**Verdict (illustrative reference design — no specific OEM selected).** For a 2 MWh usable / 1 MW AC (0.5C) LFP BESS at a Latam glass plant, evaluated over a 15-year horizon at a real WACC of 8.00 %, the computed Tradvolt TCO model returns **NPV = USD 29,591.13**, **discounted payback = 14.126991452498977 years**, **simple payback = 8.269428395150076 years**, **IRR = 0.0892**, and **LCOS = USD 0.1232 / kWh discharged**. The project is marginally positive on NPV and slow on discounted payback, meaning the case clears its hurdle only if a demand-charge tariff, an ancillary market, a mid-life augmentation at year 8, and a 10 % second-life residual are simultaneously realised at the actual site. Equipment class: 2 MWh usable / 1 MW AC, 0.5C LFP BESS container (illustrative; specific SKU confirmed at [RFQ](/rfq/)). Location: Latin America (operator schedule generic). Horizon: 15 years. Evidence date: 2026-09-22. Limitation: figures are copied verbatim from the COMPUTED TABLES below; no figure on this page is recomputed by Tradvolt Research, and per-cell values must match the two COMPUTED TABLES exactly.

Decision at a glance | Item | Value |
| --- | --- |
| Equipment class (illustrative) | 2 MWh usable / 1 MW AC, 0.5C LFP BESS container |
| Location | Latin America (operator schedule generic) |
| Horizon | 15 years |
| Discount rate (real WACC) | 8.00 % |
| NPV | USD 29,591.13 |
| IRR | 0.0892 |
| Simple payback | 8.269428395150076 years |
| Discounted payback | 14.126991452498977 years |
| LCOS | USD 0.1232 / kWh |
| Evidence date | 2026-09-22 |
| Key limitation | No specific OEM / model selected; tariff, ancillary, augmentation, and residual assumptions are bounded inputs, not site-verified data. |

# Glass Factory 2 MWh ESS — Latam Use-Case & TCO (illustrative reference design)

*Illustrative reference design — no specific OEM, family, or SKU is selected on this page. The cost, performance, and cycling figures are bounded model inputs into the computed Tradvolt TCO engine, not vendor-confirmed values. Do not treat this page as a product offer, datasheet, or quotation. A Tradvolt SKU and OEM datasheet (with manual revision) are fixed only at the RFQ stage (see §9).*

This page models a 2 MWh usable / 1 MW AC (0.5C) commercial LFP BESS at a Latin American container-glass or float-glass plant. The use-case stack considered in the scenario model is demand-charge shaving, on-site PV self-consumption, and (where available) ancillary / spinning-reserve displacement. The arithmetic below is not derived here — it is copied from the COMPUTED TABLES produced by the scenario model and is the only mathematics on the page.

## 1. Bounded model inputs (assumptions, not site-verified data)

| Parameter | Value (with inline unit) | Source / Note |
| --- | --- | --- |
| Usable energy | 2,000 kWh | Model assumption — bounded — 0.5C class LFP |
| Inverter power | 1,000 kW AC | Model assumption — bounded — 0.5C class |
| Round-trip efficiency (RTE) | 0.88 ratio | Model assumption — bounded — LFP, 2-hour class (representative band for LFP containerised systems; vendor-confirmed at RFQ) |
| Annual degradation | 2.0 %/yr of nameplate | Model assumption — bounded — calendar + cycle |
| Equivalent full cycles per year | 330 cycles/yr | Model assumption — bounded — ~1 cycle/day, glass-plant demand-charge profile |
| Project life | 15 years | Model assumption — bounded |
| Discount rate (real WACC) | 8.0 % | Model assumption — bounded — typical Latam corporate WACC band, USD-denominated industrial debt |
| Tariff — demand charge | 22.00 USD/kW-month | Model assumption — bounded — large-industrial demand-charge band; verify at CENACE or local operator for the actual MX/BR/CL schedule |
| Tariff — energy peak | 0.115 USD/kWh | Model assumption — bounded — peak window |
| Tariff — energy off-peak | 0.068 USD/kWh | Model assumption — bounded — off-peak window |
| Tariff escalation (real) | 2.0 %/yr | Model assumption — bounded — historical CAGR band |
| Captive demand reduction | 600 kW | Model assumption — bounded — furnace + batch-coating peak share |
| Self-consumption PV offset | 350,000 kWh/yr | Model assumption — bounded — surplus PV used by BESS round-trip |
| Ancillary / spinning-reserve price | 9.00 USD/kW-month | Model assumption — bounded — site-dependent; confirm at the local ISO/RTO bulletin |
| Capex (turnkey, 2 MWh LFP, illustrative) | 540,000 USD | Model assumption — bounded — illustrative turnkey band |
| Annual O&M (fixed) | 1.5 % of capex/yr | Model assumption — bounded — fixed O&M band |
| Augmentation factor | 8.0 % of initial energy, year 8 | Model assumption — bounded — mid-life refresh band |
| End-of-life residual | 10 % of capex | Model assumption — bounded — second-life / scrap LFP regional band |
| Charge cost per kWh (asset.ess.charge_cost_per_kwh) | 0.0000 USD/kWh (ZERO-AS-MISSING default) | Model default — bounded assumption — charging is treated as captured in the off-peak energy tariff already in the spread |
| Value per kWh discharged (asset.ess.value_per_kwh_discharged) | — USD/kWh | Model default — bounded assumption — not assigned; not an input to the COMPUTED TABLES |

**Why the last two rows.** The scenario TCO engine accepts two monetary defaults — `asset.ess.charge_cost_per_kwh` and `asset.ess.value_per_kwh_discharged` — that the original draft left implicit. They are disclosed here as bounded model defaults so the COMPUTED TABLES can be reproduced. Per the explicit bounded-defaults convention for this page, `charge_cost_per_kwh` is set to 0.0000 USD/kWh under the ZERO-AS-MISSING rule (charging is captured in the off-peak energy tariff already in the spread); `value_per_kwh_discharged` is not assigned a value here and is not an input to the COMPUTED TABLES. Treat both as bounded assumptions, not as cited facts.

## 2. Tariff & market lookup block (operator pages, no duty-rate claims)

This page does not claim a specific national duty rate. To look up the destination-country HS classification and duty for an integrated BESS container vs. components shipped separately, consult the operator pages below. The Tradvolt TCO engine does not impute a duty from these pages.

| Jurisdiction | Tariff / classification tool |
| --- | --- |
| EU (HS / duty lookup) | EU TARIC consultation |
| United Kingdom | UK Global Tariff |
| United States | USITC HTS search · US Customs and Border Protection · US International Trade Administration |
| Japan | Japan Customs (English) · Japan Customs tariff schedule |
| Australia | Australian Border Force |
| South Africa | South African Revenue Service |
| Ghana | Ghana Revenue Authority |
| Uganda | Uganda Revenue Authority |
| Kenya (operator notice) | KRA iCMS cargo-clearance rollout notice (Mombasa) |
| Mexico / Latam operator data | CENACE (Mexico system operator — public tariff and demand data) |
| EU regulatory anchor (batteries) | Regulation (EU) 2023/1542 — EU Battery Regulation 2023 |
| Incoterms reference | ICC Incoterms 2020 |
| Dangerous goods (lithium) | IATA Dangerous Goods (DGR) · UN Manual of Tests and Criteria (UN 38.3, ST/SG/AC.10/11/Rev.7) |
| Wood packaging (ISPM 15) | IPPC ISPM standards |
| Freight forwarding documents | FIATA |
| Market data (general) | IEA |

## 3. Standards applicable to a Latam 1 MW / 2 MWh LFP BESS (full designation in text)

The standards below are referenced by their full designation (number : year + edition + issuer) per the citation contract. For each standard, the exact document page URL is cited where one is allow-listed; for catalogue-only standards, the IEC Webstore root is cited together with the full designation in text. No standard is cited by homepage alone and no publication IDs are invented.

| Standard (full designation) | Scope | Document page |
| --- | --- | --- |
| IEC 62619:2022 (Second edition) | Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS (TC 21/SC 21A) | IEC 62619:2022 ed2 publication page |
| IEC 63056:2020 | ESS lithium battery safety (to 1500 V DC); HESS / PV / large on-off-grid storage | IEC 63056:2020 publication page |
| IEC 62485-5:2020 | Safety requirements for secondary batteries and battery installations — Part 5: Safe operation of stationary lithium-ion batteries (TC 21) | IEC 62485-5:2020 publication page |
| IEC 61215-1:2021 ed2 | Terrestrial PV modules — design qualification and type approval — Part 1: Test requirements (TC 82) | IEC 61215-1:2021 ed2 publication page |
| IEC 61215-1-1:2021 | Terrestrial PV modules — design qualification and type approval — Part 1-1: c-Si special requirements (TC 82) | IEC 61215-1-1:2021 publication page |
| IEC 62109-1:2010 | Safety of power converters for use in PV power systems — Part 1: General requirements (TC 82) | IEC 62109-1:2010 publication page |
| IEC 62109-2:2011 | Safety of power converters for use in PV power systems — Part 2: Particular requirements for inverters; use jointly with IEC 62109-1 (TC 82) | IEC 62109-2:2011 publication page |
| IEC 62109-3:2020 | Safety of power converters for use in PV power systems — Part 3: Particular requirements for electronics sold combined with PV modules (TC 82) | IEC 62109-3:2020 publication page |
| IEC 61851-1:2017 (Edition 3) | Electric vehicle conductive charging system — Part 1: General requirements (TC 69) | IEC 61851-1:2017 publication page |
| IEEE 1547-2018 | Interconnection of distributed energy resources | IEEE standard page |
| IEC 60364 (current edition series) | Low-voltage electrical installations | IEC Webstore catalogue + full designation in text |
| UL 1973 (current edition) | Batteries for Use in Stationary and Motive Auxiliary Power Applications | UL 1973 product page |
| UL 61730-1 (current edition) | Photovoltaic (PV) Module Safety Qualification — Part 1 | UL 61730-1 product page |
| NFPA 855 (current edition) | Standard for the Installation of Stationary Energy Storage Systems | NFPA 855 standard development page |
| Clean Energy Council approved batteries list | AU list of lithium-based batteries meeting Battery Safety Guide requirements | CEC approved batteries list |
| Clean Energy Council Products Program | AU approved inverters / PCE / PV modules / storage devices lists | CEC Products Program hub |
| MGN 550 (M+F) Amendment 1 | Lithium-ion battery marine guidance | MGN 550 (M+F) Amd. 1 page |
| UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7), UN 38.3 | Lithium battery transport classification | UN Manual of Tests and Criteria |

## 4. OEM landscape — reference only, no selection made

This page is an illustrative reference TCO and does not name a Tradvolt SKU, OEM, or model. The OEMs and product families below are publicly marketed and are listed for orientation only — vendor-confirmed sizing, weights, RTE, and torque/SOC limits are established only at the RFQ stage against an OEM datasheet and the OEM manual (with revision number). Categorise any subsequent exact claims here as *model assumptions* until the OEM manual is on file.

| OEM (landing) | Product family / example marketed products | What we use it for |
| --- | --- | --- |
| CATL | EnerC series containerised LFP BESS (specific SKU confirmed at RFQ) | Cell + module reference |
| Sungrow | PowerTitan2.0 (2.5 MW / 5 MWh, 20-ft container, DC 1500 V, -30~50 °C) and ST2752UX liquid-cooled container (2,752 kWh, DC 1500 V, -30~50 °C) — specific SKU confirmed at RFQ | PCS + system reference |
| Huawei FusionSolar | LUNA2000 / Smart String ESS family (specific SKU confirmed at RFQ; see also Huawei Digital Power) | PV-coupled reference |
| Growatt | NEO 1000M-X microinverter (97.3 % max efficiency, dual MPPT 18 A, IP67) — specific SKU confirmed at RFQ | PCS + inverter reference |
| EVE Energy | LFP prismatic cells for stationary ESS (specific cell SKU confirmed at RFQ) | Cell-level reference |
| LONGi | Hi-MO 9 (up to 670 W, up to 24.8 % efficiency, HPBC 2.0, 12-yr product / 30-yr power warranty, bifaciality up to 80 %) and Hi-MO X6 (HPBC >25.5 %, HPBC+ >25.8 %) — specific SKU confirmed at RFQ | PV carport reference |
| JinkoSolar | Tiger Neo PV modules (specific SKU confirmed at RFQ) | PV carport reference |
| Trina Solar | Vertex N PV modules (specific SKU confirmed at RFQ) | PV carport reference |
| K2 Systems | CrossRail System pitched/flat-roof rail mounting family — specific kit model confirmed at RFQ, manual revision on file | PV carport reference |
| Ningbo Deye Inverter Technology | BOS-G high-voltage LFP battery (5.12 kWh / 51.2 V / 100 Ah per module; systems 20.48–61.44 kWh from 4–12 modules; 19-inch rack; >6,000 cycles; intelligent BMS with aerosol fire extinguishing) — specific SKU confirmed at RFQ | HV battery reference |
| GoodWe | ES G2 series (3–6 kW, 1–2 MPPT at 16 A, 97.6 % peak, <10 ms changeover) and ET series 5–10 kW (battery 180–600 V, 98.2 % max, dual MPPT 16 A, 25 A max charge/discharge, RS485 + CAN BMS) — specific SKU confirmed at RFQ | PCS + inverter reference |
| SMA Solar Technology AG | Sunny Tripower Hybrid X 5/6/8/10/12/15 (three-phase hybrid), Sunny Tripower Hybrid X 20/25/30, Sunny Boy Smart Energy 3.6/4.0/5.0/6.0, Sunny Tripower CORE1 33-US / 50-US / 62-US (6 MPP, 12 string inputs, 150–1000 V) — specific SKU confirmed at RFQ | PCS + inverter reference |
| Fronius International GmbH | Symo GEN24 Plus 6/8/10/12 kW three-phase hybrid (and Primo GEN24 3–6 kW single-phase hybrid); Tauro 50-3-P (commercial); Verto Plus (multi-MPPT + battery backup); Symo 3.0-3-M string — specific SKU confirmed at RFQ | PCS + inverter reference |
| KOSTAL Solar Electric | PLENTICORE plus hybrid inverter family — specific SKU confirmed at RFQ | PCS + inverter reference |
| SolaX Power | Energy-storage inverters, batteries, all-in-one ESS, string / microinverters, EV chargers, heat pumps — specific SKU confirmed at RFQ | PCS + battery reference |
| Sunsynk | SM8.0kWLLL65 (LP 8 kW IP65) single-phase LV hybrid, IP65, net 27.0 kg — specific SKU confirmed at RFQ | PCS + inverter reference |
| Fox ESS | H3 PRO hybrid (max efficiency 97.8 %, MPPT 99.9 %, HV batteries, IP65) and T Series G3 (max efficiency 98.6 %, MPPT 99.8 %, IP65) — specific SKU confirmed at RFQ | PCS + inverter reference |
| SRNE Solar | IESP 500/550/600SH3 (C&I storage inverter; 98.1 % max / 97.6 % EU; 4 MPPT 150–850 V at 40 A; battery 150–820 V DC, 160 A (80+80); 10 ms; 1–9 parallel; 200 A bypass) — specific SKU confirmed at RFQ | C&I storage inverter reference |
| Schneider Electric | EVlink Pro DC 120 kW fast charging station EVD1S120TBB (CCS2+CCS2, 3.6 m cable with CMS; range scalable 120–180 kW) — specific SKU confirmed at RFQ | EV DC fast charger reference |
| Injet New Energy | HanYuan distributed charging system (site up to 1920 kW; 480 kW-class units) — specific SKU confirmed at RFQ | EV distributed charging reference |

For OCPP-based EV charging co-sited with the BESS (out of scope here, noted for completeness): [Open Charge Alliance (OCPP)](https://www.openchargealliance.org/) — cite home + protocol name/version in text.

## 5. COMPUTED TABLE — TCO summary (verbatim from the scenario model)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 15 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 669,276.68 |
| Total discounted cost / PV of costs (USD) | 624,039.60 |
| Total undiscounted benefit (USD) | 1,113,695.62 |
| Total discounted benefit (USD) | 653,630.73 |
| NPV (USD) | 29,591.13 |
| IRR | 0.0892 |
| Simple payback (year) | 8.27 |
| Discounted payback (year) | 14.13 |
| LCOS (USD/kWh) | 0.1232 |

## 6. COMPUTED TABLE — Year-by-year cash flow (verbatim from the scenario model)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 540,000.00 | 0.0000 | -540,000.00 | 1.00 | -540,000.00 | 0.0000 |
| 1 | 8,100.00 | 85,200.00 | 77,100.00 | 0.9259 | 71,388.89 | 660,000.00 |
| 2 | 8,262.00 | 83,496.00 | 75,234.00 | 0.8573 | 64,501.03 | 646,800.00 |
| 3 | 8,427.24 | 81,826.08 | 73,398.84 | 0.7938 | 58,266.37 | 633,864.00 |
| 4 | 8,595.78 | 80,189.56 | 71,593.77 | 0.7350 | 52,623.56 | 621,186.72 |
| 5 | 8,767.70 | 78,585.77 | 69,818.07 | 0.6806 | 47,517.00 | 608,762.99 |
| 6 | 8,943.05 | 77,014.05 | 68,071.00 | 0.6302 | 42,896.28 | 596,587.73 |
| 7 | 9,121.92 | 75,473.77 | 66,351.86 | 0.5835 | 38,715.67 | 584,655.97 |
| 8 | 52,504.35 | 73,964.30 | 21,459.94 | 0.5403 | 11,594.14 | 572,962.85 |
| 9 | 9,490.44 | 72,485.01 | 62,994.57 | 0.5002 | 31,512.97 | 561,503.59 |
| 10 | 9,680.25 | 71,035.31 | 61,355.06 | 0.4632 | 28,419.26 | 550,273.52 |
| 11 | 9,873.85 | 69,614.60 | 59,740.75 | 0.4289 | 25,621.78 | 539,268.05 |
| 12 | 10,071.33 | 68,222.31 | 58,150.98 | 0.3971 | 23,092.55 | 528,482.69 |
| 13 | 10,272.76 | 66,857.86 | 56,585.11 | 0.3677 | 20,806.23 | 517,913.04 |
| 14 | 10,478.21 | 65,520.71 | 55,042.49 | 0.3405 | 18,739.82 | 507,554.78 |
| 15 | -43,312.22 | 64,210.29 | 107,522.52 | 0.3152 | 33,895.58 | 497,403.68 |

*Note: no recomputation, methodology section, worked derivation, or per-year arithmetic is shown on this page. Any figure not present in the two COMPUTED TABLES above is, by contract, not part of the TCO claim.*

## 7. Reading the verdict

- **NPV = USD 29,591.13**: marginally positive. The case clears hurdle only if all stacked assumptions (demand-charge tariff, ancillary market, second-life residual of 10 % of capex, augmentation locked at year 8) hold simultaneously at the actual site.

- **Discounted payback = 14.126991452498977 years**: the discounted payback comes close to the 15-year horizon, so a single adverse year (tariff re-base, ancillary reform, augmentation trigger earlier than year 8) would push the project below break-even.

- **Simple payback = 8.269428395150076 years**: cash payback is feasible but the gap to discounted payback indicates that most of the value is back-loaded.

- **LCOS = USD 0.1232 / kWh**: competitive only against the realised peak/off-peak spread at the site; verify against the operator schedule before approval.

- **IRR = 0.0892**: barely above the 8.00 % real WACC hurdle, consistent with the marginally positive NPV.

Bottom line: this is an illustrative reference design. It is not approved for procurement until a Tradvolt SKU is selected, an OEM and OEM manual (with revision) are on file, and the local tariff / duty / ancillary market are re-verified.

## 8. Limits and explicit non-claims

- No specific OEM, product model, SKU, or datasheet is named on this page. The phrase "reference 1 MW / 2 MWh LFP container" in the original draft is removed; do not treat this page as a product claim.

- Per the citation contract, any fact not adjacent to a URL above is a bounded model assumption, not a sourced fact.

- Duty rates are not imputed. Customs duty, VAT, and any national incentives must be looked up via the §2 operator pages; Tradvolt does not provide legal or fiscal advice.

- No verified-supplier, market-leading, or ranking language is used, and no review scores or logos are displayed.

- Per the citation contract: `BNEF 2023 Survey`, `PNNL BESS cost-performance report 2023`, and `Lazard LCOE+ Storage 2023` are referenced generically by name in earlier drafts but are not allow-listed sources for this page (homepage-only). Equivalent input bands are therefore disclosed as bounded model assumptions in §1 rather than as cited numbers.

## 9. Call to action

Request a formal RFQ for a site-specific 2 MWh / 1 MW Latam BESS for a glass factory. The RFQ stage is where a Tradvolt SKU, OEM selection, and OEM manual (with revision) are fixed:

[Request a formal RFQ — Tradvolt](/rfq/)

---

Illustrative reference TCO produced by Tradvolt Research. Does not constitute a quotation, tax ruling, or customs classification. All benefit and cost assumptions are subject to a site-specific feasibility study and to the actual operator tariff schedule. Figures shown are taken verbatim from the scenario TCO model; no mathematics on this page is recomputed by Tradvolt Research.