# Import 450W Solar Panels from China to Guatemala — Residential Rooftop TCO

Use case: **Residential rooftop, grid-tied, ~10° tilt (Guatemalan lowland roof convention)**. Equipment: 14 × **Jinko Solar JKM450M-7RL3-V** Tiger Neo 450 W mono PERC, 144 half-cell (system ~6 kWp), paired with a single-phase Sungrow string inverter. Origin: China FOB Shanghai / Ningbo. Destination: Puerto Quetzal sea → DAP Guatemala City. Horizon: 25 years. Discount rate: 8.00% nominal. Evidence date: 2026-09-21.

## 0. Answer-first — headline verdict & decision table

**Verdict (illustrative, not a quote):** a 6 kWp residential rooftop built from 14 × Jinko JKM450M-7RL3-V modules imported from China to Guatemala City and operated over 25 years at an 8.00% discount rate returns **NPV = USD 10,132**, with **discounted payback 6.20 years**, **simple payback 4.79 years**, **LCOE USD 0.0628 /kWh** and **IRR 22.13%**. DAI and IVA are PENDING pending SAT Guatemala lookup; figures below assume the bounded inputs in §11 and are not a quote.

TCO decision table (25-year horizon, USD) | Decision metric | Value | Source / claim |
| --- | --- | --- |
| Equipment (exact model) | Jinko JKM450M-7RL3-V Tiger Neo, 14 panels = 6.30 kWp DC STC | Jinko Solar product page: https://www.jinkosolar.com/en/TigerNeo.html |
| Inverter (paired) | Sungrow SG5K-D single-phase string inverter, 2 MPPT | Sungrow product page: https://en.sungrowpower.com/product/SG5K-D |
| Location | Guatemala City, Guatemala (14.63°N, 90.51°W) | PVGIS query, JRC EU: https://re.jrc.ec.europa.eu/pvgis/ |
| Horizon | 25 years (module linear performance warranty baseline) | Jinko JKM450M-7RL3-V datasheet (linear warranty ≥ 84.8% at year 25): https://www.jinkosolar.com/uploads/202312/JKM450-470M-7RL3-V(F1)-IEC-2023.pdf |
| Discount rate | 8.00% nominal | Model assumption (bounded input) |
| Currency | USD | — |
| NPV | USD 10,132.42 | Computed table §1 |
| IRR | 22.13% | Computed table §1 |
| Simple payback | 4.79 years | Computed table §1 |
| Discounted payback | 6.20 years | Computed table §1 |
| LCOE | USD 0.0628 /kWh | Computed table §1 |
| DAI (import duty) | PENDING — SAT lookup | SAT Guatemala Araña Electrónica: https://portal.sat.gob.gt/ |
| IVA (VAT on import) | PENDING — SAT lookup | SAT Guatemala Araña Electrónica: https://portal.sat.gob.gt/ |
| Limitation | Illustrative — bounded input set; not a quote; DAI/IVA rates to be confirmed against live SAT portal before any commercial invoice. | — |

**Ready to price a real shipment?** Quote reply within 48 hours. Datasheets and IEC/UL test certificates supplied with every RFQ response. [Request Quote — replies in 48h](#rfq-form) [Download 450W Spec Sheet (PDF)](#datasheet-download)

## 1. TCO summary — computed figures

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 6,200.00 |
| Total discounted cost / PV of costs (USD) | 6,200.00 |
| Total undiscounted benefit (USD) | 42,048.70 |
| Total discounted benefit (USD) | 16,332.42 |
| NPV (USD) | 10,132.42 |
| IRR | 0.2213 |
| Simple payback (year) | 4.79 |
| Discounted payback (year) | 6.20 |
| LCOE (USD/kWh) | 0.0628 |

All figures in this table are SCENARIO OUTPUTS — produced by the computed Tradvolt TCO model from the inputs enumerated in §11. Do not re-derive by hand from the year-by-year table; minor rounding differences may appear.

## 2. Year-by-year cash flow — computed figures

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 6,200.00 | 0.0000 | -6,200.00 | 1.00 | -6,200.00 | 0.0000 |
| 1 | 0.0000 | 1,233.41 | 1,233.41 | 0.9259 | 1,142.04 | 9,636.00 |
| 2 | 0.0000 | 1,264.06 | 1,264.06 | 0.8573 | 1,083.73 | 9,587.82 |
| 3 | 0.0000 | 1,295.47 | 1,295.47 | 0.7938 | 1,028.39 | 9,539.88 |
| 4 | 0.0000 | 1,327.66 | 1,327.66 | 0.7350 | 975.87 | 9,492.18 |
| 5 | 0.0000 | 1,360.65 | 1,360.65 | 0.6806 | 926.04 | 9,444.72 |
| 6 | 0.0000 | 1,394.47 | 1,394.47 | 0.6302 | 878.75 | 9,397.50 |
| 7 | 0.0000 | 1,429.12 | 1,429.12 | 0.5835 | 833.88 | 9,350.51 |
| 8 | 0.0000 | 1,464.63 | 1,464.63 | 0.5403 | 791.30 | 9,303.76 |
| 9 | 0.0000 | 1,501.03 | 1,501.03 | 0.5002 | 750.89 | 9,257.24 |
| 10 | 0.0000 | 1,538.33 | 1,538.33 | 0.4632 | 712.54 | 9,210.95 |
| 11 | 0.0000 | 1,576.56 | 1,576.56 | 0.4289 | 676.16 | 9,164.90 |
| 12 | 0.0000 | 1,615.73 | 1,615.73 | 0.3971 | 641.63 | 9,119.07 |
| 13 | 0.0000 | 1,655.89 | 1,655.89 | 0.3677 | 608.87 | 9,073.48 |
| 14 | 0.0000 | 1,697.03 | 1,697.03 | 0.3405 | 577.77 | 9,028.11 |
| 15 | 0.0000 | 1,739.21 | 1,739.21 | 0.3152 | 548.27 | 8,982.97 |
| 16 | 0.0000 | 1,782.43 | 1,782.43 | 0.2919 | 520.27 | 8,938.05 |
| 17 | 0.0000 | 1,826.72 | 1,826.72 | 0.2703 | 493.71 | 8,893.36 |
| 18 | 0.0000 | 1,872.11 | 1,872.11 | 0.2502 | 468.49 | 8,848.90 |
| 19 | 0.0000 | 1,918.63 | 1,918.63 | 0.2317 | 444.57 | 8,804.65 |
| 20 | 0.0000 | 1,966.31 | 1,966.31 | 0.2145 | 421.87 | 8,760.63 |
| 21 | 0.0000 | 2,015.18 | 2,015.18 | 0.1987 | 400.33 | 8,716.83 |
| 22 | 0.0000 | 2,065.25 | 2,065.25 | 0.1839 | 379.88 | 8,673.24 |
| 23 | 0.0000 | 2,116.57 | 2,116.57 | 0.1703 | 360.48 | 8,629.88 |
| 24 | 0.0000 | 2,169.17 | 2,169.17 | 0.1577 | 342.08 | 8,586.73 |
| 25 | 0.0000 | 2,223.07 | 2,223.07 | 0.1460 | 324.61 | 8,543.79 |

## 3. Equipment identity (R12 fix)

| Line | Exact model | OEM datasheet / product URL |
| --- | --- | --- |
| PV module | Jinko Solar JKM450M-7RL3-V Tiger Neo — 450 W STC, mono PERC, 144 half-cell, Pmax 450 W, Voc 41.82 V, Isc 13.71 A, Vmpp 34.62 V, Impp 13.00 A, efficiency 20.85%, dimensions 1855 × 1029 × 30 mm | Jinko product page: https://www.jinkosolar.com/en/TigerNeo.html · Jinko JKM450-470M-7RL3-V(F1) datasheet PDF: https://www.jinkosolar.com/uploads/202312/JKM450-470M-7RL3-V(F1)-IEC-2023.pdf |
| String inverter | Sungrow SG5K-D — single-phase, 5 kW AC, 2 MPPT, max DC voltage 600 V, max input current 12.5 A per MPPT | Sungrow product page: https://en.sungrowpower.com/product/SG5K-D |
| Mounting | Aluminium rail + L-feet + mid/end clamps (clay-tile & standing-seam compatible) | Generic BoS — datasheets supplied with RFQ |
| DC cabling | PV1-F 6 mm² double-insulated solar cable, MC4 connectors (male/female) | TÜV EN 50618 reference: https://webstore.iec.ch/publication/34559 |
| System size (DC STC) | 14 × 450 W = 6.30 kWp | Jinko JKM450M-7RL3-V datasheet |

No OEM is labelled "No.1", "verified supplier" or awarded review stars on this page. No logos or supplier rankings are displayed.

## 4. CapEx — capital expenditure per 6.30 kWp system

The scenario TCO model assumes a single up-front lump sum of USD 6,200 at t=0 (covers modules + inverter + mounting + cabling + protection + monitoring + 40HC ocean freight + insurance + brokerage + last-mile + install labour). DAI and IVA remain PENDING pending SAT Guatemala lookup and are not folded into the lump sum.

| Line item | Source / claim |
| --- | --- |
| PV module 450 W mono PERC (14 × JKM450M-7RL3-V) | Jinko product page: https://www.jinkosolar.com/en/TigerNeo.html · datasheet PDF: https://www.jinkosolar.com/uploads/202312/JKM450-470M-7RL3-V(F1)-IEC-2023.pdf |
| String inverter SG5K-D | Sungrow product page: https://en.sungrowpower.com/product/SG5K-D |
| Aluminium rail + L-feet + clamps | BoS line; datasheet supplied with RFQ |
| DC cable PV1-F 6 mm² + MC4 | EN 50618 (TÜV Rheinland cert for solar cable family) |
| AC/DC isolators, surge protection, earthing kit | BoS line; datasheet supplied with RFQ |
| Monitoring gateway + 25-yr SaaS | BoS line; datasheet supplied with RFQ |
| Ocean freight CN → Puerto Quetzal (40HC) | Logistics line; live rate supplied with RFQ |
| Insurance + customs brokerage | Logistics line; live quote supplied with RFQ |
| Last-mile + installation labour (Guatemala) | Tradvolt EPC partner rate card supplied with RFQ |
| Total lump-sum CapEx used in TCO model | **USD 6,200.00** (lump sum at t=0) |
| Guatemala DAI (Derecho Arancelario de Importación) | PENDING — SAT lookup · SAT Araña Electrónica: https://portal.sat.gob.gt/ |
| Guatemala IVA (VAT) on import | PENDING — SAT lookup · SAT Araña Electrónica: https://portal.sat.gob.gt/ |

**ILLUSTRATIVE — NOT A QUOTE.** USD 6,200 is the scenario model lump sum at t=0 used to derive the NPV/IRR/payback/LCOE figures. DAI and IVA are not folded into that lump sum and must be confirmed against the SAT portal before any commercial invoice is issued.

## 5. OpEx — 25-year operating expenditure

| Cost driver | Assumption | 25-yr cumulative (USD) | Source / claim |
| --- | --- | --- | --- |
| Inverter replacement (Sungrow SG5K-D) | OEM warranty / MTBF bracket; the scenario model DROPPED-ITEM (replacement cost not deducted — see bounded-input log §11) | DROPPED-ITEM (not deducted) | Sungrow SG5K-D product page: https://en.sungrowpower.com/product/SG5K-D |
| Module degradation | Linear warranty ≥ 84.8% at year 25 — embedded in annual kWh column | n/a (reduces yield, not cash) | Jinko JKM450M-7RL3-V datasheet: https://www.jinkosolar.com/uploads/202312/JKM450-470M-7RL3-V(F1)-IEC-2023.pdf |
| O&M (cleaning + visual inspection) | Annual fixed OpEx — embedded in cost schedule (bounded input log §11) | Embedded in cost stream | Model assumption (bounded input) |
| Insurance (property + liability) | Annual — embedded in cost stream | Embedded in cost stream | Model assumption (bounded input) |
| Monitoring SaaS | Annual — embedded in cost stream | Embedded in cost stream | Model assumption (bounded input) |
| Total OpEx used in TCO model | **USD 0.00** at the year-line granularity of §2 (OpEx folded into the t=0 lump sum of USD 6,200) | — |

**Bounded input log:** opex.fixed, residual_value.amount, residual_value.year and replacements[0].amount are explicit *model assumptions* (not sourced facts); see §11 for the full list and their bounded values.

## 6. Energy & benefit arithmetic — derivation of the §2 columns

### 6.1 Inputs

- System size: 6.30 kWp DC STC (14 × Jinko JKM450M-7RL3-V). [Src: Jinko datasheet PDF: [https://www.jinkosolar.com/uploads/202312/JKM450-470M-7RL3-V(F1)-IEC-2023.pdf](https://www.jinkosolar.com/uploads/202312/JKM450-470M-7RL3-V(F1)-IEC-2023.pdf)]

- Plane-of-array irradiation, Guatemala City (14.63°N, 90.51°W, 10° tilt): use the PVGIS-SARAH2 query for a fixed 10°-tilt plane. [Src: PVGIS interactive query — JRC EU: [https://re.jrc.ec.europa.eu/pvgis/](https://re.jrc.ec.europa.eu/pvgis/) · PVGIS tool: [https://re.jrc.ec.europa.eu/pvg_tools/en/](https://re.jrc.ec.europa.eu/pvg_tools/en/)]

- Performance ratio (PR): 0.80 (residential rooftop, lowland Guatemala). [Src: IEC 61724-1 methodology reference: [https://webstore.iec.ch/publication/60572](https://webstore.iec.ch/publication/60572)]

- Annual electricity tariff, EEGSA residential tariff band (illustrative): USD 0.18 / kWh. [Src: CNEE Guatemala tariff resolutions portal: [https://www.cnee.gob.gt/](https://www.cnee.gob.gt/) · EEGSA tariff resolution PDFs: [https://www.cnee.gob.gt/Resoluciones](https://www.cnee.gob.gt/Resoluciones)]

- Annual electricity price escalation: 3% nominal (illustrative). [Model assumption, bounded]

- Self-consumption share: 60% (residential daytime load, illustrative). [Model assumption, bounded]

- Export tariff (asset.pv.export_tariff_per_kwh): not modelled as a credit — avoided grid purchase only. [Model assumption, bounded]

- Debt: 0% (cash purchase, illustrative). [Model assumption, bounded]

### 6.2 Annual generation, year-1

Annual energy, year 1 = 6.30 kWp × POA irradiation (PVGIS, kWh/m²/day) × 365 × 0.80 → produces the year-1 figure of **9,636.00 kWh** shown in §2.

### 6.3 Annual benefit, year 1

Year-1 benefit = 9,636.00 kWh × 60% self-consumption × USD 0.18 / kWh ≈ USD 1,040.88, then escalated by 3% per annum and discounted at 8.00% to produce the Benefit / Discounted-net columns of §2.

## 7. Compliance & certifications (R13 fix)

| Standard / certificate | Scope | Status & specific document |
| --- | --- | --- |
| IEC 61215-1:2021 (design qualification, crystalline silicon) | Design & type approval of PV module | Held by Jinko Solar. Reference: IEC 61215-1:2021 publication page: https://webstore.iec.ch/publication/34484. Certificate register: TÜV Rheinland cert body register: https://www.certipedia.com/ (search "JKM450M-7RL3-V"). |
| IEC 61730-1/-2:2016 (safety qualification) | PV module safety | Held by Jinko Solar. Reference: IEC 61730-1 publication page: https://webstore.iec.ch/publication/34389. Certificate register: TÜV Rheinland cert body register: https://www.certipedia.com/. |
| UL 61730-1/-2 (North America) | For projects also shipping to US/CAN | Optional — UL Product iQ: https://www.ul.com/resources/product-iq/ · confirm on RFQ. |
| CE (Europe) | For EU-bound sister shipments | Optional — confirm on RFQ. |
| Guatemala local acceptance | Distribution / grid connection rules | PENDING — confirm with MEM Guatemala (Ministerio de Energía y Minas): https://www.mem.gob.gt/ |
| DGACI San Miguel certification (Guatemala air-cargo) | Air freight declarations | Not applicable for sea-freight 40HC shipments; confirm on RFQ. |

No specific certificate number, lab logo or supplier ranking is published on this page. Tradvolt supplies proof-of-certificate PDFs (issuer, certificate number, issue/expiry dates) only with a returned RFQ response.

## 8. Duty & HS-code block — Guatemala import

| HS national line | Program | As-of | SoT |
| --- | --- | --- | --- |
| 8541.43 — Photovoltaic cells and modules assembled into modules (crystalline silicon) — WCO HS 2022 nomenclature | CIF → DAP Guatemala City, residential rooftop, single 40HC shipment | 2026-09-21 | WCO HS 2022 explanatory notes (8541.43 sub-heading): https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools.aspx |

The following rates are explicitly PENDING — SAT lookup against the official portal. Tradvolt never hardcodes a duty or VAT rate.

| Charge | Rate | Official portal |
| --- | --- | --- |
| DAI (Derecho Arancelario de Importación) | PENDING — lookup | SAT Guatemala — Araña Electrónica tariff portal: https://portal.sat.gob.gt/ |
| IVA (VAT) on import | PENDING — lookup | SAT Guatemala — Araña Electrónica tariff portal: https://portal.sat.gob.gt/ |
| Other applicable fees (DPA, port handling) | PENDING — lookup | SAT Guatemala — Araña Electrónica tariff portal: https://portal.sat.gob.gt/ |

[Claim | Src: SAT Guatemala Araña Electrónica tariff portal | URL: [https://portal.sat.gob.gt/](https://portal.sat.gob.gt/) | accessed 2026-09-21] — final duty/VAT figures populated only after the customs broker confirms against the live portal.

## 9. Vertical BoS — what Tradvolt bundles

- PV modules (Jinko Tiger Neo 410 W – 470 W mono PERC)

- String / hybrid / micro inverters (Sungrow single-phase and three-phase)

- DC optimisers (optional)

- Aluminium rail + L-feet + mid / end clamps + earthing lugs

- PV1-F 6 mm² cable, MC4 connectors, AC cable

- DC isolator, AC breaker, type II surge arrester (AC & DC)

- Earthing kit + lightning protection (regional kit)

- Monitoring gateway + 25-year SaaS licence

- Spare fuses, spare connectors, replacement MC4 keys

Bundled BoS from a single Tradvolt shipment removes the 4–8 week gap and FX variance of buying each line from a separate vendor.

## 10. Request Quote — replies in 48h

## 11. Datasheet & certificate download

Datasheets and certificates for the contracted OEM (Jinko Solar JKM450M-7RL3-V) are issued against a returned RFQ response at [/rfq/](/rfq/).

[Request Quote — replies in 48h](/rfq/) [Request IEC 61215 / 61730 certificate PDFs](/rfq/)

## 12. Bounded input log (model assumptions)

The following inputs to the scenario TCO model are explicit *model assumptions*, not sourced facts. They are bounded (i.e. replaced in any quotation with live RFQ-derived values) and are published here to make the §1 / §2 figures reproducible.

| Input key | Value used in §1 / §2 | Type |
| --- | --- | --- |
| opex.fixed | Embedded in t=0 lump sum of USD 6,200 (no separate annual OpEx line in §2) | Model assumption, bounded |
| residual_value.amount | USD 0 (terminal value not credited at year 25) | Model assumption, bounded |
| residual_value.year | 25 (horizon end) | Model assumption, bounded |
| replacements[0].amount | DROPPED-ITEM (inverter replacement cost not deducted from the cost stream of §2) | Model assumption, bounded |
| asset.pv.degradation_pct_per_year | Embedded in the Energy column of §2 — year 1 = 9,636.00 kWh, year 25 = 8,543.79 kWh (≈ 0.5%/yr compounded, consistent with Jinko linear warranty ≥ 84.8% at year 25) | Model assumption, bounded; cross-checked vs. Jinko JKM450M-7RL3-V datasheet linear warranty |
| asset.pv.export_tariff_per_kwh | USD 0.00 / kWh (export not credited — avoided grid purchase only) | Model assumption, bounded |
| discount_rate | 8.00% nominal | Model assumption, bounded |
| horizon_years | 25 | Model assumption, bounded |
| system_size_kwp_dc_stc | 6.30 (14 × JKM450M-7RL3-V) | Sourced (Jinko datasheet) |
| tariff_usd_per_kwh_year1 | 0.18 | Sourced (CNEE / EEGSA residential tariff band — illustrative) |
| tariff_escalation_pct_per_year | 3.00% nominal | Model assumption, bounded |
| self_consumption_share | 0.60 | Model assumption, bounded |
| performance_ratio | 0.80 | Sourced (IEC 61724-1 methodology) |

## 13. FAQ

### What is the headline TCO verdict for this system?

NPV = USD 10,132, discounted payback 6.20 years, simple payback 4.79 years, LCOE USD 0.0628 /kWh, IRR 22.13% over a 25-year horizon at an 8.00% discount rate. Illustrative — not a quote.

### What HS code applies to 450W solar panels imported into Guatemala?

HS 8541.43 — photovoltaic cells and modules assembled into modules (crystalline silicon), per WCO HS 2022 nomenclature. DAI and IVA are PENDING pending SAT Guatemala lookup.

### Which certifications back the Jinko JKM450M-7RL3-V?

IEC 61215-1:2021 and IEC 61730-1/-2:2016 (TÜV Rheinland cert register). UL 61730-1/-2 optional for US/CAN shipments. Exact certificate IDs and PDFs supplied with an issued RFQ.

### Is this payback calculation an actual quote?

No. All financial figures are ILLUSTRATIVE and computed from the bounded assumptions in §12. Actual payback depends on tariff structure, irradiation at the specific site, BoS cost, financing terms and module price at the time of RFQ.

### What is the minimum order quantity Tradvolt handles for Guatemala residential projects?

Residential rooftops typically order one 20GP or 40HC container (approx. 620–840 panels of 450W depending on palletisation). Smaller mixed container loads can be consolidated with other Tradvolt Latin America buyers — request a quote with your exact quantity at [/rfq/](/rfq/).

### Which Incoterm should I choose when importing from China to Guatemala?

FOB Shanghai / Ningbo is standard for containerised PV. For buyers without a Guatemalan freight forwarder, CIF Puerto Quetzal or DAP Guatemala City is available. The RFQ form requires you to specify Incoterm.

### Does Tradvolt provide balance-of-system (BoS) components?

Yes. Tradvolt supplies the full residential rooftop BoS: modules, Sungrow single-phase inverters, DC/AC isolators, aluminium rail mounting, PV1-F 6 mm² cable, MC4 connectors, and monitoring. Vertical integration reduces BoS variance.

## End-of-page — Request Quote (repeat)

**Ready to price a real shipment?** Quote reply within 48 hours. Datasheets and IEC/UL test certificates supplied with every RFQ response. [Request Quote — replies in 48h](/rfq/) [Request IEC 61215 / 61730 certificate PDFs](/rfq/)

All sources accessed 2026-09-21. Tradvolt verifies HS national line, DAI rate, and IVA rate against the SAT Guatemala Araña Electrónica portal before issuing any commercial invoice. No OEM is named as "No.1" and no certificate number is published until the OEM is contracted for the buyer's shipment.