# Fuel-Station Solar 80 kWp — Use Case & TCO (MEA)

On-site canopy PV for retail fuel stations across the Middle East & Africa. 80 kWp DC, 25-year horizon, 6% real discount, computed discounted cash flow. Equipment envelope with model confirmed at RFQ.

**Verdict (evidence date 2026-09-22).** At 80 kWp DC in the MEA base case, the 25-year real discounted TCO yields **NPV ≈ USD 90,736.85**, **discounted payback ≈ 6.18 yr**, **simple payback ≈ 5.06 yr**, **IRR ≈ 20.15 %**, and **LCOE ≈ USD 0.0411/kWh**. The system is a net saver in present-value terms. **Recommendation: Proceed.** Limitations: country-specific import duty lines for HS 8541.43 / 8504.40 / 7308.90 / 8544.42 are **PENDING** at the WCO/EU TARIC/USITC lookups below; capex is a TradVolt procurement envelope and must be re-bid at RFQ; the canopy K2 Systems manual revision is deferred to RFQ award.

Decision at a glance | Decision point | Value | Source / row |
| --- | --- | --- |
| Equipment family envelope | 80 kWp DC, Jinko Tiger Neo 3.0 N-type modules on canopy | §2 Inputs |
| Location | Middle East & Africa (MEA), utility-grid-tied | §1 Framing |
| Horizon | 25 years | §2 Inputs |
| Discount rate (real) | 6.00 %/yr | §2 Inputs |
| NPV (25-yr, real) | USD 90,736.85 | §4 scenario TCO tables |
| IRR | 20.15 % | §4 scenario TCO tables |
| Simple payback | 5.06 yr | §4 scenario TCO tables |
| Discounted payback | 6.18 yr | §4 scenario TCO tables |
| LCOE | USD 0.0411/kWh | §4 scenario TCO tables |
| Recommendation | **Proceed** — proceed with a confirmed soiling plan, model pin-down, and HS-duty confirmation at RFQ | §5 Verdict |

[Request Quote — 80 kWp Fuel-Station Canopy (MEA)](/rfq/) Download cash-flow CSV

## 1. Use case framing

An 80 kWp canopy typically covers four to six pump islands plus the forecourt parking bays. The station remains grid-connected; the PV array offsets daytime consumption (lighting, chillers, dispensers, POS, back-of-house AC) and trims diesel-fired generator run-time. Forecourt loads in MEA latitudes peak with daytime solar irradiance, so the self-consumption share is high and exported surplus is modest under local net-billing rules.

## 2. Equipment & inputs (cited)

Equipment is named to specific publicly marketed **models** from the listed datasheets; the exact OEM manual revision for the canopy rail is confirmed with the EPC at RFQ. Module, inverter, and battery-family pages are deep-linked to datasheet PDFs or specific product pages where available.

| Input | Value | Unit | Source / row owner |
| --- | --- | --- | --- |
| Modules (specific model) | Jinko Tiger Neo 3.0 — JKM650-670N-66QL6-BDV-F1-EN family, STC 650–670 Wp class, N-type TOPCon, 24.06–24.80% module efficiency, BNPI up to 746 Wp; 12-yr product / 30-yr linear power warranty; -0.26%/°C Pmax; 1.0% + 0.35%/yr linear degradation. Qty ≈ 120 pcs (80 kWp DC envelope). Family candidates also include LONGi Hi-MO 9 (up to 670 W, up to 24.8%, HPBC 2.0 back-contact; 12-yr product / 30-yr power warranty; bifaciality up to 80%) and LONGi Hi-MO 5m / 6 / 7. | model | Jinko Tiger Neo 3.0 datasheet PDF (JKM650-670N-66QL6-BDV-F1-EN) · LONGi Hi-MO 9 product page · LONGi Hi-MO 5m family page |
| Inverters (specific model) | Three-phase string inverters. Family candidates: Sungrow SG string inverter range (incl. SG125HT C&I 3-phase), Huawei FusionSolar SUN2000-330KTL-H1 (330 kW 3-phase 1500 V DC 8-MPPT). Inverter datasheet/report No. and any OEM manual revision confirmed at RFQ. | model | Sungrow string inverter range · Huawei SUN2000-330KTL-H1 |
| Mounting / canopy | Galvanized-steel fuel-station canopy with rail-based PV mount. Family: K2 Systems N-Rack ground-mount system (driven-pile ground mount + S-Rack rail). K2 Systems N-Rack installation manual revision confirmed at RFQ; the K2 download portal is bot-walled, so the manual PDF URL cannot be deep-linked here — naming the system family + revision will be added to the file at RFQ award. | family | K2 Systems N-Rack ground-mount system |
| System size (DC) | 80 | kWp | TradVolt use-case envelope, fuel-station 80 kWp (MEA) |
| Specific yield (year 1) | 1,520 | kWh/kWp/yr | EC JRC PVGIS photovoltaic calculator (PVGIS-SARAH2) for MEA hot-arid sites; band cross-checked against IRENA, Renewable Power Generation Costs in 2023, MEA utility-scale band 1,400–1,620 kWh/kWp/yr (mid) |
| Performance ratio (year 1) | 0.82 | — | IEA PVPS, Trends in PV Applications 2024, hot-arid canopy PR 0.78–0.85 |
| Annual degradation | 0.5 | %/yr | IEA PVPS, Trends in PV Applications 2024, c-Si (insured Tier-1); cross-check with Jinko Tiger Neo 3.0 datasheet (1.0% + 0.35%/yr linear) |
| Tariff (grid import, base) | 0.12 | USD/kWh | World Bank Business Ready (successor to Doing Business Getting-Electricity), commercial electricity, MEA median (model input) |
| Tariff escalation | 2.0 | %/yr (real) | IEA, World Energy Outlook 2024, MEA real tariff drift (model input) |
| Discount rate (WACC, real) | 6.0 | %/yr | TradVolt base case, MEA commercial PV (unlevered, USD) |
| Horizon | 25 | years | TradVolt convention, aligned with Tier-1 module power warranty (Tiger Neo 3.0 30-yr linear power) |
| Capex line — modules | 9,500 | USD | TradVolt procurement envelope, Jinko Tiger Neo 3.0 N-type 650–670 Wp class, FOB MEA port, q1 2026 |
| Capex line — inverters | 5,200 | USD | TradVolt procurement envelope, three-phase string inverters (Sungrow SG range / Huawei SUN2000-330KTL-H1), q1 2026 |
| Capex line — mounting + canopy | 18,400 | USD | TradVolt procurement envelope, K2 Systems N-Rack + galvanized-steel canopy over forecourt, MEA |
| Capex line — DC & AC BoS | 4,100 | USD | TradVolt procurement envelope, q1 2026 |
| Capex line — EPC + commissioning | 7,800 | USD | TradVolt procurement envelope, MEA fuel-station retrofit EPC |
| Capex line — soft costs | 3,800 | USD | TradVolt procurement envelope, permits + grid study + insurance, MEA |
| Capex line — contingency | 5.0 | % capex ex-contingency | **TradVolt convention, no external source** (5 % standard markup on capex ex-contingency) |
| Capex line — total at t=0 (computed) | 51,240 | USD | scenario TCO summary (year-0 cost line) |
| Fixed Opex (year 1) | 1.0 | % capex/yr | IRENA, Renewable Power Generation Costs in 2023, O&M band for <1 MW commercial PV; **TradVolt convention, no external source** for the 1 %/yr capex cap |
| Inverter replacement (year 12) | 5,200 | USD | **TradVolt convention, no external source** (swap-cost equals initial inverter capex line) |
| Diesel-displaced share of savings | 15 | % kWh savings | TradVolt base case, hybrid forecourt loads in MEA |
| Diesel displaced cost | 0.28 | USD/kWh | IEA, World Energy Outlook 2024, MEA behind-the-meter diesel LCOE band 0.24–0.32 (mid) |

**Model assumptions (bounded, not sourced facts).**

- **asset.pv.self_consumption_pct:** 85% (bounded envelope for daytime-aligned forecourt loads in MEA; **TradVolt convention, no external source**).

- **asset.pv.export_tariff_per_kwh:** 0.04 USD/kWh (bounded envelope for MEA net-billing rules; **TradVolt convention, no external source**).

- Residual value: **USD 2,500** at **year 25** (treated as a benefit in the cash-flow table; bounded envelope for end-of-life inverter/scrap steel credit). **TradVolt convention, no external source.**

- Year-25 cost line in the computed cashflow is **−USD 1,675.84**: this is the net of the year-25 fixed opex escalation (USD 824.16) less the residual credit (USD 2,500), per the **TradVolt convention, no external source** for the residual credit treatment. The benefit row carries the year-25 generation value as normal.

- Capex cost lines above are TradVolt procurement envelopes at the named equipment family; final landed figures depend on the HS duty and freight decisions flagged in §7 and §8.

- Canopy structural dossier (K2 Systems N-Rack installation manual revision, wind-load calc per local code, fuel-station fire-rating): **TradVolt convention, no external source** on this page; revision is added at RFQ award. The K2 Systems download portal is bot-walled for automated deep-linking; the manual PDF will be attached to the RFQ pack at award.

## 3. scenario TCO tables

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 6.00 % |
| Total undiscounted cost (USD) | 70,352.33 |
| Total discounted cost / PV of costs (USD) | 61,155.01 |
| Total undiscounted benefit (USD) | 310,340.70 |
| Total discounted benefit (USD) | 151,891.86 |
| NPV (USD) | 90,736.85 |
| IRR | 0.2015 |
| Simple payback (year) | 5.06 |
| Discounted payback (year) | 6.18 |
| LCOE (USD/kWh) | 0.0411 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 51,240.00 | 0.0000 | -51,240.00 | 1.00 | -51,240.00 | 0.0000 |
| 1 | 512.40 | 10,336.00 | 9,823.60 | 0.9434 | 9,267.55 | 121,600.00 |
| 2 | 522.65 | 10,490.01 | 9,967.36 | 0.8900 | 8,870.91 | 120,992.00 |
| 3 | 533.10 | 10,646.31 | 10,113.21 | 0.8396 | 8,491.24 | 120,387.04 |
| 4 | 543.76 | 10,804.94 | 10,261.17 | 0.7921 | 8,127.81 | 119,785.10 |
| 5 | 554.64 | 10,965.93 | 10,411.29 | 0.7473 | 7,779.92 | 119,186.18 |
| 6 | 565.73 | 11,129.32 | 10,563.59 | 0.7050 | 7,446.92 | 118,590.25 |
| 7 | 577.05 | 11,295.15 | 10,718.10 | 0.6651 | 7,128.15 | 117,997.30 |
| 8 | 588.59 | 11,463.45 | 10,874.86 | 0.6274 | 6,823.02 | 117,407.31 |
| 9 | 600.36 | 11,634.25 | 11,033.90 | 0.5919 | 6,530.95 | 116,820.27 |
| 10 | 612.37 | 11,807.60 | 11,195.24 | 0.5584 | 6,251.36 | 116,236.17 |
| 11 | 624.61 | 11,983.54 | 11,358.92 | 0.5268 | 5,983.74 | 115,654.99 |
| 12 | 5,837.10 | 12,162.09 | 6,324.99 | 0.4970 | 3,143.32 | 115,076.72 |
| 13 | 649.85 | 12,343.31 | 11,693.46 | 0.4688 | 5,482.35 | 114,501.33 |
| 14 | 662.84 | 12,527.22 | 11,864.38 | 0.4423 | 5,247.63 | 113,928.83 |
| 15 | 676.10 | 12,713.88 | 12,037.78 | 0.4173 | 5,022.94 | 113,359.18 |
| 16 | 689.62 | 12,903.31 | 12,213.69 | 0.3936 | 4,807.87 | 112,792.39 |
| 17 | 703.42 | 13,095.57 | 12,392.16 | 0.3714 | 4,602.01 | 112,228.42 |
| 18 | 717.48 | 13,290.70 | 12,573.21 | 0.3503 | 4,404.95 | 111,667.28 |
| 19 | 731.83 | 13,488.73 | 12,756.90 | 0.3305 | 4,216.32 | 111,108.95 |
| 20 | 746.47 | 13,689.71 | 12,943.24 | 0.3118 | 4,035.76 | 110,553.40 |
| 21 | 761.40 | 13,893.69 | 13,132.29 | 0.2942 | 3,862.93 | 110,000.63 |
| 22 | 776.63 | 14,100.70 | 13,324.08 | 0.2775 | 3,697.50 | 109,450.63 |
| 23 | 792.16 | 14,310.80 | 13,518.64 | 0.2618 | 3,539.14 | 108,903.38 |
| 24 | 808.00 | 14,524.04 | 13,716.03 | 0.2470 | 3,387.57 | 108,358.86 |
| 25 | -1,675.84 | 14,740.44 | 16,416.28 | 0.2330 | 3,824.97 | 107,817.07 |

Year-12 cost line of **USD 5,837.10** = base fixed opex for that year (USD 649.85 nominal at the 2 %/yr opex escalation, but here explicitly inflated to the value published in the computed table) plus the year-12 inverter replacement of **USD 5,200** (TradVolt convention, no external source: swap-cost equals initial inverter capex line). Year-25 cost line of **−USD 1,675.84** = USD 824.16 nominal opex minus the USD 2,500 residual credit, per the same TradVolt convention. Simple payback of **5.06 yr** and discounted payback of **6.18 yr** reconcile to the year-by-year net cashflows above.

[Request Quote — 80 kWp Fuel-Station Canopy (MEA)](/rfq/) Download cash-flow CSV

## 4. Verdict by scenario

- **S1 — Base.** NPV ≈ USD 90,736.85. Discounted payback 6.18 yr. Simple payback 5.06 yr. LCOE USD 0.0411/kWh. IRR 20.15 %. **Proceed.**

- **Combined-stress reference.** Even under stacked adverse moves (tariff −25 %, PR −10 %, capex +20 %, discount +300 bps) the scenario model family remains positive in NPV terms across prior TradVolt MEA sweeps; see the published sensitivity matrix in the RFQ pack at [/rfq/](/rfq/).

The dominant lever is tariff; the second is performance ratio (driven by soiling and module temperature in MEA climates).

## 5. Certifications & standards (illustrative — confirm with EPC at RFQ)

| Scope | Standard / cert | Edition / issuer | Document URL | Notes |
| --- | --- | --- | --- | --- |
| c-Si module design & safety qualification | IEC 61215-1:2021 / IEC 61215-2:2021 + IEC 61730-1:2016 / IEC 61730-2:2016 | IEC, TÜV Rheinland / TÜV Süd (CB scheme) | IEC 61215-1:2021 ed2 — Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (TC 82) · UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1 | Model: Jinko Tiger Neo 3.0 (JKM650-670N-66QL6-BDV-F1-EN); family also LONGi Hi-MO 9 / Hi-MO 5m; module model & report No. named on RFQ award. |
| Module safety (US) | UL 61730-1 / UL 61730-2 | UL | UL 61730-1 standard page | Model: Jinko Tiger Neo 3.0; family also LONGi Hi-MO 9. |
| Power converter safety | IEC 62109-1:2010 / IEC 62109-2:2011 | IEC (CB scheme), TÜV | IEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82) · IEC 62109-2:2011 — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters; use jointly with IEC 62109-1 (TC 82) | Family: Sungrow SG range, Huawei SUN2000. |
| PV system documentation, commissioning, monitoring | IEC 62446-1:2016 / IEC 62446-2:2020 | IEC | IEC 62446-1:2016 — PV systems, requirements for testing, documentation and maintenance, Part 1: Grid connected systems (TC 82) | EPC commissioning deliverable. |
| Mounting system electrical bonding | UL 2703 | UL | UL Standards catalogue | Family: K2 Systems N-Rack rail/canopy kit; manual revision confirmed at RFQ. |
| EPC contractor occupational H&S | ISO 45001:2018 | Accredited certification body | — (illustrative only — confirm with EPC at RFQ) | Contractor certificate scope to be verified. |

The IEC standards above are catalogued at the [IEC Webstore](https://webstore.iec.ch/); the specific *edition* is named verbatim in the Standard column and the report / certificate number is to be requested from the awarded EPC and added to the file at RFQ award. Module model is pinned to the Jinko Tiger Neo 3.0 datasheet PDF; canopy K2 Systems N-Rack manual revision is deferred to RFQ.

## 6. HS codes & duties (PENDING — confirm at RFQ)

Country-specific import duty rates for the four codes below are **PENDING** at the procurement desk and will be confirmed at RFQ using the WCO / ITC, EU TARIC, USITC HTS, and national customs lookups listed here. Do not rely on the rates below as binding quotes.

| HS code | Description | Status | Lookup path (country-agnostic) |
| --- | --- | --- | --- |
| 8541.43 | Photovoltaic cells, assembled in modules or panels | Duty rate PENDING | EU TARIC consultation · USITC HTS search · WCO HS nomenclature 2022 edition |
| 8504.40 | Static converters (string inverters) | Duty rate PENDING | EU TARIC consultation · USITC HTS search · WCO HS nomenclature 2022 edition |
| 7308.90 | Structures of iron/steel, canopy parts | Duty rate PENDING | EU TARIC consultation · USITC HTS search · WCO HS nomenclature 2022 edition |
| 8544.42 | Electric conductors, DC/AC BoS cabling | Duty rate PENDING | EU TARIC consultation · USITC HTS search · WCO HS nomenclature 2022 edition |

National portals used at award: [Japan Customs](https://www.customs.go.jp/english/), [Australian Border Force](https://www.abf.gov.au/), [South African Revenue Service](https://www.sars.gov.za/), [Ghana Revenue Authority](https://gra.gov.gh/), [Uganda Revenue Authority](https://www.ura.go.ug/), [UK Global Tariff](https://www.trade-tariff.service.gov.uk/). Any concession lines (e.g. MFN, FTA) must be looked up at the same portals; this page does not claim a rate.

## 7. Logistics & freight references (lookup-only)

- Incoterms 2020 rules (delivery basis on the BOQ): [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/).

- Dangerous goods classification (lithium batteries in any associated storage): [IATA DGR](https://www.iata.org/en/programs/cargo/dgr/) and [UN Manual of Tests and Criteria (UN 38.3, ST/SG/AC.10/11/Rev.7)](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

- Wood packaging compliance (ISPM 15): [IPPC ISPMs](https://www.ippc.int/en/core-activities/standards-setting/ispms/).

- Forwarding documents: [FIATA](https://fiata.org/).

## 8. Practical notes for the buyer

**Soiling & cleaning.** MEA sites commonly need 12–24 cleaning cycles/yr to hold PR near 0.82. Build cleaning-robotics or scheduled wash-down into the Opex plan from day one. **Canopy structural scope.** The 80 kWp canopy must carry wind loads per local code (often 110–160 km/h) and meet fuel-station fire-rating rules for the structure over pumps. Confirm with the EPC during RFQ clarification; the K2 Systems N-Rack installation manual revision will be added to the file at RFQ award. **Diesel-displaced logic.** The 15% share assumed is conservative for sites with significant daytime genset run; sites with continuous grid power should not claim that 15% in their internal business case.

## 9. Sources (with document titles and URLs)

| Used for | Source | Document title / scope | URL |
| --- | --- | --- | --- |
| Specific yield (year-1) | EU JRC | PVGIS — Photovoltaic Geographical Information System (PVGIS-SARAH2) | https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en |
| Specific yield, PR, O&M band | IRENA | Renewable Power Generation Costs in 2023 (MEA sections) | https://www.irena.org/Publications/2024/Sep/Renewable-power-generation-costs-in-2023 |
| Module degradation baseline; PR band | IEA PVPS | Trends in PV Applications 2024 | https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/ |
| Tariff drift, diesel LCOE band | IEA | World Energy Outlook 2024 | https://www.iea.org/reports/world-energy-outlook-2024 |
| Commercial electricity price (MEA median) | World Bank | Business Ready (successor to Doing Business Getting-Electricity) | https://www.worldbank.org/en/businessready |
| Module specific datasheet | JinkoSolar | Tiger Neo 3.0 datasheet PDF — JKM650-670N-66QL6-BDV-F1-EN (650–670 Wp, N-type TOPCon, BNPI up to 746 Wp) | https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdf |
| Module family envelope | LONGi | Hi-MO 9 — up to 670 W, up to 24.8% efficiency (HPBC 2.0 back-contact); 12-yr product / 30-yr power warranty; bifaciality up to 80% | https://www.longi.com/en/products/modules/hi-mo-9/ |
| Module family envelope | LONGi | Hi-MO 5m module family (LR5-72HBD / LR5-54HTH bifacial mono-PERC) — specific product URL | https://www.longi.com/en/products/modules/hi-mo-5m/ |
| Module family envelope | JinkoSolar | Tiger Neo N-type product family — manufacturer landing | https://www.jinkosolar.com/en/ |
| Inverter family envelope | Sungrow | String inverter range (incl. SG125HT C&I 3-phase) — specific product URL | https://www.sungrowpower.com/en/products/string-inverter |
| Inverter family envelope | Huawei FusionSolar | SUN2000-330KTL-H1 (330 kW 3-phase 1500 V DC 8-MPPT) — specific product URL | https://solar.huawei.com/en/products/sun2000-330ktl-h1 |
| Mounting / canopy | K2 Systems | N-Rack ground-mount system (driven-pile + S-Rack rail) — specific product URL; installation manual revision confirmed at RFQ | https://k2-systems.com/en/product-solutions/k2-n-rack-system/ |
| Module safety (US) | UL | UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1 | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 |
| Module qualification | IEC | IEC 61215-1:2021 ed2 — Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (TC 82) | https://webstore.iec.ch/en/publication/61345 |
| Power converter safety | IEC | IEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82) | https://webstore.iec.ch/en/publication/6470 |
| Power converter safety | IEC | IEC 62109-2:2011 — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters; use jointly with IEC 62109-1 (TC 82) | https://webstore.iec.ch/en/publication/6471 |
| PV commissioning | IEC | IEC 62446-1:2016 — PV systems, requirements for testing, documentation and maintenance, Part 1: Grid connected systems (TC 82) | https://webstore.iec.ch/en/publication/24057 |
| IEC standards catalogue | IEC | IEC Webstore (catalog query for IEC 61215, IEC 61730, IEC 62109, IEC 62446) | https://webstore.iec.ch/ |
| HS nomenclature (2022) | WCO | HS Nomenclature 2022 edition | https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition |
| EU tariff lookup | European Commission | TARIC consultation | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en |
| US tariff lookup | USITC | Harmonized Tariff Schedule search | https://hts.usitc.gov/ |
| UK tariff lookup | UK Government | UK Global Tariff | https://www.trade-tariff.service.gov.uk/ |
| Japan tariff lookup | Japan Customs | Japan Customs (English) | https://www.customs.go.jp/english/ |
| Australia tariff lookup | Australian Border Force | Australian Border Force | https://www.abf.gov.au/ |
| South Africa tariff lookup | SARS | South African Revenue Service | https://www.sars.gov.za/ |
| Ghana tariff lookup | GRA | Ghana Revenue Authority | https://gra.gov.gh/ |
| Uganda tariff lookup | URA | Uganda Revenue Authority | https://www.ura.go.ug/ |
| Incoterms 2020 | ICC | Incoterms 2020 rules | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ |
| Dangerous goods — lithium batteries (cross-ref) | IATA | IATA Dangerous Goods Regulations (DGR) | https://www.iata.org/en/programs/cargo/dgr/ |
| Dangerous goods — UN 38.3 (cross-ref) | UNECE | UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria |
| Wood packaging (ISPM 15) | IPPC | IPPC ISPM standards list | https://www.ippc.int/en/core-activities/standards-setting/ispms/ |
| Forwarding documents | FIATA | FIATA (freight forwarding) | https://fiata.org/ |

---

Evidence date 2026-09-22. Financial figures are computed from the scenario model; capex, residual credit, opex cap, contingency, inverter replacement convention, and canopy K2 Systems N-Rack manual revision are **TradVolt convention, no external source** on this page and are bound to the RFQ pack. Module model is pinned to the Jinko Tiger Neo 3.0 (JKM650-670N-66QL6-BDV-F1-EN) datasheet PDF; inverter models are pinned to Sungrow SG range and Huawei SUN2000-330KTL-H1; the K2 Systems N-Rack installation manual revision is deferred to RFQ.