# Greenhouse Solar 600 kWp — 25-Year TCO Brief (EU)

Decision-first TCO for a 600 kWp agrivoltaic greenhouse retrofit. Equipment: LONGi Hi-MO 7 LR7-66HGD modules + Huawei SUN2000-100KTL-M2 string inverters on K2 Systems SingleRail mounting. Location: Athens baseline. Horizon: 25 yr. Discount rate: 8.00 % real. Evidence date: 2026-09-22. Limitation: figures derive from the scenario TCO scenario below; no project-specific certifications are claimed on this page. HS-code and EU duty lines are PENDING — see §6.

**Verdict (Athens baseline, 25-yr, 8.00 % discount).** NPV25 = **EUR 1,213,254** (savings versus grid-only baseline). Discounted payback = **4.01 yr**. Simple payback = **3.33 yr**. LCOE = **0.0594 EUR/kWh**.

| Decision metric | Value | Direction |
| --- | --- | --- |
| NPV25 (EUR) | 1,213,254 | Net savings vs. grid-only baseline |
| Simple payback (yr) | 3.33 | Year-1 net ÷ CAPEX |
| Discounted payback (yr) | 4.01 | Discounted cumulative net crosses zero |
| LCOE (EUR/kWh) | 0.0594 | PV of costs ÷ lifetime kWh delivered |
| IRR | 30.97 % | Annualised project return |

## 1. Equipment (exact models)

| Item | Model | OEM manual / datasheet |
| --- | --- | --- |
| PV module | LONGi Hi-MO 7 LR7-66HGD-xxxM (xxxM in {580, 585, 590, 595, 600} W; 1,500 V DC, bifacial, mono-PERC) | LONGi product page: https://www.longi.com/en/ (model line confirmed at RFQ; exact watt-bin datasheet PDF confirmed at RFQ) |
| String inverter | Huawei SUN2000-100KTL-M2 (100 kW AC, 3-Phase, 6 MPPT, 1,100 V DC max, IP66) | Huawei FusionSolar product page: https://solar.huawei.com/en (datasheet revision confirmed at RFQ) |
| DC combiner | Huawei Smart DC Combiner SmartPSB2000L (string-level monitoring, DC disconnect) | Huawei FusionSolar product page: https://solar.huawei.com/en |
| Mounting | K2 Systems SingleRail kit for greenhouse roof rails (aluminium) | K2 Systems product page: https://k2-systems.com/en/ (manual revision confirmed at RFQ) |

**Certification disclosure.** This page makes no claim of any project-specific third-party certification. Equipment families listed above are typically supplied with the following standards-track documents; specific certificate numbers, issuing bodies, and revision dates must be obtained from the EPC and confirmed against the project file before procurement:

- IEC 61215-1:2021 / IEC 61215-2:2021 — Crystalline silicon PV modules — Design qualification (catalogue: [https://webstore.iec.ch/](https://webstore.iec.ch/)) — issuing body typically TÜV Rheinland, TÜV Süd, VDE, or Bureau Veritas.

- UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1: Requirements for Construction ([https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)).

- IEC 62109-1 / IEC 62109-2 — Safety of power converters for use in photovoltaic power systems (catalogue: [https://webstore.iec.ch/](https://webstore.iec.ch/)).

The "TradVolt Mini-Certificate" used in earlier drafts was a self-disclosure statement and is removed from this revision.

## 2. TCO Summary (COMPUTED — verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 698,618.16 |
| Total discounted cost / PV of costs (EUR) | 559,253.06 |
| Total undiscounted benefit (EUR) | 4,410,210.93 |
| Total discounted benefit (EUR) | 1,772,506.82 |
| NPV (EUR) | 1,213,253.76 |
| IRR | 0.3097 |
| Simple payback (year) | 3.33 |
| Discounted payback (year) | 4.01 |
| LCOE (EUR/kWh) | 0.0594 |

Convention: a positive NPV means the avoided-electricity benefit stream exceeds the cost stream in present-value terms (i.e. savings vs. an explicit grid-only baseline of identical consumption). Discounted payback is the first year in which cumulative discounted net cash flow turns non-negative. LCOE = PV of costs / lifetime discounted kWh delivered.

## 3. Year-by-Year Cash Flow (COMPUTED — verbatim)

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 468,000.00 | 0.0000 | -468,000.00 | 1.00 | -468,000.00 | 0.0000 |
| 1 | 7,200.00 | 145,008.00 | 137,808.00 | 0.9259 | 127,600.00 | 912,000.00 |
| 2 | 7,344.00 | 147,316.53 | 139,972.53 | 0.8573 | 120,003.88 | 908,352.00 |
| 3 | 7,490.88 | 149,661.81 | 142,170.93 | 0.7938 | 112,859.87 | 904,718.59 |
| 4 | 7,640.70 | 152,044.42 | 144,403.72 | 0.7350 | 106,141.05 | 901,099.72 |
| 5 | 7,793.51 | 154,464.97 | 146,671.46 | 0.6806 | 99,822.13 | 897,495.32 |
| 6 | 7,949.38 | 156,924.05 | 148,974.67 | 0.6302 | 93,879.31 | 893,905.34 |
| 7 | 8,108.37 | 159,422.28 | 151,313.91 | 0.5835 | 88,290.22 | 890,329.72 |
| 8 | 8,270.54 | 161,960.29 | 153,689.75 | 0.5403 | 83,033.79 | 886,768.40 |
| 9 | 8,435.95 | 164,538.69 | 156,102.75 | 0.5002 | 78,090.24 | 883,221.32 |
| 10 | 8,604.67 | 167,158.15 | 158,553.48 | 0.4632 | 73,440.94 | 879,688.44 |
| 11 | 8,776.76 | 169,819.31 | 161,042.55 | 0.4289 | 69,068.39 | 876,169.68 |
| 12 | 8,952.30 | 172,522.83 | 163,570.54 | 0.3971 | 64,956.11 | 872,665.01 |
| 13 | 9,131.34 | 175,269.39 | 166,138.05 | 0.3677 | 61,088.62 | 869,174.35 |
| 14 | 9,313.97 | 178,059.68 | 168,745.71 | 0.3405 | 57,451.34 | 865,697.65 |
| 15 | 9,500.25 | 180,894.39 | 171,394.15 | 0.3152 | 54,030.58 | 862,234.86 |
| 16 | 9,690.25 | 183,774.23 | 174,083.98 | 0.2919 | 50,813.45 | 858,785.92 |
| 17 | 9,884.06 | 186,699.92 | 176,815.86 | 0.2703 | 47,787.84 | 855,350.77 |
| 18 | 10,081.74 | 189,672.18 | 179,590.44 | 0.2502 | 44,942.33 | 851,929.37 |
| 19 | 10,283.37 | 192,691.76 | 182,408.39 | 0.2317 | 42,266.22 | 848,521.65 |
| 20 | 10,489.04 | 195,759.41 | 185,270.37 | 0.2145 | 39,749.43 | 845,127.57 |
| 21 | 10,698.82 | 198,875.90 | 188,177.08 | 0.1987 | 37,382.46 | 841,747.06 |
| 22 | 10,912.80 | 202,042.01 | 191,129.21 | 0.1839 | 35,156.40 | 838,380.07 |
| 23 | 11,131.05 | 205,258.52 | 194,127.46 | 0.1703 | 33,062.87 | 835,026.55 |
| 24 | 11,353.67 | 208,526.23 | 197,172.56 | 0.1577 | 31,093.98 | 831,686.44 |
| 25 | 11,580.75 | 211,845.97 | 200,265.22 | 0.1460 | 29,242.31 | 828,359.70 |

The benefit column represents avoided electricity purchases against an explicit grid-only baseline of identical annual consumption at the Athens industrial band tariff schedule (see §5 assumption set). The cost column is O&M only; CAPEX is shown at year 0.

## 4. Scenario Verdict

| Scenario | Verdict | Read-out |
| --- | --- | --- |
| Athens — baseline (model run) | Strong savings | NPV25 = EUR 1,213,254 vs. grid-only; simple payback 3.33 yr; discounted payback 4.01 yr; LCOE 0.0594 EUR/kWh. |
| Madrid / Amsterdam / Berlin | Not modelled here | This revision publishes the Athens scenario only. Multi-climate reruns require a fresh model run; do not interpolate. |
| Yield −10 % (model assumption) | Sensitivity band | Reduces lifetime kWh by ~10 % and reduces NPV25 by approximately the same proportional factor, holding all other inputs constant. Buyer should request a sensitivity rerun before procurement. |
| Tariff −15 % (model assumption) | Sensitivity band | Compresses benefit column by ~15 %; NPV25 stays positive under this single-shock test based on the model structure. |

## 5. Inputs and Assumptions

| Input | Value | Source / basis |
| --- | --- | --- |
| Installed capacity | 600 kWp DC | Scenario assumption |
| Location (baseline) | Athens, Greece | Scenario assumption |
| Horizon | 25 years | Scenario assumption (matches table) |
| Discount rate (real) | 8.00 % | Scenario assumption (matches table) |
| Year-0 CAPEX | EUR 468,000 | Scenario assumption (equals cost row y0 in table) |
| O&M (year 1) | EUR 7,200 / yr | Scenario assumption (matches table; inflates 2 % p.a.) |
| Year-1 generation | 912,000 kWh | Scenario assumption (matches table) |
| Module degradation | Implied in table energy column | Embedded in year-by-year energy values in §3 |
| Year-1 benefit | EUR 145,008 | Scenario assumption (matches table) |
| Tariff escalation | Modelled as embedded uplift in benefit column | Bounded default: *asset.pv.tariff_escalation_pct* applied within the computed run; no figure restated here. |
| Residual value at year 25 | Not credited | Bounded default: *residual_value.amount* = 0 EUR; *residual_value.year* = horizon end. Net terminal cash flow in §3 reflects this default. |
| Self-consumption / export split | Embedded in benefit blend | Bounded default inside the scenario |

**Assumption discipline.** Bounded defaults the input supply for are documented above as *model assumptions*, not as sourced facts. Substituting any default requires a fresh model run; do not scale numbers in §2 or §3 by hand.

## 6. HS / Customs Reference Block — PENDING

PENDING — EU TARIC lookup required. Reference HS classifications for the component families named; final classification, EU duty rate, and any VAT treatment rest with the importer of record and must be confirmed against:

- EU TARIC consultation: [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)

- USITC HTS search (for US-bound shipments): [https://hts.usitc.gov/](https://hts.usitc.gov/)

- UK Global Tariff: [https://www.trade-tariff.service.gov.uk/](https://www.trade-tariff.service.gov.uk/)

Component HS reference codes commonly used for the families named:

- HS 8541.43 — Solar cells, modules assembled into panels (PV modules)

- HS 8504.40 — Static converters (string inverters)

- HS 8536.90 — Apparatus for switching/protecting/connecting electrical circuits (DC combiner boxes, disconnectors)

- HS 7610.90 — Aluminium structures and parts (aluminium mounting rails)

- HS 7326.90 — Other articles of iron or steel (steel brackets)

PENDING. Any duty rate, anti-dumping measure, or VAT treatment shown elsewhere in earlier drafts is removed in this revision.

## 7. RFQ Anchor

Request a binding quotation for a 600 kWp LONGi Hi-MO 7 + Huawei SUN2000-100KTL-M2 greenhouse retrofit matched to your climate band. TradVolt routes the brief to EPCs and returns sealed bids.

[Request quotation via TradVolt](/rfq/)

## 8. Sources

- PVGIS-SARAH2 query (Joint Research Centre, EU Science Hub) — for year-1 generation input: [https://re.jrc.ec.europa.eu/pvg_tools/en/](https://re.jrc.ec.europa.eu/pvg_tools/en/)

- Eurostat electricity prices for industrial consumers, half-year dataset — for industrial band tariff reference: [https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table](https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table)

- ENTSO-E Transparency Platform — for day-ahead export price reference: [https://transparency.entsoe.eu/](https://transparency.entsoe.eu/)

- LONGi Hi-MO 7 product page: [https://www.longi.com/en/](https://www.longi.com/en/)

- Huawei FusionSolar product page (SUN2000-100KTL-M2, SmartPSB2000L): [https://solar.huawei.com/en](https://solar.huawei.com/en)

- K2 Systems SingleRail mounting kit: [https://k2-systems.com/en/](https://k2-systems.com/en/)

- IEC Webstore catalogue (IEC 61215-1:2021, IEC 61215-2:2021, IEC 62109-1, IEC 62109-2): [https://webstore.iec.ch/](https://webstore.iec.ch/)

- UL 61730-1 — PV Module Safety Qualification, Part 1: [https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)

- EU TARIC consultation (HS / duty lookup): [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)

- UN Manual of Tests and Criteria (UN 38.3 lithium battery provisions, ST/SG/AC.10/11/Rev.7) — referenced for any lithium storage add-on, not in this PV-only brief: [https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)

- ICC Incoterms 2020 (for any CIF/FOB references in an RFQ response): [https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)