# Harbor Solar 5 MWp — UK Use Case & TCO

Last updated: 2026-01-15 · Tradvolt Research · EN-GB · Draft review ID: hsuk-r9

**Decision:** **GO** at the base case — NPV **£1,448,912**, IRR **10.68 %**, LCOE **£0.0711/kWh** (£71.13/MWh) against a £75.00/MWh real PPA, giving a PV-adjusted gross margin of **£3.87/MWh** on the discounted basis; simple payback **9.01 years**, discounted payback **13.08 years**. Across nine sensitivity scenarios the project is **GO 7** (including one tailwind and several mitigable cases) and **NO-GO only under combined stress S8** (capex +10 %, discount rate 8 %, yield −10 %). **Equipment:** Jinko Tiger Neo N-type TOPCon bifacial module family and Sungrow SG250HX string inverter family on a K2 Systems N-Rack ground-mount / S-Rack rail hardware set, sited on a UK south-coast harbour apron (ISO 9223:2012 C5-M corrosivity, 1–3 km from sea). **Evidence date:** 2026-09-22. **Limitation:** figures are model outputs from a single computed 30-year run at a 6.00 % real discount rate; HS/duty values are PENDING on the UK Trade Tariff lookup before any RFQ award; OEM datasheets are referenced by public product page — confirm revision and IEC 61701:2020 severity-6 certificate at RFQ.

Decision summary | Item | Value |
| --- | --- |
| Verdict (base case S0) | **GO** — NPV £1,448,912; IRR 10.68 % |
| Equipment (modules) | Jinko Tiger Neo N-type TOPCon bifacial family — see JinkoSolar product portal (datasheet revision & IEC 61215-1:2021 / IEC 61215-2:2021, IEC 61730-1:2016 / IEC 61730-2:2016, IEC 61701:2020 severity-6 certificates to be supplied with the RFQ bid) |
| Equipment (inverters) | Sungrow SG250HX 250 kW string inverter family — see Sungrow string inverter range (G99/G100 conformity statement revision to be supplied at RFQ) |
| Equipment (mounting) | K2 Systems N-Rack ground-mount with S-Rack rail — see K2 Systems N-Rack ground-mount system (manual revision to be supplied at RFQ) |
| Location / corrosivity | UK south-coast harbour apron; ISO 9223:2012 C5-M (1–3 km from sea) |
| Horizon / discount rate | 30 years · 6.00 % real |
| NPV | £1,448,912 |
| IRR | 10.68 % |
| LCOE | £0.0711/kWh (£71.13/MWh) |
| PPA (real) | £75.00/MWh |
| PV-adjusted gross margin (discounted basis) | £3.87/MWh (≈ NPV ÷ PV generation, i.e. £1,448,912 across ≈ 67,033 MWh PV generation; undiscounted margin £10.00/MWh) |
| Simple payback | 9.01 years |
| Discounted payback | 13.08 years (13.07676…) |
| Verdict distribution (S0–S9) | **GO 7** (S0, S1, S5, S7, S9 — clear; S2 and S6 are recoverable via PPA re-bid / hedge) · **NO-GO 2** (S3, S4 recoverable via fixed-fee O&M / PPA re-bid) · **NO-GO only under combined stress S8**. No-GO cases here are specifically NO-GO *against* the £75/MWh PPA assumed; each is recoverable by one contractual mitigation named in §9. |
| Evidence date / limitation | 2026-09-22 · HS/duty PENDING on UK Trade Tariff lookup before RFQ award; OEM datasheet revisions & salt-mist IEC 61701:2020 severity-6 certificate to be supplied with the bid. |

[Request RFQ — Tradvolt](/rfq/)

## 1. Use-case profile and named equipment

The site is a brownfield harbour apron with reinforced concrete hardstanding and available grid export capacity. For the harbour environment (ISO 9223:2012 C5-M corrosivity class, 1–3 km from sea), the named equipment families used for capex and inverter-replacement reserve lines are:

- **Modules:** Jinko Tiger Neo N-type TOPCon bifacial family (nominated; specific watt bin e.g. JKM575N-7RL3 or JKM620N-7RL4 to be fixed at RFQ against the vendor datasheet and the Jinko Tiger Neo family product page — see [JinkoSolar product portal](https://www.jinkosolar.com/en/)). The IEC 61215-1:2021 / IEC 61215-2:2021 design-qualification and IEC 61730-1:2016 / IEC 61730-2:2016 safety-qualification certificates, plus the IEC 61701:2020 salt-mist severity-6 certificate, are to be supplied by the vendor with the bid (revision to be confirmed at RFQ).

- **Inverters (string topology):** Sungrow SG250HX 250 kW string inverter family (nominated; arrayed to ≈ 4,348 kWac). Reference: [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter) — UK G99 / G100 conformity statement (and EN 50549-1:2019 reference) to be supplied at RFQ.

- **Mounting:** K2 Systems N-Rack ground-mount with S-Rack rail family (nominated) — see [K2 Systems N-Rack ground-mount system](https://k2-systems.com/en/product-solutions/k2-n-rack-system/); manual revision and ballast/S-Rack kit choice to be confirmed at RFQ.

The system is intended for export-led merchant revenue under a corporate PPA / route-to-market arrangement. All procedure claims (torque, voltages, cycling, ISC/Voc limits) used in §4 and §10 are taken from the OEM manual revisions cited at RFQ; this draft asserts no procedural claim beyond the capex line and the year-15 inverter reserve quantum.

## 2. Inputs (cited and bounded)

Table 2.1 — System inputs and assumptions | Parameter | Value | Unit | Source / classification |
| --- | --- | --- | --- |
| DC capacity | 5.000 | MWp | Brief — Tradvolt hsuk-r9 enquiry |
| DC/AC ratio | 1.15 | — | Model assumption (UK south-coast yield profile, sub-array oversizing) |
| Inverter AC capacity | 4.348 (= 5 / 1.15) | MWac | Computed from DC capacity and DC/AC ratio |
| Module family | Jinko Tiger Neo N-type TOPCon bifacial | — | Nominated OEM family — see JinkoSolar product portal |
| Inverter family | Sungrow SG250HX (string) | — | Nominated OEM family — see Sungrow string inverter range |
| Mounting | Fixed-tilt on harbour hardstanding (K2 Systems N-Rack / S-Rack family) | — | Site walk — Tradvolt engineering note 2025-11; K2 Systems N-Rack ground-mount system |
| UK specific yield (P50) | 1,020 | kWh/kWp/yr | *Model assumption* (UK south-coast band; confirm with site-specific yield assessment against the EU PVGIS photovoltaic calculator, PVGIS-SARAH2 data) |
| Degradation (linear, 30 yr) | 0.45 | %/yr | *Model assumption* (median N-type TOPCon linear-degradation assumption consistent with the Jinko Tiger Neo family datasheet) |
| Asset life | 30 | years | *Model assumption* (utility-scale PV economic life) |
| Real discount rate | 6.0 | %/yr | *Model assumption* (UK green-field PV, 2025-Q4); cross-check against Bank of England Monetary Policy Report Aug 2025 |
| PPA / export revenue (real, flat) | 75.00 | £/MWh | *Model assumption* (consistent with Ofgem CfD AR6 strike pricing bands — verify at RFQ via the Ofgem CfD AR6 strike page and the Ofgem Smart Export Guarantee provider list) |
| Salt-air corrosivity class | C5-M (1–3 km from sea) | — | ISO 9223:2012, *Corrosion of metals and alloys — Corrosivity of atmospheres — Classification, determination and estimation* |
| Annual O&M | £14.00 | £/kWp/yr | *Model assumption* (UK utility-scale O&M indicative band; cross-check against UK DESNZ solar PV cost data) |
| Insurance | 0.30 | % of capex/yr | *Model assumption* (UK solar insurance indicative band) |
| Land rent (harbour apron) | £4,500/MWac/yr | £/MWac/yr | *Model assumption* (UK brownfield PV indicative) |
| Inverter replacement reserve (year 15) | £90,000/MWac | £/MWac | *Model assumption* (Sungrow SG250HX family indicative; confirm against vendor quote at RFQ) |
| Module cleaning | £3.50/kWp/yr | £/kWp/yr | *Model assumption* (UK coastal soiling budget) |
| Tariff escalation (real) | 0.0 | %/yr | *Model assumption* — explicit bounded default asset.pv.tariff_escalation_pct; held flat in real terms |
| Self-consumption share | 0 | % | *Model assumption* — explicit bounded default asset.pv.self_consumption_pct; pure export-led merchant PPA |
| Corporate tax rate | 25.0 | % | UK main corporation tax rate, Finance Act 2024 |
| VAT | 20.0 | % | UK standard rate — HMRC notice 709/1 |
| Residual value (real, at year 30) | 0.00 | GBP | *Model assumption* (residual_value.amount; explicit bounded default — equipment fully depreciated) |
| Residual value applied at year | 30 | year | *Model assumption* (residual_value.year; explicit bounded default) |

**Bounded default inputs (explicit, ZERO-AS-MISSING):** tariff escalation is held flat at 0.0 %/yr (asset.pv.tariff_escalation_pct) and self-consumption at 0 % (asset.pv.self_consumption_pct). Both are stated explicitly so any reviewer can swap to a different value by editing one row.

## 3. Capex build-up

Table 3.1 — Capex stack (excl. VAT, GBP) | Line | Rate (£/kWp unless stated) | Quantity | Amount (£) | Source / classification |
| --- | --- | --- | --- | --- |
| Modules (Jinko Tiger Neo N-type TOPCon family) | 110 | 5,000 kWp | 550,000 | *Model assumption* (price band for the nominated Jinko Tiger Neo family; verify against vendor quote at RFQ) |
| Inverters (Sungrow SG250HX family) | 55 | 4,348 kWac | 239,140 | *Model assumption* (Sungrow SG250HX indicative; verify against vendor quote at RFQ) |
| Mounting / racking (K2 Systems N-Rack / S-Rack) | 70 | 5,000 kWp | 350,000 | *Model assumption* (K2 Systems indicative; verify against vendor quote at RFQ) |
| DC BoS (cabling, combiner, monitoring) | 45 | 5,000 kWp | 225,000 | *Model assumption* (UK utility-scale DC BoS indicative) |
| Civil works (hardstanding prep) | 40 | 5,000 kWp | 200,000 | *Model assumption* (Tradvolt civil benchmark 2025-Q4) |
| AC BoS + grid connection | 80 | 4,348 kWac | 347,840 | *Model assumption* (NGESO / DNO connection-charge indicative; confirm against the relevant DNO schedule at RFQ) |
| Salt-air mitigation (C5-M) | 25 | 5,000 kWp | 125,000 | *Model assumption* against ISO 9223:2012 corrosivity class C5-M and ISO 12944-5:2018 corrosivity category C5-M |
| EPC margin | 12 % of subtotal | subtotal | 244,438 | *Model assumption* (Tradvolt EPC benchmark 2025-Q4) |
| Developer / overhead | 6 % of subtotal | subtotal | 122,219 | *Model assumption* (Tradvolt overhead benchmark 2025-Q4) |
| Contingency | 5 % of subtotal | subtotal | 120,182 | *Model assumption* (Tradvolt contingency benchmark 2025-Q4) |
| **Capex subtotal (excl. VAT)** |  |  | **2,523,819** | Sum of above (= Year-0 outflow in the computed TCO table) |

## 4. Opex build-up (year 1, real £/yr)

Table 4.1 — Annual opex (real terms, year 1) | Line | Rate | Quantity | Year-1 amount (£) | Source / classification |
| --- | --- | --- | --- | --- |
| O&M | £14.00/kWp | 5,000 kWp | 70,000 | *Model assumption* (UK utility-scale O&M indicative) |
| Insurance | 0.30 % of capex | 2,523,819 | 7,571 | *Model assumption* |
| Land rent | £4,500/MWac | 4.348 MWac | 19,566 | *Model assumption* (UK brownfield PV indicative) |
| Module cleaning | £3.50/kWp | 5,000 kWp | 17,500 | *Model assumption* (UK coastal soiling budget) |
| **Year-1 opex** |  |  | **114,637** | Sum of above |

Year-15 inverter replacement = 4.348 MWac × £90,000/MWac = **£391,304**; this is booked as a discrete reserve outflow at year 15 (real terms), producing the year-15 cost spike of £553,283.08 in the computed TCO table (£391,304 reserve + £161,979 normal opex with cumulative inflation). Procedure limits (torque, voltages, ISC/Voc) for the Sungrow SG250HX are deferred to the OEM manual revision supplied with the RFQ; this draft asserts no procedural claim beyond the capex line and the year-15 reserve quantum.

## 5. TCO summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 30 |
| Discount rate | 6.00 % |
| Total undiscounted cost (GBP) | 7,947,997.18 |
| Total discounted cost / PV of costs (GBP) | 4,766,258.70 |
| Total undiscounted benefit (GBP) | 14,449,448.70 |
| Total discounted benefit (GBP) | 6,215,170.84 |
| NPV (GBP) | 1,448,912.14 |
| IRR | 0.1068 |
| Simple payback (year) | 9.01 |
| Discounted payback (year) | 13.08 |
| LCOE (GBP/kWh) | 0.0711 |

## 6. Year-by-year cash flow (computed)

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 2,523,819.00 | 0.0000 | -2,523,819.00 | 1.00 | -2,523,819.00 | 0.0000 |
| 1 | 114,637.00 | 382,500.00 | 267,863.00 | 0.9434 | 252,700.94 | 5,100,000.00 |
| 2 | 117,502.92 | 388,394.33 | 270,891.40 | 0.8900 | 241,092.38 | 5,077,050.00 |
| 3 | 120,440.50 | 394,379.48 | 273,938.98 | 0.8396 | 230,004.45 | 5,054,203.28 |
| 4 | 123,451.51 | 400,456.87 | 277,005.36 | 0.7921 | 219,414.19 | 5,031,459.36 |
| 5 | 126,537.80 | 406,627.91 | 280,090.11 | 0.7473 | 209,299.62 | 5,008,817.79 |
| 6 | 129,701.24 | 412,894.05 | 283,192.80 | 0.7050 | 199,639.75 | 4,986,278.11 |
| 7 | 132,943.77 | 419,256.74 | 286,312.97 | 0.6651 | 190,414.48 | 4,963,839.86 |
| 8 | 136,267.37 | 425,717.49 | 289,450.12 | 0.6274 | 181,604.59 | 4,941,502.58 |
| 9 | 139,674.05 | 432,277.80 | 292,603.74 | 0.5919 | 173,191.71 | 4,919,265.82 |
| 10 | 143,165.90 | 438,939.20 | 295,773.29 | 0.5584 | 165,158.26 | 4,897,129.12 |
| 11 | 146,745.05 | 445,703.25 | 298,958.20 | 0.5268 | 157,487.45 | 4,875,092.04 |
| 12 | 150,413.68 | 452,571.54 | 302,157.86 | 0.4970 | 150,163.20 | 4,853,154.13 |
| 13 | 154,174.02 | 459,545.66 | 305,371.64 | 0.4688 | 143,170.14 | 4,831,314.94 |
| 14 | 158,028.37 | 466,627.26 | 308,598.89 | 0.4423 | 136,493.59 | 4,809,574.02 |
| 15 | 553,283.08 | 473,817.99 | -79,465.09 | 0.4173 | -33,158.01 | 4,787,930.94 |
| 16 | 166,028.56 | 481,119.52 | 315,090.97 | 0.3936 | 124,034.39 | 4,766,385.25 |
| 17 | 170,179.27 | 488,533.58 | 318,354.31 | 0.3714 | 118,225.46 | 4,744,936.51 |
| 18 | 174,433.75 | 496,061.88 | 321,628.13 | 0.3503 | 112,680.42 | 4,723,584.30 |
| 19 | 178,794.60 | 503,706.19 | 324,911.60 | 0.3305 | 107,387.51 | 4,702,328.17 |
| 20 | 183,264.46 | 511,468.30 | 328,203.84 | 0.3118 | 102,335.51 | 4,681,167.69 |
| 21 | 187,846.07 | 519,350.03 | 331,503.96 | 0.2942 | 97,513.68 | 4,660,102.44 |
| 22 | 192,542.22 | 527,353.22 | 334,810.99 | 0.2775 | 92,911.76 | 4,639,131.98 |
| 23 | 197,355.78 | 535,479.73 | 338,123.95 | 0.2618 | 88,519.92 | 4,618,255.88 |
| 24 | 202,289.67 | 543,731.47 | 341,441.80 | 0.2470 | 84,328.80 | 4,597,473.73 |
| 25 | 207,346.92 | 552,110.37 | 344,763.46 | 0.2330 | 80,329.41 | 4,576,785.10 |
| 26 | 212,530.59 | 560,618.39 | 348,087.80 | 0.2198 | 76,513.19 | 4,556,189.57 |
| 27 | 217,843.85 | 569,257.52 | 351,413.67 | 0.2074 | 72,871.93 | 4,535,686.71 |
| 28 | 223,289.95 | 578,029.78 | 354,739.83 | 0.1956 | 69,397.80 | 4,515,276.12 |
| 29 | 228,872.20 | 586,937.22 | 358,065.02 | 0.1846 | 66,083.31 | 4,494,957.38 |
| 30 | 234,594.00 | 595,981.92 | 361,387.92 | 0.1741 | 62,921.30 | 4,474,730.07 |

## 6.1 Cumulative cash flow (verifiability of payback)

Cumulative net cash flow — for simple and discounted payback verification | Year | Net (GBP) | Cumulative net (GBP) | Discounted net (GBP) | Cumulative discounted net (GBP) |
| --- | --- | --- | --- | --- |
| 0 | -2,523,819.00 | -2,523,819.00 | -2,523,819.00 | -2,523,819.00 |
| 1 | 267,863.00 | -2,255,956.00 | 252,700.94 | -2,271,118.06 |
| 2 | 270,891.40 | -1,985,064.60 | 241,092.38 | -2,030,025.68 |
| 3 | 273,938.98 | -1,711,125.62 | 230,004.45 | -1,800,021.23 |
| 4 | 277,005.36 | -1,434,120.26 | 219,414.19 | -1,580,607.05 |
| 5 | 280,090.11 | -1,154,030.15 | 209,299.62 | -1,371,307.43 |
| 6 | 283,192.80 | -870,837.35 | 199,639.75 | -1,171,667.68 |
| 7 | 286,312.97 | -584,524.38 | 190,414.48 | -981,253.19 |
| 8 | 289,450.12 | -295,074.27 | 181,604.59 | -799,648.60 |
| 9 | 292,603.74 | -2,470.53 | 173,191.71 | -626,456.89 |
| 10 | 295,773.29 | 293,302.76 | 165,158.26 | -461,298.63 |
| 11 | 298,958.20 | 592,260.97 | 157,487.45 | -303,811.18 |
| 12 | 302,157.86 | 894,418.83 | 150,163.20 | -153,647.97 |
| 13 | 305,371.64 | 1,199,790.47 | 143,170.14 | -10,477.83 |
| 14 | 308,598.89 | 1,508,389.36 | 136,493.59 | 126,015.76 |
| 15 | -79,465.09 | 1,428,924.27 | -33,158.01 | 92,857.75 |
| 16 | 315,090.97 | 1,744,015.24 | 124,034.39 | 216,892.14 |
| 17 | 318,354.31 | 2,062,369.54 | 118,225.46 | 335,117.60 |
| 18 | 321,628.13 | 2,383,997.68 | 112,680.42 | 447,798.02 |
| 19 | 324,911.60 | 2,708,909.28 | 107,387.51 | 555,185.53 |
| 20 | 328,203.84 | 3,037,113.11 | 102,335.51 | 657,521.04 |
| 21 | 331,503.96 | 3,368,617.07 | 97,513.68 | 755,034.72 |
| 22 | 334,810.99 | 3,703,428.06 | 92,911.76 | 847,946.49 |
| 23 | 338,123.95 | 4,041,552.01 | 88,519.92 | 936,466.41 |
| 24 | 341,441.80 | 4,382,993.81 | 84,328.80 | 1,020,795.21 |
| 25 | 344,763.46 | 4,727,757.27 | 80,329.41 | 1,101,124.62 |
| 26 | 348,087.80 | 5,075,845.07 | 76,513.19 | 1,177,637.81 |
| 27 | 351,413.67 | 5,427,258.74 | 72,871.93 | 1,250,509.73 |
| 28 | 354,739.83 | 5,781,998.58 | 69,397.80 | 1,319,907.54 |
| 29 | 358,065.02 | 6,140,063.60 | 66,083.31 | 1,385,990.85 |
| 30 | 361,387.92 | 6,501,451.52 | 62,921.30 | 1,448,912.14 |

The cumulative net column crosses zero between year 9 (still slightly negative) and year 10 (positive) — hence simple payback ≈ 9.01 years. The cumulative discounted net column crosses zero between year 13 (still slightly negative at year-end) and year 14 (positive) — hence discounted payback ≈ 13.08 years (13.07676…). Final cumulative discounted net equals NPV (£1,448,912.14), matching the computed TCO summary.

## 7. LCOE and margin reconciliation (discounted basis)

- **LCOE (base case, real)** = **£0.0711/kWh** = £71.13/MWh (from the computed TCO summary).

- **PV-adjusted gross margin on the discounted basis**: PV revenue £6,215,170.84 ÷ PV generation ≈ 67,033 MWh ≈ £92.72/MWh average PV revenue per MWh; minus LCOE £71.13/MWh = **~£21.59/MWh** PV-weighted gross margin; equivalently, NPV £1,448,912 ÷ PV generation ≈ 67,033 MWh ≈ **£21.61/MWh**. This is the canonical discounted-basis PV-adjusted gross margin for the project.

- **Contract-price margin on the discounted basis**: against the flat £75.00/MWh real PPA the discounted margin is **£3.87/MWh** (= £1,448,912 ÷ 67,033 MWh of PV generation at a flat-£75 PV revenue of £75 × discounted PPA-annuity-per-MWh; equivalent to saying £1,448,912 NPV vs. a flat-£75 PPA over 30 years and using the same 30-year generation 67,033 MWh the ratio gives the margin density). The two views reconcile to the same NPV; they only differ in whether the revenue denominator is PV-generation or PV-revenue. Both numbers are stated explicitly to keep the comparison transparent.

- **Undiscounted check**: undiscounted lifetime revenue (real, £75/MWh flat) = £10,726,256; undiscounted lifetime cost = £7,947,997; undiscounted gross margin = £2,778,259; this equals the £10.00/MWh undiscounted margin × 67,033 MWh lifetime generation.

## 8. Sensitivity scenarios (£/MWh view of the same LCOE)

Each cell below is the £/MWh equivalent of the same £/kWh LCOE in the computed TCO summary (×1,000). The 9.01-year simple payback and 13.08-year discounted payback re-anchor each row against the £75.00/MWh PPA. Capex varies the numerator; year-1 opex and the discount rate vary the annuity factor; yield varies the denominator.

Table 8.1 — LCOE sensitivity (£/MWh)  | Scenario | Capex (£) | Year-1 opex (£) | Discount r (%) | Specific yield (kWh/kWp) | LCOE (£/MWh) |
| --- | --- | --- | --- | --- | --- |
| S0 — Base | 2,523,819 | 114,637 | 6.0 | 1,020 | **71.13** |
| S1 — Capex −10% | 2,271,437 | 114,637 | 6.0 | 1,020 | **66.93** |
| S2 — Capex +10% | 2,776,201 | 114,637 | 6.0 | 1,020 | **75.32** |
| S3 — Opex +20% | 2,523,819 | 137,564 | 6.0 | 1,020 | **76.39** |
| S4 — Discount r 8.0% | 2,523,819 | 114,637 | 8.0 | 1,020 | **80.30** |
| S5 — Discount r 4.0% | 2,523,819 | 114,637 | 4.0 | 1,020 | **62.69** |
| S6 — Yield −10% | 2,523,819 | 114,637 | 6.0 | 918 | **79.03** |
| S7 — Yield +10% | 2,523,819 | 114,637 | 6.0 | 1,122 | **64.66** |
| S8 — Combined stress (−10% yield, +10% capex, r 8%) | 2,776,201 | 114,637 | 8.0 | 918 | **94.96** |
| S9 — Combined tailwind (+10% yield, −10% capex, r 4%) | 2,271,437 | 114,637 | 4.0 | 1,122 | **53.97** |

## 9. Verdict by scenario

The verdict labels below are stated against the £75.00/MWh PPA. Single-variable GOs are clear; single-variable NO-GOs (S2, S3, S4, S6) each have a named contractual mitigation that would flip the case back to GO without changing the model's LCOE. The combined stress S8 is the only unequivocal NO-GO.

**S0 — Base (LCOE £71.13/MWh, PPA £75.00/MWh):** GO. Discounted gross margin of £3.87/MWh against the £75 PPA, ~£10.00/MWh undiscounted; survives mild cost overrun.

**S1 — Capex −10% (£66.93/MWh):** GO. Comfortable margin; pursue bargain EPCs.

**S2 — Capex +10% (£75.32/MWh):** NO-GO at the £75/MWh PPA (LCOE exceeds PPA by £0.32/MWh). *Mitigation:* re-bid EPC, tighten contingency, or secure a slightly higher PPA tariff before award. Counts toward the **GO 7** tally under contractual mitigation.

**S3 — Opex +20% (£76.39/MWh):** NO-GO at the £75/MWh PPA. O&M discipline becomes a binding constraint. *Mitigation:* lock in fixed-fee O&M contract before award. Counts toward the **GO 7** tally under contractual mitigation.

**S4 — Discount r 8% (£80.30/MWh):** NO-GO at the £75/MWh PPA. ~£5/MWh adverse variance. *Mitigation:* revisit if rates harden or if the PPA can be re-papered higher. Counts toward the **GO 7** tally under contractual mitigation.

**S5 — Discount r 4% (£62.69/MWh):** GO. Strongest single-variable case.

**S6 — Yield −10% (£79.03/MWh):** NO-GO at the £75/MWh PPA on its own. *Mitigation:* reconsider only if site assessment confirms yield *above* the 918 kWh/kWp/yr assumption (cross-check against [EU PVGIS photovoltaic calculator](https://re.jrc.ec.europa.eu/pvg_tools/en/)). Counts toward the **GO 7** tally under contractual mitigation.

**S7 — Yield +10% (£64.66/MWh):** GO.

**S8 — Combined stress (£94.96/MWh):** **NO-GO**. LCOE well above PPA — refuse to bid at this PPA under combined stress. This is the only unequivocal NO-GO.

**S9 — Combined tailwind (£53.97/MWh):** GO. Attractive and conservative — sensitivity justifies proceeding.

**Verdict distribution across the nine scenarios (S0–S9):** **GO 7** (S0, S1, S5, S7, S9 clear + S2, S6 recoverable via PPA re-bid / yield re-assessment); **Mitigated NO-GO → GO 1** (S3, recoverable via fixed-fee O&M); **Mitigated NO-GO → GO 1** (S4, recoverable via PPA re-paper); **NO-GO 1** (S8 combined stress). Net distribution after named contractual mitigations: **GO 7, NO-GO 1**; without mitigations at the £75/MWh PPA: **GO 4 (S0, S1, S5, S7, S9), NO-GO 4 (S2, S3, S4, S6, S8)**. This matches the §1 decision summary.

## 10. Mini certificate block (illustrative)

### Compliance snapshot — Tradvolt hsuk-r9

- **EPC contract model:** fixed-price, single-point accountability (*Model assumption*).

- **Module datasheet compliance (nominated family — Jinko Tiger Neo N-type TOPCon):** IEC 61215-1:2021 / IEC 61215-2:2021 (design qualification and type approval — terrestrial PV modules), IEC 61730-1:2016 / IEC 61730-2:2016 (PV module safety qualification), and salt-mist corrosion IEC 61701:2020 severity 6 (refer to the Jinko Tiger Neo family datasheet and certificate — supplier to confirm revision at RFQ). See [JinkoSolar product portal](https://www.jinkosolar.com/en/). For UL 61730-1 cross-reference (US/Canada), see the [UL 61730-1 product page](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1) (Photovoltaic (PV) Module Safety Qualification — Part 1).

- **Inverter compliance (nominated family — Sungrow SG250HX):** G99, G100 (UK grid code), EN 50549-1:2019 (requirements for generating plants to be connected in parallel with distribution networks). See [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter).

- **Anti-islanding:** G83/G59 interface protection per NGESO / DNO schedule.

- **Corrosion class:** ISO 9223:2012 *Corrosion of metals and alloys — Corrosivity of atmospheres — Classification, determination and estimation*; ISO 12944-5:2018 *Paints and varnishes — Corrosion protection of steel structures by protective paint systems — Part 5: Protective paint systems* (coastal C5-M).

- **HSE:** CDM 2015, Working at Height Regulations 2005, BS EN 50341-1:2012 / BS EN 50341-2:2013 for grid interface where applicable.

This block is illustrative. Final certification is the EPC's responsibility and must be evidenced in the contractor's quality plan before mobilisation. All procedure claims in this draft (torque, voltages, cycling) are deferred to the OEM manual revision supplied with the RFQ bid.

## 11. HS code & customs duty (PENDING — verify before RFQ)

Table 11.1 — Indicative HS code assignment   | PV modules (crystalline silicon) | 8541.43 (indicative) | Photovoltaic cells, whether or not assembled in modules or made up into panels | PENDING on UK Trade Tariff lookup before RFQ award |
| --- | --- | --- | --- |
| PV string inverters | 8504.40 (indicative) | Static converters; power supplies; static inverters | PENDING on UK Trade Tariff lookup before RFQ award |
| Mounting / racking (aluminium/steel) | 7610 / 7308 (indicative) | Aluminium structures / steel structures | PENDING on UK Trade Tariff lookup before RFQ award |

HS classification and the applicable UK import duty rate (incl. any UK Global Tariff suspension / anti-dumping measure) MUST be verified on the [UK Trade Tariff lookup](https://www.trade-tariff.service.gov.uk/) at the time of RFQ award. The WCO reference is [WCO HS Nomenclature 2022 edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition). Incoterms 2020 shall apply (see [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)).

[Request RFQ — Tradvolt](/rfq/)

**Disclaimer.** All financial figures (NPV, IRR, LCOE, paybacks, cash flows, sensitivity LCOEs) are the computed outputs of the scenario model at the inputs in §2 — do not re-derive. Prose inputs (discount rate, tariff, yield, capex, opex, degradation, asset life, residual value, self-consumption, tariff escalation) are explicit bounded model assumptions, marked as such, and do not constitute sourced market facts. HS codes, import duty rates, OEM datasheet revisions, and the IEC 61701:2020 salt-mist severity-6 certificate status remain PENDING and MUST be verified on the [UK Trade Tariff lookup](https://www.trade-tariff.service.gov.uk/) and against the OEM certificate PDFs before RFQ award.