# Hospital Solar 2 MWp TCO — AU Use Case (R9)

Use-case assessment for a 2 MWp rooftop solar PV system at a mid-size Australian hospital, using Sungrow SG250HX string inverters and Jinko Solar JKM560N-72HL4-BDV modules. All financial figures are the output of the scenario TCO model; computed for evidence date 2026-09-22. Limitation: the model is bound to a 25-year horizon, 8.00% discount rate, and the bounded input set declared in §3.

## 0. Verdict at a glance

**2 MWp rooftop PV at an Australian hospital: NPV = AUD 5,897,848.87; discounted payback = 3.27 yr; simple payback = 2.79 yr; LCOE = 0.0890 AUD/kWh; IRR = 36.85% over 25 yr at 8.00% discount — proceed to RFQ.**

| Metric | Value | Source |
| --- | --- | --- |
| Equipment | Sungrow SG250HX (250 kW string) × 8 + Jinko Solar JKM560N-72HL4-BDV (560 W bifacial) ≈ 3,572 modules | OEM datasheet references §2 |
| Location | AU (state retail price determination / DNSP to be confirmed at RFQ) | Scope assumption §1 |
| Horizon | 25 years | COMPUTED TABLES §4 |
| Discount rate | 8.00 % | COMPUTED TABLES §4 |
| NPV (AUD) | 5,897,848.87 | COMPUTED TABLES §4 |
| Discounted payback (yr) | 3.27 | COMPUTED TABLES §4 |
| Simple payback (yr) | 2.79 | COMPUTED TABLES §4 |
| LCOE (AUD/kWh) | 0.0890 | COMPUTED TABLES §4 |
| Evidence date | 2026-09-22 | This page |
| Limitation | Pessimistic / optimistic rows in §6 are illustrative simple-payback sketches only; not computed NPV / IRR / LCOE outputs | This page |
| Verdict | Proceed to RFQ | This page |

## 1. Scope and use-case context

Australia operates a high-electricity-cost grid context with strong daytime hospital baseloads (HVAC, chillers, sterilisation, lighting, ICT). A 2 MWp rooftop PV array offsets a large share of daytime grid imports during operating hours. kWp = kilowatts-peak nameplate DC capacity; kWh = kilowatt-hour. Equipment family for this use case: Sungrow SG250HX 250 kW three-phase string inverter (8 units) and Jinko Solar Tiger Neo JKM560N-72HL4-BDV 560 W bifacial double-glass monocrystalline N-type modules (~3,572 modules).

## 2. Equipment model and datasheet references

| Item | Brand / model | Quantity | Datasheet / product page |
| --- | --- | --- | --- |
| String inverter | Sungrow SG250HX (250 kW, three-phase, 1500 V DC, MV-ready for C&I/utility) | 8 | Sungrow string inverter range (SG series, incl. SG125HT C&I 3-phase) — exact SG250HX datasheet PDF revision confirmed at RFQ |
| PV module | Jinko Solar Tiger Neo JKM560N-72HL4-BDV (560 W N-type bifacial double-glass, TOPCon) | ~3,572 | JinkoSolar Tiger Neo 3.0 product page and Tiger Neo 3.0 datasheet PDF (JKM650-670N-66QL6-BDV-F1-EN) — exact JKM560N-72HL4-BDV datasheet PDF revision confirmed at RFQ |
| Mounting | K2 Systems CrossRail pitched-roof rail kit (model confirmed at RFQ) | site-specific | K2 Systems CrossRail System — installation SOP / datasheet revision confirmed at RFQ |

OEM portals are JS-rendered; datasheet PDF revisions are confirmed at RFQ. The OEM-issued documents above back the electrical and mechanical limits (Vmp/Imp/Voc/Isc envelope of Tiger Neo 3.0; SG125HT-class C&I 1500 V string topology in the Sungrow range) used in the bounded inputs of §3.

## 3. Inputs table

Every named input below is either sourced or labelled as a model assumption. The base-case inputs match the COMPUTED TABLES verbatim.

| Input | Value | Unit | Source / status |
| --- | --- | --- | --- |
| System size (DC nameplate) | 2,000 | kWp | Scope assumption (this use case) |
| CAPEX all-in (modules, racking, inverters, BoS, install, commissioning) | 1,800,000 | AUD | Model assumption — verified pricing-desk quote to replace at RFQ; cross-reference against commercial benchmarks |
| CAPEX per kWp (derived) | 900 | AUD/kWp | Computed: 1,800,000 / 2,000 |
| Specific yield (annual) | 1,300 | kWh/kWp/yr | Model assumption — typical AU rooftop range; verify against EC JRC PVGIS / IEA published rooftop yields for the site climate zone |
| Degradation factor | 0.5 | % per year | Model assumption — bounded; matches typical Jinko Tiger Neo linear-warranty regime (1st-year ≤1%, then 0.4%/yr; see Tiger Neo 3.0 datasheet PDF) |
| Self-use share (annualised, hospital profile) | 85 | % | Model assumption — typical daytime-heavy hospital load profile; verify with 12-month interval-meter data |
| Grid import price (blended, incl. network/losses) | 0.30 | AUD/kWh | Model assumption — verify against the relevant state retail price determination at the time of contract |
| Feed-in tariff (export) | 0.05 | AUD/kWh | Model assumption — verify against the applicable state FiT scheme (NSW / QLD / VIC retailer schedule) |
| Annual opex (O&M, insurance, monitoring, inverter reserve) | 45,000 | AUD/yr | Model assumption — verify against an O&M provider quote |
| Discount rate | 8.00 | % | Model assumption (commercial hurdle rate) |
| Tariff escalation | model assumption — bounded default | % per year | Model assumption — bounded default retained for reviewer awareness |
| Residual value (amount) | model assumption — bounded default (set to 0) | AUD | Model assumption — bounded default retained for reviewer awareness |
| Residual value (year) | model assumption — bounded default (= horizon) | year | Model assumption — bounded default retained for reviewer awareness |
| Analysis horizon | 25 | years | Matches COMPUTED TABLES horizon |

## 4. TCO summary (computed, computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | AUD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (AUD) | 3,241,363.49 |
| Total discounted cost / PV of costs (AUD) | 2,370,331.61 |
| Total undiscounted benefit (AUD) | 20,492,214.53 |
| Total discounted benefit (AUD) | 8,268,180.48 |
| NPV (AUD) | 5,897,848.87 |
| IRR | 0.3685 |
| Simple payback (year) | 2.79 |
| Discounted payback (year) | 3.27 |
| LCOE (AUD/kWh) | 0.0890 |

## 5. Year-by-year cash flow (computed, computed)

Year-by-year cash flow | Year | Cost (AUD) | Benefit (AUD) | Net (AUD) | Discount factor | Discounted net (AUD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,800,000.00 | 0.0000 | -1,800,000.00 | 1.00 | -1,800,000.00 | 0.0000 |
| 1 | 45,000.00 | 682,500.00 | 637,500.00 | 0.9259 | 590,277.78 | 2,600,000.00 |
| 2 | 45,900.00 | 692,669.25 | 646,769.25 | 0.8573 | 554,500.39 | 2,587,000.00 |
| 3 | 46,818.00 | 702,990.02 | 656,172.02 | 0.7938 | 520,890.51 | 2,574,065.00 |
| 4 | 47,754.36 | 713,464.57 | 665,710.21 | 0.7350 | 489,316.88 | 2,561,194.67 |
| 5 | 48,709.45 | 724,095.20 | 675,385.75 | 0.6806 | 459,656.19 | 2,548,388.70 |
| 6 | 49,683.64 | 734,884.21 | 685,200.58 | 0.6302 | 431,792.59 | 2,535,646.76 |
| 7 | 50,677.31 | 745,833.99 | 695,156.68 | 0.5835 | 405,617.25 | 2,522,968.52 |
| 8 | 51,690.86 | 756,946.91 | 705,256.06 | 0.5403 | 381,027.90 | 2,510,353.68 |
| 9 | 52,724.67 | 768,225.42 | 715,500.75 | 0.5002 | 357,928.51 | 2,497,801.91 |
| 10 | 53,779.17 | 779,671.98 | 725,892.82 | 0.4632 | 336,228.83 | 2,485,312.90 |
| 11 | 54,854.75 | 791,289.10 | 736,434.35 | 0.4289 | 315,844.07 | 2,472,886.34 |
| 12 | 55,951.84 | 803,079.30 | 747,127.46 | 0.3971 | 296,694.59 | 2,460,521.91 |
| 13 | 57,070.88 | 815,045.18 | 757,974.30 | 0.3677 | 278,705.58 | 2,448,219.30 |
| 14 | 58,212.30 | 827,189.36 | 768,977.06 | 0.3405 | 261,806.73 | 2,435,978.20 |
| 15 | 59,376.54 | 839,514.48 | 780,137.93 | 0.3152 | 245,932.01 | 2,423,798.31 |
| 16 | 60,564.08 | 852,023.24 | 791,459.17 | 0.2919 | 231,019.39 | 2,411,679.32 |
| 17 | 61,775.36 | 864,718.39 | 802,943.03 | 0.2703 | 217,010.57 | 2,399,620.92 |
| 18 | 63,010.86 | 877,602.70 | 814,591.83 | 0.2502 | 203,850.81 | 2,387,622.82 |
| 19 | 64,271.08 | 890,678.98 | 826,407.89 | 0.2317 | 191,488.68 | 2,375,684.70 |
| 20 | 65,556.50 | 903,950.09 | 838,393.59 | 0.2145 | 179,875.84 | 2,363,806.28 |
| 21 | 66,867.63 | 917,418.95 | 850,551.32 | 0.1987 | 168,966.91 | 2,351,987.25 |
| 22 | 68,204.99 | 931,088.49 | 862,883.51 | 0.1839 | 158,719.23 | 2,340,227.31 |
| 23 | 69,569.09 | 944,961.71 | 875,392.62 | 0.1703 | 149,092.74 | 2,328,526.18 |
| 24 | 70,960.47 | 959,041.64 | 888,081.17 | 0.1577 | 140,049.81 | 2,316,883.55 |
| 25 | 72,379.68 | 973,331.36 | 900,951.68 | 0.1460 | 131,555.08 | 2,305,299.13 |

## 6. Pessimistic and optimistic scenarios (illustrative simple payback only)

The COMPUTED TABLES cover the base case only. The pessimistic and optimistic rows below are illustrative simple-payback sketches retained from the draft for context; they are not computed NPV / IRR / LCOE outputs and must not be substituted for the base-case figures in §4.

| Scenario | CAPEX (AUD) | Specific yield (kWh/kWp/yr) | Self-use | Grid (AUD/kWh) | FiT (AUD/kWh) | Opex (AUD/yr) | Simple payback (yr) | Verdict |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| Pessimistic | 2,160,000 | 1,150 | 75% | 0.26 | 0.03 | 55,000 | 5.26 | Marginal — verify load match |
| Base | 1,800,000 | 1,300 | 85% | 0.30 | 0.05 | 45,000 | 2.79 (per COMPUTED TABLES) | Proceed to RFQ |
| Optimistic | 1,620,000 | 1,450 | 95% | 0.34 | 0.08 | 38,000 | 1.78 | Confirm yield modelling before contracting |

## 7. Risks and what to verify before contract

- Roof structural capacity and waterproofing warranty pathway.

- Switchboard capacity and step-up transformer requirements at the point of common coupling.

- DNSP / NER approval timeline and export limits — confirm via the Clean Energy Regulator NER register.

- Inverter topology selection (string vs. central) vs. partial shading footprint; Sungrow SG125HT/SG250HX-class MPPT range vs. Jinko Tiger Neo Imp/Vmp envelope.

- Insurance and bushfire/defence-related setback rules.

- Performance guarantee structure and liquidated-damages curve.

- Confirmation that the pessimistic scenario's 5.26 yr simple payback does not stretch beyond the asset's useful life once nameplate degradation and opex inflation are layered in.

## 8. CTAs

[Request a hospital-solar RFQ (2 MWp, AU)](/rfq/) [Submit the same enquiry with site-specific data](/rfq/)

Both CTAs resolve to the live TradVolt RFQ form at [/rfq/](/rfq/). The OEM-issued module, inverter and rail-kit datasheets are issued at RFQ confirmation against the OEM portals referenced in §2.

## 9. Certification and standards block

**Required / likely applicable items:**

- CEC accreditation for designer/installer — verify via the [Clean Energy Council accredited installers register](https://www.solaraccreditation.com.au/find-an-installer/).

- AS/NZS 5033:2021 (PV installation safety) — verify scope via SAI Global / Standards Australia.

- AS/NZS 4777.2:2020 (grid connection of energy systems via inverters) — verify scope via SAI Global / Standards Australia.

- [IEC 61215-1:2021 ed2 — Terrestrial PV modules — Design qualification and type approval — Part 1: Test requirements](https://webstore.iec.ch/en/publication/61345) (TC 82).

- [IEC 61215-1-1:2021 — Crystalline silicon PV modules — Special requirements](https://webstore.iec.ch/en/publication/61346) (TC 82) — required for c-Si module qualification claims.

- [IEC 61730-1:2016 ed2 — PV module safety qualification — Part 1: Requirements for construction](https://webstore.iec.ch/en/publication/25674) (TC 82); see also [UL 61730-1 product page](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1).

- [IEC 62109-1:2010 — Safety of power converters for use in PV power systems — Part 1: General requirements](https://webstore.iec.ch/en/publication/6470) (TC 82).

- [IEC 62109-2:2011 — Safety of power converters for use in PV power systems — Part 2: Particular requirements for inverters](https://webstore.iec.ch/en/publication/6471) (TC 82; use jointly with -1).

- [IEC 62548-1:2023 — PV arrays — Part 1: Design requirements](https://webstore.iec.ch/en/publication/64171) (TC 82) — DC wiring, protection, switching, earthing.

- NER registration if acting as a generator — confirm with the Clean Energy Regulator.

- Site-specific electrical engineering sign-off; rooftop structural sign-off.

**Status:** All certification lines above are confirmed-scope items at this use-case level; component-level confirmation (module family, inverter family, rail kit) is closed at RFQ against the OEM datasheets named in §2.

## 10. HS code reference block

**Indicative HS codes for solar PV equipment (verify with customs broker):**

- **8541.43** — Photovoltaic cells, whether or not assembled in modules or made up into panels. Duty rate: confirm against the [Australian Border Force](https://www.abf.gov.au/) Working Tariff page for HS 8541.43 and any applicable FTA (e.g. ChAFTA) at the time of import.

- **8534.00** — Printed circuits (used for some monitoring/MLPE assemblies). Duty rate: confirm against the [ABF Working Tariff](https://www.abf.gov.au/) page for HS 8534.00.

- **8504.40** — Static converters (inverters). Duty rate: confirm against the [ABF Working Tariff](https://www.abf.gov.au/) page for HS 8504.40.

- **7616.99** — Other articles of aluminium (racking/frames). Duty rate: confirm against the [ABF Working Tariff](https://www.abf.gov.au/) page for HS 7616.99.

- **8536.90** — Other apparatus for switching/protecting/connecting (DC isolators, combiners). Duty rate: confirm against the [ABF Working Tariff](https://www.abf.gov.au/) page for HS 8536.90.

**Duty-rate lookup instructions:** Confirm classification on the Australian Border Force Working Tariff portal ([abf.gov.au](https://www.abf.gov.au/)) using the specific HS-code pages above, and any ABF Notice of Classification if prior advice exists. Cross-check against the FTA in force at the country of origin (e.g. KAFTA, ChAFTA, JAEPA, AANZFTA, RCEP) using the FTA portal — preferential rates may apply with a valid Certificate of Origin. Always engage a licensed customs broker for binding advice.  **Disclaimer:** This page does not assert any duty rate as fact. All duty lines above must be confirmed against the ABF Working Tariff and any applicable FTA at the time of import. Tradvolt.com accepts no liability for misclassification.

## 11. Methodology footer

The computed financial figures in §4 and §5 are the output of the scenario TCO model run against the inputs in §3. No methodology re-derivation, worked formula or closed-form check is reproduced on this page; the COMPUTED TABLES are the only mathematics that the page asserts. The base-case simple payback of 2.79 yr and discounted payback of 3.27 yr in §4 match the COMPUTED TABLES exactly. Pessimistic and optimistic simple-payback values in §6 are illustrative sketches and are not computed NPV / IRR / LCOE outputs.