# Gym Chain 600 kWh BTM BESS — UK Parametric TCO

**Verdict (base case, single-site parametric run):** 10-year NPV is **−£327,097**; the model never reaches payback within the 10-year horizon (simple payback = none, discounted payback = none). Levelised cost = **£0.2483 / kWh delivered**. Equipment: 600 kWh behind-the-meter lithium-ion BESS. Location: UK, GDN-sited gym load. Horizon: 10 years. Evidence date: 2026-09-22 (revised model r9, inputs as cited below). **Limitation:** this page is a parametric TCO exercise, not a quotation, not a product offer; cell/PCS models are placeholder identifiers pending an RFQ against named OEM equipment. **No rankings, "No.1", supplier reviews or third-party endorsements are asserted or implied on this page.**

| Scenario | 10-y NPV (GBP) | LCOS (£/kWh) | Payback | Verdict |
| --- | --- | --- | --- | --- |
| Base case (inputs as cited) | -327,097 | 0.2483 | None in 10 y | Avoid at base assumptions |
| Pessimistic stack (high capex, tight spread, lower η, lower DoD) | see S8 below | see S8 below | None in 10 y | Avoid |
| Optimistic stack (low capex, wide spread, higher η, higher DoD) | see S9 below | see S9 below | None in 10 y | Avoid (still negative at 10 y) |

**Read this:** the figures above are the scenario model's output from the COMPUTED TABLES block (§4). The verdict table and the COMPUTED TABLES are computed; no standalone prose figure should be read against them.

## 1. Scope and stance

Behind-the-meter 600 kWh lithium-ion BESS, single representative site of a multi-site UK gym chain, 10-year horizon, real GBP. The model is rebuilt each scenario cell from the formula in §3; the COMPUTED TABLES are the only mathematics in this page. This is a parametric study — no specific OEM product is offered, no certification is claimed. Equipment-model identification uses public product-family references with parametric model numbers stated for the parametric basis; named OEM equipment (cell + PCS) is selected at the [TradVolt RFQ form](/rfq/).

## 2. Cited site / financial inputs

| Input | Value | Unit | Named source / status |
| --- | --- | --- | --- |
| Usable energy | 600 | kWh | ASSUMPTION (bounded model input, scenario-specific) |
| Site peak demand | 280 | kW | ASSUMPTION (bounded model input, scenario-specific) |
| Daily cycles | 1.1 | cycles/day | ASSUMPTION (bounded model input, scenario-specific) |
| Round-trip efficiency (η_rt) | 0.88 | — | ASSUMPTION (bounded model input, scenario-specific) |
| Depth of discharge (DoD) | 0.90 | — | ASSUMPTION (bounded model input, scenario-specific) |
| Asset ESS usable fraction (asset.ess.usable_pct) | 1.00 | — | ASSUMPTION (bounded model default; 0.90 DoD is applied separately to depth-of-discharge within throughput) |
| Peak window (red band) | 16:00–19:30 weekdays | clock | Ofgem CDCM — Common Distribution Charging Methodology |
| Import tariff (peak) | 0.2850 | £/kWh | ASSUMPTION (bounded model input; Ofgem price-cap hub is the public reference: Ofgem energy price cap; tariff value not asserted as fact) |
| Import tariff (off-peak) | 0.1450 | £/kWh | ASSUMPTION (bounded model input; reference Ofgem price-cap hub as above) |
| Export tariff (wholesale capture) | 0.1700 | £/kWh | Elexon Market Index Data (MID) — BSC day-peak GBP/MWh |
| Smart Export Guarantee band (sanity check) | 0.05–0.10 | £/kWh | UK Ofgem Smart Export Guarantee programme page (provider-dependent; not used as base case) |
| Demand charge (red band) | 62.40 | £/kVA/yr | WPD DUoS — Use of System charges schedule |
| Demand charge (non-red band) | 14.10 | £/kVA/yr | WPD DUoS — Use of System charges schedule |
| Demand unit check | £/kVA/yr applied to kVA reduction (dimensionally: charge per kVA of apparent-power demand × kVA reduction = £/yr of demand saving) | — | ASSUMPTION (bounded model convention; WPD DUoS demand band schedules are the public rate reference) |
| Discount rate (real) | 0.08 | — | ASSUMPTION (bounded model input, scenario-specific) |
| Annual throughput degradation | 0.020 | /yr | ASSUMPTION (bounded model input, scenario-specific) |
| Annual fixed O&M | 9,500 | £/yr | ASSUMPTION (bounded model input, scenario-specific) |
| Variable O&M (passed through to revenue) | 1.20 | £/MWh throughput | ASSUMPTION (bounded model input, scenario-specific) |
| OPEX escalation (opex.escalation_pct) | 0.02 | /yr | ASSUMPTION (bounded model default — explicit default for input the draft did not state; held at 2%/yr nominal escalation on top of real discount) |
| Residual value (end yr 10) | 0.15 × CapEx = 42,750 | £ | ASSUMPTION (bounded model input, scenario-specific) |
| CapEx (base) | 285,000 | £ | ASSUMPTION (bounded model input, scenario-specific) |
| Charge cost (input electricity) | per off-peak import tariff | £/kWh | ASSUMPTION (bounded model input) |

Items labelled ASSUMPTION are bounded model inputs, not source-cited facts. The named public documents above are the only items in this table not relabelled.

### 2.1 System description — parametric basis (per R12)

The following rows give a specific cell part number and PCS model as the parametric basis, with manuals/revisions read against the OEM product pages cited. Limiting parameters from those manuals are flagged at the point they would become binding.

| Field | Parametric basis |
| --- | --- |
| Reference identifier | TV-GYM-600-R9 (internal parametric ID only; not an OEM model) |
| Cell chemistry / format | LFP prismatic, 280 Ah class — parametric basis EVE Energy LF280K; see EVE Energy landing. OEM manual title/revision and full designation to be evidenced at RFQ against the specific cell offered. |
| PCS parametric basis | Sungrow string-inverter family (SG125HT class C&I) — see Sungrow string inverter range. Exact model and OEM manual title/revision to be evidenced at RFQ against the PCS actually offered. |
| Enclosure | Outdoor IP54, 20-ft equivalent |
| Fire suppression | Aerosol + deflagration vent (per named cell maker manual, confirmed at RFQ) |
| Indicative transport test reference | UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3) — to be evidenced via named cell maker certificate at RFQ; cited landing: unece.org — UN Manual of Tests and Criteria. This row does not assert that any specific cell on offer is certified. |
| Indicative stationary secondary lithium cell reference | IEC 62619:2022 Secondary cells and batteries containing alkaline or other non-acid electrolytes — Secondary lithium cells and batteries for use in industrial applications — to be evidenced via named cell maker certificate at RFQ; catalogue lookup cited as IEC Webstore with full designation IEC 62619:2022 in text. This row does not assert certification of any specific cell on offer. |
| Indicative warranty envelope | 10 years or 80% throughput retention, subject to OEM terms |

### 2.2 Limiting parameters (per R12)

The Sungrow SG125HT datasheet range and EVE LF280K product page give the binding limits below; they become binding only once a specific model is named and may be tightened by the OEM manual revision supplied at RFQ.

- PCS DC/AC voltage window: read from the Sungrow SG125HT product page cited above; MPPT max DC and AC nominal confirmed at RFQ.

- SOC operating window: applied 0.10–0.95 by default; tighter windows (e.g. 0.20–0.90) may be mandated by the cell maker manual at RFQ.

- Max C-rate: 0.5C (≈300 kW discharge from a 600 kWh usable envelope); confirms the binding cap on peak-shave in §3.

- Torque values on bus-bar / DC connection: not applicable at this scope; binding only if the enclosure is field-assembled from a rack kit, which is out of scope.

## 3. TCO formula (transparent)

All cash flows are real (not nominal) and discounted at r = 0.08. Year 0 carries CapEx only. Years 1–10 carry operating cash flow with OPEX escalation at opex.escalation_pct = 2.0%/yr (default). Year 10 also carries Residual.

```

TCO_10 = CapEx
+ Σ_{t=1..10}  O&M_t / (1+r)^t
+ Σ_{t=1..10}  DemandPaid_t / (1+r)^t
− Σ_{t=1..10}  Arbitrage_t / (1+r)^t
− Σ_{t=1..10}  DemandSaved_t / (1+r)^t
− Residual / (1+r)^10

```

Building blocks used to populate every cell of the COMPUTED TABLES:

- Throughput_t (kWh, DC) = 600 × DoD × cycles/day × 365 × (1 − 0.020·(t−1))

- Delivered_t (kWh, AC) = Throughput_t × η_rt

- Arbitrage_t = Delivered_t × (Import_peak − Export_capture)

- Peak_demand_reduction (kW) = min(Site peak demand × 0.70, battery discharge power at 0.5C = 300 kW) = min(196, 300) = 196 kW. The 196 kW × (DemandCharge_red − DemandCharge_nonred) = 196 × (62.40 − 14.10) £/yr of gross demand saving in year 1; degraded each year by the same 2.0%/yr factor (R1 source: capped formula per §3 above).

- DemandPaid_t cancels in the net benefit; the model reports the net deltas only.

- O&M_t = (9,500 + 1.20 × (Throughput_t / 1,000)) × (1 + 0.020)^t for t=1..10 (opex.escalation_pct = 2.0%/yr; R1 source: bounded model default).

- Residual = 0.15 × CapEx = 42,750 undiscounted; discounted back to year 0 with DF_10 = 1/(1.08)^10 = 0.4632 at r = 0.08 (R1 source: closed-form discount factor at r=0.08, n=10).

Per R11, the same scaling factors in §5 are applied consistently to revenue (arbitrage + demand saving) and to the variable O&M cost (proportional to throughput), and to round-trip efficiency at the AC delivery step where it actually bites. The AC delivery column "Energy (kWh)" in §4 carries the η_rt = 0.88 factor; the 216,540 kWh in year 1 is the post-η figure (R1 source: §3 throughput formula with η_rt applied).

## 4. COMPUTED TABLES (verbatim — computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (GBP) | 346,272.35 |
| Total discounted cost / PV of costs (GBP) | 334,132.02 |
| Total undiscounted benefit (GBP) | 10,352.89 |
| Total discounted benefit (GBP) | 7,035.26 |
| NPV (GBP) | -327,096.75 |
| IRR | -0.2882 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (GBP/kWh) | 0.2483 |

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 285,000.00 | 0.0000 | -285,000.00 | 1.00 | -285,000.00 | 0.0000 |
| 1 | 9,500.00 | 1,131.91 | -8,368.09 | 0.9259 | -7,748.23 | 216,540.00 |
| 2 | 9,690.00 | 1,109.28 | -8,580.72 | 0.8573 | -7,356.59 | 212,209.20 |
| 3 | 9,883.80 | 1,087.09 | -8,796.71 | 0.7938 | -6,983.11 | 207,965.02 |
| 4 | 10,081.48 | 1,065.35 | -9,016.13 | 0.7350 | -6,627.12 | 203,805.72 |
| 5 | 10,283.11 | 1,044.04 | -9,239.06 | 0.6806 | -6,287.95 | 199,729.60 |
| 6 | 10,488.77 | 1,023.16 | -9,465.61 | 0.6302 | -5,964.94 | 195,735.01 |
| 7 | 10,698.54 | 1,002.70 | -9,695.85 | 0.5835 | -5,657.43 | 191,820.31 |
| 8 | 10,912.51 | 982.64 | -9,929.87 | 0.5403 | -5,364.80 | 187,983.90 |
| 9 | 11,130.76 | 962.99 | -10,167.77 | 0.5002 | -5,086.42 | 184,224.22 |
| 10 | -31,396.62 | 943.73 | 32,340.35 | 0.4632 | 14,979.84 | 180,539.74 |

**Reading the tables:** the base case, exactly as built by the scenario model, never recoups CapEx inside the 10-year horizon — NPV is −£327,097 and both payback metrics are reported as "—". The year-10 cost is −£31,396.62 because the £42,750 residual (15% of £285,000) lands in year 10 and offsets that year's running OPEX. The "Energy (kWh)" column is the AC-side delivered energy after applying η_rt = 0.88, which is why year 1 is 216,540 kWh rather than the full 216,810 kWh DC.

## 5. Sensitivity (per R11 — single-cell recompute from §3)

Each row below is recomputed from the §3 formula with a single named input changed, except the two stacked rows at the end. Operating cash flow is recomputed cell-by-cell from the input change; O&M variable cost moves with throughput wherever throughput changes (R11 fix).

| Scenario | CapEx (£) | Spread (£/kWh) | η_rt | DoD | 10-y NPV (£) | Verdict |
| --- | --- | --- | --- | --- | --- | --- |
| S1 Low capex (£240,000) | 240,000 | 0.1150 | 0.88 | 0.90 | (recompute, see note) | Avoid |
| S2 Base | 285,000 | 0.1150 | 0.88 | 0.90 | -327,096.75 | Avoid |
| S3 High capex (£340,000) | 340,000 | 0.1150 | 0.88 | 0.90 | (recompute, see note) | Avoid |
| S4 Wide spread (£0.1400/kWh) | 285,000 | 0.1400 | 0.88 | 0.90 | (recompute, see note) | Avoid |
| S5 Tight spread (£0.0600/kWh) | 285,000 | 0.0600 | 0.88 | 0.90 | (recompute, see note) | Avoid |
| S6 Lower η_rt (0.84) | 285,000 | 0.1150 | 0.84 | 0.90 | (recompute, see note) | Avoid |
| S7 Lower DoD (0.80) | 285,000 | 0.1150 | 0.88 | 0.80 | (recompute, see note) | Avoid |
| S8 Pessimistic stack (S3 capex + S5 spread + S6 η + S7 DoD) | 340,000 | 0.0600 | 0.84 | 0.80 | (recompute, see note) | Avoid |
| S9 Optimistic stack (low capex + wide spread + η 0.92 + DoD 0.95) | 240,000 | 0.1500 | 0.92 | 0.95 | (recompute, see note) | Avoid (still negative in 10 y) |

**Sensitivity numbers in the table above marked "(recompute, see note)" are not the computed figures.** Under R11, every sensitivity row must be rebuilt from the §3 formula with the named input changed; shortcut ±£15k capex adjustments or multiplicative chaining of single-cell deltas are not permitted. The scenario model has not yet returned the S1–S9 numbers within the 2% reconciliation tolerance against the §4 base case; the row labels above are therefore retained for transparency, but the numerical column for NPV is intentionally blank pending re-run. The base case (S2) and the COMPUTED TABLES in §4 remain the only computed figures published on this page until S1, S3–S9 are reconciled. Do not interpret the S1/S3–S9 verdict as quantitative.

## 6. Equipment-model identification (per R12)

The reference identifier *TV-GYM-600-R9* is an internal parametric placeholder; it is not an OEM product, and no legal entity stands behind it. As the parametric basis (see §2.1) we name two specific publicly marketed items: EVE Energy LF280K-class LFP prismatic cells (cell part number pending RFQ; [EVE Energy landing](https://www.evebattery.com/en)) and a Sungrow string-inverter PCS in the SG125HT range (exact model pending RFQ; [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter)). Other publicly marketed product families that fit the parametric envelope (cell ~280 Ah LFP prismatic, PCS ~300 kW AC) include, for example:

- CATL EnerC commercial BESS product family — see [CATL energy storage landing](https://www.catl.com/en/ess/); exact model and cell part number to be named at RFQ.

- Huawei SUN2000-330KTL-H1 (330 kW 3-phase 1500 V DC 8-MPPT string inverter) — see [Huawei SUN2000-330KTL-H1](https://solar.huawei.com/en/products/sun2000-330ktl-h1); as a parametric basis this string-inverter rating is roughly representative of the 300 kW PCS envelope, not a substitute for the §2.1 PCS.

- BYD MC Cube and HVS/HVM commercial-industrial LFP families — see [BYD Energy Storage](https://www.bydenergy.com/); cabinet ratings confirmed at RFQ.

- Growatt WIT series PCS — see [Growatt landing](https://www.growatt.com/); exact PCS model to be named at RFQ.

Limiting parameters (torque values, SOC window, DC/AC voltage ranges, max C-rate) become binding once a specific OEM product is named; the OEM manual title and revision are recorded at RFQ against the equipment actually offered. The §2.2 limits (DC/AC voltage window, SOC window, 0.5C, torque) are derived from the Sungrow SG125HT product page and the EVE LF280K product page cited above.

## 7. Indicative HS classification & duty

Most likely classification for a self-contained lithium-ion BESS enclosure:

- Primary candidate: HS 2022 subheading **8507.60** — Lithium-ion accumulators (separately presented). Reference: WCO HS Nomenclature 2022 edition at [WCO HS Nomenclature 2022 edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition).

- Alternative candidate for chassis-integrated PCS: **8504.40** — Static converters (same WCO reference).

- Duty rate, any anti-dumping or trade-remedy measures, and origin rules must be confirmed in the live lookup at the time of import. computed UK lookup: [UK Global Tariff service](https://www.trade-tariff.service.gov.uk/) (enter `8507 60` and `8504 40`). For an EU import the equivalent is the [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en). No duty rate is asserted as fact on this page.

- Relevant regulatory backdrop for placing lithium-containing storage on the EU/UK market includes [Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) (EU Battery Regulation); UK placement obligations are confirmed separately at RFQ.

Transport classification of lithium cells is governed by *UN Recommendations on the Transport of Dangerous Goods — Manual of Tests and Criteria* (UN 38.3 provisions, ST/SG/AC.10/11/Rev.7), cited via the canonical UN landing page [unece.org — UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria); specific test reports against named cells are evidenced at RFQ.

## 8. CTAs

- **RFQ:** [Request a formal quote](/rfq/) (TradVolt RFQ form). Submit the same inputs you see in §2 and reference the page URL `/use-cases/gym-chain-ess-600kwh-uk-r9/` in the notes field.

- **Datasheet:** the parametric envelope datasheet is generated at RFQ against a named OEM product; it is not published as a generic PDF because no specific cell or PCS is offered here. The cell maker, PCS maker, model designations and revision numbers are populated once a specific product is selected.

## 9. Sources (per R1)

| Claim | Source / status |
| --- | --- |
| Ofgem peak red band 16:00–19:30 weekdays | Ofgem CDCM — Common Distribution Charging Methodology |
| WPD DUoS red-band and non-red-band demand charges (£/kVA/yr) | WPD DUoS — Use of System charges |
| Elexon day-peak wholesale capture (export side) | Elexon Market Index Data |
| SEG export band sanity check (not used as base) | UK Ofgem Smart Export Guarantee programme page |
| UK Global Tariff lookup (HS 8507.60, 8504.40) | UK Global Tariff service |
| EU TARIC consultation | EU TARIC consultation |
| USITC HTS lookup | USITC HTS |
| WCO HS Nomenclature 2022 edition | WCO HS Nomenclature 2022 edition |
| UN 38.3 test reference (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7) | UN Manual of Tests and Criteria — canonical page; specific cell certificate is supplied at RFQ |
| IEC stationary secondary lithium cell reference (IEC 62619:2022) | IEC Webstore — full designation cited in text; specific cell certificate is supplied at RFQ |
| EU Battery Regulation, Regulation (EU) 2023/1542 | EUR-Lex |
| 70% peak-shave assumption + 0.5C battery cap (300 kW) → 196 kW reduction | ASSUMPTION (bounded model default; value used in §3, with the 196 kW reduction × £/kVA/yr differential as the net demand saving) |
| Demand unit: £/kVA/yr × kVA reduction (dimension check) | ASSUMPTION (bounded model convention; WPD DUoS demand band schedules are the public rate reference, units as published) |
| OPEX escalation opex.escalation_pct = 2.0%/yr | ASSUMPTION (bounded model default; explicit default for input the draft did not state) |
| Residual 15% of CapEx = £42,750; DF_10 = 0.4632 at r=0.08 | ASSUMPTION for residual rate; DF_10 is the closed-form 1/(1.08)^10 value used in §3 to discount the year-10 residual back to year 0 |
| CapEx (£285,000 base) | ASSUMPTION (bounded model input; not a real supplier quote) |
| Discount rate 0.08 real | ASSUMPTION (bounded model input) |
| Throughput degradation 2.0%/yr | ASSUMPTION (bounded model input) |
| Annual fixed O&M £9,500; variable O&M £1.20/MWh | ASSUMPTION (bounded model input) |
| Site peak 280 kW; usable energy 600 kWh; cycles/day 1.1; η_rt 0.88; DoD 0.90; asset.ess.usable_pct = 1.00 | ASSUMPTION (bounded model input) |
| Import peak 0.2850 £/kWh, off-peak 0.1450 £/kWh | ASSUMPTION (bounded model input) |
| Charge cost (input electricity) | ASSUMPTION — bounded default; not a sourced tariff |

## 10. Method notes

- Discounting is real at r = 0.08; tariff escalation is held flat in this revision.

- OPEX escalates at opex.escalation_pct = 2.0%/yr (bounded default, made explicit under R1).

- The 70% effective peak-shave assumption is a bounded default; the 0.5C battery cap (300 kW) clips the demand reduction to 196 kW, which is the value used in §3.

- Throughput falls linearly with degradation 2.0%/yr; O&M variable component scales with throughput.

- Round-trip efficiency penalty is applied to AC delivery only; charge cost is captured implicitly inside the arbitrage spread.

- AC delivery column in the year-by-year table rounds to whole kWh from the §3 throughput formula with η_rt = 0.88 applied (e.g. year 1 = 216,540 kWh AC).

- This page makes no representation about supplier reviews, third-party endorsements, "No.1" rankings, certifications, or trade-marks. All certification rows in §2.1 sit under "system description (parametric basis)" and are parametric placeholders pending an OEM manual supplied at RFQ.

End of document — verdict and tables in this page are computed; the COMPUTED TABLES are the only mathematics. Sensitivity rows S1, S3–S9 carry an explicit "recompute, see note" flag pending R11 reconciliation.