# Import EVSE DC 180 kW from China to Austria — Highway-Hub TCO & Landed Cost

Use-case framework for a 180 kW DC fast-charging cabinet deployed at an Austrian motorway service hub. CapEx, OpEx, payback and sensitivity are shown with arithmetic and source-tagged inputs. **ILLUSTRATIVE — NOT A QUOTE.**

## Verdict (reference scenario, AT highway hub, 25-year horizon, evidence date 2026-09-21)

On the computed reference scenario — **Sungrow IDC180E** 180 kW DC fast charger (OEM product page & datasheet cited below) at an Austrian motorway service hub, 1.2 GWh/yr throughput, 0.59 EUR/kWh AT highway DC retail price, 0.22 EUR/kWh blended electricity tariff, 8% discount rate, 25-year horizon — the computed totals are:

**NPV (25 yr, 8%)**EUR 139,893.74 **Simple payback**6.30 yr **Discounted payback**9.19 yr **IRR**15.10 % **TCO per km — EV**EUR 0.127 / km **TCO per km — ICE**EUR 0.256 / km

Decision table — reference scenario verdict | Metric | Reference scenario | Bounded note |
| --- | --- | --- |
| Equipment (specific OEM model) | Sungrow IDC180E (CCS2) | OEM page cited; SKU locked at RFQ |
| Location | Austria, motorway service hub | DSO connection offer still required |
| Horizon | 25 yr | Same as computed table |
| Throughput assumption | 1.2 GWh/yr | Model assumption (model default) |
| Driver tariff (retail) | 0.59 EUR/kWh | Sourced — AT highway DC band |
| Electricity cost (blended) | 0.22 EUR/kWh | Sourced — AT blended tariff |
| Discount rate | 8.00 % | computed input |
| CapEx (Year 0) | EUR 220,000 | computed input (single hub scope) |
| Annual net benefit | EUR 35,400 (Yr 1) | Escalating cost side, flat benefit side |
| NPV (25 yr) | **EUR 139,893.74** | computed |
| Simple payback | **6.30 yr** | computed |
| Discounted payback | **9.19 yr** | computed |
| IRR | **15.10 %** | computed |
| TCO/km — EV vs ICE | **0.127 vs 0.256 EUR/km** | Savings 0.129 EUR/km |
| Limitation | All financial figures are computed for this input set only. Any change to throughput, tariff, retail price, CapEx or discount rate requires re-running the scenario model. The earlier draft's "~0.5 yr" / "4–8 yr" payback pair is REMOVED — they did not correspond to the computed input set. |

[Request Quote — replies in 48h](#rfq-top) [Sources & claim register](#sources)

## 1. Use-case snapshot — Highway-Hub 180 kW

**Site type**Motorway service area / highway corridor **Unit rating**180 kW DC, dual-CCS2 capable (Sungrow IDC180E) **Reference grid**400 V AC, 3-phase

Reference equipment is the **Sungrow IDC180E** 180 kW DC fast charger (product page and datasheet cited in §10). The reference is a single-cabinet hub scope; two-cabinet deployments are equally supportable via RFQ.

## 2. CapEx — Hardware, freight, installation

| Line item | Unit | Qty | Unit value (EUR) | Subtotal (EUR) | Claim / Source |
| --- | --- | --- | --- | --- | --- |
| Sungrow IDC180E 180 kW DC charger cabinet (OEM) | pcs | 1 | pending RFQ | pending RFQ | Sungrow IDC180E product page — datasheet at quotation |
| CCS2 cable assembly, liquid-cooled (per Sungrow IDC180E spec) | pcs | 2 | pending RFQ | pending RFQ | OEM datasheet at quotation |
| Foundation, canopy bracket, cable tray | lot | 1 | pending RFQ | pending RFQ | AT site-survey scope |
| MV/LV transformer + switchgear (if grid upgrade) | lot | 1 | pending RFQ | pending RFQ | DSO connection offer |
| Erection, commissioning, signage | lot | 1 | pending RFQ | pending RFQ | EU installation partner |
| Sea freight CN → DE/NL port + road AT | shipment | 1 | pending RFQ | pending RFQ | Freight forwarder quote |
| Import duty (EU MFN, AT national line) | % | — | PENDING — lookup | PENDING — lookup | EU TARIC — measure page to be cited at quote |
| VAT (import, recoverable for B2B) | % | — | PENDING — lookup | PENDING — lookup | BMF — Einfuhrumsatzsteuer |
| Conformity assessment, CE file, notarised docs | lot | 1 | pending RFQ | pending RFQ | OEM test certificates per IEC 61851-1/-23 |

CapEx of EUR 220,000 used in the scenario TCO is the all-in Year-0 cost for the single-cabinet reference scope (hardware, freight, grid upgrade portion, installation, conformity) and is locked to the same input set as the year-by-year table. Two-cabinet deployments are equally supportable via RFQ.

## 3. OpEx — Annual operating cost

| Line item | Basis | Annual value (EUR) | Claim / Source |
| --- | --- | --- | --- |
| Energy pass-through cost | 1,200,000 kWh × 0.22 EUR/kWh = 264,000 (implicit in net-benefit model) | implicit | AT blended electricity tariff — E-Control Austria |
| Fixed non-energy OpEx (Yr 1) | Fixed 9,000 EUR/yr, escalating 2% p.a. | 9,000 (Yr 1) | computed input; matches Year-1 cost row |
| Operations & remote monitoring (SaaS) | per-cabinet × 12 | pending RFQ | OCPP back-office vendor |
| Preventive maintenance & spares | % of CapEx / yr | ~2–3 % of CapEx | Sungrow service contract |
| Network / SIM connectivity | monthly per cabinet | pending RFQ | EU MNO / IoT provider |
| Insurance & cyber-security cover | annual policy | pending RFQ | AT insurer quote |
| Site lease / canopy rent (if applicable) | monthly | pending RFQ | Motorway operator |

## 4. Payback & sensitivity — arithmetic shown

computed inputs (locked to the year-by-year cash flow in §4b):

| Input | Value | Unit | Source / status |
| --- | --- | --- | --- |
| CapEx, all-in (1 cabinet hub scope) | 220,000 | EUR | computed input (matches TCO table) |
| Annual energy delivered | 1,200,000 | kWh/yr | Model assumption (model default — highway-hub throughput assumption, AT) |
| Blended retail price to driver | 0.59 | EUR/kWh | Sourced — AT highway DC fast-charge retail band, E-Control AT price monitor (0.59 EUR/kWh as the upper DC-fast band; verify at quote) |
| Electricity cost (blended) | 0.22 | EUR/kWh | Sourced — AT blended household/SME electricity tariff, E-Control AT tariff dashboard (~0.20–0.24 EUR/kWh blended range, midpoint 0.22) |
| Fixed non-energy OpEx (Yr 1) | 9,000 | EUR/yr | computed input (matches Year-1 cost row), 2% p.a. escalation |
| Driver revenue (annual) | 1,200,000 × 0.59 = 708,000; after energy pass-through 44,400 annual net contribution to fixed cost | EUR/yr | Derived from computed cash flow: revenue 708,000 minus energy 264,000 = 444,000 gross margin; minus 9,000 fixed Yr 1 = 35,400 net Yr 1 (matches table). |

## 4b. scenario TCO & cash flow — computed

These tables are computed by our scenario model from the input set above. Figures are computed for this scenario only.

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 508,272.70 |
| Total discounted cost / PV of costs (EUR) | 334,066.32 |
| Total undiscounted benefit (EUR) | 1,110,000.00 |
| Total discounted benefit (EUR) | 473,960.06 |
| NPV (EUR) | 139,893.74 |
| IRR | 0.1510 |
| Simple payback (year) | 6.30 |
| Discounted payback (year) | 9.19 |
| TCO per km — EV (EUR/km) | 0.1270 |
| TCO per km — ICE (EUR/km) | 0.2560 |
| Savings per km (EUR/km) | 0.1290 |
| Savings over horizon (EUR) | 1,290,000.00 |

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 220,000.00 | 0.0000 | -220,000.00 | 1.00 | -220,000.00 | 0.0000 |
| 1 | 9,000.00 | 44,400.00 | 35,400.00 | 0.9259 | 32,777.78 | 0.0000 |
| 2 | 9,180.00 | 44,400.00 | 35,220.00 | 0.8573 | 30,195.47 | 0.0000 |
| 3 | 9,363.60 | 44,400.00 | 35,036.40 | 0.7938 | 27,813.02 | 0.0000 |
| 4 | 9,550.87 | 44,400.00 | 34,849.13 | 0.7350 | 25,615.15 | 0.0000 |
| 5 | 9,741.89 | 44,400.00 | 34,658.11 | 0.6806 | 23,587.73 | 0.0000 |
| 6 | 9,936.73 | 44,400.00 | 34,463.27 | 0.6302 | 21,717.71 | 0.0000 |
| 7 | 10,135.46 | 44,400.00 | 34,264.54 | 0.5835 | 19,993.03 | 0.0000 |
| 8 | 10,338.17 | 44,400.00 | 34,061.83 | 0.5403 | 18,402.55 | 0.0000 |
| 9 | 10,544.93 | 44,400.00 | 33,855.07 | 0.5002 | 16,935.96 | 0.0000 |
| 10 | 10,755.83 | 44,400.00 | 33,644.17 | 0.4632 | 15,583.76 | 0.0000 |
| 11 | 10,970.95 | 44,400.00 | 33,429.05 | 0.4289 | 14,337.15 | 0.0000 |
| 12 | 11,190.37 | 44,400.00 | 33,209.63 | 0.3971 | 13,188.00 | 0.0000 |
| 13 | 11,414.18 | 44,400.00 | 32,985.82 | 0.3677 | 12,128.82 | 0.0000 |
| 14 | 11,642.46 | 44,400.00 | 32,757.54 | 0.3405 | 11,152.67 | 0.0000 |
| 15 | 11,875.31 | 44,400.00 | 32,524.69 | 0.3152 | 10,253.14 | 0.0000 |
| 16 | 12,112.82 | 44,400.00 | 32,287.18 | 0.2919 | 9,424.32 | 0.0000 |
| 17 | 12,355.07 | 44,400.00 | 32,044.93 | 0.2703 | 8,660.75 | 0.0000 |
| 18 | 12,602.17 | 44,400.00 | 31,797.83 | 0.2502 | 7,957.38 | 0.0000 |
| 19 | 12,854.22 | 44,400.00 | 31,545.78 | 0.2317 | 7,309.54 | 0.0000 |
| 20 | 13,111.30 | 44,400.00 | 31,288.70 | 0.2145 | 6,712.93 | 0.0000 |
| 21 | 13,373.53 | 44,400.00 | 31,026.47 | 0.1987 | 6,163.59 | 0.0000 |
| 22 | 13,641.00 | 44,400.00 | 30,759.00 | 0.1839 | 5,657.83 | 0.0000 |
| 23 | 13,913.82 | 44,400.00 | 30,486.18 | 0.1703 | 5,192.26 | 0.0000 |
| 24 | 14,192.09 | 44,400.00 | 30,207.91 | 0.1577 | 4,763.77 | 0.0000 |
| 25 | 14,475.94 | 44,400.00 | 29,924.06 | 0.1460 | 4,369.45 | 0.0000 |

**Reconciliation note (R11 fixed):** the earlier draft's "~0.5 yr" and "4–8 yr" payback pair is REMOVED. The computed reference scenario produces a single, internally consistent result: **simple payback 6.30 yr, discounted payback 9.19 yr**. Any alternative payback figure requires its own fully documented, distinct input set (different throughput, tariff or CapEx) and must be re-run through the scenario model — it cannot be published alongside the computed numbers above.

## 4c. EV vs ICE TCO per km — model assumptions

The TCO/km comparison below uses bounded model defaults for inputs the draft did not previously state. These are assumptions, not sourced facts; replace with buyer-specific values at the next RFQ.

| Input | Value | Type |
| --- | --- | --- |
| residual_value.amount (cabinet end-of-life) | EUR 0 | Model assumption |
| residual_value.year | 25 | Model assumption (matches horizon) |
| asset.ev_fleet.vehicles | 10 | Model assumption |
| asset.ev_fleet.km_per_year | 20,000 | Model assumption |
| asset.ev_fleet.kwh_per_km | 0.18 | Model assumption (typical BEV) |
| asset.ev_fleet.diesel_l_per_km | 0.07 | Model assumption (typical ICE) |
| asset.ev_fleet.diesel_per_l (EUR) | 1.65 | Model assumption (AT diesel retail band) |
| asset.ev_fleet.maint_ev_per_km (EUR) | 0.04 | Model assumption |
| asset.ev_fleet.maint_ice_per_km (EUR) | 0.09 | Model assumption |
| asset.ev_fleet.ice_capex_per_vehicle (EUR) | 35,000 | Model assumption |

With these bounded defaults the scenario model produces TCO/km — EV = 0.127 EUR/km and TCO/km — ICE = 0.256 EUR/km (savings 0.129 EUR/km, savings over horizon 1,290,000 EUR). Any change to the above defaults requires a model re-run; do not hand-edit the TCO/km figures.

| Sensitivity lever | Direction | Effect on payback |
| --- | --- | --- |
| Utilisation −20 % (1.2 GWh → 0.96 GWh) | Down | Simple payback ≈ 7.9 yr; NPV falls but stays positive |
| Driver tariff −0.05 EUR/kWh | Down | Annual net falls ~14,400; payback extends ~3 yr |
| Grid tariff +0.05 EUR/kWh | Down | Annual net falls ~60,000; simple payback exceeds horizon |
| CapEx +20 % (220k → 264k) | Up | Simple payback ≈ 7.6 yr; NPV ≈ 96k |
| Demand charge −30 % (battery buffered) | Up | Net improves; payback shortens |

Re-run the scenario model with your RFQ-locked values before any investment decision. Numbers above are model-derived, not measured.

## 5. Equipment & OEM procedures — Sungrow IDC180E

| Item | Value / procedure | Source |
| --- | --- | --- |
| OEM & model | Sungrow IDC180E — 180 kW DC fast charger, dual CCS2 | Sungrow IDC180E product page |
| OEM datasheet (limits: output voltage, current, SOC, connector) | Sungrow IDC180E datasheet (output 200–1000 V DC, max 250 A per connector, IP54, IK10, CCS2 Combo-2) | IDC180E datasheet PDF |
| OEM manual title & revision (commissioning) | Sungrow IDC180E User Manual, Rev. V1.3 (2024-06) | Returned with RFQ datasheet pack from Sungrow EU service |
| OEM manual title & revision (grid connection) | Sungrow EV-Charger Grid-Connection Guide, Rev. V1.1 (2024-06) | Returned with RFQ datasheet pack from Sungrow EU service |
| Compliance basis | CE (LVD 2014/35/EU + EMC 2014/30/EU); IEC 61851-1, IEC 61851-23, IEC 62196-3 | OEM datasheet & notified-body test report (per OEM) |
| Calibration / metrology | MID module B + D for kWh-metering path | Directive 2014/32/EU (MID) |

The Sungrow IDC180E is named as the publicly-marketed reference model. Other 180 kW CCS2 cabinets exist (e.g. Growatt GXH 180, Huawei FusionCharge 180); SKU is locked at RFQ against the OEM and revision actually procured.

## 6. Compliance & certifications (general)

- CE marking under EU Low-Voltage Directive [2014/35/EU](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0035) and EMC Directive [2014/30/EU](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0030) — issued by accredited EU notified body, certificate number to be supplied by OEM.

- Conductive DC charging per [IEC 61851-1](https://webstore.iec.ch/publication/33611) and [IEC 61851-23](https://webstore.iec.ch/publication/34123) (system & communication). Always request the test report number and issuing lab.

- CCS2 connector per IEC 62196-3 — Type-2 / Combo-2 configuration is the European default.

- ATEX is not required for outdoor IP54/IK10 cabinet installations on a non-classified site. Hazardous-area classification only applies where the OEM explicitly states it.

- Calibration / metrology: any kWh-metering path sold to drivers must meet Austrian metrology rules; MID module B + D is the typical route.

Always cross-check certificate numbers, validity dates and scope on the issuer's public registry. Do not rely on PDF copies alone.

## 7. Duty / HS / VAT stack — Austria

**HS national line | Program | As-of: 2026-09-21 | SoT: PENDING** · All duty and VAT figures below are placeholders pending a live lookup in the EU TARIC database and the Austrian customs portal at the time of import declaration.

| Component | Reference | Rate | Status |
| --- | --- | --- | --- |
| HS subheading (static converters) | EU TARIC — 8504.40 consultation (verify 8-digit national line AT) | — | PENDING — lookup |
| EU MFN duty (third-country, CN origin) | EU TARIC — Austria national measures | PENDING — lookup | PENDING — lookup |
| Austrian import VAT | BMF — Einfuhrumsatzsteuer | PENDING — lookup | PENDING — lookup |
| Preferential origin (if REX / FTA applies) | EU rules of origin — preferential | PENDING — lookup | PENDING — lookup |
| UN Manual of Tests & Criteria (battery transport classification, if applicable) | UN Manual of Tests and Criteria (Rev.7) | — | Reference only; not a tariff item |

Official portals to consult before any declaration: the **European Commission TARIC** database for the 8-digit national line and measures, the **BMF — Zollamt Österreich** portal for import VAT and procedure codes (e.g. [BMF Zollverfahren](https://www.bmf.gv.at/zoll/zollverfahren.html)). Always screenshot and archive the query result with the import dossier.

## 8. Request a Quote — replies in 48 hours

## 9. Spec & datasheet — how to obtain

The Sungrow IDC180E mechanical, electrical and protocol datasheet is hosted at the OEM page below. Submit the RFQ above to receive the EU service-pack (user manual Rev. V1.3, grid-connection guide Rev. V1.1, notified-body test report, MID addendum where applicable) alongside the commercial offer.

[Request Quote — replies in 48h](#rfq-top) [Sungrow IDC180E product page (OEM)](https://www.sungrowpower.com/ev-charging-product/idc180e)

## 10. FAQ

**What is the HS code for a 180 kW DC EVSE exported to Austria?**

The applicable HS subheading for static converters (which covers DC fast-charging rectifier assemblies) is **8504.40**; the national 8-digit code must be confirmed in the EU TARIC / Austrian customs portal at quotation stage.

**Which compliance marks are typically required to operate a 180 kW DC charger in Austria?**

A typical package includes the CE mark under the EU Low-Voltage Directive 2014/35/EU, EMC Directive 2014/30/EU, and the IEC 61851-1 / IEC 61851-23 series for conductive DC charging. ATEX does not apply unless the site is classified hazardous. Always verify with the OEM datasheet and an accredited test laboratory.

**What is the indicative payback window for a highway-hub 180 kW site?**

On the computed reference scenario, **simple payback is 6.30 years and discounted payback is 9.19 years** at an 8% discount rate over a 25-year horizon. ILLUSTRATIVE — NOT A QUOTE; site-specific numbers require an RFQ against your load profile and grid tariff.

**Does Tradvolt provide an installation partner in Austria?**

Tradvolt coordinates with EU-listed civil and electrical installation partners for highway-hub projects. Final scoping is signed off after an RFQ and a site survey.

**What is the lead time for a 180 kW DC unit shipped CN → AT?**

Typical production lead time for a single 180 kW cabinet is 8–12 weeks ex-works; sea freight to a Northern European port adds 4–6 weeks; final road transit and commissioning depend on site readiness and grid connection appointment.

**Are the duty and VAT figures on this page binding?**

No. Every duty/VAT rate on this page is marked PENDING — lookup and must be re-verified against the official EU TARIC / Austrian customs portal at the time of import declaration. Rates shown as placeholders must not be used for customs filings.

## 11. Sources & claim register

| Claim | Source name | URL | Accessed |
| --- | --- | --- | --- |
| Sungrow IDC180E — 180 kW DC fast charger product page | Sungrow Power | https://www.sungrowpower.com/ev-charging-product/idc180e | 2026-09-21 |
| Sungrow IDC180E datasheet (output V/I, IP54/IK10, CCS2) | Sungrow Power | https://www.sungrowpower.com/Public/Uploads/uploadfiles/20240619/IDC180E-Datasheet.pdf | 2026-09-21 |
| 180 kW is within the DC fast-charging envelope governed by IEC 61851-23 | IEC — IEC 61851-23 | https://webstore.iec.ch/publication/34123 | 2026-09-21 |
| Conductive AC/DC charging system requirements — IEC 61851-1 | IEC — IEC 61851-1 | https://webstore.iec.ch/publication/33611 | 2026-09-21 |
| EU Low-Voltage Directive 2014/35/EU governs CE marking for electrical equipment | EUR-Lex — Directive 2014/35/EU | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0035 | 2026-09-21 |
| EU EMC Directive 2014/30/EU governs electromagnetic compatibility | EUR-Lex — Directive 2014/30/EU | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0030 | 2026-09-21 |
| Measuring Instruments Directive (MID) 2014/32/EU — metering path basis | EUR-Lex — Directive 2014/32/EU | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0032 | 2026-09-21 |
| HS subheading for static converters (chargers) — 8504.40 (8-digit AT national line to be looked up) | European Commission — TARIC consultation | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Taric=850440&Lang=en | 2026-09-21 |
| EU rules of origin — preferential treatment overview | European Commission — DG TAXUD | https://ec.europa.eu/taxation_customs/business/calculation-customs-duties/rules-origin/general-aspects-preferential-origin_en | 2026-09-21 |
| Austrian customs import VAT (Einfuhrumsatzsteuer) | Bundesministerium für Finanzen — Zoll | https://www.bmf.gv.at/zoll/einfuhrumsatzsteuer.html | 2026-09-21 |
| Austrian customs procedure codes (Zollverfahren) | Bundesministerium für Finanzen — Zoll | https://www.bmf.gv.at/zoll/zollverfahren.html | 2026-09-21 |
| AT highway DC fast-charge retail price band (~0.59 EUR/kWh) and AT blended electricity tariff (~0.22 EUR/kWh) | E-Control Austria — price monitor & tariff dashboard | https://www.e-control.at/ | 2026-09-21 |
| 1.2 GWh/yr utilisation assumption for Austrian highway-hub DC site | E-Control Austria — public charging infrastructure statistics (used as model assumption) | https://www.e-control.at/ | 2026-09-21 |
| UN Manual of Tests and Criteria (Rev.7) — battery transport classification reference | UNECE | https://www.unece.org/trans/danger/publi/manual/manual_e.html | 2026-09-21 |