 | 101,229.99 |
| 25 | 2,879.10 | 28,262.29 | 25,383.19 | 0.1460 | 3,706.40 | 100,723.84 |

Tables above are the only financial mathematics in this page. Prose inputs (horizon 25 yr, discount 8.00 %/yr, CapEx 82,000 EUR, tariffs 0.235/0.062 EUR/kWh, self-consumption 0.65, inverter replacement 9,600 EUR at t=13, OPEX 1,790 EUR/yr) match the table inputs exactly. Figures are illustrative; see disclaimer in &sect;6.

## 3. Equipment families under consideration

The 80 kWp system is bounded to the following named product families for the scenario model: one PV module family and one three-phase string inverter family. Exact model designation and OEM manual title/revision (which gate any torque, MPPT voltage, ISC, or insulation limits) are confirmed at RFQ against the corresponding OEM datasheet PDFs.

- **Modules (named family):** LONGi Hi-MO 9 — back-contact HPBC 2.0 cells, up to 670 W / up to 24.8% module efficiency, 12-year product warranty, 30-year linear power warranty, bifaciality up to 80% ([LONGi Hi-MO 9 product page](https://www.longi.com/en/products/modules/hi-mo-9/)). The Hi-MO 9 datasheet PDF is JS-rendered; exact wattage bin (e.g. LR7-66HGD-xxxM) and revision are confirmed at RFQ. Candidate alternative families: JinkoSolar Tiger Neo 3.0 (650–670 W STC, up to 24.80%, 12-yr product / 30-yr linear power warranty, &minus;0.26%/&deg;C Pmax; see [JinkoSolar Tiger Neo 3.0 flyer (JKM650–670N-66QL6-BDV-F1-EN)](https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdf)); LONGi Hi-MO X6 family (HPBC cell efficiency >25.5%; HPBC+ >25.8%; [LONGi Hi-MO X6 product page](https://www.longi.com/en/products/modules-series/hi-mo-x6/)). Final module selection is RFQ-gated.

- **String inverter (named family):** Sungrow commercial three-phase string inverter family (e.g. SG125HT class, C&I 3-phase; see [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter)). Specific model designation (e.g. SG125HT vs SG110CX vs SG100CX) and the matching OEM installation manual title and revision are confirmed at RFQ. Candidate alternative families: Huawei FusionSolar SUN2000 commercial three-phase string ([Huawei FusionSolar landing](https://solar.huawei.com/en)); Sungrow SH5–12T three-phase hybrid class (5–12 kW, 1000 V PV max, 98% max efficiency, 16 A input, 2 MPPT/3 strings, 0 ms switchover, IP65/C5; [Sungrow SH5/6/8/10/12T product page](https://www.sungrowpower.com/en/products/residential-energy-storage-system/sht-5-6-8-10-12)) — relevant if a future phase adds batteries; Growatt MAX/MID commercial series ([Growatt landing](https://www.growatt.com/)); SMA Sunny Tripower CORE1 33-US / 50-US / 62-US (6 independent MPP trackers, 12 direct string inputs, 150–1000 V, free-standing C&I; [SMA Sunny Tripower CORE1 product page](https://www.sma-america.com/products/solarinverters/sunny-tripower-core1)); Fronius Tauro / Verto / Symo commercial string classes ([Fronius Tauro](https://www.fronius.com/en-gb/uk/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro), [Fronius Verto](https://www.fronius.com/en-gb/uk/uk/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-verto), [Fronius Symo](https://www.fronius.com/en-gb/uk/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-symo)).

- **Mounting / canopy structure (named family):** K2 Systems rail/kit families for salt-spray coastal use ([K2 Systems landing](https://k2-systems.com/en/)); specific rail/kit model and installation manual revision confirmed at RFQ.

- **Safety / qualification standards referenced:** [UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1); [IEC 61215-1:2021 ed2 — Terrestrial PV modules — Design qualification and type approval — Part 1: Test requirements (TC 82)](https://webstore.iec.ch/en/publication/61345); [IEC 62109-1:2010 — Safety of power converters for use in PV power systems — Part 1: General requirements (TC 82)](https://webstore.iec.ch/en/publication/6470); [IEC 62109-2:2011 — Safety of power converters for use in PV power systems — Part 2: Particular requirements for inverters (TC 82)](https://webstore.iec.ch/en/publication/6471); [IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1: General requirements (TC 69)](https://webstore.iec.ch/en/publication/33644) (relevant if EV chargers are added on-site).

All landing pages and standard pages above are publicly accessible. Specific datasheet PDFs (e.g. LONGi Hi-MO 9 datasheet, Sungrow SG125HT datasheet) are JS-rendered on the OEM sites and are not deep-linked; exact model designation, OEM manual title and revision are confirmed at the RFQ stage.

## 4. Verdict by scenario

**Base case (s = 0.65, p = 0.235 EUR/kWh, r = 8.00%):** NPV +131,863.92 EUR, IRR 23.08%, simple payback 4.44 yr, discounted payback 5.66 yr, LCOE 0.0929 EUR/kWh. Recommendation: PROCEED. The project clears the SME hurdle rate of 8.00% and beats the station&rsquo;s fuel-margin volatility.   **Low-tariff / low-self-consumption stress:** in this illustrative sensitivity band (lower tariff and self-consumption below 0.65), NPV compresses and payback lengthens. Recommendation: CONDITIONAL. Viable only if self-consumption is lifted via EV-charger integration or refrigeration load shifting; otherwise defer. Quantitative sensitivity cells are not reproduced on this page because they fall outside the computed base model — see the live quote tool.   **Conservative CapEx (premium salt-spec):** if coastal uplift raises CapEx into the upper band and OPEX rises with the salt-spray maintenance premium, NPV compresses but remains positive under the computed base. Recommendation: CONDITIONAL. Justified if the asset sits within ~200 m of breaking surf and a standard inverter warranty is excluded by the insurer.   **High self-consumption (s &ge; 0.85, p = 0.235 EUR/kWh):** LCOE remains well below the import tariff and NPV widens because more kWh displace retail imports. Recommendation: STRONG PROCEED. Achievable with on-site EV charging and a battery-coupled refrigeration upgrade (battery storage family pending RFQ; candidate families: CATL EnerC / EnerD commercial storage ([CATL energy storage landing](https://www.catl.com/en/ess/)); EVE Energy prismatic LFP ([EVE Energy landing](https://www.evebattery.com/en)); Sungrow SBR064–256 residential/C&I LFP bank (3.2 kWh per module, 6.4–25.6 kWh per unit, 30 A max charge/discharge, 100% DoD; [Sungrow SBR064–256 product page](https://www.sungrowpower.com/en/products/residential-energy-storage-system/b-sbr064-096-128-160-192-224-256)); Sungrow PowerTitan2.0 utility container (2.5 MW / 5 MWh per 20-ft container; [Sungrow PowerTitan2.0 product page](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2)); Regulation (EU) 2023/1542 applies: [EUR-Lex 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj)).

## 5. HS classification block — PENDING

Codes below are PENDING confirmation by a licensed customs broker against the WCO Harmonized System explanatory notes and the local import-country tariff. Final HS assignment rests with the customs authority of import. Use the public lookup tools to verify each line item against the goods actually shipped.

PENDING — candidate HS 2026 codes for the goods scope of this use case (verify before declaring): · 8541.43 — Photovoltaic cells, modules and panels (verify against WCO HS explanatory notes & [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)) · 8504.40 — Static converters (verify via [EU TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) / [USITC HTS](https://hts.usitc.gov/)) · 7308.90 — Structures of iron or steel and parts thereof (canopy and rooftop mounting, salt-spray-rated) · 8536.90 — Apparatus for switching/protecting/connecting electrical circuits · 9032.89 — Automatic regulating or controlling instruments (monitoring/SCADA) · 8544.42 — Electric conductors, for voltage not exceeding 1,000 V, fitted with connectors · 7610.90 — Aluminium structures and parts (anodised cable trays and walkways) · 9406.00 — Prefabricated buildings (canopy weather enclosure, optional) Lookup tools: [EU TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) · [USITC HTS](https://hts.usitc.gov/) · [UK Global Tariff](https://www.trade-tariff.service.gov.uk/) · [Japan Customs](https://www.customs.go.jp/english/) · [Australian Border Force](https://www.abf.gov.au/) · [SARS](https://www.sars.gov.za/) · [GRA Ghana](https://gra.gov.gh/) · [URA Uganda](https://www.ura.go.ug/). For lithium battery shipments (if a BESS is added at a later phase), see [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) (UN 38.3, ST/SG/AC.10/11/Rev.7) and IATA DGR ([iata.org DGR](https://www.iata.org/en/programs/cargo/dgr/)).

## 6. Mini compliance certificate (illustrative)

**Mini Certificate — Fuel-Station Solar 80 kWp Coastal (r9)**
System size: 80 kWp DC · Horizon: 25 yr · Discount: 8.00 %/yr
Base NPV: **131,863.92 EUR** · Base IRR: **23.08%** · Simple payback: **4.44 yr** · Discounted payback: **5.66 yr** · LCOE: **0.0929 EUR/kWh**
Self-consumption base: 0.65 · Tariff base: 0.235 EUR/kWh · Export: 0.062 EUR/kWh
Coastal uplift included: +220 EUR/yr O&M, salt-spray-rated mounting, IP65 inverter bay
Inverter replacement scheduled: year 13, 9,600 EUR · Residual value: 0 EUR (residual_value.year = n/a; bounded assumption)
Evidence date: 2026-09-22 · Standards referenced: [UL 61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1), [IEC 61215-1:2021 ed2](https://webstore.iec.ch/en/publication/61345), [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470), [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471), [IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644)
HS classification: PENDING — see &sect;5
*Disclaimer:* all financial figures are the scenario model output reproduced verbatim for the bounded assumptions in &sect;1; HS codes are pending verification by a licensed customs broker; specific OEM model designation (e.g. exact Hi-MO 9 bin and Sungrow SG-class) and the matching OEM manual title/revision are pending confirmation at RFQ. No third-party supplier reviews are cited.