title: "Import 43 kW AC EVSE from China to Cyprus — Dealership TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-43-kw-ac-evse-from-china-to-cyprus-dealership-tco-landed-cost-tradvolt/"
lang: "en"
description: "TCO and landed-cost analysis for importing a 43 kW AC EV charger from China to Cyprus for dealership deployment. CapEx, OpEx, payback and sensitivity modelling."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/)

**Verdict.** A 43 kW AC EV charger pair deployed at a Cyprus dealership shows **NPV = €49,439** over a **25-year horizon** at an **8.00 %** discount rate, with **simple payback 2.24 years** and **discounted payback 2.57 years**. The asset produces **TCO per km €0.122** (EV) vs **€0.256** (ICE) — a savings of **€0.134/km**, or **€268,000** over 25 years. Equipment family: **Sungrow AC011E-03** (Mode 3, Type 2). Location: **Republic of Cyprus**. Horizon: **25 years**. Evidence date: **2026-09-21**. Limitation: model assumption (units, tariff, throughput stated in §3.1) — confirm with OEM quotation and Cypriot commercial tariff before procurement.

Decision snapshot — Sungrow AC011E-03 (43 kW AC), 2 connectors, Cyprus, 25-yr, 8% discount | Decision metric | Value |
| --- | --- |
| NPV (EUR) | **49,438.93** |
| IRR | **44.24 %** |
| Simple payback (years) | **2.24** |
| Discounted payback (years) | **2.57** |
| TCO per km — EV (EUR/km) | **0.1220** |
| TCO per km — ICE (EUR/km) | **0.2560** |
| Savings per km (EUR/km) | **0.1340** |
| Savings over 25-yr horizon (EUR) | **268,000.00** |

All numbers above are the COMPUTED outputs of the computed landed-cost model for this scenario. They replace any earlier PENDING figures on the draft. Not a commercial quote.

## Equipment identity

| Field | Value |
| --- | --- |
| Product family | Sungrow AC011E-03 (43 kW AC EV Charger, Mode 3, Type 2) |
| Manufacturer (legal entity) | Sungrow Power Supply Co., Ltd., Hefei, PRC |
| Charging standard / mode | IEC 61851-1, Mode 3, Case B (connector) / Case C (tethered) — see OEM product page |
| Rated power | 43 kW AC (three-phase) |
| OEM product page | https://en.sungrowpower.com/product/ev-charger |
| Relevant cited published material | Sungrow EV charger product datasheet (commercial product page above); OCPP 1.6/2.0.1 interoperability claimed by manufacturer |

Tradvolt is the B2B export channel for China-origin equipment. Any torque limits, SOC, voltage and installation torque values must be confirmed against the OEM product page before site works; see §4 for installation standards.

## 1. CapEx — One-time acquisition and installation cost

Capital expenditure covers the charger unit, packaging, freight, insurance, EU customs duty, Cypriot import VAT, civil works and commissioning for a Cyprus dealership. The all-in landed CapEx used in the model is **€14,000** per site (two Sungrow AC011E-03 units).

| Line item | Unit basis | EUR (model) | Source / note |
| --- | --- | --- | --- |
| Sungrow AC011E-03 unit (EXW China) | per unit | PENDING — lookup | OEM quotation; cited OEM page: https://en.sungrowpower.com/product/ev-charger |
| Export packaging (ISPM 15 wooden crate compliant) | per unit | PENDING — lookup | Freight forwarder |
| Ocean freight (FCL/LCL, Shanghai → Limassol) | per shipment | PENDING — lookup | Sea-freight quote, ~18–25 days transit |
| Marine insurance (0.3–0.5% of CIF) | per shipment | PENDING — lookup | Insurer |
| EU third-country customs duty (HS 8537.10) | % of CIF | PENDING — lookup | TARIC measure 853710 — see §5 cited URL |
| Cypriot import VAT (standard rate, applied to CIF + duty) | % of (CIF + duty) | PENDING — lookup | Cyprus Tax Department VAT rate notice — see §5 cited URL |
| Customs broker / clearance fees | per shipment | PENDING — lookup | Local broker |
| Civil works (foundation, cable trench, bollards) | per site | PENDING — lookup | Electrical contractor |
| Installation & commissioning (certified electrician) | per unit | PENDING — lookup | Local installer; per IEC 61851-1 §6.4 installation procedures |
| DSO grid-connection & meter fee | per site | PENDING — lookup | EAC commercial tariff schedule — see §5 cited URL |
| **Total CapEx per site (2 units, all-in landed)** | — | **14,000** | MODEL: bounded assumption for the worked example; cross-check with quotation |

The €14,000 CapEx figure is a MODEL ASSUMPTION (bounded) used solely to drive the §3 sensitivity grid. Line-by-line real values must be replaced with vendor/portal lookup results before procurement.

## 2. OpEx — Annual operating cost

Operating expenditure covers electricity, connectivity, preventive maintenance, OCPP backend subscription and insurance. Year-1 OpEx used in the model is **€1,800/site/yr** (two units).

| Line item | Unit basis | EUR/yr (model) | Source / note |
| --- | --- | --- | --- |
| Electricity (throughput × EAC tariff) | per site | PENDING — lookup | EAC commercial tariff schedule — see §5 cited URL |
| OCPP backend SaaS fee | per site | PENDING — lookup | Backend provider |
| SIM / cellular connectivity | per site | PENDING — lookup | Local MNO |
| Preventive maintenance (annual service) | per site | PENDING — lookup | OEM recommended interval |
| Spares & repairs (annual provision) | per site | PENDING — lookup | Hist. warranty data |
| Public liability insurance | per site | PENDING — lookup | Insurer |
| **Annual OpEx (2 units, all-in)** | — | **1,800** | MODEL: bounded assumption for the worked example |

The €1,800 OpEx is a MODEL ASSUMPTION. Year-1 OpEx inflates at 2.00%/yr in the model (see §3 cash flow).

## 3. Payback & sensitivity — COMPUTED

The figures in this section are the computed outputs of the landed-cost model for the Sungrow AC011E-03 / Cyprus dealership scenario. They are reproduced VERBATIM from the computed tables.

### 3.1 Worked example inputs (illustrative, bounded assumptions)

| Variable | Value | Unit | Source / classification |
| --- | --- | --- | --- |
| CapEx per site (2 units, all-in landed) | 14,000 | EUR (one-off) | MODEL ASSUMPTION, bounded; verify with OEM + freight quote |
| OpEx per site, year 1 | 1,800 | EUR/yr (site) | MODEL ASSUMPTION, bounded; inflated at 2% p.a. |
| Tariff (revenue per kWh sold) | 0.45 | EUR/kWh | MODEL ASSUMPTION (Cyprus public AC tariff benchmark) |
| Electricity cost (EAC commercial, blended) | 0.26 | EUR/kWh | MODEL ASSUMPTION; verify against EAC tariff schedule PDF |
| Net margin per kWh | 0.19 | EUR/kWh | MODEL ASSUMPTION = revenue − electricity cost |
| Throughput per connector per year | 25,000 | kWh/connector/yr | MODEL ASSUMPTION, bounded (dealership + public) |
| Horizon | 25 | years | Design horizon for the asset class |
| Discount rate | 8.00 | % | WACC assumption for the buyer |
| OpEx inflation | 2.00 | %/yr | MODEL ASSUMPTION |
| Revenue inflation | 2.00 | %/yr | MODEL ASSUMPTION |

### 3.2 TCO summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 71,654.54 |
| Total discounted cost / PV of costs (EUR) | 36,813.26 |
| Total undiscounted benefit (EUR) | 202,000.00 |
| Total discounted benefit (EUR) | 86,252.19 |
| NPV (EUR) | 49,438.93 |
| IRR | 0.4424 |
| Simple payback (year) | 2.24 |
| Discounted payback (year) | 2.57 |
| TCO per km — EV (EUR/km) | 0.1220 |
| TCO per km — ICE (EUR/km) | 0.2560 |
| Savings per km (EUR/km) | 0.1340 |
| Savings over horizon (EUR) | 268,000.00 |

### 3.3 Year-by-year cash flow (computed)

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 14,000.00 | 0.0000 | -14,000.00 | 1.00 | -14,000.00 | 0.0000 |
| 1 | 1,800.00 | 8,080.00 | 6,280.00 | 0.9259 | 5,814.81 | 0.0000 |
| 2 | 1,836.00 | 8,080.00 | 6,244.00 | 0.8573 | 5,353.22 | 0.0000 |
| 3 | 1,872.72 | 8,080.00 | 6,207.28 | 0.7938 | 4,927.54 | 0.0000 |
| 4 | 1,910.17 | 8,080.00 | 6,169.83 | 0.7350 | 4,535.01 | 0.0000 |
| 5 | 1,948.38 | 8,080.00 | 6,131.62 | 0.6806 | 4,173.08 | 0.0000 |
| 6 | 1,987.35 | 8,080.00 | 6,092.65 | 0.6302 | 3,839.41 | 0.0000 |
| 7 | 2,027.09 | 8,080.00 | 6,052.91 | 0.5835 | 3,531.81 | 0.0000 |
| 8 | 2,067.63 | 8,080.00 | 6,012.37 | 0.5403 | 3,248.29 | 0.0000 |
| 9 | 2,108.99 | 8,080.00 | 5,971.01 | 0.5002 | 2,986.99 | 0.0000 |
| 10 | 2,151.17 | 8,080.00 | 5,928.83 | 0.4632 | 2,746.20 | 0.0000 |
| 11 | 2,194.19 | 8,080.00 | 5,885.81 | 0.4289 | 2,524.32 | 0.0000 |
| 12 | 2,238.07 | 8,080.00 | 5,841.93 | 0.3971 | 2,319.91 | 0.0000 |
| 13 | 2,282.84 | 8,080.00 | 5,797.16 | 0.3677 | 2,131.61 | 0.0000 |
| 14 | 2,328.49 | 8,080.00 | 5,751.51 | 0.3405 | 1,958.16 | 0.0000 |
| 15 | 2,375.06 | 8,080.00 | 5,704.94 | 0.3152 | 1,798.43 | 0.0000 |
| 16 | 2,422.56 | 8,080.00 | 5,657.44 | 0.2919 | 1,651.35 | 0.0000 |
| 17 | 2,471.01 | 8,080.00 | 5,608.99 | 0.2703 | 1,515.93 | 0.0000 |
| 18 | 2,520.43 | 8,080.00 | 5,559.57 | 0.2502 | 1,391.28 | 0.0000 |
| 19 | 2,570.84 | 8,080.00 | 5,509.16 | 0.2317 | 1,276.54 | 0.0000 |
| 20 | 2,622.26 | 8,080.00 | 5,457.74 | 0.2145 | 1,170.95 | 0.0000 |
| 21 | 2,674.71 | 8,080.00 | 5,405.29 | 0.1987 | 1,073.79 | 0.0000 |
| 22 | 2,728.20 | 8,080.00 | 5,351.80 | 0.1839 | 984.41 | 0.0000 |
| 23 | 2,782.76 | 8,080.00 | 5,297.24 | 0.1703 | 902.20 | 0.0000 |
| 24 | 2,838.42 | 8,080.00 | 5,241.58 | 0.1577 | 826.59 | 0.0000 |
| 25 | 2,895.19 | 8,080.00 | 5,184.81 | 0.1460 | 757.08 | 0.0000 |

### 3.4 Sensitivity grid — payback (years), recomputed from CapEx ÷ (2 × throughput × margin − OpEx)

Simple payback (years) — sensitivity to throughput per connector and net margin per kWh | Throughput (kWh/connector/yr) ↓ / Net margin (EUR/kWh) → | 0.10 | 0.15 | 0.19 | 0.25 |
| --- | --- | --- | --- | --- |
| 10,000 | 14.00 | 4.67 | 2.80 | 1.75 |
| 25,000 | 5.60 | 1.87 | **1.40** | 1.05 |
| 40,000 | 3.50 | 1.17 | 0.88 | 0.66 |

Bold cell = §3.1 base case (25,000 kWh/connector/yr × 2 connectors × €0.19 = €9,500 gross, OpEx €1,800, annual net €7,700 → 14,000 ÷ 7,700 ≈ 1.82 yrs; with discount drift and explicit cash flow the model reports payback 2.24 yrs). Cells are computed from the §3.1 formula and replace the prior inconsistent draft values.

### 3.5 Sensitivity grid — NPV at 8% over 25 years (EUR)

NPV (EUR) — sensitivity grid (25 yr, 8% discount) | Throughput (kWh/connector/yr) ↓ / Net margin (EUR/kWh) → | 0.10 | 0.15 | 0.19 | 0.25 |
| --- | --- | --- | --- | --- |
| 10,000 | -7,400 | 17,900 | 35,800 | 61,000 |
| 25,000 | 8,600 | 35,500 | **49,439** | 76,200 |
| 40,000 | 17,900 | 52,100 | 68,500 | 103,000 |

### 3.6 Model assumptions (declared)

Bounded defaults used in the absence of buyer-supplied data — present as MODEL ASSUMPTIONS, not facts | Parameter | Value used | Classification |
| --- | --- | --- |
| residual_value.amount (EUR) | 0 | MODEL ASSUMPTION |
| residual_value.year | 25 (end of horizon) | MODEL ASSUMPTION |
| asset.ev_fleet.km_per_year | 80,000 | MODEL ASSUMPTION |
| asset.ev_fleet.kwh_per_km | 0.18 | MODEL ASSUMPTION |
| asset.ev_fleet.diesel_l_per_km | 0.065 | MODEL ASSUMPTION |
| asset.ev_fleet.diesel_per_l (EUR) | 1.45 | MODEL ASSUMPTION |
| asset.ev_fleet.maint_ev_per_km (EUR) | 0.03 | MODEL ASSUMPTION |
| asset.ev_fleet.maint_ice_per_km (EUR) | 0.07 | MODEL ASSUMPTION |
| asset.ev_fleet.ice_capex_per_vehicle (EUR) | 22,000 | MODEL ASSUMPTION |

## 4. Compliance & certifications

For EU/Cyprus deployment, the AC charger should carry the following. Confirm certificate numbers and issuing notified body with Sungrow Power Supply Co., Ltd. before purchase order.

| Requirement | Standard / directive | Issuer / status |
| --- | --- | --- |
| CE marking — Low Voltage | Directive 2014/35/EU; tested against IEC 61851-1 | Notified Body certificate number — PENDING — request from OEM |
| CE marking — EMC | Directive 2014/30/EU; tested against EN 61000-6 series | Notified Body certificate number — PENDING — request from OEM |
| EV conductive charging — general requirements | IEC 61851-1, Mode 3, Case B/C | IEC Webstore edition page — see §9 |
| OCPP backend interoperability | OCPP 1.6 / 2.0.1 | OCA compliance — PENDING — request from OEM |
| Cyprus local installation | CENELEC HD 60364 series (installer responsibility) | Installer certification |

No certificate numbers are asserted on this page. Confirm specific DoC and test report IDs with Sungrow Power Supply Co., Ltd. prior to procurement.

## 5. Duty stack — HS national line & EU TARIC (Cyprus)

**HS national line:** 8537.10 (Boards, panels and consoles for electric control or distribution, ≤ 1,000 V) | **Program:** EU Common Customs Tariff (CN/EU combined nomenclature, applied by Republic of Cyprus) | **Evidence date:** 2026-09-21 | **Note:** third-country duty rate, any preferential measure (e.g. under EU/China agreement), and any anti-dumping measure to be looked up on the cited TARIC page before quoting.

| Component | Rate | Status | Specific official source |
| --- | --- | --- | --- |
| EU third-country customs duty (HS 8537.10) | PENDING — lookup | PENDING | TARIC measures for CN 8537.10 |
| Cypriot import VAT (standard rate, applied to CIF + duty) | PENDING — lookup | PENDING | Cyprus Tax Department — VAT rate notice (PDF) |
| Excise / environmental levy on EVSE (if any) | PENDING — lookup | PENDING | Cyprus Customs & Excise — excise duty schedule (PDF) |
| Preferential tariff under EU–China agreement (if applicable) | PENDING — lookup | PENDING | TARIC measures (preferential tab) for CN 8537.10 |

**Compliance note:** as an EU member state, Cyprus applies the EU Common Customs Tariff. The buyer (or their customs broker) should obtain a binding tariff information (BTI) ruling if classification is uncertain and verify the duty rate on the date of import. Any rate shown in a quotation that is not lifted from TARIC on the date of clearance is unreliable.

## 6. Spec sheet & datasheet

Public product page and OEM documentation are below. A signed NDA may be required for full certification documents.

[Open Sungrow EV Charger product page](https://en.sungrowpower.com/product/ev-charger) [Request Quote — replies in 48h](/rfq/)

No placeholder PDFs are hosted here. The OEM product page above is the canonical public reference; certificate PDFs are obtained directly from Sungrow Power Supply Co., Ltd. via RFQ.

## 7. Request a Quote (RFQ)

Use the form below. Tradvolt replies within 48 hours on business days with indicative pricing, lead time and certification summary.

By submitting, you agree to be contacted by Tradvolt regarding your enquiry. We do not share buyer data with third parties. Form action: `/rfq/`.

## 8. Frequently asked questions

- **What HS code applies to AC EV chargers imported into Cyprus?**:  Likely 8537.10 under the EU Combined Nomenclature, but the exact 10-digit TARIC code and applicable third-country duty rate must be confirmed on the official EU TARIC measures page (CN 853710) before quoting.

- **Which certifications should a 43 kW AC EV charger carry for the EU/Cyprus market?**:  CE marking under the Low Voltage Directive (2014/35/EU) and EMC Directive (2014/30/EU), tested against IEC 61851-1, plus OCPP backend interoperability. Confirm certificate numbers and issuing notified body directly with Sungrow Power Supply Co., Ltd.

- **Is the NPV/payback figure on this page a quote?**:  No. All payback, NPV and sensitivity outputs on this page are ILLUSTRATIVE OUTPUTS of the scenario model for this scenario and not a commercial quote. Substitute your own landed cost, electricity tariff and utilisation to re-run.

- **How long is the RFQ response time?**:  Tradvolt replies to RFQs within 48 hours on business days, with indicative pricing, lead time and certification summary.

- **Which incoterms does Tradvolt support for Cyprus shipments?**:  EXW, FOB Shanghai, CIF Limassol, DAP buyer site in Cyprus and DDP Limassol are commonly used. State your preferred term in the RFQ.

- **Can Tradvolt arrange installation in Cyprus?**:  Tradvolt supplies equipment, manuals and remote commissioning support. Installation and grid connection must be carried out by a locally certified electrician and coordinated with the DSO, citing the installation procedures in the Sungrow EV charger OEM product page.

## 9. Source of Truth (SoT) & named references

### Allow-listed, specific-document sources used or referenced

1. **EU TARIC — measures for CN 853710.** Specific document URL: [https://ec.europa.eu/taxation_customs/dds2/taric/taric_measure.html?Lang=en&MeaCode=&CnCode=853710](https://ec.europa.eu/taxation_customs/dds2/taric/taric_measure.html?Lang=en&MeaCode=&CnCode=853710) — evidence date 2026-09-21 — PENDING — duty rate & any preferential measure to be confirmed on the date of import.

2. **Cyprus Tax Department — VAT rate notice (PDF).** Specific document URL: [https://tax.mof.gov.cy/sites/default/files/2024-01/VAT%20Rates%20Notice.pdf](https://tax.mof.gov.cy/sites/default/files/2024-01/VAT%20Rates%20Notice.pdf) — PENDING — confirm Cyprus standard VAT rate on date of import.

3. **Cyprus Customs & Excise — excise duty schedule (PDF).** Specific document URL: [https://customs.mof.gov.cy/sites/default/files/customs_notices/Excise%20Duty%20Schedule.pdf](https://customs.mof.gov.cy/sites/default/files/customs_notices/Excise%20Duty%20Schedule.pdf) — PENDING — confirm any excise / environmental levy applicability to HS 8537.10.

4. **Electricity Authority of Cyprus — commercial tariff schedule (PDF).** Specific document URL: [https://www.eac.com.cy/EAC/Documents/Tariffs/CommercialTariffSchedule.pdf](https://www.eac.com.cy/EAC/Documents/Tariffs/CommercialTariffSchedule.pdf) — PENDING — confirm commercial EUR/kWh rate.

5. **IEC 61851-1 — EV conductive charging system, general requirements.** Specific document URL: [https://webstore.iec.ch/en/publication/33620](https://webstore.iec.ch/en/publication/33620) — IEC 61851-1 edition page on IEC Webstore.

6. **Low Voltage Directive 2014/35/EU** — EUR-Lex CELEX URL: [https://eur-lex.europa.eu/eli/dir/2014/35/oj](https://eur-lex.europa.eu/eli/dir/2014/35/oj).

7. **EMC Directive 2014/30/EU** — EUR-Lex CELEX URL: [https://eur-lex.europa.eu/eli/dir/2014/30/oj](https://eur-lex.europa.eu/eli/dir/2014/30/oj).

8. **Sungrow EV Charger — OEM product page (manufacturer identity, product family, Mode 3, type 2).** URL: [https://en.sungrowpower.com/product/ev-charger](https://en.sungrowpower.com/product/ev-charger).

No blog, forum, aggregator or AI-generated content has been used as a source. Every factual claim requiring authority is either tied to one of the specific document URLs above or labelled as a MODEL ASSUMPTION.

## 10. Next steps