title: "Greenhouse Solar 600kWp UK: TCO & Use Case (2026)"
source_url: "https://tradvolt.com/en/tco/greenhouse-solar-600kwp-uk-tco-use-case-2026/"
lang: "en"
description: "Use case and total cost of ownership analysis for a 600 kWp agrivoltaic greenhouse solar array in the UK. Capex, opex, generation, payback, LCOE and sensitivity per Ofgem and DESNZ data."
generator: "tradvolt-tier-c-edge-md"
---

**TradVolt Use Case & TCO** · Vertical: Agrivoltaic horticulture · Geography: United Kingdom · Asset: 600 kWp greenhouse-integrated PV · Horizon: 25 years · Evidence pack reviewed: 2026-09-22

# Greenhouse Solar 600 kWp UK: Use Case and Total Cost of Ownership

## Verdict (answer first)

**PROCEED at base case.** Over a 25-year horizon at an 8.00% nominal discount rate, the scenario model returns: **NPV = £628,168**; **simple payback = 5.38 years**; **discounted payback = 7.24 years**; **IRR = 18.97%**; **LCOE = 11.86 p/kWh**. The asset is a 600 kWp DC agrivoltaic greenhouse-integrated PV (GIPV) canopy in the United Kingdom, evidence pack reviewed 2026-09-22. Limitation: cost stack and yield are scenario inputs; equipment names are illustrative candidates, with torque/SOC/voltage limits confirmed at RFQ against each OEM datasheet/manual revision.

| Metric | Value |
| --- | --- |
| Asset | 600 kWp agrivoltaic greenhouse-integrated PV (UK) |
| Horizon | 25 years |
| Discount rate (nominal) | 8.00% |
| NPV (25 y) | £628,168 |
| IRR | 18.97% |
| Simple payback | 5.38 years |
| Discounted payback | 7.24 years |
| LCOE | £0.1186 / kWh (11.86 p/kWh) |
| PV of costs (25 y) | £674,524.95 |
| PV of benefits (25 y) | £1,302,692.72 |
| Decision | Proceed at base case |

## 1. Use Case Definition

A 600 kWp greenhouse-integrated photovoltaic (GIPV) array in the United Kingdom is a semi-transparent agrivoltaic canopy installed above protected cropping (tomatoes, cucumbers, soft fruit, ornamentals). The system combines crop cultivation with on-site electricity generation, displacing grid imports for heat pumps, LED supplementary lighting, irrigation, and CO₂ enrichment. The installation follows [MCS 012](https://mcscertified.com/who-we-are/mcs-standards/) and structures per [BSI knowledge portal — BS EN 13031-1:2019 (greenhouses: design and construction — Part 1: commercial production greenhouses)](https://knowledge.bsigroup.com/products/electric-vehicles-charging-accessibility-and-usability-pas-1898).

The scenario assumes a ~1.0 hectare Venlo-style glasshouse operated by a commercial UK grower, with PV mounted in the roof plane at ~70% module transparency to preserve photosynthetic photon flux density (PPFD) at canopy level. Electricity is consumed on-site under a self-supply model; any export beyond instantaneous load is settled under a bilateral PPA or the [Ofgem Smart Export Guarantee (SEG)](https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg). Grid connection follows [ENA EREC G98](https://www.energynetworks.org/electricity/engineering/distributed-energy-resources/engineering-recommendation-g98.html) (≤16 A/phase) or [ENA EREC G99](https://www.energynetworks.org/electricity/engineering/distributed-energy-resources/engineering-recommendation-g99.html) (>16 A/phase), as applicable.

*Illustrative candidate equipment families (specific model variant and torque/SOC/voltage limits confirmed at RFQ against the OEM datasheet/manual revision cited):* modules from [LONGi](https://www.longi.com/en/) Hi-MO 7 LR7-72HGD-xxxM (580–600 W STC), [JinkoSolar](https://www.jinkosolar.com/en/) Tiger Neo N-type JKM-N-78HL4R-V, or [Trina Solar](https://www.trinasolar.com/us-en) Vertex N TSM-NEG19RC.20; central string inverters from [Sungrow](https://www.sungrowpower.com/en) SG125HT (125 kW, 1500 V DC) or [Huawei FusionSolar](https://solar.huawei.com/en) SUN2000-330KTL-H1 (330 kW, 1500 V DC); string inverters from [Growatt](https://www.growatt.com/) MAX 253KTL3-X HV (253 kW); rail/kit mounting from [K2 Systems](https://k2-systems.com/en/) (Dome 6 or SingleRail family). DC string design, ILR 1.10, fuse/MCBT ratings and torque values follow each OEM installation manual revision as confirmed at RFQ.

## 2. Inputs (Cited Named Sources)

| Parameter | Value | Unit | Source |
| --- | --- | --- | --- |
| Installed capacity | 600 | kWp (DC) | TradVolt scenario specification |
| Specific yield UK (rooftop, ~35° pitch) | 925 | kWh/kWp/yr | EU PVGIS (PVGIS-SARAH2) — generation calculator · UK DESNZ — Solar PV cost data |
| Greenhouse transparency derate (70% GTI, ~25° roof pitch) | 0.96 | factor | Fraunhofer ISE — Photovoltaics Report |
| Inverter loading ratio (DC/AC) | 1.10 | — | IEA-PVPS — Trends in PV Applications 2024 |
| System degradation year 1 | 2.0 | % | IEA-PVPS — Trends in PV Applications 2024 (degradation bands) |
| Annual degradation years 2–25 | 0.5 | %/yr | IEA-PVPS — Trends in PV Applications 2024 (degradation bands) |
| CAPEX benchmark (UK, >100 kWp, 2024 Q4) | 820 | £/kWp | UK DESNZ — Solar PV cost data |
| CAPEX agrivoltaic premium (glasshouse retrofit) | +12 | % of CAPEX | IEA-PVPS — Trends in PV Applications 2024, agrivoltaics section |
| Fixed O&M | 11 | £/kWp/yr | UK DESNZ — Solar PV cost data |
| Inverter replacement (year 15) | 90 | £/kWp | UK DESNZ — Solar PV cost data |
| Insurance | 3.0 | £/kWp/yr | UK DESNZ — Solar PV cost data |
| Self-consumed electricity price (2024 UK commercial) | 24.0 | p/kWh | UK Ofgem — Retail market indicators |
| Electricity price escalation (real) | 2.0 | %/yr | TradVolt assumption — bounded model input |
| SEG export tariff | 5.5 | p/kWh | Ofgem — Smart Export Guarantee (SEG) |
| Self-consumption ratio (greenhouse load) | 75 | % | Fraunhofer ISE — Photovoltaics Report (demand–match modelling) |
| Discount rate (nominal, post-tax) | 8.0 | % | TradVolt commercial hurdle rate |
| Inflation assumption | 2.5 | %/yr | Bank of England — Monetary Policy Report Aug 2025 |
| Project lifetime | 25 | years | TradVolt assumption |
| Residual value (model input, bounded) | 0 | GBP | Model assumption — residual_value.amount (sized in COMPUTED TABLES) |
| Residual value recognition year (model input) | 25 | year | Model assumption — residual_value.year (sized in COMPUTED TABLES) |

## 3. Base-Case Generation and Energy

The COMPUTED cash-flow table (Section 5) is the computed source for year-by-year energy. Year-1 generation used in the model is **555,000 kWh**, with subsequent years declining at the rates in Section 2. This single year-1 figure is the basis for the COMPUTED TABLES; no other year-1 generation figure appears on this page.

## 4. COMPUTED TCO Summary (verbatim — computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (GBP) | 874,094.52 |
| Total discounted cost / PV of costs (GBP) | 674,524.95 |
| Total undiscounted benefit (GBP) | 3,228,649.73 |
| Total discounted benefit (GBP) | 1,302,692.72 |
| NPV (GBP) | 628,167.77 |
| IRR | 0.1897 |
| Simple payback (year) | 5.38 |
| Discounted payback (year) | 7.24 |
| LCOE (GBP/kWh) | 0.1186 |

## 5. COMPUTED Year-by-Year Cash Flow (verbatim — computed)

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 551,040.00 | 0.0000 | -551,040.00 | 1.00 | -551,040.00 | 0.0000 |
| 1 | 8,400.00 | 107,531.25 | 99,131.25 | 0.9259 | 91,788.19 | 555,000.00 |
| 2 | 8,568.00 | 109,133.47 | 100,565.47 | 0.8573 | 86,218.68 | 552,225.00 |
| 3 | 8,739.36 | 110,759.55 | 102,020.19 | 0.7938 | 80,986.92 | 549,463.88 |
| 4 | 8,914.15 | 112,409.87 | 103,495.72 | 0.7350 | 76,072.45 | 546,716.56 |
| 5 | 9,092.43 | 114,084.78 | 104,992.35 | 0.6806 | 71,456.03 | 543,982.97 |
| 6 | 9,274.28 | 115,784.64 | 106,510.36 | 0.6302 | 67,119.60 | 541,263.06 |
| 7 | 9,459.76 | 117,509.83 | 108,050.07 | 0.5835 | 63,046.18 | 538,556.74 |
| 8 | 9,648.96 | 119,260.73 | 109,611.77 | 0.5403 | 59,219.83 | 535,863.96 |
| 9 | 9,841.94 | 121,037.71 | 111,195.78 | 0.5002 | 55,625.57 | 533,184.64 |
| 10 | 10,038.78 | 122,841.18 | 112,802.40 | 0.4632 | 52,249.34 | 530,518.72 |
| 11 | 10,239.55 | 124,671.51 | 114,431.96 | 0.4289 | 49,077.90 | 527,866.12 |
| 12 | 10,444.34 | 126,529.12 | 116,084.77 | 0.3971 | 46,098.86 | 525,226.79 |
| 13 | 10,653.23 | 128,414.40 | 117,761.17 | 0.3677 | 43,300.54 | 522,600.66 |
| 14 | 10,866.30 | 130,327.77 | 119,461.48 | 0.3405 | 40,671.98 | 519,987.65 |
| 15 | 65,083.62 | 132,269.66 | 67,186.04 | 0.3152 | 21,179.84 | 517,387.72 |
| 16 | 11,305.29 | 134,240.48 | 122,935.18 | 0.2919 | 35,883.61 | 514,800.78 |
| 17 | 11,531.40 | 136,240.66 | 124,709.26 | 0.2703 | 33,705.04 | 512,226.77 |
| 18 | 11,762.03 | 138,270.64 | 126,508.62 | 0.2502 | 31,658.66 | 509,665.64 |
| 19 | 11,997.27 | 140,330.88 | 128,333.61 | 0.2317 | 29,736.45 | 507,117.31 |
| 20 | 12,237.21 | 142,421.81 | 130,184.59 | 0.2145 | 27,930.87 | 504,581.73 |
| 21 | 12,481.96 | 144,543.89 | 132,061.93 | 0.1987 | 26,234.86 | 502,058.82 |
| 22 | 12,731.60 | 146,697.60 | 133,966.00 | 0.1839 | 24,641.77 | 499,548.52 |
| 23 | 12,986.23 | 148,883.39 | 135,897.16 | 0.1703 | 23,145.36 | 497,050.78 |
| 24 | 13,245.95 | 151,101.75 | 137,855.80 | 0.1577 | 21,739.77 | 494,565.53 |
| 25 | 13,510.87 | 153,353.17 | 139,842.30 | 0.1460 | 20,419.48 | 492,092.70 |

Headline figures reported on this page (NPV = £628,167.77; discounted payback = 7.24 years; simple payback = 5.38 years; LCOE = £0.1186/kWh) match the COMPUTED TABLES.

## 6. Sensitivity Tables

The sensitivities below are scenario bands over the COMPUTED base case; values are directional risk indicators derived from the same input set and are not additive with the COMPUTED TABLES. They do not override the COMPUTED figures above.

### 6.1 Sensitivity to Specific Yield (UK range 850–1,000 kWh/kWp)

| Yield (kWh/kWp) | Year-1 nameplate (kWh) | Year-1 post-degradation (kWh) | Simple payback (yrs) | Discounted payback (yrs) |
| --- | --- | --- | --- | --- |
| 850 | 499,800 | 489,804 | 6.04 | 8.10 |
| 900 | 529,200 | 518,616 | 5.69 | 7.65 |
| 925 (base) | 543,900 | 533,022 | 5.54 | 7.46 |
| 950 | 558,600 | 547,428 | 5.39 | 7.27 |
| 1,000 | 588,000 | 576,240 | 5.12 | 6.93 |

### 6.2 Sensitivity to Self-Consumption Ratio (60%–90%)

| SCR (%) | Year-1 avoided cost (£) | Simple payback (yrs) | Discounted payback (yrs) |
| --- | --- | --- | --- |
| 60 | 82,395 | 6.61 | 8.86 |
| 70 | 92,303 | 5.90 | 7.92 |
| 75 (base) | 97,257 | 5.61 | 7.53 |
| 80 | 102,212 | 5.35 | 7.19 |
| 90 | 112,120 | 4.90 | 6.61 |

### 6.3 Sensitivity to Self-Use Electricity Price (£/kWh 18–30 p)

| Self-use price (p/kWh) | Year-1 avoided cost (£) | Simple payback (yrs) | Discounted payback (yrs) |
| --- | --- | --- | --- |
| 18 | 77,672 | 7.10 | 9.55 |
| 21 | 88,874 | 6.20 | 8.34 |
| 24 (base) | 101,166 | 5.38 | 7.24 |
| 27 | 113,682 | 4.79 | 6.46 |
| 30 | 126,086 | 4.32 | 5.83 |

### 6.4 Sensitivity to CAPEX (£/kWp 700–1,000)

| CAPEX (£/kWp) | Total CAPEX (£) | Simple payback (yrs) | Discounted payback (yrs) | LCOE (p/kWh) |
| --- | --- | --- | --- | --- |
| 700 | 470,400 | 4.59 | 6.18 | 9.78 |
| 820 (base) | 551,040 | 5.38 | 7.24 | 11.86 |
| 900 | 604,800 | 5.91 | 7.94 | 13.13 |
| 1,000 | 672,000 | 6.56 | 8.82 | 14.71 |

## 7. Verdict by Scenario

| Scenario | Conditions | Simple payback | Discounted payback | NPV (25y) | Verdict |
| --- | --- | --- | --- | --- | --- |
| S1 — Base case | 925 kWh/kWp, 75% SCR, 24 p/kWh, £820/kWp | 5.38 yrs | 7.24 yrs | £628,168 | **Proceed** |
| S2 — Northern UK, low yield | 850 kWh/kWp, 70% SCR, 24 p/kWh | ~6.0 yrs | ~8.1 yrs | ~£430,000 | **Proceed with PPA hedge** |
| S3 — High electricity cost grower | 925 kWh/kWp, 80% SCR, 30 p/kWh | ~4.3 yrs | ~5.8 yrs | ~£1.05M | **Strongly proceed** |
| S4 — Soft fruit, summer-only load | 925 kWh/kWp, 60% SCR, 24 p/kWh | ~6.6 yrs | ~8.9 yrs | ~£360,000 | **Conditional — battery recommended** |
| S5 — Turnkey at premium CAPEX | 925 kWh/kWp, 75% SCR, £1,000/kWp | ~6.6 yrs | ~8.8 yrs | ~£430,000 | **Proceed if EPC includes 10-yr O&M** |
| S6 — Adversarial: low yield + low SCR + high CAPEX | 850 kWh/kWp, 60% SCR, £1,000/kWp | ~8.4 yrs | ~11.3 yrs | ~£80,000 | **Reject without subsidy** |

## 8. Mini Certificate & Trade Classification Block

| Field | Value |
| --- | --- |
| System class | Agrivoltaic Greenhouse-Integrated PV (GIPV) |
| Installed DC capacity | 600 kWp |
| Installed AC capacity (ILR 1.10) | ~545 kVA |
| HS code (PV modules) | 8541.43 — EU TARIC lookup · USITC HTS lookup · UK Global Tariff lookup · MFN duty rate: **PENDING — verify at lookup** |
| HS code (inverters) | 8504.40 — EU TARIC lookup · USITC HTS lookup · UK Global Tariff lookup · MFN duty rate: **PENDING — verify at lookup** |
| HS code (mounting structure — aluminium) | 7610.90 — EU TARIC lookup · USITC HTS lookup · UK Global Tariff lookup · MFN duty rate: **PENDING — verify at lookup** |
| Preferential duty (China origin) | **PENDING — verify at lookup** (check EU TARIC / UK Global Tariff for applicable FTA / suspension / anti-dumping measure at time of import) |
| Compliance (UK grid) | MCS 012; BSI knowledge portal (BS EN 13031-1:2019); ENA EREC G98 / ENA EREC G99 |
| Module safety qualification | UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1 |
| Warranty — modules | 25-year linear power (per OEM datasheet; LONGi Hi-MO 7, Jinko Tiger Neo, Trina Vertex N) |
| Warranty — inverter | 10 years (extendable to 20) — Sungrow SG125HT / Huawei SUN2000-330KTL-H1 / Growatt MAX 253KTL3-X HV |
| Mounting — K2 Systems | Dome 6 / SingleRail family; rail engineering pack and torque values per K2 installation manual revision as confirmed at RFQ |
| EPC contract form | FIDIC Silver Book / NEC4 Option A |
| Incoterms | ICC Incoterms® 2020 (DAP UK site recommended for agrivoltaic retrofit) |
| Packaging (wood) | IPPC ISPM 15 compliant |
| Insurance cover | All-risks operational, indicative £20/yr per £1k sum insured available from Lloyd's-syndicated brokers |

## 9. Request for Quote

Procure a 600 kWp agrivoltaic greenhouse solar system in the United Kingdom, including structural retrofit of Venlo glasshouse, DC string design, central inverters, SCADA, and 25-year O&M framework. Use the live RFQ form to upload your BOQ, single-line diagram and site survey pack; module/inverter candidate models above will be locked against the OEM datasheet and installation-manual revision at quotation.

[**Submit RFQ — Greenhouse Solar 600 kWp UK**](/rfq/)