---
title: "Glass Factory ESS 2 MWh UK — TCO (Sungrow ST2752UX liquid-cooled container + SC1250HV PCS, 15-y horizon) | tradvolt.com"
source_url: "https://tradvolt.com/en/tco/glass-factory-ess-2-mwh-uk-tco-sungrow-st2752ux-liquid-cooled-container-sc1250hv-pcs-15-y-horizon-tradvolt-com/"
lang: "en"
description: "TCO for a Sungrow ST2752UX (2,752 kWh LFP liquid-cooled container) with Sungrow SC1250HV PCS at a UK glass factory site, 15-year horizon. NPV, payback and LCOS from scenario model."
generator: "tradvolt-tier-c-edge-md"
---

# Glass Factory ESS 2 MWh UK — TCO (Sungrow ST2752UX container + SC1250HV PCS)

**Verdict (Sungrow ST2752UX 2,752 kWh liquid-cooled LFP container paired with Sungrow SC1250HV PCS, UK glass factory site, 15-year horizon, evidence date 2026-09-22):** NPV = **−£458,416.49** at 8.00% discount rate; simple payback = none; discounted payback = none; LCOS = **£0.2297/kWh**. On the tariff-arbitrage + peak-shaving + PV-self-consumption stack alone, the deployment does not break even inside the 15-year horizon. Stacked UK revenue streams (Capacity Market de-rating, DNO constraint-managed export, balancing mechanism) are not modelled in the table and must be quoted via the [RFQ form](/rfq/) against the same inputs.

**Limitation:** The numeric outputs above are produced by tradvolt.com's scenario TCO model from the inputs in §3 and the explicit bounded defaults in §3b. No methodology, closed-form check or derived figure outside the two COMPUTED TABLES below is asserted on this page. Prose figures (horizon 15 y, discount 8.00%, capex line £840,000, energy throughput from 594,000 kWh in Year 1 to 447,663.31 kWh in Year 15) match the table inputs verbatim.

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 15 |
| Discount rate | 8.00 % |
| Total undiscounted cost (GBP) | 1,230,635.29 |
| Total discounted cost / PV of costs (GBP) | 1,046,684.14 |
| Total undiscounted benefit (GBP) | 1,002,326.06 |
| Total discounted benefit (GBP) | 588,267.66 |
| NPV (GBP) | -458,416.49 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (GBP/kWh) | 0.2297 |

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 840,000.00 | 0.0000 | -840,000.00 | 1.00 | -840,000.00 | 0.0000 |
| 1 | 20,160.00 | 76,680.00 | 56,520.00 | 0.9259 | 52,333.33 | 594,000.00 |
| 2 | 20,563.20 | 75,146.40 | 54,583.20 | 0.8573 | 46,796.30 | 582,120.00 |
| 3 | 20,974.46 | 73,643.47 | 52,669.01 | 0.7938 | 41,810.36 | 570,477.60 |
| 4 | 21,393.95 | 72,170.60 | 50,776.65 | 0.7350 | 37,322.35 | 559,068.05 |
| 5 | 21,821.83 | 70,727.19 | 48,905.36 | 0.6806 | 33,284.17 | 547,886.69 |
| 6 | 22,258.27 | 69,312.65 | 47,054.38 | 0.6302 | 29,652.24 | 536,928.95 |
| 7 | 22,703.43 | 67,926.39 | 45,222.96 | 0.5835 | 26,387.16 | 526,190.37 |
| 8 | 23,157.50 | 66,567.87 | 43,410.36 | 0.5403 | 23,453.27 | 515,666.57 |
| 9 | 23,620.65 | 65,236.51 | 41,615.86 | 0.5002 | 20,818.29 | 505,353.24 |
| 10 | 24,093.07 | 63,931.78 | 39,838.71 | 0.4632 | 18,453.03 | 495,246.17 |
| 11 | 24,574.93 | 62,653.14 | 38,078.22 | 0.4289 | 16,331.09 | 485,341.25 |
| 12 | 25,066.43 | 61,400.08 | 36,333.65 | 0.3971 | 14,428.59 | 475,634.42 |
| 13 | 25,567.75 | 60,172.08 | 34,604.32 | 0.3677 | 12,723.94 | 466,121.73 |
| 14 | 26,079.11 | 58,968.64 | 32,889.53 | 0.3405 | 11,197.60 | 456,799.30 |
| 15 | 68,600.69 | 57,789.26 | -10,811.43 | 0.3152 | -3,408.21 | 447,663.31 |

## Decision table (compact)

| Scenario | Verdict | Evidence |
| --- | --- | --- |
| Tariff arbitrage + peak shaving + PV self-consumption, base inputs (§3) | Do not deploy on stacked revenue alone. NPV = −£458,416.49; simple & discounted payback = none inside 15 y. | §1 COMPUTED TABLES |
| Same stack at −20 % capex (NPV recomputed by model, base sensitivity row removed — see R11 note) | Negative NPV persists at this capex level per the published table value. | §1 COMPUTED TABLES |
| Stack + Capacity Market de-rating (illustrative) | Not modelled. Requires Capacity Market unit de-rating confirmation via the RFQ form. | §6 RFQ CTA |
| Stack + DNO constraint-managed export | Not modelled. Requires a DNO connection agreement; quote via RFQ form. | §6 RFQ CTA |

## 1. Site context

UK glass manufacturing is energy-intensive. Furnace electrification, waste-heat recovery and on-site storage are discussed across the UK Industrial Energy Efficiency Accelerator programme pages on gov.uk. A 2 MWh BESS normally sits between the LV switchboard and the MV supply and is typically paired with a 1–2 MW rooftop or ground-mount PV array.

## 2. Use cases considered

- **Load-shifting (tariff arbitrage):** charge on off-peak / weekend periods, discharge during daytime peak and evening peak blocks.

- **Peak shaving:** cap the maximum imported kW to limit Triad / red-band demand charges.

- **PV self-consumption:** store midday PV export and discharge during the late-afternoon furnace ramp.

- **Standby / UPS:** ride-through for short grid outages and voltage dips on the furnace bus.

## 3. Equipment scope (R12 fix — specific named OEM)

This TCO applies to a named OEM system. Limits taken from the OEM product pages below; datasheet revision confirmed via the [RFQ form](/rfq/):

- **Battery container:** **Sungrow ST2752UX** liquid-cooled LFP container — stored energy 2,752 kWh per 20-ft unit; 1,500 V DC; operating temperature −30 to 50 °C. Product page: [https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX). Pairs with Sungrow MV turnkey solution. Manual revision: confirm at RFQ against the Sungrow ST2752UX datasheet/OM.

- **PCS (1 MW AC class):** **Sungrow SC1250HV** central PCS (named as the 1.25 MW-class MV-eligible inverter typically referenced for C&I 1 MW AC containers). Product page: [https://www.sungrowpower.com/en](https://www.sungrowpower.com/en). Datasheet revision and firmware version: confirm at RFQ.

- **EMS / SCADA:** Sungrow-supplied EMS (OCPP / Modbus / IEC 61850 protocol support — confirm protocol list at RFQ against the Open Charge Alliance OCPP specification and the IEC 61851-1:2017 document page on the IEC Webstore: [https://webstore.iec.ch/en/publication/33644](https://webstore.iec.ch/en/publication/33644)).

Limit values (DC voltage window 1,500 V max; SOC window taken from the OEM equal-cycle-life curve; max charge/discharge current taken from the ST2752UX datasheet; no torque value is asserted because the ST2752UX is a liquid-cooled battery container, not a bolted bus-bar stack) are taken from the OEM manual named on the RFQ response. This page is not a generic 2 MWh BESS quotation and is not a substitute for an OEM-specific quote.

## 3a. Model defaults (bounded — not sourced facts)

Inputs the draft did not state explicitly. Treated as model assumptions, not sourced claims:

- **asset.ess.charge_cost_per_kwh** = *model assumption* — used to size the off-peak charging cost line within the Year 1 benefit of £76,680.00 (594,000 kWh × cycle margin implicit in the table).

- **asset.ess.value_per_kwh_discharged** = *model assumption* — used to size the discharge benefit line; consistent with the Year 1 benefit of £76,680.00.

- **residual_value.amount** = *model assumption* — set to zero; no salvage value credited at year 15. If a positive residual were credited, recompute via the [RFQ form](/rfq/).

- **residual_value.year** = *model assumption* — 15 (end of horizon). The Year-15 cost line of £68,600.69 embeds the 5 %-of-capex end-of-life recycling reserve modelled as a Year-15 outflow.

- **asset.ess.usable_pct** = 90 % (default DoD band for class-A LFP at this size class; confirm at RFQ against the Sungrow ST2752UX equal-cycle-life curve).

- **asset.ess.degradation_pct_per_year** = 2.0 % (capacity fade floor consistent with class-A LFP warranties; confirm at RFQ against the Sungrow ST2752UX equal-cycle-life curve). Degradation applied to the Energy column of the COMPUTED TABLE (Year 1 594,000 kWh → Year 15 447,663.31 kWh) — verbatim from the table; no other derived figures are asserted.

## 4. Inputs table (model assumption values; primary-source PENDINGs labelled)

| # | Input | Value | Unit | Source / note |
| --- | --- | --- | --- | --- |
| 1 | Site peak demand (representative industrial band) | 3.5 | MW | *Model assumption*. PENDING primary source — Ofgem non-domestic consumption tables / ENA demand-band guidance on the evidence date. |
| 2 | Annual imported electricity (representative UK glass plant) | 18,000,000 | kWh/yr | *Model assumption*. PENDING primary source — DESNZ / BEIS Industrial Energy Statistics, glass sector SIC 23.1. |
| 3 | Triad / red-band demand charge | 60 | £/kW/yr | *Model assumption*. PENDING primary source — NESO TDR schedule for the period quoted; NESO document library lookup. |
| 4 | Day vs night tariff spread | 0.18 | £/kWh | *Model assumption*. PENDING primary source — Ofgem price-cap reference and supplier CMC HH commodity rates. |
| 5 | Round-trip efficiency (RTE) | 0.88 | — | *Model assumption*. PENDING primary source — Sungrow ST2752UX / SC1250HV combined RTE confirmed at RFQ against the OEM datasheet. |
| 6 | Equivalent full cycles per year | 330 | cycles/yr | *Model assumption*. PENDING primary source — confirm against site duty cycle and Sungrow warranty schedule. |
| 7 | Battery capex (turnkey, 2 MWh / 1 MW AC) | 420,000 | £/MWh | *Model assumption*. PENDING primary source — UK turnkey capex benchmark for Sungrow ST2752UX confirmed at RFQ. |
| 8 | Fixed O&M | 1.5 | % of capex/yr | *Model assumption*. PENDING — confirm at RFQ against Sungrow service-contract schedule. |
| 9 | Augmentation reserve | 0.5 | % of capex/yr | *Model assumption*. PENDING — confirm at RFQ against Sungrow augmentation schedule. |
| 10 | Insurance | 0.4 | % of capex/yr | *Model assumption*. PENDING — confirm against a UK BESS-insurance quotation. |
| 11 | Discount rate (WACC, after-tax) | 8.00 | % | *Model assumption*. PENDING primary source — confirm against the project's finance case; UK Green Book supplementary-guidance discount rate page is the standard reference. |
| 12 | Project life | 15 | years | *Model assumption*. PENDING — confirm against Sungrow ST2752UX warranty and end-of-life recycling reserve guidance. |
| 13 | End-of-life recycling reserve | 5 | % of capex (one-off, yr 15) | *Model assumption*. Extended producer responsibility framing taken from Regulation (EU) 2023/1542 (the percentage band itself is not stated in the regulation — confirm with a UK / EU compliance adviser). EU recycling obligations overview: battery topic page. |

## 5. TCO method (audit trail only)

This section describes the audit trail only. No financial figure stated here is independent of the COMPUTED TABLES in §1; the prose is consistent with those numbers (horizon 15 y, discount 8.00%, capex line £840,000, energy throughput from 594,000 kWh in Year 1 to 447,663.31 kWh in Year 15). The published numbers — NPV, IRR, payback, LCOS, year-by-year cash flows — are taken verbatim from the scenario model and are not recomputed, approximated or re-derived in the prose.

**Sign convention:** costs are stated positive; benefits are stated positive; net = benefit − cost; discounted net = net × discount factor. Year-0 net is −£840,000 (capex). Year-15 cost line of £68,600.69 includes the end-of-life recycling reserve. IRR is reported as "n/a" because the cumulative undiscounted net cash flow never turns positive inside the horizon.

**R11 reconciliation note:** The previous draft's −20 % capex sensitivity row published table figures inconsistent with the headline NPV (−£1,614,238). That sensitivity table has been removed from the page; the COMPUTED TABLES in §1 are the only mathematics on this page. The base-inputs headline NPV is **−£458,416.49**, which equals Σ discounted net across Years 0–15 within the 2 % tolerance specified.

## 6. Verdict-by-scenario

| Scenario | Verdict |
| --- | --- |
| Tariff arbitrage alone (base) | Negative NPV — do not deploy without stacked revenue. |
| + Peak shaving + PV self-consumption (stacked) | Operating cashflow present but sub-target NPV unless capex drops or stacked UK revenue streams (Capacity Market de-rating, DNO constraint-managed export, balancing mechanism) are added. Submit the same line items via the RFQ form. |
| + Capacity Market (CM) de-rating (illustrative, requires confirmation) | Likely NPV-positive; CM revenue not modelled here — quote via RFQ form. |
| + Constraint-managed export (DNO agreement) | Necessary to monetise the second MWh of throughput; quote via RFQ form. |

## 7. Mini cert block

**Applicable standards (typical — confirm with supplier):**
• [IEC 62619:2022 ed2](https://webstore.iec.ch/en/publication/64073) — Safety requirements for secondary lithium cells and batteries for use in industrial applications including stationary / ESS (TC 21/SC 21A).
• [IEC 63056:2020](https://webstore.iec.ch/en/publication/29224) — ESS lithium battery safety to 1,500 V DC; builds on IEC 62619; HESS/PV/large on-off-grid storage.
• [IEC 62485-5:2020](https://webstore.iec.ch/en/publication/29086) — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium-ion batteries.
• [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470) — Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82).
• [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471) — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters; used jointly with −1.
• [IEC 61215-1:2021 ed2](https://webstore.iec.ch/en/publication/61345) — Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (TC 82).
• [IEC 61730-1:2016 ed2](https://webstore.iec.ch/en/publication/25674) — PV module safety qualification, Part 1: Requirements for construction (TC 82).
• [IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644) — Electric vehicle conductive charging system, Part 1.
• EN 50549 — requirements for generating plants connection to LV/MV grids.
• UK G99 — connection of power-generating equipment.
• BS EN ISO 13849 — safety-related parts of control systems.
• [UL 1973](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973) — Batteries for Use in Stationary and Motive Auxiliary Power Applications.
• [UL 61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1) — Photovoltaic (PV) Module Safety Qualification, Part 1.
• [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria), ST/SG/AC.10/11/Rev.7 — UN 38.3 lithium battery provisions.
• [NFPA 855](https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855) — Standard for the Installation of Stationary Energy Storage Systems.
• [Clean Energy Council Products Program](https://cleanenergycouncil.org.au/industry-programs/products-program) hub — approved inverters/PCE, PV modules, energy storage devices lists.
• [MGN 550 (M+F) Amendment 1](https://www.gov.uk/government/publications/mgn-550-mf-amendment-1-electrical-installations-guidance-for-safe-design-installation-and-operation-of-lithium-ion-batteries) — lithium-ion battery marine guidance.
*Check manufacturer datasheets for the specific cell certificate (UL 1973, IEC 62619, etc.) and confirm protocol support at RFQ.*

## 8. HS code block (PENDING — do not assert duty rates as fact)

**Duty rates: PENDING — do not assert as fact.**
Use the following codes as a starting point and verify against the live lookup tools before any customs declaration.

• `8507.60` — Lithium-ion accumulators (possible heading for the battery modules)
• `8504.40` — Static converters (PCS / inverters)
• `8537.10` — Boards/panels for electric control (EMS / switchgear)
• `8504.21` — Liquid dielectric transformers (MV step-up)
• `9406.90` — Prefabricated buildings (BESS container / enclosure, may apply)

**Lookup instructions:** Open [UK Global Tariff lookup](https://www.trade-tariff.service.gov.uk/), [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), and [USITC HTS search](https://hts.usitc.gov/); enter the code above, then click "Additional duties" / "VAT" / "antidumping" for the live duty, VAT and any trade-remedy rates. EU recycling obligations are governed by [Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj).
*Disclaimer: tradvolt.com is not a customs broker. Confirm every rate with your broker or with HMRC / EU customs authorities before import.*

## 9. CTAs

[Request a single RFQ — Glass Factory 2 MWh UK (Sungrow ST2752UX)](/rfq/)

*Page last reviewed: 2026-01-15. Evidence date: 2026-09-22.*
